PROJECT: Major Repair of Permanent Bridges WEATHECloudy

LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 1 REPORT
June 20, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Some of the workers


Installation of Traffic
simultaneously dig
Barricades and Lights for
the ground for
Detour Road
lightpost installation

Labor
Jackhammer Steelman
Shovel Carpenter/Mason
20-June-2018
Crowbar Jackhammer operator
(Wednesday)
Foreman
Timekeeper

Workers use the


jackhammer to carry
Destruction of the Left Side out the removal of
(Wing Wall) of the Bridge concrete in the left
wing wall of the
bridge.
PROJECT: Major Repair of Permanent Bridges WEATHECloudy
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 1 REPORT
June 21, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Due to traffic
occurrence on the
One Lane of Bridge detour road, the
Opened to Travellers bridge is partially
open for a short
period of time.
Engineer
Labor
Jackhammer Steelman
Shovel Carpenter/Mason
21-June-2018
Crowbar Jackhammer operator
(Thursday)
Foreman
Timekeeper

Workers use the


jackhammer to carry
Destruction of the Left Side out the removal of
of the Bridge (continuation) asphalt and concrete
in the left side of the
bridge.
PROJECT: Major Repair of Permanent Bridges WEATHECloudy
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 1 REPORT
June 22, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Steelman starts to
Bar Bending
bend bars.

Labor
Jackhammer Steelman
Shovel Carpenter/Mason
22-June-2018
Crowbar Jackhammer operator
(Friday)
Foreman
Timekeeper

Workers uses the


removed asphalt and
Destruction of the Left Side
concrete as
of the Bridge (continuation)
additional fill for the
Detour road.
WEEK 1 REPORT
June 23, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Engineer
Jackhammer Labor Workers uses the
Shovel Carpenter/Mason removed asphalt and
23-June-2018 Destruction of the Left Side
Crowbar Jackhammer operator concrete as
(Saturday) of the Bridge (continuation)
Foreman additional fill for the
Timekeeper Detour road.
PROJECT: Major Repair of Permanent Bridges WEATHELight to Moderate Rain
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 2 REPORT
June 25, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Workers install the


lateral ties to the
Tieing the Rebars vertical deformed
bars to be used as
reinforcement.

Jackhammer Labor
Shovel Carpenter/Mason
25-June-2018
Crowbar Jackhammer operator
(Monday)
Push-pull tape Foreman
Timekeeper

Workers were tasked


Minor adjustments for the to even the uneven
Detour Road grounds on the
detour road.
Labor
Jackhammer Carpenter/Mason The removal of
25-June-2018 Destruction of the Bridge Shovel Jackhammer operator asphalt and concrete
(Monday) (continuation) Crowbar Foreman is done on the left
Push-pull tape Timekeeper side of the bridge.
PROJECT: Major Repair of Permanent Bridges WEATHEMostly Cloudy
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 2 REPORT
June 26, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Removal of asphalt
Destruction of the Bridge
at the right side of
(continuation)
the bridge started.

Jackhammer
Shovel Engineer
Crowbar Labor
Push-pull tape Carpenter/Mason
26-June-2018
Welding machine Jackhammer operator
(Tuesday)
Hack saw Foreman
Wood saw Welder
Sledge hammer Steelman
Hammer Timekeeper

Formworks Making for Welding of metal


Bridge Railing and formworks for
Wingwall railings.
PROJECT: Major Repair of Permanent Bridges WEATHEMostly Cloudy
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 2 REPORT
June 27, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Formworks Making for Installation of


Bridge Railing and rebards into the
Wingwall (continuation) formworks.

Shovel
Crowbar Labor
Hack saw Steelman
Wood saw Carpenter/Mason
27-June-2018
Hammer Jackhammer operator
(Wednesday)
Push-pull tape Foreman
Pencil Timekeeper

Asphalt and concrete


Destruction of the Bridge on the right side of
(continuation) the bridge nearly
finished removing.
PROJECT: Major Repair of Permanent Bridges WEATHEPartly Cloudy
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 2 REPORT
June 28, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Concrete was poured


Pouring of concrete
into the metal and
mixture to the formworks
wood formwork.

Concrete mixer Engineer


Jackhammer Labor
Shovel Carpenter/Mason
28-June-2018
Hammer Jackhammer operator
(Thursday)
Wood saw Foreman
Hack saw

Removal of asphalt
Destruction of the Bridge
and concrete finished
(continuation)
in the right side.
PROJECT: Major Repair of Permanent Bridges WEATHELight Rain
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 2 REPORT
June 29, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

DPWH
representative
requested for
Additional road signs additional road signs
for both left and
right part of the
bridge
Concrete mixer Labor
Jackhammer Steelman
Shovel Carpenter/Mason
29-June-2018
Hammer Jackhammer operator
(Friday)
Wood saw Foreman
Hack saw Timekeeper

Removal of concrete
Destruction of the Bridge on the top of the
(continuation) beam that supports
the deck.
PROJECT: Major Repair of Permanent Bridges WEATHEOvercast / Gray dull sky
LOCATION: Linactagan Br. Along San Jose - Lupao Rd FIRM: Wizard Concrete Solutions and Construction Corp.
APPRENTICES: Rey Jay L. Bergonio, OWNER:Government
Philip Christian M. Cudal MANAGEEngr. Jan Sta. Romana
Megel Joshua F. Ramiterre
WEEK 2 REPORT
June 30, 2018
EQUIPMENT/ PERSON/S
DATE/DAY ACTIVITIES REMARKS PICTURE
MATERIALS INVOLVED

Carpenter/Mason Another batch of


Jackhammer Jackhammer operator concrete was poured
Pouring of concrete Foreman into the formwork.
mixture to the formworks
Timekeeper Edges of the said
(continuation)
concrete were
removed.

30-June-2018
(Saturday)

Carpenter/Mason
Jackhammer Jackhammer operator Jackhammer was
Destruction of the Left Side used simultaneously
Foreman
of the Bridge (continuation) to remove the
Timekeeper asphalt and concrete.