BRSM 

Systems:QMS ISO 9001 (2008) 

Assessment Report/Checklist 
Form 009 

 
CLIENT‐ORGANIZATION (NAME):    Rahdar Sanat Keyhan 

PHYSICAL LOCATION(s):   No.66 , esfandyar  Blvd. , Valie Assr Ave , Tehran, 
iran 

Stage II Audit Date(s):    11 May 2016 

Stage I Audit Date(s):    27 April 2016 

NAICS (or NACE) CODE 27.32 

ISO 9001 EXCLUSIONS:    7.3 ,  7.5.2, 7.5.4 

 
Assessment objectives: To do third party assessment of the 
management system of the company against the 
requirements of QMS and legal requirements . 
 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL Mojtaba Ramezani
Assessor 2  
Assessor 3  
Assessor 4
Assessor 5
Assessor 6
 
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 

2  Scope of activities  Manufacture of silicon cable and wire 

3  Legal status  Standards for design and test such as : ISIRI 607‐1 to 607‐6   

4  Quality Management System 
The organization has developed quality manual (QM/00) which includes
all standard clauses, organization sope of activity and relted processes.
Also they have established management responsibility procedure
General  (RSKPQ00) which indiclude process map, processes criteria table has
Requirements –  defined in Data analysis procedure (RSKPQ9). They have identified
4.1  What is the  processes specifically with 14 related activities. For example for A
implementation /  monitoring and measurement process, customer satisfaction evaluation
transition date?  activity with citeria (more than 80%) was observed.
All analysijng and measurement methods have been determined in
processes criteria table (F01- RSKPQ9).
They have not outsourced the conduction of main processes. 
Quality policy (RSKWQ8) with main objectives about increasing customer
satisfaction, quality improvement in order to increasing service provision
quality, not having delay in serives delivery to customers, increasing
organization profit. The reviewe period of quality policy has been
determined annually.
The organization has developed quality manual (RSKQ1) which includes
all standard clauses, organization sope of activity and relted processes.
The reviewe period of quality manual has been determined annually.
Documentation 
They have designed a document & record control procedure (Rskpq1),
4.2  Requirements 
internal audit procedure (RSKPQ4), control of nonconformity procedure A
(includes records) 
(RSKPQ19), corrective and preventive action procedure (RSKPQ5).
For ensuring the effectiveness of organization operation and performance
of quality management system , they conduct management review
(RSKPQ2).
In document & record control procedure (RSKPQ1), they have designed
a table which indicates the retention period of records (RSKQZ6 /2 / 91.09  
) and master list with determining the document distribution (RSKQZ6 /1 / 
91.09  ). 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 2 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Quality manual has documented and has implied all procedure and
instruction related to standard requirements. Quality manual has
4.2.2  Quality Manual approved by top management(Mr.Jahedian) and before approve , has A
reviewed by MR.IRAJI (management representative) 

Control of  They have designed document & record control procedure (Rskpq1),
4.2.3 
Documents 
which indicates approval & obsolete methods of documents by applying A
“approved” & “obsolete” stamps with green and red colour.
master list with determining the document distribution (RSKQZ6 /1 / 91.09  
), retention period of records table (RSKQZ6 /2 / 91.09  ), table of
Control  of  registering the document changes (RSKQZ6 /2 / 91.09  ) have been
observed.
4.2.4  Records  –  Are  A
records…  Records of sells should keep for 10 years in sells department and after
that they must be archived
 
They have developed anagement responsibility procedure. They have
identified 5 processes with 14 related activities. For example for
monitoring and measurement process, customer satisfaction evaluation
activity with citeria (more than 70%) was observed. Also organization
chart (rskwe5) with determining 19 job positions was observed.
Organization has determined 4 quality objectives (rskpq9) which were
about reducing delay rate in services delivero to customer less than 3% in
comparision of current projects, increasing number of contracts in current
year to 10, increasing customer satisfaction to 90%.
Management 

Commitment 
Quality policy (RSKWQ8) with main objectives about increasing customer A
satisfaction, quality improvement in order to increasing service provision
quality, not having delay in serives delivery to customers, increasing
organization profit was observed. The reviewe period of quality policy has
been determined annually.
They have conducted management review in 24-April-2016. All inputs
have been discussed in related form and the main out puts were about
acquiring quality management system certificates, recruiting 5 more staff
for increasing the construction speed rate.

Organization has developed a procedure for contracting and evaluation


customer satisfaction (RSKPF1). All obligations and customer needs and
Customer  Focus  –  requirements will be recorded in contract. Project planning and allocating
5.2  (may  relate  to  resources will be based on the contract. For example contract of “Reil A
7.2.1 and 8.2.1)  pardaz system” and planning table of this contract was observed.
 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 3 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Quality policy (RSKWQ8) with main objectives about increasing customer


satisfaction, quality improvement in order to increasing service provision
quality, not having delay in serives delivery to customers, increasing
organization profit was observed. The reviewe period of quality policy has
5.3  Quality Policy been determined annually. A
İ asked the concept of quality policy from mr.rostami in office as financial
responsible and mr. azizi as Line operator that they awared appropriately.
 
Organization has determined 4 quality objectives which were about
reducing delay rate in services delivero to customer less than 3% in
Planning;5.4.1
comparision of current projects, increasing number of contracts in current
Quality
year to 10, increasing customer satisfaction to 90%.
Objectives/5.4.2
5.4 
quality By developing management responsibility procedure ,internal audit A
management procedure ,they ensure of quality management system planning and
system planning improvement.
 

5.5 

Top management by consulting the management representative has


designed the organization chart with 19 job positions. All job positions has
Responsibility, 
5.5.1  related qualifications, infrastructures in job description form (RSKWE4) A
Authority  
i checked job description of management representative, managing
director, storekeeper. All were appropriate.

Mrs.Ghaderi as Quality control manager has been identified as M.R .


Management  The assignment letter signed by M.D was observed.
5.5.2  A
Representative 
 

Internal Internal communication has based on the phone, email and fax between
5.5.3  office and working sites. The related devices were appropriate and A
Communication
practical. 

5.6 

They have conducted management review in 24-April-2016. All inputs


5.6.1  General  have been discussed in related form and the main out puts were about A
acquiring quality management system certificates, recruiting 2 more staff
for increasing the sells rate.
Management review meeting has been condcuted by participation of M.D,
M.R , product supervisor, and QMS consultant.
5.6.2  Review Inputs  Review output has been A
 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 4 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

5.6.3  Review Output

6  Resource Management

6.1  Refer to 6.2 ,6.3, They have developed a procedure for human resource management and
7.4 ,8.2.1 training (RSKPE1), job description (rskwe4), staff training profile training
need evaluation (RSKEZ12), training schedule (RSKEZ13), training course
6.2  Human Resources 
effectiveness evaluation (RSKEZ14).
I checked profile of mr.saadat as warehouse keeper, mr. Hashemi as
Laboratory supervisor.
6.2.1  General  A
Training need evaluation has been done for 2 courses like MSP software,
ICDL software. Training schedule for 2 courses have been prepared.
Competence,  1 training course has been conducted.
6.2.2  Awareness  and  Record of evaluation for mr.azizi with gradeof 83%, mrs.ghaderi with A
Training  78% for Msp software methods, mrs.besharati with grade of 88% for Msp
software were observed.
They have developed PM procedure (RSKPM1) and list of equipments in
form of (RSKQZ40) and equipment profile (RSKQZ6) were observed. I
checked profiles of Stretching Machine.
6.3  Infrastructure  A   
Each profile includes PM planning such as cleanliness and spare part
changing. All repairing will be recorded in the same form.

They have developed a procedure for control and monitoring work


environment in all ascpects like safety and cleanliness as operation
Work 
6.4  control procedure (RSKwE6). Site visit checklist (RSKQZ4) in 94/07 has A   
Environment   visited
 

7  Product Realization 

Production process has implemented by (RSKPP5).. In this documents


has determined required specifications according to standards . such as :
IEC 5525-1-1.
Organization has developed a procedure for contracting and evaluation
Planning of  customer satisfaction (RSKPE4). All obligations and customer needs and
7.1  Product  requirements will be recorded in contract. Project planning and allocating A   
Realization  resources will be based on the contract. For example contract of “RAJA
PROJECT” and planning table of this contract was observed.
All customer requirements such as delivery date, raw material and
technical specifications have been determined.

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 5 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

All obligations and customer needs and requirements will be recorded in 
contract. Project planning and allocating resources will be based on the 
Determination  of  contract. For example contract of “RAJA PROJECT” and planning table of 
Requirements  this contract was observed. 
7.2.1  A   
Related  to  the 
All customer requirements such as delivery date, raw material and 
Product  
technical specifications have been determined. 
 

7.2  Customer‐Related Processes 

Review of  Before signing contract, they estimate project price and steps in form of 
Requirements  (WE5), i checked the form for Raja project. By signing the contract 
7.2.2  A   
Related to the  organization commits to cover all requirements determined by 
Product   customer. 
Communication with customer is based in letters and project 
progression report that they send to customer. All records remains in 
Customer  project profile. For example i checked the related records of Raja 
7.2.3  A  
Communication  project. 
 

7.3  Design and Development 

Design and  Excluded
7.3.1  Development     
Planning 
Excluded
7.3.2  D & D Inputs     
Excluded
7.3.3  D & D Outputs     

D & D  Excluded
7.3.4     
Reviewing 
Excluded
7.3.5  Verification     
Excluded
7.3.6  Validation     

Control of (D & D)  Excluded
7.3.7     
Changes 
7.4  Purchasing 
Purchasing  R
7.4.1  there was not determined  specified order time to order the product in  S
Process 
warehouse  AR K
Purchasing  P
7.4.2  They have designed purchasing and supplier evaluation (PW1). Records  W
Information  

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 6 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

of purchasing request   1

Each project supervisor is the main responsible for controlling and 
approving the purchased items. I checked the related record in form of 
Verification of  quality control of raw material (Cooper) in 10‐MARCH‐2015 in Raja 
7.4.3 
Purchases  project. 
 
 

7.5  Production and Service Provision 

They have developed quality control procedure (RSKPQ12), all 
controlling criteria are based on Standards and contracts. All approved 
Control of  steps are recorded in reporting checklists of Control procedure 
7.5.1  Production and  (RSKPQ19).  A  
Service Provision   I checked control records of  product that was produced in 95/01/22  
report (RSKQZ100) 
 

Validation of 
Processes for 
7.5.2  Excluded   
Production and 
Service Provision 
Identification and traceability are applicable by tracing the Daily
Identification  and  production form, project forms and reports. In finish products on Farvardin
7.5.3 
Traceability  that I have checked all products were clear and appropriate. For example A  
X2 wire 1*1
Customer property includes technical data, contract and information.
Customer 
7.5.4 
Property 
Organization commits itself to protect the property in contract as a special A  
clause. I checked the Raja project contract.
They have developed a procedure for storage activities(PW!). i checked
Inventory of semi product and final product of X4 wire 1*1 that produced
Preservation of 
7.5.5 
Product 
in last month . All records of entering and exiting from storage are A  
registered in a specific software.

Control of  For controlling the measuring devices, they have developed a profile form
Monitoring and  (RSKQZ21). Current measuring device which needs to be calibrated is
7.6 
Measuring 
Caliper No.12. A  
I checked calibration of Tensile tension device that registerd on
Devices  DG94U2191 by Deghat gostar company
8  Measurement, Analysis and Improvement 
By developing internal audit procedure, customer satisfaction evaluation
procedure, conducting management review and data analysis,
8.1  General  A   
determining quality policy and quality objectives they can control and
monitor their improvement.
8.2  Monitoring and Measuring 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 7 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Organization has developed a procedure for contracting and evaluation


Customer 
8.2.1 
Satisfaction 
customer satisfaction (RSKPE2). Customer satisfaction form RSKQZ104, A  
for Raja project in 10-July-2015 with grade of 90% were observed. 
They have developed internal audit procedure (RSKPQ4), internal audit 
plan (RSKQZ8), internal audit (RSKQZ11‐P04), audit report (RSKQZ12). 
They have conducted internal audit in 29‐MARCH‐2016 and issued 4 
8.2.2  Internal Audits  nonconformities about incompleteness of records. Checklist questions  A  
cover all standards requirements. Internal audit has been conducted by 
M.R and consultant. 
The related corrective actions (RSKQZ15) were checked. 
processes criteria table observed.  
Monitoring  and  All analyzing and measurement methods have been determined in 
8.2.3  Measurement  processes criteria table They have conducted data analysis in 20‐JULY‐ A  
Process  2015. The report including bar charts of customer satisfaction and 
supplier evaluation grades were observed. 
They have developed quality control procedure (RSKPQ10), all 
controlling criteria are based on Istandards. 
 I checked Single core cables which produced in 95/02/01 that reported  
in (RSKQZ18). 
Product name : X2 1*1 
Product code : SIF 
 
Monitoring  and 
Specifications :    result  Normal 
8.2.4  Measurement  of 
Ohmic resistance per  19.6  Lower than 20  A  
Product 
meter 
Diameter  2.62  Between 2.5 to 3 
Insulation thickness  0.67  Lower than 0.6 
Tensile aging  7.8  upper than 4 
 
 

Control of Non‐ They have developed control of nonconformity procedure (PQ19). Also


8.3  Conforming  designed form for registering nonconformity RSKQZ107). They have not A  
Product  issued any nonconformity yet.

According to the result of Data analysis procedure the result shows:


8.4  Analysis of Data  production delay is 2.1%, acceptable range 3%,. Customer satisfaction A
 

83% acceptable range 80%

8.5  Improvement 

Continual  Planning  of  Improvement  has  done  by  planning  of  objective  and 
8.5.1 
Improvement  corrective /preventive action procedure.  A  

They  have  developed  a  procedure  for  corrective  and  preventive  action 


8.5.2  Corrective Action 
(RSKPQ5).  All  issued  coorective  actions  are  for  internal  audit  A  

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 8 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

nonconformities which have been described inabove sections. 
8.5.3  Preventive Action  They have not issued preventive action yet.  A  

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 9 of 10 
By exception, we indicate the specific Strengths and weakness of the organization in light of the management system, as we perceive and seen through
processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and planning of the assessment.
This aspect relates to Accreditation Body as it does to the protection of consumers in the client-organization’s role within their respective supply – chain.

Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.

Strength Weakness

Lay out of stroge Inventory Control  
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:N/A

action Request Type II Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

RSK-01-2016:There was not determined specified order time to order the product in warehouse

Observation Form-018 – with uniquely specific identification:N/A

ATL: Mr. Ramezani. DATE: 11 May 2016

END of REPORT
 

FORM-014 – Opening Meeting Checklist FORM-009 – MS Reporting,


FORM-017 – Closing Meeting Checklist FORM-008 – RA / AR, as requires
FORM-005 – Participants of opening & closing meetings FORM-018 – OBS, as requires
FORM-004 – Assessment Plan FORM-010 – As requires, recommendation for CoR
FORM-007 – Planning onto -004, as process determined FORM-026 – Assessment documents check-sheet, optional