热 处 理 工 艺卡 EXHIBIT 09-01,EDITION2, REV.

0
HEAT TREATMENT INSTRUCTION
□现场 FIELD SITE 现场名称 SITE NAME: IBRI INDEPENDENT POWER PROJECT 表号 LIST NO.: HTI-IBRI-P91-003
18LBA10BR001-BQ006
DRAWING NO./ COL. NO./ WELDER
JOB NO. STG-02 18LBA10BR001-BQ008 /
REV.NO. REV.NO. NO.

A335P91
MATERIAL\P-No.
20’’ X 65.1 PART NAME STG-18 SA335 P91 PIPING JOINT No.
THICKNESS
support ≤13mm
工艺说明
CHARGE HOLDING HEATING HOLDING COOLING SOAK DISCHARGE
H.T. H.T. FACILI- DISCRIPITION
TEMP. TEMP. RATE TIME RATE BAND TEMP.
NO. TYPE METHOD TIES ①热电偶应该与被测金属密切
(℃) (℃) (℃/h) (h) (℃/h) (mm) (℃)
接触
Locally Electrical ①The thermocouples shall be
1 PWHT Heat Resistanc -- 745±10 ≤150 3 ≤150 392 -- attached closely with metal
Treatment e Heater ② Use at least 4
TIME-TEMPERATURE CHART THERMOCOUPLE LOCATION AND ATTACHMENT thermocouples for PWHT. And
the temperature control
thermocouple is located in
weld center, and one control
thermocouple should at the
top of the pipe(5G position).
③ 最 大 层 间 温 度 不 超 过 350
℃。
③A maximum inter-pass
temperature of 350 ℃ shall
not be exceeded
④W=weld width,
R=Inside Diameter of
pipe mm
t=Wall thickness mm
⑤.Each heater with a
thermocouple for temperature
control or monitoring
编制 批准
PREPARED APPROVED
BY BY

日期 DATE 日期 DATE

Table 1
PWHT for weld thinkness mm
A335P91 13―37.5 37.5―50 50―75
holding
time 3 4 5