NPPC REVIVAL & UPGRADATION PLAN ……… UPDATED D P R
Appendix 1
Page 1
Table-1 : MACHINEWISE RECOMMENDED REMEDIAL MEASURES
I. MF Machine Complex
1. Incoming pulp cy. variation – Reported by Cy. control needed at the outlet of Bleached
operating personnel of NPPC HD Tower
2. All cy. control valves are installed on high As maintenance of control valves is difficult
altitudes and their outlet NRVs are vertically they will be lowered down and NRVs to be
downwards relocated in horizontal lines .
3. All instruments are pneumatic type and their All instruments shall be electronic type and
tubing are missing shall be controlled thru’ DCS
6. All drains got jammed They are to be cleaned, widened and proper
slope to be provided .
2. The centri-cleaners are of old model and They are to be replaced with efficient 4-stage
hence are inefficient for the production of the cleaners including Deculator and a Pr. Screen
proposed value added product(s) .
5. All instruments are pneumatic type and all They are to be replaced with electronic inst.
tubes are missing And shall be controlled thru’ DCS.
1. Pressurised Headbox
4. Dryer Section
- Condition is O.K. All Dryer cylinders, Felt - All drying cylinders to be cleaned/ground.
Rolls & Paper Rolls got rusted .
- Hood is O.K. - All felt rolls to be ground, cleaned and
dynamically rebalanced .
- Dryer gears are O.K. - All cylinder & roll bearing assemblies to be
overhauled.
- Additional new dryers with accessories to
be installed.
DEVELOPMENT
CONSULTANTS
NPPC REVIVAL & UPGRADATION PLAN ……… UPDATED D P R
Appendix 1
Page 3
7. Reel Section
AUXILIARIES : MF Machine
1. Steam System
Conditions of Hood, fans, heaters, air exhaust Need to be overhauled and painted. Hood to
system are O.K. but got rusted in places. be extended for the additional dryers.
4. Lubrication System
(Central Oil Lubrication)
- Profuse oil leakage through C-shur tube - New structure for the tube banks to be
banks faced earlier by NPPC . installed.
- The supporting structures of the C-shur (The oil leakage was due to the sagging of
(flowmeters) stations at the basement got the tube banks)
sagged . - System to be augmented for additional
dryers.
5. Control Panels
All instruments for pneumatic & electric - The existing system to be replaced with
controls got damaged/ some components are DCS.
missing .
(Headbox panel is comparatively better)
- Line shaft, indrive/cardon shaft, geared - Complete overhauling & cleaning /painting
couplings, clutch & brake assembly, belt required.
shiftner assembly, cone pulleys & gear
boxes, conditions are O.K. but got
rusted.
- One floating shaft beside the prime - New sectional drive to be installed for the
mover, geared coupling teeth is wearing entire section.
out very fast. Requires frequent teeth
grinding/ replacement. This is due to
misalignment of shaft.
DEVELOPMENT
CONSULTANTS
NPPC REVIVAL & UPGRADATION PLAN ……… UPDATED D P R
Appendix 1
Page 5
1. Incoming pulp cy. variation – Reported by Cy. control needed at the outlet of Bld. HD
operating personnel Tower
2. All cy. control valves are installed on high Maintenance of control valves are difficult, they
altitudes and their outlet NRVs are vertically will be lowered down and NRVs to be relocated
downwards in horizontal lines
3. All insts. are pneumatic type and their tubings All insts. shall be electronic type and shall be
are missing controlled thru’ DCS
4. Baseplates of all pumps get corroded They are to be replaced with a new one.
6. All drains got jammed They are to be cleaned, widened and proper
slope to be provided .
2. The centri-cleaners are of old model and They are to be replaced with efficient 3-stage
hence are inefficient for the production of the cleaners
proposed value added product(s) .
4. All insts. are pneumatic type and all tubes are They are to be replaced with electronic inst.
missing And shall be controlled thru’ DCS.
1. Pressurised Headbox
2. Wire Part
3. Press Part
- Condition is O.K. All Dryer Cylinders, Felt - All drying cylinders to be cleaned/ground.
Rolls & Paper Rolls got rusted .
- Hood is O.K. - All felt rolls to be ground, cleaned and
dynamically rebalanced .
- Dryer gears are O.K. - All cylinder & roll Brg. assemblies to be
overhauled.
AUXILIARIES : MG Machine
1. Steam System
2. Dryer Hood
3. M. G. Hood
4. Vacuum System
5. - Profuse oil leakage through C-shur tube - New supporting structure for the tube
banks faced earlier . banks to be installed.
- The supporting structures of the C- - According to NPPC, they have no problem
shur (flowmeters) stations at the with the C-shurs now .
basement got sagged.
6. Control Panels
All instruments for pneumatic & electric - Complete new instruments required for
controls got damaged/some components are each of the sections from headbox to reel
missing . and shall be controlled thru DCS
Headbox panel is comparatively better.
- Complete new internal & field tubing
required.
2. Talcum Dissolver is located adjacent to the Talcum Dissolver to be shifted to the Gr. Floor
control room at the operating floor, due to by which lifting of Talcum bags could also be
which the entire area is dusty and avoided other than keeping control room area
malfunctioning of controllers . clean .