You are on page 1of 239

Renewable Energy Guidelines 

Volume 8 

Transmission & Distribution in Rural Power Supply Systems
Design ‐ Specification ‐ Installation 

Pakistan Poverty Alleviation Fund, Islamabad 
 
 

 
The Renewable Energy Guideline Series has been developed by the German‐Pakistan project “Development of 
Hydropower  and  Renewable  Energy  (HRE)  in  Khyber‐Pakhtunkhwa”,  funded  by  German  Development  Bank 
(KfW) on behalf of “Ministry for Economic Cooperation and Development” (BMZ). 

Pakistan Poverty Alleviation Fund (PPAF) 
Project team: 
Mr. Zaffar Pervez Sabri 
Senior Group Head, Public Goods and Services 
Mr. Kamal Afridi 
General Manager, Water, Energy & Climate Change 
Mr. Shaukat Ali 
Renewable Energy Specialist   
 
Contact  address:  
1‐Hill View Road, Banigalla, Islamabad 
PAKISTAN 
E‐mail: zaffar@ppaf.org.pk 
Phone: (+92‐51) 261 3935‐50 
Name of Consultants: 
INTEGRATION 
Team:  
Dr. Ulrich Frings ‐ Team Leader 
Mr. Sher Khan – Deputy Team Leader 
 
www.integration.org 
Author:   
Ulrich Frings 
 

Date: September, 2013 

Copyright © Pakistan Poverty Alleviation Fund – 2013 
Reproduction is authorized provided the source is acknowledged and provided a reference copy is being sent to 
PPAF and the reproduction is not sold. 
For further information: Pakistan Poverty Alleviation Fund, www.ppaf.org.pk 
Note: The information contained within this document has been developed within a specific scope and might be 
up‐dated in the future. 

 
Volume 8 
 Transmission & Distribution 
   

Guidelines & Manuals 

Volume 1: Life Cycle Cost Analysis in MHP Planning 

Volume 2: Community Contribution Aspects in Rural Power Supply Systems 

Volume 3: General Design Criteria on MHPs 

Volume 4: Design Aspects of Community PV Systems 

Volume 5: Operation & Maintenance Aspects of MHPs 

Volume 6: Quality Assurance & Control of Civil Works 

Volume 7: Health, Safety & Environmental Aspects in Civil Works 

Volume 8: Transmission & Distribution in Rural Power Supply Systems 
Design ‐ Specification ‐ Installation 

Volume 9: Electro‐Mechanical Equipment for MHPs 
Design ‐ Specification ‐ Installation 

Volume 10: Commissioning Guidelines PV ‐ MHP 

Volume 11: Micro/Mini Hydropower Design Aspects 

Volume 12: Civil Works in Rural Power Supply Systems 
   

  Renewable Energy Guidelines  Nov. 2013 i
Volume 8 
Transmission & Distribution  

Table of Contents 
1  Background ................................................................................................................................. 1 
2  General information ................................................................................................................... 1 
2.1  Specification standards and regulations ............................................................................. 1 
3  Guidelines ................................................................................................................................... 2 
3.1  Demand aspects .................................................................................................................. 2 
3.2  Transmission & distribution ................................................................................................ 4 
4  Documentation ......................................................................................................................... 13 
4.1  Operation and maintenance manuals .............................................................................. 13 
4.2  Installation and commissioning procedures ..................................................................... 14 
4.3  Operation .......................................................................................................................... 14 
5  General requirements and works ............................................................................................. 15 
5.1  Electrical equipment/materials ........................................................................................ 15 
5.2  Welding and heat treatment ............................................................................................ 17 
5.3  Protection of machined surfaces ...................................................................................... 18 
6  Erection and installation ........................................................................................................... 21 
6.1  General .............................................................................................................................. 21 
6.2  Safety practices ................................................................................................................. 21 
6.3  Details of installation ........................................................................................................ 21 
7  Testing and commissioning ...................................................................................................... 27 
7.1  MV lines ............................................................................................................................ 27 
7.2  LV lines .............................................................................................................................. 27 
7.3  Acceptance ........................................................................................................................ 27 
8  Technical specifications ............................................................................................................ 29 
8.1  Overhead conductors ....................................................................................................... 29 
8.2  Power cables ..................................................................................................................... 32 
8.3  Stay wire............................................................................................................................ 35 
8.4  Overhead conductor fittings ............................................................................................. 36 
8.5  Insulators .......................................................................................................................... 38 
8.6  LV outdoor distribution panels for step‐down transformers ........................................... 42 
8.7  Distribution substations .................................................................................................... 45 
8.8  Concrete poles .................................................................................................................. 49 
8.9  Wooden poles ................................................................................................................... 53 
8.10  Lattice steel poles ............................................................................................................. 57 
8.11  Distribution transformers ................................................................................................. 60 
8.12  Customer current meter boxes ......................................................................................... 66 
8.13  Mini circuit breaker ........................................................................................................... 70 
8.14  LV aerial bundled conductors (ABC) ................................................................................. 72 
8.15  Accessories for LV aerial bundled conductor .................................................................... 75 
8.16  Single‐phase and three‐phase electronic kWh meters ..................................................... 80 
8.17  MV combined disconnector and fuse cut‐outs ................................................................. 83 
8.18  Surge arresters .................................................................................................................. 92 
8.19  11 kV cable ........................................................................................................................ 94 
9  Spare parts, tools and site consumables .................................................................................. 97 
9.1  Spare parts ........................................................................................................................ 97 
9.2  Tools and appliances ......................................................................................................... 97 
9.3  Site Consumables, lubricating oil and grease for first filling ............................................. 97 
9.4  Specified spare parts and tools ......................................................................................... 97 
10  Annexes .................................................................................................................................. 108 
   

ii    Renewable Energy Guidelines  Nov. 2013


Volume 8 
 Transmission & Distribution 
   

List of tables 
Table 3‐1: Demand figures .................................................................................................................... 3 
Table 3‐2: Transmission line – main features ....................................................................................... 5 
Table 3‐3: Summary of load flow analysis ........................................................................................... 11 
Table 8‐1: Conductors: nominal area and overall diameter ............................................................... 29 
Table 8‐2: Characteristics of ACSR conductors ................................................................................... 30 
Table 8‐3: Measurements and tests for stay wire .............................................................................. 36 
Table 8‐4: Performance characteristics – PIN insulator ...................................................................... 38 
Table 8‐5: Performance characteristics – PIN insulator ...................................................................... 39 
Table 8‐6: Performance characteristics – suspension insulator ......................................................... 40 
Table 8‐7: Performance characteristics – PIN insulator ...................................................................... 40 
Table 8‐8: Correlation of max. current and size of busbar ................................................................. 43 
Table 8‐9: Cable sizing ......................................................................................................................... 46 
Table 8‐10: Concrete poles ................................................................................................................. 51 
Table 8‐11: Pole dimensions ................................................................................................................ 55 
Table 8‐12: System requirements ....................................................................................................... 57 
Table 8‐13: System requirements ....................................................................................................... 58 
Table 8‐14: Loading test ...................................................................................................................... 59 
Table 8‐15: MCB‐Characteristics ......................................................................................................... 71 
Table 8‐16: Combined disconnector/fuse cut out .............................................................................. 84 
Table 8‐17 Surge arrester performance characteristics ...................................................................... 92 
 
 
 
 
 
Acronyms and abbreviations 
A    Ampere 
AC    Alternating Current 
AKRSP    Aga Khan Rural Support program 
ACSR    Aluminium Conductor Steel reinforced 
CDM    Clean Development Mechanism 
CO    Community Organizations  
DC    Direct Current 
EC    European Commission 
ELC    Electronic Load Controller 
E&M    Electro‐mechanic 
FDC    Flow Duration Curve 
GI    Galvanized Iron 
GIS    Geographic Information System 
GIZ    German Technical Cooperation 
GOs    Government Organization 
GPS    Global Positioning System 
HDPE    High Density Polyethylene 
H&S    Health & Safety 
hrs    hours 
HV    High Voltage 
Hz    Hertz (frequency unit) 
INGOs    International Non Governmental Organization 
KfW    German Development Bank 
kW    Kilo Watt 
kWh    Kilo Watt Hour 

  Renewable Energy Guidelines  Nov. 2013 iii


Volume 8 
Transmission & Distribution  

kV    Kilo Volt 
LED    Light‐Emitting Diode 
Lit    Liter 
LSOs    Local Support Organizations  
LT    Low Tension 
LV    Low Voltage 
MCB    Moulded Circuit Breaker 
MCCB    Moulded Case Circuit Breaker 
MDPE    Medium Density Polyethylene 
MHP    Mini/micro Hydropower Plant 
MSDS    Material Safety Data Sheets 
NGOs    Non‐Governmental Organizations  
O&M    Operation and Maintenance 
PF    Power Factor 
PCD    Pitch Circle Diameter 
PPAF    Pakistan Poverty Alleviation Fund 
POs     Partner Organizations (COs) 
PPIB    Private Power Infrastructure Board 
PURE    Productive Use of Renewable Energy  
PPE    Personal Protective Equipment 
PV    Photovoltaics 
PVC    Polyvenylchloride 
SM     Social Mobilizer  
SRSP    Sarhad Rural Support Program 
RCBO    Residual Current Breaker with Overload Protection 
SSLS    Solar Street/home Lighting System 
Rs.    Pakistani Rupees 
T&D     Transmission and Distribution  
TOP    Terms of Partnership 
V    Volt 
WOs     Women Organizations 
XLPE    Cross‐linked polyethylene 

iv    Renewable Energy Guidelines  Nov. 2013


Volume 8 
 Transmission & Distribution 
   

1 Background 
The  series  on  technical  guidelines  and  manuals  aims  to  support  the  POs  and  COs  in  the  design, 
procurement  of  material  and  equipment,  the  supervision  of  construction,  and  the  later  sustainable 
operation of the respective power supply system. The manual on Transmission and Distribution (T&D) 
provides  basic  design  criteria,  necessary  field  data  to  be  collected  and  the  technical  specifications  as 
basis for procurement. 

The transmission and Distribution system is based on the Pakistani standard voltage which is 11 kV for 
the transmission, 0.4 kV for the 3‐phase and 230 V for the 1‐phase distribution system. Power frequency 
is 50 Hz. 

Recommendations  towards  specific  design  criteria,  material  and  equipment  consider  the  envisaged 
construction  methodology  and  operation  approach  (both  are  community  based)  and  the  remoteness 
and accessibility of construction sites. 

2 General information 
Within  the  project  “Development  of  hydropower  and  renewable  Energy  in  KPK”  the  construction  of  a 
number of hydropower stations of capacities ranging from between 50 kW to 500 kW is planned. 

The  following  guidelines  and  technical  specifications  are  dealing  with  transmission  and  distribution 
systems for rural electrification. They are valid for both hydropower and PV systems. 

The  POs  shall  design  the  respective  systems  according  to  the  guidelines  and  shall  ensure  that  the 
equipment and material supplied and installed fulfill the below standards. 

The  compliance  of  design,  material,  and  equipment  with  this  technical  guidelines  &  standards  will  be 
checked during commissioning and final inspection of the respective subproject. Issuing of completion 
and  final  acceptance  certificates  and  the  related  final  payment  is  strictly  reliant  on  the  complete 
application of these technical guidelines & standards. 

2.1 Specification standards and regulations 

Unless otherwise specified, the Works shall be carried out in accordance with the current requirements 
of: 
 National Pakistan Standards 
 The relevant International Electro‐technical Commission Standards (IEC) 
 The relevant standards from the American Society of Mechanical Engineers (ASME) 
 The relevant standards from the International Standards Organisation (ISO). 
   

  Renewable Energy Guidelines  Nov. 2013 1
Volume 8 
Transmission & Distribution  

3 Guidelines 
In the following, the principle steps and basic considerations and assumptions to design a transmission 
and distribution network in rural power supply systems are presented. 

It  starts  with  the  assessment  of  demand  and  demand  growth  as  basic  data  for  system  sizing.  It  is 
followed by detailed discussions of technical parameter of the transmission and distribution system and 
the respective calculations to be undertaken.  

Standard equipment and configurations are compiled in Annex 2, design examples in Annex 3;. 

3.1 Demand aspects 

3.1.1 Households 

Electricity demand usually varies according to the  
 Settlement (urban / rural),  
 Household size and households per compound,  
 Wealth level,  
 Potentials for productive use,  
 Work and consumption pattern.  
In  principle  electricity  demand  shall  be  calculated  based  on  baseline  surveys.  If  such  surveys  are  not 
available the following definitions may be applied: 
 household size: 9 persons,  
 No. of HH per compound: 1.0. 
With respect to the design load, households are divided into 2 groups: 

Normal  household:  Basic  power  demand  for  lighting,  communication,  kitchen  appliances,  etc.:  Peak 
load 1 kW. 

Better off household: Use electric power for cooking and heating: Peak load 3 kW. These households will 
have  to  pay  a  additional  connection  charge  due  to  higher  connection  costs  (cables,  etc.(  and  they  are 
obliged to pay an upfront deposit to justify their capability to pay the higher bill. 

In  principle,  people  should  be  supported  in  using  electric  power  for  heating  and  cooking  due  to  the 
considerable  higher  impacts  on  environmental  protection  (forest  conservation,  greenhouse  gas 
mitigation, etc.). However, consumers should be able to pay for the higher electricity bill, the generation 
capacity is sufficient, and the consumers are ready to implement load shifting measures as advised by 
the power station1 the people should investments for cables, etc. to those who want (and can afford) 
heating and cooking by using electric power  

   

                                                            
1
 This could be limitation to either cooking or heating at the same time, shifting of heating to low load times and storage of heat in night storage 
ovens 

2  Renewable Energy Guidelines  Nov. 2013  
Volume 8 
 Transmission & Distribution 
   

3.1.2 Other consumer groups 

Other consumers are divided into the following groups: 
 Public 
 Mosques 
 Shops (normal daily article shops with 230 V AC, 1 phase electricity supply) 
 Workshops (with 400 V, AC, 3 phase electricity supply). 
Public, mosques 
To  determine  the  demand,  public  buildings  such  as  administration,  schools  and  mosques  are  treated 
similarly  to  households.  Load  is  calculated  at  1 kW  with  a  coincidence  factor  of  0.5  per  connection. 
Special loads have been calculated for Basic Health Units (BHU; 3 kW).  
Shops – single phase services 
Shops connected by a single‐phase service include retail shops, small restaurants, and small workshops 
(e.g.  electronic  repair,  photo‐copying  shops).  They  usually  have  a  single  light  bulb  and  some  minor 
electric appliances (e.g. TV, radio, tape, soldering station, small electric tools). Their load was estimated 
at being 500 W with a unity coincidence factor (c.f.).  
Workshops – three phase services 
Workshops receiving a three phase supply comprise heavier machinery and equipment. (e.g. car, metal 
workshops and carpenters). The maximum load is estimated at 3 kW with a c.f. of 0.5.  

Table 3‐1: Demand figures 
Item  Load (kW)  c.f.*  Design load per 
connection 
Household rural 1: basic  1.0  0.5  0.5 
Household rural 2: better off  3.0  0.5  1.5 
Public service Institutions  1.0  1.0  1.0 
Shops  0.5  0.5  0.25 
Mosque  1.0  0.5  0.5 
Work shop (3‐phase connection)  3.0  0.5  1.5 

Note: c.f. Coincidence factor 
Source: Own compilation 
 

3.1.2.1 Estimated growth rates of electricity demand 
Annual growth rate of electricity demand for consumptive purposes 
Since  there  is  an  immediate  and  positive  correlation  between  population  growth,  numbers  of 
households  or  families,  numbers  of  electricity  connections,  it  was  decided  to  maintain  an  average  3% 
p.a. growth rate for the electricity demand. However, migration is high in the project areas. It amount to 
about 2%. The resulting growth rate is 1% per annum. 
Annual growth rate of electricity demand for public and social services 
The justification for a 1% p.a. growth rate of public electricity demand is less evident and needs further 
investigation.  Service  growth  rate  in  hospitals  or  schools  are  correlated  with  population  growth,  but 
most  of  these  services  don’t  use  electricity  yet  or  only  marginal.  In  other  cases  it  depends  on 

  Renewable Energy Guidelines  Nov. 2013 3
Volume 8 
Transmission & Distribution  

government budget allocations or contributions of the Muslim community (mosques), etc. Nevertheless 
it  was  decided  to  maintain  this  population‐related  growth  figure  as  well  for  the  growth  pattern  of 
electricity  demand  in  public  or  social  services,  will  be  maintained  for  the  time  being  at  best 
approximation, but the trend might be more iterative. 
Annual growth rate of electricity demand in business development 
The figure of 10% p.a. growth rate in the initial three to five years is based on (1) a rapid substitution 
process  to  replace  Diesel  or  Kerosene  generators  by  electric  motors  for  productive  use;  (2)  the  large 
replacement  of  water  mill  flour  grinders  by  more  convenient  electric  flour  mills;  (3)  the  improving 
general  economic  environment  for  business  opportunities  using  electricity  productively  as  soon  as 
electricity quality is assured; (4) observations of the general trends in other countries where electricity 
has  been  newly  installed.  The  figure  10%  growth  p.a.  nevertheless  is  a  first  estimation  which  needs 
further  justifications  and  observations  from  practical  cases.  Also  in  this  case  the  growth  rate  of 
electricity  demand  for  PURE  might  –  after  the  first  three  to  five  years  –  settle  on  a  lower  rate  in  the 
following years. 
Other electricity unit standards to estimate demand 
The standards applied are based on local conditions and observations, but should be verified by practical 
experiences  (e.g.  kW  connection  capacity  /  school;  kW  connection  capacity  per  BHU,  etc.)  and  likely 
growth  potential.  Presently,  hardly  any  school  is  connected  to  an  electricity  grid  or  has  its  own 
generator. But, as has been observed in other regions, there will be a trend for electricity demand for 
lighting (evening literacy classes, installation of PC training centres in schools, or even teaching material 
using electricity) as soon as budgets are allocated by government.  

3.2 Transmission & distribution 

Transmission  and  distribution  systems  networks  convey  the  electric  power  from  the  power  station  to 
the consumers. Transmission lines deals with medium or high voltage while distribution is based on low 
voltage level, usually 0.4 and 0.23 kV. 

3.2.1 Transmission line 

Transmission lines are based on 11 kV voltage and comprise of overhead conductor (ACSR) mounted on 
9 m or 12 m concrete or steel poles. Pole spacing and selection of required strength shall be based on 
the site conditions including the need to locate poles: 
 To adequately service the electrical load in the immediate area 
 Clear of roads and vehicle and pedestrian access ways 
 To ensure all safety and legal clearances above ground and separation from buildings and structures 
are obtained all times 
 For satisfactory access for construction, future maintenance and operational purposes 
 To conveniently service consumer premises. 
The average span for MV is anticipated to be approximately 80 m. For longer spans the design adopted 
shall provide satisfactory mid‐span separation between conductors and sufficient free board.  

The average span for joint MV/LV construction is anticipated to be approximately 50 m 

The  detailed  design  of  the  overhead  line  routes  shall  be  based  on  existing  routes.  Routes  shall  be 
surveyed and pegged prior to the preparation of the drawings. Construction shall follow the approved 
drawings. 

4  Renewable Energy Guidelines  Nov. 2013  
Volume 8 
 Transmission & Distribution 
   

The design may be based on standard designs given in Table 3‐2. Otherwise, the following calculations 
and verifications need to be conducted: 
 Mechanical strength calculations for all pole positions 
 Sag and tension calculations for the proposed conductors 
 Verification of safety clearances 
 Electrical design of route, length and rating of each LV circuit 
 Determination of LV neutral earthing points 
 Verification of required transformer capacity. 
All conductor sagging shall be in accordance with the prevailing ambient temperature. 

Table 3‐2: Transmission line – main features 
Pole configuration   Horizontal type 3 
phase conductor 
Minimum vertical clearance   
‐ ground accessible to pedestrians only  6.5 m 
‐ open country  6.0 m 
‐ roads, streets  7.0 m 
‐ buildings, accessible points, flat roofs upon   5.0 m 
  which man may stand    
‐ power line above trees  2.5 m 
‐ power lines above steel structures  3.0 m 
‐ power line above telecommunication lines  2.5 m 
Normal span  80 m 

Maximum span  110 m 

Minimum depth of embedment of poles  1.5 m 

Minimum horizontal phase to phase separation  1.8 m 

Sag tension  <22 kN 

Wind pressure  380 N/m² 

Ice thickness  <9.5 mm 

Source: Own compilations; the selected parameter follow Din VDE 101 and 
Pakistani practice 

ACSR conductors will be used, because they comply with the Pakistani standards. In addition, they do 
have cost advantages over other conductor material and can at best withstand the climatic conditions in 
the project area. Supporting poles are made of concrete of 9 – 12 m height. Special arrangements are 
foreseen  for  road  crossings  in  order  to  achieve  sufficient  ground  clearance.  The  overhead  line  span 
lengths vary with alignment conditions from between 50 to 110 m.  

Suspension  poles  are  planned  at  every  10th  pole  or  in  case  of  larger  line  angles  (<30°).  For  lower  line 
angles, double supports with twin‐sets of pin insulators will be used.  

Sectionalizers and/or reclosers should be provided in extended and large networks to ease starting of 
the power station and to isolated fault section without shutting down the entire system. 

  Renewable Energy Guidelines  Nov. 2013 5
Volume 8 
  Transmission & Distribution 

Figure 3‐1: Transmission line design ‐ Example 

 
Source: Own compilations 
 

6  Renewable Energy Guidelines Nov. 2013   
Volume 8 
 Transmission & Distribution 
   

The final design of the MV network shall include but is not limited to: 
 The number and route of MV lines 
 The distances between poles  
 A GIS location of all MV poles at the design stage 
 A GIS based single line “as built” drawing of all MV lines including a GPS location of all poles, kind of 
pole and kind of assembly. 
The technical data of the 11 kV transmission system are as follows: 
 Transmission: 
o Voltage: 11 kV 
o Conductor: ACSR; 120 mm² 
o Poles: Concrete 9 ‐ 12 m 
o 3 sectionalizers with 1 auto‐recloser if required 
 Sub‐Stations: 
o 2‐pole open air type 
o Surge arrester/lightning protection 
o Manual breaker (MCB) for each feeder line 
o 1 main MCB for main line from transformer 
o Electric control box with consumption meters, remote sensing devices, etc. 
o Short circuit fuses 
 Transformer:  
o 11 kV/0.4 kV; ONAN; DNy5; uk=4.5%; pole mounted  

3.2.2 Distribution network 

The  distribution  network  starts  from  the  transformer  sub‐station  and  comprises  of  the  0.4 kV  feeder 
network,  meter  boxes,  the  customer  service  lines  and  the  handing  over  station  at  the  customer’s 
premises.  The  0.4 kV  feeders  comprise  of  ABC  cables  fixed  on  7 m  steel  tubes  or  house  walls.  Meter 
boxes  are  installed  at  public  places  are  feeder  poles.  From  here  double  core  service  lines  lead  to  the 
customer’s premises. Design examples are shown in Annex 3. 

The final design of the LV network from each distribution substation shall include but is not limited to: 
 The number and route of LV distributors 
 The cross section of LV wire to be used, based on a 8% maximum allowable voltage drop from the 
transformer to the end of each LV distributor 
 A location of all MV and LV poles and their distances in between at the design stage 
 A GIS based single line “as built” drawing of all LV lines including a GPS location of all poles, kind of 
pole and kind of assembly. 
Additional sub‐distribution panels may be installed at points where diameter of ABC is reduced. 
   

  Renewable Energy Guidelines  Nov. 2013 7
Volume 8 
Transmission & Distribution  

The technical data for the 400/230 V distribution network are as follows: 
 Distribution Feeder (0.4 kV) 
o 0.4kV ABC conductor 
o Design radius: 500 m – 700 m 
o Public  mounted  meter  boxes  with  3  or  6  meters,  equipped  with  one  main  MCB  and  MCBs  for 
every feeder line 
 Customer Service Lines and House Connections (0.23 kV): 
o Double core, double isolated 8 mm² Al for 1 kW peak load and 10 mm² for 3 kW peak load; 16 to 
25 mm² for 3‐phase supplies 
o Design load: 0.5 kW; 1.5 kW 
o Coincidence factor: 0.5 
o RCBO’s in houses selective to MCB’s. 

3.2.2.1 Meter boxes 

Meter boxes are made of a metal water proof cover and a lockable door and are installed at the feeder 
poles.  Installation  at  public  locations  is  preferred  because  termination  of  the  cable  and  installation  of 
the  meter  within  the  compound  would  be  more  difficult.  However,  the  meters  positioned  in  public 
require  additional  safety  devices  or  larger  conductor  diameters  to  safely  interrupt  power  in  case  of 
faults.  Considerable  attention  has  been  given  to  minimise  and  optimise  the  number  of  meter  boxes 
required. 

Meter  boxes  are  installed  close  to  a  number  of  compounds  each  of  which  is  supplied  individually  via 
two‐core cables. The connection from the overhead feeder line to the meter box is done by using 4 x 16 
– 25 mm² cables. The meter boxes will be installed in such a way that maximum length of compound 
connections is about 50 m with an average length of about 40 m. 

Each box is protected via a MCCB fuse breaker of respective size. The number of meters installed in each 
meter box varies between 3 and 6 and care must be taken to balance the load distribution between the 
three‐phases. Each outgoing line is protected by a MCCB of reasonable size (10 A to 16 A).  

3.2.2.2 Compound connection cables 

The consumers are to be connected from the meter boxes via a 2 x 8 mm² or 2 x 10 mm² Aluminium 
cable.  With  a  design  load  of  1 kW  and  a  maximum  length  of  50 m,  the  voltage  drop  is  well  below  1% 
(0.8% for 1,000 W). The permissible continuous rating of the connection cable is 45 A is also well above 
the maximum expected load current of 5 A. Average length of compound connections is 40 m.  

RCBO’s are installed in suitable boxes in each compound. De‐energizing of the compound can then be 
achieved via the RCBO which is much faster and more sensitive against faults within the compound as it 
can  safely  isolate  all  hazardous  situations.  The  RCBO  is  designed  with  a  current  rating  of  25  A  and  a 
maximum fault current rating of 30 mA. 

3.2.3 Transformer substations 

All transformer substations are pole mounted. Transformers do have vector group of Dyn5, and off‐load 
tap changer with minimum +/‐5% at 5 positions. The transformer capacity is calculated according to the 
total load of all connected feeders. Standard transformer sizes are then used to select the unit required 
for each substation. 

8    Renewable Energy Guidelines  Nov. 2013 
Volume 8 
 Transmission & Distribution 
   

The sub‐station comprises of a 11 kV line breaker/disconnector, surge arrestors and high voltage fuses, 
the  transformer  and  the  low‐voltage  switchboard  including  a  main  MCB.  In  addition,  a  consumption 
meter is installed. A typical lay‐out and single line diagram of this arrangement is presented in Annex 2.  

Each 0.4 kV feeder can be individually switched via suitable MCBs. The sizes were calculated according 
to nominal and fault currents ensuring that maximum fault currents can be withstood while the lowest 
fault current (fault at the end of each feeder) is safely tripped. Consumption meters on the low voltage 
side of the 20/0.4 kV transformer and on each 0.4 kV feeder will allow close and individual monitoring of 
the losses along every feeder line. 

The  total  number  of  transformers  is  based  on  the  maximum  supply  area  which  is  determined  by  the 
maximum permissible power losses or voltage drop which was set at about 8%, which will, together with 
the  20 kV  voltage  drops  of  about  2%  (maximum  3%)  lead  to  a  total  voltage  drop  of  about  10%  which 
seems  acceptable  for  the  supply  system.  For  concentrated  settlement  parts,  the  supply  radius  of  one 
transformer  is  about  500 m  while  in  villages  where  houses  are  more  scattered  and  total  load  is  less, 
supply radius may reach 600 to 700 m. However, the maximum permissible voltage drop of 8% should 
be never exceeded.  

3.2.4 Earthing system 

Proper  earthing  is  required  to  ensure  consumer  personal  safety  and  equipment  protection.  It  is 
therefore  imperative  to  achieve  a  sufficiently  low  earth  resistance  to  allow  the  passage  of  sufficient 
current  to  operate  relays  or  blow  fuses.  The  switchyard  and  sub‐station  earthing  system  resistances 
should  therefore  be  less  or  equal  to  2.0  Ώ.  A  detailed  description  of  earthing  system  is  compiled  in 
chapter 6.3.7. 

The earthing system includes the following components: 
 Switchyard and substations: Separate connections for surge arrestors, neutral point of transformers, 
all metal fittings; mixed LV/MV earthing with resulting system lower resulting resistivity or separate 
HV and LV earthing system with comparable higher tolerable system resistivity 
 Earthing of all poles of the 11 kV transmission line 
 0.4 kV  distribution  line:  solidly  earthed  at  substation;  earthing  of  every  10  ‐12th  pole,  and  the 
terminal pole of every feeder 
 3‐phase workshops: Separate earthing and installation of T‐N system. 

3.2.5 Control & protection 

The operation of an isolated supply system presents a challenge with respect to a sustainable operation. 
Beside the voltage and frequency regulation which may be problematical in case of tripping single high 
loads,  problems  may  arise  through  transient  voltage  peaks  due  to  lightning  or  switching,  temporary 
faults along the transmission overhead line, and through permanent system faults. 

Voltage and frequency regulation will be done via the main control system in the power station. With 
respect to  transient voltage peaks and temporary/permanent faults line sectionalizers and/or recloser 
may be installed. The recloser will deal with all transient fault problems while the sectionalizer allows 
permanently  faulty  sections  of  the  transmission  overhead  line  to  be  isolated  while  keeping  the 
remaining sections in operation 

The  power  station  should  be  started  under  no‐load  or  part  load  conditions.  Thus,  a  number  of 
substations  have  to  be  disconnected  prior  to  starting  generation.  Switching  and  control  of  the 
substations will be done either manually at each sub‐station or via a remote control system that trips a 

  Renewable Energy Guidelines  Nov. 2013 9
Volume 8 
Transmission & Distribution  

motor  driven  main  switch  at  the  substation.  The  control  system  also  provides  indication  of  the 
operational status of the substation MCB back at the power station’s control room.  

3.2.6 Load flow analysis 

Comprehensive  load  flow  analyses  are  required  carried  out  for  both  the  transmission  and  the 
distribution  system.  The  results  shall  confirm  that  all  standards  are  met  and  all  safety  and  protection 
devices are fully functioning.  

3.2.6.1 Transmission line and sub‐stations 

The  load  flow  analysis  for  the  transmission  system  comprises  the  transmission  line  from  the  power 
station to the LV side of the substation transformers. Individual loads per feeder and power losses along 
the feeder lines were determined assuming full load conditions. System inputs are as follows: 
 Maximum generation capacity: In MVA 
 Transmission line (120 mm², ACSR): Length, material, size 
 Transformer substations: number, total Capacity in MVA 
 Distribution feeders: number, total length, total design load 
 Permissible voltage drops: 3.0% 
 Load and generation acceleration factor: 1.0 
 Solution method: exact (iterative) 
 Source impedances: included. 
   

10    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

The  analyses  shall  confirm  that  the  system  operates  under  stable  conditions  and  all  standards  are 
satisfied. All results are summarized in a table (example see Box 1). 

Box 1: Results of load flow analysis – Golain Astore project 

Table 3‐3: Summary of load flow analysis 
Item  Voltage drop  Σ Losses 
  VD %  kW  KVAr  KVA 
Transformer  0.27 – 1.31  2.4  6.0  24.7 
Lines  0.1 ‐ 0.3  0.1  18.5  18.5 
Total  0.37 – 1.61  2.5  24.5  24.7 
Total installed generation capacity    500.0  125.0  625.0 
Total power demand    229.6  97.6  249.5 
Load factor of power station*    46%     
Power factor    0.92     
Source: Own compilations, Annex V‐5.5.1 
*Load factor: power demand /capacity installed 

Voltage losses at transformer varies between 0.27% and 1.31%; losses along the transmission line 
are due to the low load about zero. Thus, total losses are well below the set target of 3%. 

The load factor of 46% indicates that sufficient capacity for the supply and further grid extensions 
are  available.  The  power  factor  of  0.92  indicates  sufficient  reactive  power  (power  factor  of 
generators = 0.8).  

3.2.6.2 Feeder lines 

The calculation of conductor/cable size is based on the maximum permissible voltage drop of about 8% 
and  the  minimum  current  flow  required  to  safely  activate  the  respective  tripping  devices  in  the 
substation  in  the  event  of  a  fault  and  feeder  loading  in  excess  of  the  maximum  permissible  current 
rating of the  cable. As example the resulting  data for Golain Astore projects are compiled in Annex 2. 
Voltage drop is well below 1% at a cable size of 35 mm². 

The results are compiled in Annex V‐5.5.2. Except one feeder (feeder 1 in TF 1) with a voltage loss of 7% 
all other figures are well below 3.3%. The nominal cable diameters vary between 16 mm² and 35 mm² 
but should be unified at 35 mm² due to easier handling and stock keeping. The total length of the 400 V 
feeders to be erected is estimated at about 36 km. 

3.2.7 Fault analysis 

Fault  studies  should  be  undertaken  separately  for  the  distribution  system  including  compound 
connections.  Short  circuit  faults  along  the  compound  lines  are  tripped  by  the  MCCB’s  in  the  meter 
boxes,  while  fault  current  along  the  400 V  feeders  are  tripped  by  the  MCB’s  in  the  substations. 
Transmission Line 

Short circuit studies for the transmission system are based on the 11 kV overhead line. The results of the 
short  circuit  analyses,  which  should  include  balanced  and  unbalanced  fault  events  and  which  should 
indicate  that  in  all  cases  and  for  all  voltage  levels,  fault  currents  are  well  above  the  nominal  current 

  Renewable Energy Guidelines  Nov. 2013 11
Volume 8 
Transmission & Distribution  

which is required for the safe tripping of short circuit currents. The results are used to further specify 
the fuses and current ratings of the circuit breaking devices installed on the 11 kV line. 

3.2.7.1 Feeder lines and compound connections 

Fault currents at the LV system depend on the entire system impedances and should be calculated for 
the following cases: 
 Three‐phase balanced short circuit at the substation to determine the maximum system fault current 
which has to be withstood by the equipment installed 
 Single  line‐ground  short  circuit  at  the  meter  box  which  represents  the  minimum  fault  current  that 
has to be safely tripped 
 Single line‐ground short circuit at compound entrance representing the minimum fault currents to be 
tripped by the MCCB’s in the meter boxes. 
The results for Golain Astore are compiled in Annex 2. According to the results, MCB rating is 40 A at all 
feeder lines. The fault current is at minimum 80 A for single and 660 A for three‐phase short circuit. All 
feeders will be safely tripped by the 25 A MCBs.  
   

12    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

4 Documentation 

4.1 Operation and maintenance manuals 

The O & M manuals shall contain the following information in sufficient detail to enable the operator to 
maintain,  dismantle,  reassemble,  adjust  and  operate  the  works  with  all  its  items  of  works  and 
installations: 

4.1.1 Table of contents 

a) List of illustrations 
b) Introduction 
c) Detailed description 
Detailed description shall contain a complete and accurate description of the works, all components 
and  ancillary  equipment,  their  assembling  and  dismantling.  An  accurate  list  stating  clearances, 
tolerances, temperatures, fits, etc. shall be included. 
d) Operating principles and characteristics 
A  brief  summary  of  the  technical  operating  principles  of  the  works,  including  diagrams,  circuit 
diagrams, sequence diagrams, piping, etc. 
e) Operating instructions 
The  instructions  shall  contain  the  sequence  of  individual  manipulations  required  for  operation. 
Tables, lists and graphic presentations should be used whenever possible for making the description 
readily understandable. An appropriate trouble‐shooting list shall be included in this chapter. 
f) Testing and adjustment 
The  entire  testing  and  adjustment  procedure  required  for  the  works  after  overhauls  and  during 
operation shall be described. 
g) Maintenance instructions 
This section is divided into the following paragraphs: 
i) Preventive  maintenance,  indicating  the  inspections  required  at  regular  intervals,  the  routine 
cleaning and lubricating operations, the regular safety checks and similar steps. 
The maintenance instructions shall include a tabular summary of the required activities sorted 
according to 
 Daily 
 Weekly 
 Monthly 
 Quarterly 
 Yearly 
  (Or other) cycles as applicable. 
ii) Repair and adjustment procedures including fault tracing  
iii) Spare part lists, containing all the necessary data for ordering spare parts. Detailed drawing for 
each item of spare parts shall be supplied. The above list should include minimum and maximum 
quantities of spares to be maintained by the project. 

  Renewable Energy Guidelines  Nov. 2013 13
Volume 8 
Transmission & Distribution  

iv) Tool lists, containing all necessary data of tools required 
v) List of Suppliers of bought out items and their contact details.  
vi) As‐built drawings. 

4.2 Installation and commissioning procedures 

The installations procedures shall describe in sequential steps the erection of major equipment and shall 
contain  sufficient  details  such  as  equipment  preparation  at  work  shop,  handling  of  large  and  heavy 
pieces, levelling, anchoring, site welding, site painting, erection checks, site pressure tests, site flushing 
and  cleaning  of  hydraulic  systems,  alignment  and  run  out  checks  to  allow  the  Operator  to  plan  and 
supervise  the  works  at  site,  if  required.  The  documentation  shall  contain  the  log  sheets  for  taking 
measurements during installation. 

Pre‐commissioning  tests  and  procedures  shall  be  described  in  sequential  steps  for  the  pre‐
commissioning  of  all  electrical  and  mechanical  equipment  and  shall  also  contain  sufficient  details  viz. 
checking of installations, ratings, cable terminal checking and operation test of all auxiliary equipment 
etc. necessary log sheets shall be annexed to facilitate proper recording of test results. 

The commissioning procedures shall sequentially and in sufficient detail describe activities and tests for 
all systems covered by the contract. 

4.3 Operation  

The operation should contain a detailed description of start and stop sequences, emergency measures, 
identification of major fault and resolving thereof, all maintenance works and schedules and additional 
useful information to sustainably operate the power station.  

   

14    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

5 General requirements and works 

5.1 Electrical equipment/materials 

5.1.1 General 

All  components  shall  be  of  an  approved  and  reliable  design.  The  highest  extent  of  uniformity  and 
interchange  ability  shall  be  reached.  The  design  shall  facilitate  maintenance  and  repair  of  the 
components. 

Unless otherwise stated, ratings of main electrical works (in feeds, bus‐ties), whether originally specified 
or not, shall generally include a safety margin of 10% under consideration of the worst case to be met in 
service.  

Short‐circuit  calculations  shall  be  evaluated  giving  full  evidence  that  every  electrical  component  can 
withstand  the maximum  stresses under fault conditions, for fault levels and durations obtained under 
the  worst  conditions  e.g.  upon  failure  of  the  corresponding  main  protection  device  and  time  delayed 
fault clearing by the back‐up protection device. 

All works shall be suitable for the prevailing climatic conditions.  

5.1.2 Moulded case circuit breakers 

All moulded case circuit breakers shall be of 2 or 3‐pole type as required, having thermal time delay and 
instantaneous  trips  with  "On‐Trip‐Off",  indicating  /  operating  mechanism.  Circuit  breakers  used  in 
combination  type  motor  starters  or  contactors  shall  have  the  operating  mechanisms  interlocked  with 
the starter or contactor cover so that the cover cannot be opened unless the circuit breaker is open. The 
breakers shall comply with applicable section of IEC 157/1 or equivalent standards. 

5.1.3 Control relays 

Relays used as auxiliary control devices in conjunction with motor starters and magnetic contactors shall 
be of the type designed for machine tool application featuring contact convertibility. All contacts shall 
have a minimum thermal current rating of 10 A over a range of 6 to 600 V AC. 

5.1.4 Terminal blocks 

All terminal blocks shall be mounted in an accessible position with the spacing between adjacent blocks 
not less than 100 mm and space between the bottom blocks and the cable gland plate being a minimum 
of  200 mm.  Sufficient  terminals  shall  be  provided  to  allow  for  the  connection  of  all  incoming  and 
outgoing cables, including spare conductors and drain wires. In addition 20 percent spare terminals shall 
be provided. In enclosed cubicles, the terminal blocks shall be inclined toward the door for facilitating 
terminations. 

Terminals shall be of the channel mounting type and shall comprise a system of individual terminals so 
that terminal blocks can be formed for easy and convenient cabling consistent with the high reliability 
required of the circuits. 

Terminal  blocks  shall  be  provided  with  shorting  links  and  paralleling  links  where  applicable  and 
mounting identification numbers and / or letters. 

  Renewable Energy Guidelines  Nov. 2013 15
Volume 8 
Transmission & Distribution  

Terminal  blocks  shall  conform  to  the  applicable  standards.  The  smallest  size  to  be  used  shall  be 
designated for 2.5 mm² wire and not more than two conductors shall be connected under one terminal 
clamp. 

Terminal identification shall be provided corresponding to wire number of connected leads. 

Circuit terminals for 415 V AC shall be segregated from other terminals and shall be equipped with non‐
inflammable,  transparent  covers  to  prevent  contact  with  live  parts.  Warning  labels  with  red  lettering 
shall be mounted thereon in a conspicuous position. 

5.1.5 Equipment wiring 

All  wiring  connections  shall  be  readily  accessible  and  removable  for  test  or  other  purposes.    Wiring 
between terminals of the various devices shall be point to point. 

Multi‐conductor  cables  shall  be  connected  to  the  terminal  blocks  in  such  a  manner  as  to  minimise 
crossovers. Approved claw washers of crimp type connector shall be used to terminate all small wiring. 
Each  conductor  shall  be  individually  identified  at  both  ends  through  a  system  providing  ready  and 
permanent identification, utilising slip‐on ferrules 

Markers  may  be  typed  individually  or  made  up  from  sets  of  numbers  and  letters  firmly  held  in  place. 
Open markers shall not be accepted. 

Markers  must  withstand  the  local  environment  and  only  fungus  proof  materials  will  be  accepted. 
Ferrules of adhesive type are not acceptable. 

All trip circuits shall employ markers having a red background. 

5.1.6 Cubicles and control panels 

Cubicles and control panel enclosures shall be of sheet steel with minimum thickness of 2.5 mm, of rigid 
self‐supporting construction and supplied with channel bases. 

Cubicles  shall  be  fitted  with  close  fitting,  gasketted,  hinged,  lift‐off  doors  capable  of  being  opened 
through 180 deg. The doors shall be provided with integral lock and master key. 

Cubicles  and  panels  shall  be  vermin  proof.  Removable  gland  plates  shall  be  supplied  and  located  to 
provide  adequate  working  clearance  for  the  termination  of  cables.  The  cables  and  wiring  shall  enter 
from bottom or top. 

The  cubicles  and  panels  shall  be  adequately  ventilated,  if  required,  by  vents  or  louvers. All  ventilating 
openings shall be provided with corrosion‐resistant metal screens or a suitable filter to prevent entrance 
of insects or vermin. Space heating elements with thermostatic control shall be included in each panel. 

Where cubicles are split between panels for shipping, terminal blocks shall be provided on each side of 
the split with all necessary cable extensions across the splits. These cable extensions shall be confined 
within the panels with suitable internal cable ducts. 

Unless stated otherwise, all cubicles and panels shall be provided with a ground bus with 40 mm copper 
bar  extending  throughout  the  length.  Each  end  of  this  bus  shall  be  drilled  and  provided  with  lugs  for 
connecting ground cables ranging from 70 to 240 mm². 

All  instruments,  control  knobs  and  indicating  lamps  shall  be  flush  mounted  on  the  panels.  Relays  and 
other devices sensitive to vibration shall not be installed on doors or hinged panels and no equipment 
shall be installed on rear access doors. 

16    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

The  instrument  and  control  wiring  including  all  electrical  interlocks  and  all  interconnecting  wiring 
between sections shall be completely installed and connected to terminal blocks by the manufacturer. 
The interior of all cubicles and panels shall have a mat white finish unless specified otherwise. 

Switched interior light and socket outlets shall be provided for all cubicles and control panels. 

All cubicles and control panels shall be provided with nameplates, identifying the purpose of the panel 
and all of its components. 

All cubicles, switch gear cabinets and control panels shall be protected to IP 54. 

5.1.7 Earthing 

Provision shall be made for earthing all equipment intended for connection in an A.C. mains supply. All 
structural metal work and metal chassis shall be connected to earth. Connection between circuits and 
metal  work  shall  only  be  made  for  reasons  of  safety  and  /  or  reduction  of  interference.  Where  such 
connections are made, they shall not be used as normal current carrying earth returns. 

Earthing conductors shall be at least equal in cross sectional area to the supply conductors and shall be 
capable of carrying the fault current. 

5.2 Welding and heat treatment 

5.2.1 Welding 

All  welding  (except  welding  of  thin  plates  or  piping  of  small  sizes)  shall  be  performed  by  electric‐arc 
method and where practical, with process‐controlled automatic machines. 

Butt welds can be welded from one side only and shall be provided with back strips on the whole length 
of the seam to be welded. 

After  being  deposited,  welds  shall  be  cleaned  of  slag  and  shall  show  uniform  sections,  smoothness  of 
weld metal, feather edges without overlap, and no porosity and clinker. Visual inspection of the ends of 
welds shall indicate good fusion with the base metal.  

Where weld metal is deposited in successive layers, each layer shall be thoroughly preened before the 
next layer is applied. 

All welds transverse to the direction of flow shall be ground flush with the plates on the inside. Welds 
shall be ground flush on both the inside and the outside wherever dynamic stress occurs. 

Particular care shall be taken in aligning and separating the edges of the members to be joined by butt‐
welding so that complete penetration and fusion at the bottom of the joint will be ensured. Where fillet 
welds are used, the members shall fit closely and shall be held together during welding. 

The cut surfaces of plates requiring weld joints shall be free of all visible defects, such as laminations, 
surface  defects  caused  by  shearing  or  flame‐cutting  operations.  The  edges  and  surfaces  to  be  welded 
shall  be  free  of  rust,  mill  scale,  grease,  oil,  paint  or  any  other  foreign  matter.  Welding  over  painted 
surface shall be prohibited ‐ all painting materials next to the joint to be welded shall be removed well 
beyond the heat‐affected zone. 

  Renewable Energy Guidelines  Nov. 2013 17
Volume 8 
Transmission & Distribution  

5.2.2 Welding qualifications 

For welding of principal stress carrying parts, the standard of welding procedures, welders and welding 
operators shall conform to standards equivalent to the requirements of the ASME Boiler and Pressure 
Vessel Code, Sections VIII and IX, or DIN 8560, DIN 8563 and EN 287.  

All welders and welding operators assigned to the work shall have passed a performance qualification 
test. If more than one year has elapsed since the welder or welding operator passed his last test, then 
he shall again be tested.  

5.2.3 Quality and procedure control 

Quality  control  methods  e.g.  radiography,  ultrasonic  crack  detection  etc.  shall  be  done  in  accordance 
with the appropriate manufacturing  code. However, the Supplier shall indicate clearly in the technical 
data sheets the extent to which these methods shall be used. 

All welded joints, which have to be tight, shall be inspected or tested by dye penetration tests. 

All major welds carried out on parts under hydraulic pressure shall be at least 10% radio‐graphically and 
100%  ultrasonic  examined.  All  welds  on  the  skin‐plates  shall  be  additional  dye  penetration  tested  as 
directed by the Engineer. 

The  Supplier  shall  indicate  in  the  corresponding  drawings  the  type  of  non‐destructive  testing  to  be 
carried out during manufacture and at site. 

5.2.4 Defects and repairs 

Plates  with  laminations  discovered  after  cutting  shall  be  rejected  unless  the  laminated  portion  is  only 
local and can easily be repaired; such repairs shall require the consent of the Engineer. 

Defects in welds, which are to be repaired, shall be chipped out to sound metal and the areas to be DP 
(Dye  penetration)  or  ultrasonically  tested  to  ensure  that  the  defective  material  has  been  completely 
removed  before  repair  of  welding  is  carried  out.  Repairs  shall  be  carried  out  in  accordance  with  the 
relevant standards and to the approval of the Engineer. The Supplier shall be fully responsible for the in‐
service performance of all welding work. 

The Work shall be 100% inspected again by the method used first to determine such faulty work. 

5.2.5 Heat treatment 

Heat treatment shall be performed on all fabricated parts which are stressed during fabrication as per 
the approved heat treatment / weld procedure and are to be finish machined. 

Heat  treatment  of  field  erection  welding  seams  shall  be  performed  according  to  the  specifications  for 
the  welding  procedure  for  the  corresponding  parts,  which  shall  be  submitted  to  the  Engineer  for 
approval. 

5.3 Protection of machined surfaces  

5.3.1 General 

Machine‐finished surfaces shall be thoroughly cleaned of foreign matter. Finished surfaces of large parts 
and other surfaces shall be protected with wooden pads or other suitable means. Unassembled pins or 

18    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

bolts  shall  be  oiled  or  greased  and  wrapped  with  moisture‐resistant  paper  or  protected  by  other 
approved means. 

5.3.2 Corrosion protection 

All  ferrous  metal  work  shall  be  provided  with  an  effective  painted  or  galvanized  finish,  applied  in 
accordance with the best practice to protect from corrosion. 

5.3.3 Painting 

5.3.3.1 Surface preparation 

All  surfaces  to  be  painted  shall  be  thoroughly  cleaned  by  suitable  means  before  application  of  paint. 
After cleaning the surfaces shall be rinsed in a manner that no residues will remain. 

For  removing  rust  and  mill  scale  on  structural  steel,  piping  and  other  steel  surfaces,  particularly  parts 
which will be in contact with water, exposed to heavy condensation and humidity or subjected to high 
temperature  shall  be  sandblasted  (sandblasting  SA  2.5).  Parts  which  cannot  be  sandblasted,  shall  be 
cleaned of rust by power tool cleaning to the highest degree possible.  

The clean surfaces which are in contact with water shall receive a shop coat with a quick‐drying highly 
pigmented 2‐pack zinc‐rich primer (e.g. Inertol R, 60 µm each) and three final coats (e.g. Inertol Poxitar 
F, 100 µm each), unless otherwise specified. 

The  clean  surfaces  which  are  in  contact  with  air  shall  receive  a  shop  coat  with  a  quick‐drying  highly 
pigmented 2‐pack zinc‐rich primer (e.g. Inertol R, 80 µm each) and one final coat (e.g. PVC‐single‐layer 
lacquer, 80 µm), unless otherwise specified. 

Primed  surfaces  contaminated  with  oil  or  grease  shall  be  de‐greased  in  a  manner  not  affecting  the 
quality of the primer. 2‐component coatings older than six (6) months shall be roughened prior to the 
application of the next coat. 

5.3.3.2 Application procedure 

The  most  commonly  used  methods  of  application  are  painting  by  brush,  roller,  pressure  and  airless 
spraying equipment. Selection of the application method depends on the surface to be painted. 

For all paints the surface temperature of the metal shall not be higher than +50*C during the painting. 
Concerning special paints, the requirements set by the paint manufacturer shall be followed. All painting 
shall be free of cracks and blisters and all runs shall be brushed out immediately. After application of the 
last coat the paint system shall be free of pores.  

Metallic parts, which are embedded in concrete, shall be painted with cement base paints.  

5.3.3.3 Galvanizing 

Unless  otherwise  specified,  all  fasteners  and  steel  structures  of  exterior  and  interior  steel  surfaces  of 
outdoor  Works  shall  be  hot‐dip  galvanized  or  electrolytically  galvanized.  For  galvanizing,  only  original 
blast furnace raw zinc shall be applied, which shall have a purity of 98.5%.  

The thickness of the zinc coat shall be: 
 For  bolts  and  nuts  of  sizes  above  M36  approx.  60  micrometer  and  for  sizes  below  M36  25 
micrometer. 

  Renewable Energy Guidelines  Nov. 2013 19
Volume 8 
Transmission & Distribution  

 For  all  other  parts,  except  for  hydraulic  steel  structures  or  parts  intermittently  or  permanently 
submerged in water, approx. 50 micrometer  
 For  hydraulic  steel  structures  or  parts  intermittently  or  permanently  submerged  in  water,  approx. 
100 micrometer. 
Cleaning: All material to be galvanized shall be cleaned carefully of rust, loose scale, dirt, oil, grease, and 
other foreign matters. Particular care shall be taken to clean slag from welded areas. 

Galvanizing  of  hardware:  Bolts,  nuts,  washers,  locknuts  and  similar  hardware  shall  be  galvanized  in 
accordance with the relevant standards.  

Straightening  after  galvanizing:  All  plates  and  shapes,  which  have  been  warped  by  the  galvanizing 
process,  shall  be  straightened  by  being  re‐rolled  or  pressed  without  injury  to  the  protective  coating. 
Materials that have been harmfully bent or warped in the process of fabrication or galvanizing shall be 
rejected.  

5.3.4 Bolts, screws, nuts, etc. 

All bolts, studs, screws, nuts and washers shall be to the ISO metric system.  Mild steel bolts and nuts 
shall be of precision cold forged or hot forged type with machined faces parallel to one another. 

All parts, other than structural steel work, bolted together shall be spot faced on the back to ensure that 
nuts and bolt heads bed down satisfactorily. Mild steel nuts and bolts shall be zinc or cadmium plated. 
Stainless  steel  bolts,  nuts,  washers  and  screws  shall  be  used  for  holding  renewable  parts  in  water  or 
when exposed to high humidity  

All  bolts  or  studs  which  will  be  subject  to  high  stress  and  /  or  temperature  shall  be  of  approved  high 
tensile material with nuts of approved material. All bolts and studs larger than M60 shall be drilled for 
heaters or shall have an extension for pre‐tensioning by hydraulic tools. 

Fitted bolts shall be a driving fit in the reamed holes they occupy, shall have the screwed portion of a 
diameter such that it will not be damaged in driving and shall be marked in a conspicuous position to 
ensure correct assembly at site. 

   

20    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

6 Erection and installation 

6.1 General 

These  works  include  but  are  not  limited  to  the  installation  of  poles,  cross  arms,  pins,  insulators, 
hardware,  conductors,  transformers,  relays,  fuse  cut‐outs,  surge  arresters;  the  installation  of 
transformer  boxes,  of  grounding  and  stay  wires  and  other  support  structures  and  anchors;  the 
installation of cables.  

The PO shall comply with all applicable and approved safety regulations while carrying out the works on 
site. He shall be responsible for adequate protection of persons, plant and materials against injuries and 
damages resulting from his operations. 

6.2 Safety practices 

All works shall be undertaken with close attention to high standards of safety to workers, to the public 
and to the plant and equipment. 

All  of  the  workers  shall  be  effectively  trained  and  competent  in  safe  working  practices  that  must  be 
adhered  to  at  all  times.  All  personnel  shall  be  issued  with  and  use  relevant  personal  and  work  team 
related  safety  equipment  at  all  times.  The  safety  equipment  shall  be  maintained  in  good  order  and 
condition. 

Personal  safety  equipment  for  linemen  and  others  working  on  the  network  shall  include  but  not  be 
limited to: 
 Safety helmet 
 Protective gloves 
In addition linemen who work on poles or from ladders or elevated platforms shall be supplied with and 
use at all times: 
 Safety belts and/or harnesses 
 Insulating gloves when working on or in proximity to energized LV circuits 
 Suitable rated insulated gloves when operating energized MV equipment. 

6.3 Details of installation 

6.3.1 Erection of poles 

In order to prevent obstruction of entrances, windows, driveways and for placement of stays (guys) the 
PO shall be responsible for the field verification of pole location to prevent obstructions as mentioned 
above prior the commencement of excavation works. 

The  types  of  poles  included  in  the  specifications  shall  be  used  for  design  taking  into  account  system 
requirements, height of installations and loading conditions. 

The embedding of poles shall be made in accordance with the respective standard and the dimensions 
indicated  therein  shall  be  maintained  in  all  cases,  with  tolerances  of  75 mm.  The  11 kV  poles  shall  be 
made  of  r/f  concrete  of  round  or  rectangular  shape  or  lattice  steel  poles  according  to  the  respective 
Pakistani Standards.  

  Renewable Energy Guidelines  Nov. 2013 21
Volume 8 
Transmission & Distribution  

ABC  cable  are  fixed  on  7 m  concrete,  steel,  or  wooden  poles.  Installation  at  house  walls  shall  be 
considered as an option within villages.  

Pole  erection  shall  be  made  using  the  equipment  and  erection  techniques  that  guarantee  an  erection 
free of shocks causing cracks to the poles. 

After  installation,  poles  shall  be  perpendicular  and  perfectly  aligned  unless  otherwise  stated  on 
drawings. 

6.3.2 Erection of stay wires 

Anchored  guys  shall  be  used  on  dead‐end  poles  or  any  other  pole  specified  in  the  drawings  and/or 
required standards. 

Stay wires shall avoid interference with line conductors at all times. Stays shall be attached to the pole 
or  the  structure  as  close  as  possible  to  the  conductors  load  centre.  Stays  shall  have  an  angle  not  less 
than  45°  and  not  greater  than  60°  in  reference  to  ground  level.  Stays  shall  be  solidly  anchored  to  the 
ground with proper anchors and with depth as specified on standards in order to support the tension 
stress. Stays shall be anchored with specified type of galvanized steel anchor rod, and secured to above‐
mentioned anchor. 

All stays are to be equipped with insulators of appropriate type. The insulators shall be installed in such 
a height that the upper part of the stay wire cannot be touched. 

Stays  shall  be  installed  before  tensioning  line  conductors  and  shall  have  enough  tension  to  slightly 
incline  the  poles  in  the  opposite  direction  to  the  line,  in  such  a  manner  that  after  tensioning  the  line 
conductor pole acquires its vertical position and shall not yield in any case. 

6.3.3 Line construction 

MV and LV construction shall be in accordance with Pakistani standards. Poles shall be transported and 
handled  with  care.  During  transport  the  poles  shall  be  supported  along  the  full  length  with  minimum 
overhang.  Lifting  shall  be  done  by  suitable  cranes  using  straps  or  slings  that  cannot  damage  the  pole 
surface. The straps and slings shall be applied at the designated lifting points only. Excavation shall be 
minimal to permit satisfactory placement and compaction of the backfill. In poor ground bearing pads 
for vertical loads shall be provided. Backfill material shall be of dry soil, or cement stabilized soil, or C12 
concrete to achieve suitable strength.  

All cross arms shall be fitted with two cross arm braces. All bolt heads and nuts that bear on concrete 
surfaces shall be fitted with a washer. Pole through bolts, cross arm bolts and mounting bolts for other 
equipment shall be long enough to fully engage nut and washer but shall not extend more than 25 mm 
beyond  the  nut  after  correctly  tightened.  Anchor  deadmen  and  guys  shall  be  installed  before  the 
conductors are erected. The alignment and tension of the guy wires shall be such as to ensure that the 
guys correctly carry the design loads and that poles are plumb at the completion of the works. Pulling 
out, tensioning and sagging of conductors shall be carried out in a manner that avoids damage or over 
stressing of the conductor. All conductor joints and connectors shall be applied to specifically prepared 
and cleaned surfaces using approved corrosion inhibitors. All fittings shall be applied in a workmanlike 
manner fully in accordance with the manufacturer’s instructions. Combined disconnectors and dropout 
fuses  and  surge  arresters  shall  be  installed  in  accordance  with  manufacturer’s  instructions.  The  surge 
arresters at distribution transformers shall be installed on the feeder side but as close as possible to the 
combined disconnector & dropout fuses.  

Necessary tree cleaning and suitably dispose of all debris from the construction site shall be carried out. 

22    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

The  main  specifications  regarding  installation  of  conductors  used  on  designs  for  erection  are  briefly 
described in the following. 

Line  conductors  shall  be  supported  by  the  structures  and  shall  have  cross  sections  as  indicated  on 
drawings and design specifications. 

Before conductor stringing, it shall be assured that no broken, cracked or scratched insulator exists and 
that all insulators are of the required type. 

The primary circuit conductors shall be supported by specified insulators and shall be fastened to it with 
same type of conductor wire. 

The  primary  conductors  shall  terminate  on  suspension  insulators  as  specified,  with  preformed 
conductors of proper size with cotter pin attachments at the insulator. 

Line conductor splicing shall be made where required provided that splices are at distances greater than 
10 m from support of the conductor and no more than one splice in one span. 

Conductor splices shall be made using splice sleeves compression.  

During stringing operations the conductors shall be carefully manipulated and be continuously inspected 
to avoid any kinking or damage. 

During  stringing  it  is  expressly  forbidden  to  drag  conductors  over  the  street,  ground,  rocky  or  hard 
surfaces, etc., where the conductor can be damaged. 

While stringing, the conductor shall be carefully observed in order to eliminate damaged parts and to 
avoid formation of knots, twists or premature breakages. 

All  stringing  tools,  jacks,  wheels,  sheaves,  etc.  shall  be  of  proper  type  and  shall  avoid  any  damage  to 
conductor such as scratches, kinkings, abrasions etc. during stringing operations. 

No line structure shall be brought out of place during stringing and tensioning of conductors. 

No stringing and tensioning operations shall be made during periods of high wind or during night. 

Stringing  blocks  (sheaves)  shall  be  fixed  on  supports  which  are  mounted  on  the  poles  to  receive  the 
conductors in order to allow stringing of conductors. 

Blocks for stringing and tensioning shall be of adequate diameter. All blocks shall be equipped with ball 
or  rolling  bearings  of  high  quality.  The  grooves  shall  be  covered  with  a  neoprene  lining  or  in  case  of 
stringing aluminium conductor grooves shall be made of a good aluminium alloy. 

No splices or reparation sleeves (armour rods) shall be permitted through stringing blocks. 

It shall not be permitted for conductors to hang in blocks for more than a stringing working day before it 
is finally clipped in. 

Conductors shall be strung by a controlled tension method (braked pull) in order to avoid contact with 
the ground or any other object above ground level. 

Conductors  shall  be  sagged  using  a  set  of  appliances  (tensioning  jacks,  come  along  clamps,  etc.) 
connected in series to conductors through a dynamometer fixed on the pole where the conductor shall 
be deadening. Then  tension shall be applied by a tensioning jack until the dynamometer registers the 
tension specified in the standard (it shall be necessary to increase tension to allow tension relief when 
the  apparatus  are  removed  and  the  conductor  is  hanging  from  the  insulator  string).  Gripping  clamps 
shall be installed immediately and shall be disconnected from all appliances. The air temperature during 

  Renewable Energy Guidelines  Nov. 2013 23
Volume 8 
Transmission & Distribution  

conductor stringing shall be measured by a certified glass thermometer which shall hang totally exposed 
to the elements on the parallel conductor to the one being sagged. 

Sag conductor values shall be verified on suspension spans according to the local standards and shall be 
accepted within a tolerance of 12 mm for spans of 30 m, provided that conductors in same span have 
the same sags. 

The spans selected for sag checking shall be approximately equal to the ruling span in this line section 
and supporting structures on both sides of the span shall preferably be at the same elevation. 

6.3.4 Insulated conductors 

Low  voltage  double,  triple  and  quadruple  conductors  shall  be  installed  following  the  guidelines 
previously  mentioned  for  bare  conductor  installation  which  are  applicable  to  LV  and  according  to  the 
respective standards. 

In order not to damage insulation of the conductors during installation, it shall be completely forbidden 
to allow conductors to be in contact with the ground. In addition blocks shall have adequate grooves to 
accept three or four conductor cables without permitting any damage to them. 

6.3.5 Insulators 

6.3.5.1 Pin insulators 

Pin insulators used on primary transmission and distribution lines shall be installed on the poles before 
lifting and mounting of poles. Proper adjustment shall be verified for every element and the position of 
the insulator slot in the direction of the line. 

Prior to clipping in the conductor the insulators shall be inspected for for cleanliness, damage, groove 
alignment, tightness of fixing elements, etc. and shall take the necessary steps to correct all mistakes. 

6.3.5.2 Insulator strings 

The  assembly  of  insulator  strings  shall  be  done  carefully,  taking  special  precautions  to  assure  that  all 
pins remain properly installed. Before proceeding with the assembly it shall be verified that all elements 
do not have any defect and are clean. 

The insulator string shall be installed on the erected pole in a careful manner in order to avoid shocks 
which can cause damage to insulators when lifted. 

6.3.5.3 Spool insulators 

Spool insulators shall be installed on the corresponding pole attaching support in accordance with the 
LV distribution standard, taking precautions to assure that the securing pin is properly installed. 

Before  installation  the  insulator  shall  be  inspected  to  assure  that  it  does  not  have  any  defect  and  is 
clean. 

6.3.6 Erection of transformers 

Transformers shall be installed at support poles. Cut‐out mounting shall be made on pole structures in 
an open position. Correct functioning and proper size of fuses shall be verified before mounting. All MV 
and LV cable connections shall be made by using compression connectors. 

24    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

6.3.7 Earthing 

6.3.7.1 General 

Earthing layouts for MV and LV systems are compiled in Annex 2. The MV or LV buried earth grid shall 
comprise of not less than three standard earth rods spaced 3 m or more in a triangular pattern around 
the pole structure, substation, or equipment building. Where Site conditions make this impractical, the 
earth grid shall comprise of not less than three standard earth rods spaced 2 m or more apart installed 
in a straight line underneath the line of the overhead MV distributor. If additional earthing is required to 
achieve the threshold, the earth grid shall be extended in a radial pattern with bare copper conductor 
and rods at not less than 2 m spacing. 

All earth connections on the distribution network shall be constructed with not less than 35 mm² copper 
conductor. All leads from the equipment above ground on the pole or at the substation to the first earth 
rod  shall  be  PVC  covered.  Beyond  the  first  earth  rod  direct  buried  35 mm²  copper  conductor  shall  be 
used. Copper conductor for earthing may be hard drawn or soft drawn. For mechanical protection, the 
earth  laid  between  2.5 m  above  to  400 mm  below  ground  shall  be  installed  inside  a  20 mm  diameter 
polyethylene pipe of black colour. The polyethylene pipe and conductor shall be secured to the pole by 
stainless steel banding at intervals not less than 750 mm. All buried earth conductors shall be not less 
than 450 mm below the ground. 

All earth rods shall be made of extensible copper clad steel (or hot dip galvanized), normal length 1,500 
x 15 mm diameter. Single or jointed earth rods shall be used as necessary to achieve a satisfactory earth 
test. Rods shall be driven into the ground in such a way that the top is not less than 450 mm below the 
surface. The earth rod assembly shall be fitted with a purpose designed clamp suitable for up to three 
35 mm² copper conductors. 

6.3.7.2 MV earthing requirements 

Within  the  MV  network  all  exposed  metal  work  shall  be  directly  earthed  to  the  locally  established 
earthing system fitted with a test link. Locations include distribution transformer substations, switching 
stations,  etc.  The  maximum  resistance  of  the  local  earth  grid  shall  be  not  more  than  3  Ohm.  MV 
lightning arresters shall be earthed by an independent connection but may utilize the same earth grid as 
other MC equipment. A test link must not be inserted in any lightning arrestor earth connection. 

All exposed metal at the substation including transformer tank, transformer bearers, MV fuse supports, 
LV cubicle frame, etc. shall be inter connected and connected to the ground with a copper conductor of 
not less than 35 mm² cross section preferably in a ring circuit. 

6.3.7.3 LV earthing construction requirements 

The overall resistivity of the LV distribution system shall be less than 2 Ohm. Where the recommended 
practices are followed the overall value will usually be less than 1 Ohm. 

At every distribution transformer substation two LV earth grids shall be installed, one each at the first LV 
pole away from the transformer at two different LV distributors. This is necessary to ensure sufficient 
separation from the MV earth grid at the transformer. Each grid  shall be directly connected to the LV 
neutral. The earth lead to each of these earth grids shall be fitted with a test link located on the pole just 
above the polyethylene pipe and arranged in such a way to isolate the system neutral from the earth 
grid for testing. The test link shall be insulated or positioned so that it does not make electrical contact 
with the pole when opened. Each of these earth grids must have a measured resistivity of not greater 
than 2 Ohm. The provision of two separate earth grids provides security against damage to one of them 
and allows for routine testing. 

  Renewable Energy Guidelines  Nov. 2013 25
Volume 8 
Transmission & Distribution  

In case installation of two LV earth grids is not possible on separate poles away from the transformer, 
one of the LV grids  may  be installed  adjacent to  the transformer pole  provided it is separated by less 
than 5 m from any part of the MV grid and the buried leads to the LV grid are electrically independent 
(e.g. PCV covered conductor installed in polyethylene pipe). 

The LV neutral shall be earthed at every third or fourth pole and at least every 200 m, and at all meter 
boxes, and at the end of each LV distributor. Earth connections along the LV distributor and at the ends 
of  the  distributor  shall  comprise  a  single  earth  stake  solidly  connected  to  the  neutral  conductor  with 
35 mm²  copper  PCV  covered  conductor.  No  test  link  is  required.  Where  LV  distributors  from  adjacent 
transformers meet the neutral shall be interconnected and earthed. 

6.3.7.4 Earth rods 

Earth rods shall be of 19 mm diameter solid copper with integral driving head and shall be provided of 3 
m length. Three rods of each size shall be provided for each distribution transformer. 

Earth  rod  clamps  shall  be  of  high  copper  content  alloy  and  provided  with  stainless  steel  U‐bolts.  The 
clamps shall be suitable for either parallel or right angle connection. 

PVC  water  pipe  shall  be  supplied  for  protection  of  the  35 mm²  earthing  conductor  used  in  the 
distribution substations. The PVC water pipes shall have 20 mm internal diameter, be UV resistant and 
conform  to  BS  3505  or  similar  standard  and  be  supplied  in  4  m  length.  For  earthings  at  houses 
galvanized steel rods of 1.50 length can be used, always provided that the final maximum resistivity is 
achieved. 

6.3.7.5 Copper earthing conductor 

Insulated  Copper  earthing  conductor  is  required  for  outdoor  earthing  of  MV  and  LV  overhead  line 
equipment. The conductor shall be single core stranded high conductivity annealed copper conductor, 
with extruded black PVC and yellow/green XLPE insulation of nominal 1.0 mm thickness; nominal core 
size is 35 mm² and 10 mm² for house earthings. The cable shall be rated for 600/1000 V. The conductor 
shall be supplied in drums. 

Terminal  lugs  shall  be  of  heavily  tinned  high  purity  copper  and  of  compression  type  pre‐filled  with 
compound. 

   

26    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

7 Testing and commissioning 

7.1 MV lines 

All primary lines shall be energized, in accordance with local standard procedures. 

Voltage  measurements  shall  be  made  on  metallic  parts  of  the  structures  and  guying  cables  to  detect 
possible  leakage  voltage.  If  such  voltages  are  found,  the  PO  shall  proceed  to  eliminate  them  with  the 
necessary corrections. 

All loose insulators and insulator ties causing radio interference shall be corrected. 

Load measurements shall be made on high voltage lines at the departure structures of the substation, 
and load shall be balanced. 

Proper phasing of lines at all 90° angles and sectionalizing switches to preserve the same existing phase 
sequence to all customers is to be assured. 

Primary voltages shall be measured at substation departure structures, at each sectionalizing switch and 
other suitable locations. 

Special precautions shall be taken to have the same phase sequencing in circuits of different substations 
when these circuits are provided with transfer switches. 

The  load  shall  be  balanced  to  ±15%  of  unbalance  between  phases  or  10%  difference  between  the 
maximum and minimum values in amperes during peak hour. 

7.2 LV lines 

All  secondary  lines  shall  be  disconnected  from  the  feeding  transformer(s)  prior  to  energizing  of 
transformer(s). 

The rotation at each three phase customer entrance shall be observed, marked, and disconnected and 
rotation of new feed verified prior to reconnection of service from new secondary feed. 

The transformer(s) shall be energized and no secondary load voltage shall be measured at the bushing. If 
the voltage is correct, then the secondary lines will be connected to the transformer(s) bushings. Prior 
to connecting three phase services, the voltage and rotation shall be verified to be correct. 

If  after  connecting  the  secondary  lines  to  the  transformer  bushing  and  prior  to  connecting  any 
customer, there is a short circuit in the lines, the reasons shall be identified and measures for short‐cut 
clearance to be undertaken. 

The  load  shall  be  balanced  to  to  ±5%  unbalance  between  phases,  or  10%  of  the  difference  between 
maximum and minimum values in amperes during peak hour on each transformer. 

No distribution transformer shall have loads exceeding 150% of nominal capacity during peak hour. 

7.3 Acceptance 

The  taking‐over  testing  of  any  part  or  section  of  the  permanent  works  which  can  operate  as  an 
independent unit, shall be performed as per the test procedure agreed upon. 

  Renewable Energy Guidelines  Nov. 2013 27
Volume 8 
Transmission & Distribution  

Immediately  upon  termination  of  any  such  testing  of  a  part  or  section  of  the  permanent  works  a 
"protocol of acceptance" which shall be deemed to be the test certificate. 

This document shall be signed by an authorized representative of the Client (PPAF), the PO and the CO, 
and shall form an integral part of the later "taking‐over certificate". 

This "protocol of acceptance" shall state: 
 The date of testing 
 The quantity and type of works concerned 
 Statement of all minor defects which have to be corrected by the PO/CO 
 Confirmation that the guaranteed data have been proven. 
If any test for the verification of the guaranteed data could not be performed for operational reasons, 
this  part  of  the  acceptance  shall  be  stated  in  the  "protocol  of  acceptance"  and  be  postponed  for  a 
mutually agreed period. 
   

28    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8 Technical specifications 
The  technical  specifications  describe  the  quality  requirements  of  the  various  parts.  The  specifications 
shall be included in the request for quotations or tender procedure. All material and equipment supplied 
and installed shall be according to these specifications. 

The  compliance  of  all  material  and  equipment  used  shall  be  guaranteed  and  confirmed  by  the  site 
engineer and shall be subject to revision during commissioning. 

All materials, whether fully specified herein or not, shall be of first class quality particularly with regard 
to  manufacture,  strength,  ductility  and  durability  and  shall  conform  to  the  best  modern  practice  and 
comply in all respects with these Specifications. 

8.1 Overhead conductors 

8.1.1 Conductor drums 

Overhead  conductors  shall  be  delivered  wound  on  strong  wooden  drums  treated  to  an  approved 
international  standard  by  vacuum  impregnation  with  copper‐chrome‐arsenate  (CCA)  preservative  to 
resist rotting and termite and fungus attacks. Drums with an outside diameter exceeding 2.5 m and an 
outside width exceeding 1.4 m shall not be used. The central hole of the drums shall be reinforced with 
a steel plate of at minimum 10 mm thickness to fit an axle size of 95 mm diameter. The thread of bolts 
used  to  strengthen  the  cable  drums  shall  be  peened  in  such  a  way  that  the  nut  can  be  tightened  but 
cannot be readily removed. The interior of the conductor drums shall be lined with bituminous paper to 
prevent  the  conductor  from  being  in  contact  with  the  timber.  Waterproof  paper  and  felt  lining  shall 
overlap at seams by at least 20 mm and the seams shall be sealed. 

This  specification  covers  the  design,  manufacture,  testing,  supply,  delivery  and  performance 
requirements of ACSR for use in the overhead lines. 

Table 8‐1: Conductors: nominal area and overall diameter 
Conductor  Number & Diameter of wires  Overall Diameter 
(mm) 
Al  Fe 
50/8  6/3.2  1/3.20  9.60 
70/12  26/1.85  7/1.44  11.7 
95/15  26/2.15  7/1.67  13.6 
120/20  26/2.44  7/1.90  15.5 
120/70  12/3.60  7/3.60  18.0 
150/25  26/2.70  7/2.10  17.1 
Source: Own compilations 

8.1.2 Standards 

The equipment supplied shall conform to the latest edition of the appropriate IEC Specifications and/or 
other recognised international standards. In particular: 
 IEC 60028  International Standard of resistance of copper 
 IEC 6088  Zinc‐coated steel wires for stranded conductors 
 IEC 60104  Aluminium – magnesium – silicon alloy wire for overhead line conductors 

  Renewable Energy Guidelines  Nov. 2013 29
Volume 8 
Transmission & Distribution  

 EN 50 182.2001 (Table F.19) 
 DIN 48204 
 DIN 48201/8. 

8.1.3 Physical characteristics ACSR CONDUCTOR 

The physical, mechanical and electrical characteristics of the required ACSR conductors according to DIN 
48 204 are compiled in Table 8‐2. 

Table 8‐2: Characteristics of ACSR conductors 
Conductor  Weight  Nominal breaking load  Max. DC resistance at 20 °C 
(kg/km)  (N)  (Ohm/km) 
50/8  196  16,870  0.595 
70/12  284  26,790  0.413 
95/15  383  37,200  0.306 
120/20  494  45,650  0.243 
120/70  904  98,160  0.236 
150/25  604  55,250  0.194 
Source: Own compilations 

8.1.4 Material 

The aluminium wires used in the construction of the ACSR stranded conductors shall be made of quality 
aluminium  material,  type  GIE  in  condition  H9  as  specified  in  IEC  60889  or  equivalent.  The  galvanised 
steel  wires  used  in  the  construction  of  the  ACSR  stranded  conductors  shall  be  of  the  standard  tensile 
strength grade given in IEC 60888 or equivalent. 

Both,  aluminium  and  steel  wires  shall  be  smooth  and  free  from  inequalities.  The  aluminium  and  steel 
wires shall have the physical, mechanical and electrical characteristics given in Tables 3‐1 and 3‐2 above. 

8.1.5 Constructional features 

The constructional features of the round wire, concentric lay, ACSR stranded conductors, starting from 
aluminium and steel wires will conform with constructional features of IEC 60889 (aluminium wire), IEC 
60888 (steel wire) and IEC 61089 (stranded conductors) and/or DIN 48 204. 

In all conductor construction, successive layers shall have opposite directions of lay, the outermost layer 
being right handed. Right handed lay and left handed lay shall be as defined in the latest edition of IEC 
61089. The wires in each layer shall be evenly and closely stranded. In conductors having multiple layers 
of  aluminium  wires,  the  lay  ratio  of  each  aluminium  layer  shall  not  be  larger  than  the  lay  ratio  of  the 
aluminium layer directly below it. Steel wires shall be formed during stranding so that they remain inert 
when  the  conductor  is  cut.  The  finished  conductor  shall  be  free  from  dirt,  grit,  excessive  amounts  of 
drawing oil and other foreign deposits. 

8.1.6 Tolerances 

The nominal diameter of wires shall be expressed in millimetres to two decimal digits. In wires used in 
ACSR,  the  measurement  of  wire  diameter  shall  not  depart  from  the  nominal  diameter  by  more  than 
+0.03 mm for wires up to and including 3.00 mm diameter. For wires above that size, measurements of 
wire diameter shall not depart from the nominal diameter by more than +1%. 

30    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

For the purpose of checking compliance with the above requirement, the diameter shall be determined 
by  two  measurements  at  right  angles  taken  at  the  same  cross  section.  Resistance  measurements  of 
resistance shall be carried out to an accuracy of not less than 0.1%. 

8.1.7 Conductor grease 

The  inner  layers  of  all  bare  aluminium  conductors  shall  be  smeared  with  an  approved  anti  corrosive 
grease having a high melting point. The grease shall completely fill the interstices between the steel core 
and the aluminium strands and between all strands. There shall be no excess grease remaining on the 
outer surface which might cause adherence of grit and other material during conductor pulling out and 
erection. The minimum drop point (IP 31) of the grease shall be 110°C, and it shall not migrate towards 
the bottom of the conductor when the conductor is maintained, continuously, at a temperature of 95°C. 
The specified characteristics of the grease shall be unimpaired after heating to 15°C above its drop point 
for 150 hours. The grease shall not flow within, nor exude from the conductor, at temperatures up to 
and including 110°C. All greases shall permit operation of the conductors at a temperature of 80°C. The 
grease shall comply with the standard IEC/TS 61394.  

8.1.8 Delivery lengths 

Bare conductors shall be delivered on drums with conductor lengths of 1,000 m or longer. These lengths 
shall be subject to a permitted tolerance of +5%. 

It  shall  be  permissible  to  supply  not  more  than  5%  of  the  drums  with  random  lengths,  none  of  which 
shall be shorter than one  half of the standard length. All such lengths shall  be clearly marked as non‐
standard. Not more than one length of conductor may be contained in any delivery drum. In the case of 
conductors delivered in coils, random or non‐standard lengths shall not be permitted. 

8.1.9 Tests 

Test methods for ACSR conductors or their component wires shall be in accordance with IEC 60888, IEC 
60889, IEC 61089, IEC 60468 and IEC 61395 if no type test certificates are provided. 
   

  Renewable Energy Guidelines  Nov. 2013 31
Volume 8 
Transmission & Distribution  

8.2 Power cables  

8.2.1 General 

All cables shall be XLPE‐type. 0.4 kV‐XLPE power cables in full length (without intermediate joints) shall 
be  required  to  interconnect  all  LV  parts  at  the  substations.  Continuous  current  carrying  capacity  for 
these cables shall be taken as 400 Ampere with a fault level of 18 kA for 1 second. The insulation level of 
all these cables shall be maximum 1.0 kV grade. 

8.2.2 Design requirements 

All  cables  shall  be  designed  to  cope  with  short  circuit  conditions  and  voltage  drop.  Fusing  capacity  of 
power cables may be taken for fault duration of 200 ms. Maximum short circuit current for 400 V power 
circuits shall be 18 kA.  

The cables shall be capable of satisfactory operation under a power supply system voltage variation of 
±10%  and  frequency  variation  of  ±5%  and  a  combined  frequency  voltage  variation  of  10%  (absolute 
sum).  The  cables  shall  have  heat  and  moisture  resistant  properties.  These  shall  be  of  type  and  design 
with proven record of power distribution installation. 

The  cables  shall  be  maximum  1,000  volts  grade,  heavy  duty  multi‐core,  stranded  aluminium  /  copper 
conductor, colour coded, laid up, armoured inner sheathed, conforming to IEC. 

8.2.3 Conductor 

The conductor shall be made from stranded annealed aluminium to form compact conductor having a 
resistance within the limits specified in relevant IEC.  

8.2.4 Conductor shield 

The conductor having a semi‐conducting screen shall ensure perfectly smooth profile and avoid stress 
concentration.  The  conductor  screen  shall  be  extruded  in  the  same  operation  as  the  insulation.  The 
semi‐conducting polymer shall be cross‐linked. 

8.2.5 Insulation 

The  insulation  of  the  cables  shall  be  extruded  type  and  shall  be  designed  and  manufactured  for  the 
specified system voltage. The manufacturing process shall ensure that insulation is free from voids. 

The  insulation  shall  withstand  mechanical  and  thermal  stresses  under  steady  state  and  transient 
operating  conditions.  The  extrusion  method  should  give  very  smooth  interface  between  semi‐
conducting screen and insulation. The insulation of the cable shall be of high standard quality. 

8.2.6 Insulation shield 

In order to confine electrical field to the insulation a non‐magnetic semi‐conducting shield shall be put 
over  the  insulation.  The  insulation  shield  shall  be  extruded  in  the  same  operation  as  the  conductor 
shield  and  the  insulation  by  triple  extrusion  process.  The  cable  insulation  shall  be  strippable.  Metallic 
screening as given in this specification for the various control and power cables and special cables shall 
be provided. 

32    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.2.7 Sheath 

The  sheath  shall  be  suitable  to  withstand  the  site  conditions  and  specified  temperature  conditions.  It 
shall be of adequate thickness and applied by a continuous process to produce a sheath of consistent 
quality free from any defects. The sheath shall be extruded. 

8.2.8 Armour 

Hard drawn aluminium wire armouring / single galvanized steel tape / wire armouring shall be used. The 
diameter of the aluminium wire shall be as per the table for the dimensions of the galvanized steel wire 
armour given in the relevant standard. 

8.2.9 Service and outer sheath 

The  cable  shall  have  suitable  fillers  laid  up  with  the  conductors,  before  the  sheath  is  applied  and  the 
fillers shall be of substantially circular cross section. Fillers shall be suitable for operating temperature of 
the insulation and compatible with the insulation. 

8.2.10 Colour scheme and identification 

To facilitate easy identification of phases a colour scheme of red, yellow, and blue for phases and black 
for neutral shall be adopted for power cables.  

All the cables shall carry manufacturer data in a permanent, legible manner at an interval of at least 3 
meter run. The manufacturer’s data shall include the name; cable size, voltage rating together with any 
other information. 

8.2.11 Cable lugs 

Cable  lugs  shall  be  supplied  as  per  cable  schedule  and  these  shall  be  made  of  copper  tube  electro 
tinned. Longneck‐crimping lugs shall be used for cables of size 400 mm² and above. No bimetallic action 
shall take place between the aluminium conductor of the cable and the cable‐connecting lug by filling 
the lugs with suitable compound. The lugs shall be of standard quality conforming to relevant IEC. 

8.2.12 Cable glands 

The cable glands shall be of double compression type and shall be made of brass duly electro tinned in 
order  to  avoid  corrosion  and  oxidation  of  the  surface.  The  nipple  threads  shall  be  in  accordance  with 
IEC. Glands shall provide neat, tight, dust and vermin proof termination. 

Glands shall be provided with rubber ring to hold the cables firmly when check‐nut is slightly tightened. 
Gland shall be complete with suitable washers etc. 

8.2.13 Cable junction boxes 

Junction  boxes  shall  be  constructed  of  sheet  steel  of  thickness  not  less  than  2 mm.  The  door  shall  be 
adequately  strengthened  to  ensure  rigidity  and  strength.  Sheet  steel  and  sections  used  in  enclosures 
shall be cut neatly and finished free from burrs. Ample wiring space shall be provided at the sides, and 
back of the enclosure for incoming and outgoing circuits. Removable plates with gaskets shall be fitted 
at the top and bottom of the box to provide the entry for conduit or cable. The door shall be suitably 
gasketed and fitted with a lock type handle. The door shall be hung on hinges having brass bodies and 
stainless steel pins. 

  Renewable Energy Guidelines  Nov. 2013 33
Volume 8 
Transmission & Distribution  

Each  cable  junction  box  shall  be  provided  with  terminals  of  adequate  rating  on  the  terminal  strip  of 
suitable thickness. Disconnecting (sliding) type terminal blocks shall be provided, to facilitate testing & 
maintenance without disconnecting the cables. 

Multi‐block terminal board of 15 Ampere, 500 V rating shall be provided to form assembly of number of 
terminal block. Assembly may be secured with only two screws on the surface. There shall be provision 
on the strips to add more terminals in case of further requirement. 

8.2.14 Packing 

All  cables  shall  be  supplied  on  non‐returnable  wooden  drums  with  adequate  barrel  diameter  so  as  to 
avoid  any  damage  to  the  cables  and  to  withstand  rough  handling  during  transportation  and  storage. 
Preferably not more than one length shall be wound on one drum.  

A layer of waterproof paper shall be applied to the surface of the drums and over the outer cable layer. 
A circular space of at least 40 mm shall be left between the cable and the lagging. Each drum shall carry 
the name of the manufacturer, the name of the Project, order number, item number, type, size length 
of cable, net and gross weight duly stenciled thereon. 

8.2.15 Tests 

Certificates for following tests shall be provided. 
a) Annealing test (for Cu) 
b) Tensile test (for Al) 
c) Wrapping test (for Al) 
d) Conductor resistance test 
e) Test for thickness of insulation and sheath 
f) Tensile strength and elongation at break of insulation and sheath 
g) Insulation resistance test 
h) High voltage test at room temperature. 
   

34    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.3 Stay wire 

8.3.1 Design 

The stay‐wire covered by this specification is required for use on stays and flying stays from poles. 

The stay‐wire must be designed and manufactured in such a way that it will satisfactorily withstand the 
thermal,  mechanical  and  environmental  stress  to  which  it  will  be  subjected  during  installation  and 
throughout its lifetime in service. Its minimum breaking load shall be not less than 36 kN. 

8.3.2 Manufacture 

The  stay‐wire  in  this  specification  shall  be  drawn  from  steel  which  shall  conform  to  IEC  60888. 
Galvanising shall comply with DIN 50 976 or ASTM A385. 

Each wire shall be approximately circular in section and shall contain no weld, joint or splice whatever. It 
shall be free from any scale, inequalities, spills, splits or any other defects. The wire shall be galvanised 
in accordance with DIN 1548 or ASTM A385 and tested to DIN 50 952 or equivalent. 

Each wire shall be completely and smoothly galvanised before stranding. The stranding shall be carried 
out in such a way that if an evenly distributed pull is applied at the ends of the completed strand, each 
wire shall take an equal share of the pull. 

The lay of the wires shall be right handed. The length of lay, which shall be defined as the axial length of 
one complete turn of the helix, shall be in accordance with the technical data schedule. 

8.3.3 Stay‐wire coils 

Normally, the stay‐wire shall be smoothly and uniformly coiled in standard 100 m coils with a tolerance 
of ±5%. It shall be permissible to supply not more than 5% of the total length in random lengths, none of 
which shall be shorter than one half of the nominal length. These lengths shall be clearly marked as non‐
standard. 

The  coils  shall  have  a  minimum  diameter  of  520 mm.  To  prevent  damage  during  transportation, 
handling or storage, the coils shall be lagged with paper and hessian or with hessian laminated paper, or 
in other alternative manner suggested by the supplier at the time of bidding and demonstrably safe. 

8.3.4 Labelling 

Each coil shall be clearly labelled with a metallic label marked with the following information: 
 Manufacturer's name; 
 Size of wire; 
 Length of wire in metres; and 
 Weight of wire in kilograms. 

8.3.5 Tests 

Table 8‐3 shows the measurements and tests that shall be carried out on the stay‐wire, in case no type 
certificate by a recognized institution is provided by the Supplier: 
   

  Renewable Energy Guidelines  Nov. 2013 35
Volume 8 
Transmission & Distribution  

Table 8‐3: Measurements and tests for stay wire 
Description  Required Value 
Size of Stay‐wire:  7/16 SWG 
Diameter of single wire before stranding   
‐ Nominal  4.0 mm 
‐ Maximum  4.1 mm 
‐ Minimum  3.9 mm 
Minimum weight of zinc coating before stranding  254 g/m² 

Nominal overall diameter of stranded stay‐wire  9.45 mm 
Maximum tensile strength of individual wires  850 N/mm² 
ultimate tensile strength of individual wires  700 N/mm² 
Minimum percent elongation qat rupture    
before  5% 
after   4.25% 
stranding 
Break load  36.26 kN 
Wrapping test for ductility: Turns on and one being  8 
Source: Own compilations 

8.4 Overhead conductor fittings 

8.4.1 General 

This  specification  covers  the  design,  manufacture,  testing,  supply,  delivery  and  performance 
requirements of insulator fittings and hardware and of conductor splice and termination connectors as 
required by the 11 kV system. 

The  dimensions  and  characteristics  given  in  this  specification  are  intended  to  describe  typical 
distribution  overhead  line  fittings  and  hardware  which  will  maintain  the  general  look  of  the  existing 
network  and  will  take  advantage  of  the  availability  of  tools  and  the  familiarity  of  the  staff  with  these 
kinds of arrangements. 

It will be the supplier’s responsibility to ensure that all fittings, hardware and accessories are capable of 
supporting the mechanical and electrical loads imposed on them by climatic conditions and conductor 
tensions under worst design conditions. 

The  preformed  fittings  shall  be  compatible  with  ASCR  conductors.  The  supplier  shall  ensure  that  all 
preformed  fittings  are  compatible  for  installation  with  the  insulators  and  thimbles  as  required  for 
correct construction.  

Preformed  fittings  shall  be  of  correct  size  for  the  conductor  to  which  it  is  to  be  fitted  and  shall  be  of 
adequate strength for the purpose for which it is intended. The preformed fittings shall not slip whilst 
service. 

36    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.4.2 Preformed fittings 

8.4.2.1 Connector for MV overhead conductors 

Conductor connectors are required for Aluminium to Aluminium non‐tension and tension joints, and for 
connecting Aluminium conductor to terminals of outdoor and indoor electrical equipment. Aluminium 
connectors shall be suitable for ACSR conductors. These shall be complete with all special tools required, 
protective grease, tapes bolts and washers appropriate to the application for which they are used.  

All  connectors  shall  be  supplied  pre‐filled  with  high  quality  oxide  inhibiting  compound  and  shall  be 
protectively capped to prevent spillage or spoilage of this compound. All connectors shall be clearly and 
permanently marked with the correct size and category.  

In addition all connectors shall comply with the following: 
 The current must be uniformly distributed among the strands of the conductor 
 The connector must have at least the same conductance as the conductor and continuously carry the 
full current rating of the conductor size they are designed for 
 The original quality of contacts shall be maintained throughout the connector’s service life. 
 Glow discharges and radio interferences must be reduced to a minimum. 
All  compression  connectors  shall  be  suitable  for  installation  using  either  manual  or  hydraulic 
compression  tolls.  Details  of  dies  and  tools  required  for  the  compression  connectors  offered  shall  be 
submitted with the tender documents. 

Oxide inhibiting grease shall be suitable for Aluminium to Aluminium and to Copper bolted joints and as 
filling compound for Aluminium fittings which accept copper conductors. 

The compound shall be free of zinc particles or grit, shall be high “drop point” grease based and shall 
remain stable at high temperatures. 

8.4.2.2 Full tension mid‐span joints 

Full  Tension  Mid‐Span  Joint  shall  be  of  compression  in‐line  sleeve  type  suitable  for  connection  of 
stranded ASCR conductors. 

8.4.2.3 General non‐tension connectors 

Non‐Tension  Connectors  shall  be  of  compression  type  with  extrusion  section  of  the  H  type  for 
connection of ASCR stranded conductors. 

8.4.3 Terminal lugs 

Terminal  Lugs  shall  be  heavily  tinned  plated  aluminum  and  of  the  compression  type  prefilled  with 
compound suitable for connection of conductor onto copper terminals using 12 mm diameter bolts.  

8.4.4 Stainless steel strap and equipment 

Stainless steel strap is required to attach items of overhead line hardware to poles and cross arms. It will 
also be used for attaching cables and conduit to poles. The strap shall be made of stainless steel with a 
dimension  of  10  x  0.7 mm  minimum  and  be  supplied  in  rolls  of  50 m  length.  The  stainless  steel  strap 
shall have four smoothed edges to minimize the possibility of cutting. 

  Renewable Energy Guidelines  Nov. 2013 37
Volume 8 
Transmission & Distribution  

8.5 Insulators 

This  specification  covers  the  design,  manufacture,  testing,  supply,  delivery  and  performance 
requirements  of  pin  insulators,  suspension  insulators,  disc  insulators,  bobby  insulators,  and  stay 
insulators  required.  It  is  the  supplier’s  responsibility  to  ensure  that  the  mechanical  strength  of  the 
proposed insulators is sufficient to support the loads generated, as per line design, by wind acting on the 
insulators and by conductor tension for maximum windspan and bad design conditions, for all insulator 
duties and for all permitted line  deviations. The average span is  calculated at being 80 m  on MV.  The 
11 kV conductor cross section shall be 120 mm².  

All insulators shall be delivered with all necessary assemblies, mounting and fixing material as clamps, 
bolts,  nuts,  washers,  spring  rings,  brackets,  etc.  in  sufficient  quantity,  in  qualities  as  required  by  the 
respective standards and of suitable dimensions. All costs are included in the respective unit costs. 
All insulators shall be clearly marked with the name or trademark of the manufacturer and the year of 
manufacture. In addition, each unit shall be marked with the specified mechanical or electromechanical 
failing load.  These markings shall be legible and indelible.  The  markings may  be printed or impressed, 
provided  such  impressions  do  not  impair  the  performance  of  the  insulator.  Markings  shall  be  applied 
before firing. The insulators shall meet the performance characteristics as compiled in Table 8‐4. 
In Pakistan preferably porcelain brown glazed insulators are used, but other type of insulators, with a 
proven track record may also be alternatively used. 

8.5.1 Pin insulators 

8.5.1.1 Performance characteristics 

Pin  insulators  are  used  along  the  high  and  low  voltage  transmission  and  distribution  lines.  They  are 
mounted at metal crossarms and at the top of the poles.  

Table 8‐4: Performance characteristics – PIN insulator 
Maximum system voltage  12 kV 
Nominal system voltage  11 kV 
Minimum creepage distance  350 mm 
Power frequency 50 Hwithstand voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Power frequency 50 Hz flashover voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Impulse withstand voltage   
positive  90 kVp  
negative  110 kVp 
Source: Own compilations 

8.5.1.2 Design and construction 

The  relevant  vertical  dimensions  shall  be  such  that  when  combined  with  the  pin  insulator  spindle  the 
design requirements at the relevant voltage level for conductor clearance from the cross‐arm shall be 
met. 

38    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

The design shall be such that stresses due to expansion and contraction in any part of the insulator shall 
not  lead  to  deterioration.  Precautions  shall  be  taken  to  avoid  chemical  reaction  between  cement  and 
metal fittings by the choice of suitable materials or by the manufacturing method. Single piece insulator 
construction is preferred. 

The insulating material shall not engage directly with hard metal. Pin insulators shall be provided with a 
thimble of suitable material. Cement used in the construction of the insulator shall not cause fracture by 
expansion  or  loosening  by  contraction  and  proper  care  shall  be  taken  to  locate  the  individual  parts 
correctly during cementing. The insulators shall have a centre tap groove. 

The  insulator  spindle  shall  have  the  whole  length  of  the  stalk  threaded  to  facilitate  using  the  pin 
insulators on different line configurations. 

Ferrous parts, unless of stainless steel, shall be hot dip galvanised in accordance with EN 1461 or ASTM 
A123 and ASTM A385, with the exception of cotter pins which shall be galvanised using the methods of 
ASTM A385, but with a coating mass of 500 g/m². 

8.5.2 Stay insulators 

Stay  or  guy  strain  insulators  are  used  at  anchoring  systems  for  poles  when  load  conditions  exceeds 
specified safety load  

Table 8‐5: Performance characteristics – PIN insulator 
Maximum system voltage  12 kV 
Nominal system voltage  11 kV 
Minimum creepage distance  350 mm 
Power frequency 50Hwithstand voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Power frequency 50 Hz flashover voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Impulse withstand voltage   
positive  90 kVp  
negative  110 kVp 
Source: Own compilations 

8.5.2.1 Dimensions 

The  Supplier  shall  guarantee  that  the  dimensions  and  tolerances  of  the  insulators  applied  are  in 
accordance with the drawing and allow easy connection of stay wires. The insulators shall be used with 
7/16 SWG steel stay‐wire. The insulators shall be suitable for use with preformed fittings  on the stay‐
wire,  have  a  minimum  hole  diameter  of  22 mm  and  be  such  that  a  straight  stay‐wire  can  be  passed 
through it.  

8.5.3 Suspension insulators 

Suspension or string insulators are used at poles where line direction changes to a certain degree or in 
regular distances to balance weights. The string insulators consist of 2 disk shaped insulators which are 

  Renewable Energy Guidelines  Nov. 2013 39
Volume 8 
Transmission & Distribution  

attached to each other by metal clevis pin or ball and socket links. Diameter of disks units is 257 mm and 
standard length is 146 mm.  

Table 8‐6: Performance characteristics – suspension insulator 
Maximum system voltage  12 kV 
Nominal system voltage  11 kV 
Minimum creepage distance  350 mm 
Power frequency 50 withstand voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Power frequency 50 Hz flashover voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Impulse withstand voltage   
positive  90 kVp  
negative  110 kVp 
Source: Own compilations 

8.5.4 Post insulators 

Post insulators shall be used along the poles and for sub‐stations. 

Table 8‐7: Performance characteristics – PIN insulator 
Maximum system voltage  12 kV 
Nominal system voltage  11 kV 
Minimum creepage distance  350 mm 
Power frequency 50 withstand voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Power frequency 50 Hz flashover voltage   
‐ wet  30 kV 
‐ dry  55 kV 
Impulse withstand voltage   
positive  90 kVp  
negative  110 kVp 
Source: Own compilations 

 
   

40    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.5.5 Insulator tests 

8.5.5.1 General 

The Supplier shall provide test certificates by a recognized institution that confirm that:  
 the insulators conform with this specification and that the required type tests have been carried out; 
 samples have withstood the specified sample tests. Respective reports shall include complete details 
of  all  the  tests  listed  below.  Numerical  values  shall  be  given  for  each  individual  test  result  in  all 
appropriate cases; and 
 each insulator of any consignment has withstood the routine tests specified. 

8.5.5.2 Type tests 

Type tests are intended to verify the main electrical characteristics of an insulator which depend chiefly 
on its shape and size. These tests are normally made only once. They shall be repeated only when the 
design or the material of the insulator is changed. The type tests required are: 
 dry, lightning impulse withstand voltage test; 
 critical impulse flashover test; 
 wet, power frequency voltage test: 
Flashover on any of the insulators under the specified withstand test conditions will result in rejection of 
the insulator design; 
 thermal mechanical performance: the manufacture shall state the result of the thermal mechanical 
performance  test,  carried  out  in  accordance  with  the  requirements  of  IEC/TR  60575,  on  a 
representative sample of the insulators proposed. The value of Qs shall be not less than the value of 
the acceptance constant K, as specified in appendix A6 of IEC/TR 60575; 
 radio  interference:  the  manufacturer  shall  state  the  result  of  the  radio  interference  voltage  test 
carried  out  in  accordance  with  IEC  60437  at  a  voltage  of  11 kV,  50 Hz.  The  maximum  radio 
interference voltage measured at 1 MHz will be 100 mV and 50 mV respectively; and 
 power arc test. 
Where relevant, these tests shall be carried out in accordance with IEC 60383.  

8.5.5.3 Sample tests 

These tests are made for the purpose of verifying the characteristics of an insulator and the quality of 
the  materials  used.  They  are  carried  out  on  insulators  taken  at  random  from  batches  offered  for 
acceptance. 

The tests shall be conducted according to the sampling procedure of IEC 60383, clause 23. The minimum 
quantity for sample tests shall be 5 units. Failure of one insulator shall warrant re‐testing according to 
clause  33  of  IEC  60383.  Failure  of  two  or  more  insulators  on  retest  shall  result  in  the  rejection  of  the 
batch. 

8.5.5.4 Routine tests 

These tests are made for the purpose of eliminating insulators with manufacturing defects. They shall be 
made on every insulator offered for acceptance. The following tests shall be carried out: 
 Visual examination; 
 Mechanical  test:  the  tensile  load  in  the  mechanical  routine  test  shall  be  50%  of  the  specified 
electromechanical or mechanical failing load, rather than 40% as required by clause 36 of IEC 60383; 

  Renewable Energy Guidelines  Nov. 2013 41
Volume 8 
Transmission & Distribution  

 Electrical test. 

8.6 LV outdoor distribution panels for step‐down transformers 

8.6.1 General 

The  LV  cabinets  are  designed  to  provide  branch  circuit  feeders  for  power  distribution  from  the 
distribution transformers. The LV cabinets shall be supplied with main MCB on the incoming, and on the 
outgoing feeder. The low voltage cable distribution cabinet (switchboard) shall be designed for outdoor 
installation at the substations. 

The housing shall be made of galvanized steel with two lockable hinged doors for pole mounting. Rated 
voltage  is  0.6/1,0 kV.  They  should  be  pre‐wired  with  three  phase  main  copper  bus  bar,  one  neutral 
copper bus bar and one earth bus on ready for service basis. The meter boxes shall basically comply with 
the following standards: 
 IEC 600068  Environmental testing general and guidance 
 IEC 60529  Degree of protection provided by enclosures (IP‐Code) 
 IEC 60947‐2 LV switch gear and control gear. 

8.6.2 Scope of supply 

The equipment to be installed in each LV cabinet shall include the following: 
1) One incoming moulded case circuit‐breaker (MCCB) with electronic overcurrent and short‐circuit 
protection device (from distribution transformer) 
2) Three current transformers 
3) Three ampere meters 
4) One electronic 3‐phase energy meter 
5) One voltmeter 0 ‐ 500 Volt 
6) One selector switch 
7) Three main copper bus bars 
8) One neutral copper bus bar 
9) One earth bar 
10) Outgoing MCBs with electronic overcurrent and short‐circuit protection device. Number and sizes 
are in accordance with the transformer capacity, the number of feder, and the feeder load 
11) One receptacle 230 Volt, 16 A, with earthing contact 
12) Cabinet illumination with door contact operated on‐off switch 
13) Mounting and installation material (bolts, nuts, cable shoes, earthing material for connection to 
the station earthing system, etc.) 
200% spare fuses shall be supplied with each LV cabinet. 

8.6.3 Enclosure 

The  enclosure  shall  a  metal  panel,  rigid,  self‐supporting  structure,  with  suitable  structural  steel 
reinforcement, stiffening and bracing. When the structures are assembled, the surfaces shall be flat and 
smooth and shall have ample strength to withstand all stresses encountered in shipping, installation and 
operation  without  distortion,  vibration  or  other  damage.  The  structures  shall  be  complete  with 
removable lifting lugs as required. 

42    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Doors shall open 100° outwards and shall have a latching device to lock the door in open position during 
maintenance or operation on the panel. All doors shall use the same lock and key combination for the 
complete  supply.  Doors  shall  be  rigid  and  fitted  with  close  fitting  flexible  seals  to  prevent  ingress  of 
liquids, moisture, dust and vermin. Each door shall be equipped with a lever type handle and three point 
latches sufficiently strong to hold it in alignment when closed. Hinges shall be of the lift‐off pattern with 
one pin engaging before the other for ease of fitting. 

Provision shall be made for bottom entry of cables. Removable gland plates of an approved type non‐
flammable  insulating  vermin‐proof  material  shall  be  provided.  All  cables  shall  enter  vertically  from 
below and at their point of entry the cabinet shall be sealed. 

The panel face shall be at least 3 mm cold rolled steel sheet selected for flatness and free from surface 
defects. The  panel front shall be all welded and ground smooth. After steel fabrication the panel face 
shall be flat with a maximum deviation of 1 mm over the total surface. 

A lamp shall be fitted inside each cabinet and shall be so arranged that all wiring is illuminated evenly 
without  dazzle.  The  lamp  shall  be  controlled  by  a  door  switch.  One  receptacle  230  V,  16  A  shall  be 
provided. 

LV  Cabinets  shall  have  two  compartments:  one  for  the  incoming  supply  with  the  main  MCCB,  the 
measurement instruments and the energy meter and the second compartment for the outgoings MCCB. 
The degree of protection shall be IP51 acc. to IEC 60529. 

Main Copper busbar shall be designed for a continuous operation at rated current and for a short circuit 
current of 10 kA. 

8.6.4 Interior 

Earth  and  neutral  bars  shall  be  provided  and  fitted.  The  bars  will  be  made  of  brass.  Each  neutral 
connection shall be identified. 

The bus bar shall be constructed from copper conductor insulated as indicated in the table below. The 
bus bar shall be fully insulated and colour coded. Crimp lugs shall be supplied for the neutral a dearth 
bus bar. The crimp lug shall be supplied in a plastic bag taped to the interior of each LV cabinet. 

Table 8‐8: Correlation of max. current and size of busbar 
Incoming Current  Minimum Size of Busbar 
(A)  (mm) 
200‐400  5 x 30 
600  12 x 70 
800  15 x 70 
1,000  25 x 80 
Source: Own compilation 

8.6.5 Equipment 

8.6.5.1 Molded case circuit breakers (MCCB) 

Circuit breakers must be able to make, carry and break currents under normal operating conditions and, 
be  able  to  make  the  current,  withstand  it  and  to  interrupt  it  after  a  defined  length  of  time  under 
abnormal short circuit conditions. 

  Renewable Energy Guidelines  Nov. 2013 43
Volume 8 
Transmission & Distribution  

The  tripping  current  shall  be  designed  according  to  the  nominal  current  and  the  calculated  minimum 
short circuit current. 

MCCB  shall  be  fitted  with  an  electronic  tripping  unit  for  overcurrent  and  short  circuit  protection.  This 
unit shall provide an adjustable threshold for overload, short‐circuit and instantaneous short circuit with 
different operating times. 

The circuit breakers shall be used for routine switching operations and to protect apparatus and sections 
of the distribution system from damages of the short‐circuit currents. 

Circuit breakers shall be designed for panel board mounting and shall be provided with suitable clamp 
type connectors. The interrupting capacity of the breakers shall be minimum 10 kA. 

Multi‐pole breakers shall have a single operating handle which shall operate all poles simultaneously to 
close or trip the breaker. The operating handles shall clearly indicate whether the breakers are in "ON" 
or "OFF" or TRIPPED" position. 

The MCCB shall comply with IEC 947‐2 and DIN VDE 0660 part 101. 

8.6.5.2 Current transformers 

The  current  transformers  shall  be  commensurate  to  a  rated  bus  bar  current  as  mentioned  above  and 
shall  have  a  tapped  secondary  winding  to  provide  two  different  ratios,  e.g.  300:5.  Secondary  currents 
shall be 5 A. It shall comply with IEC 60044‐1 last edition or DIN VDE 0414. Accuracy class shall be IEC 0.5 
M5. Rated output shall be at least 15 VA. Current transformers shall be window (slipover) type and shall 
be adequate for vertical mounting. 

8.6.5.3 Three pole LV fuse switch 

Three pole LV fuse switches are required to fuse and switch the low voltage on three phase distribution 
transformers. The fuse switches are mounted in the LV cabinets. The equipment supplied shall conform 
to  the  latest  edition  of  the  appropriate  IEC  Specifications  and/or  other  recognised  international 
standards as IEC 60269, IEC 60529 and IEC 60947. The switch fuses shall be ganged. The fuse switch shall 
have bolted tunnel terminals which can accept 95 mm² to 240 mm² copper or aluminum conductor. 

8.6.5.4 Electrical and mechanical requirements 

The fuse switch shall have the following ratings in compliance with IEC 60947‐3: 
 Minimum rated operational voltage:       190 V 
 Minimum rated insulation voltage:         1,000 V 
 Rated frequency:             50 ‐ 60 Hz 
 Minimum operational current:  
o with connecting links:           250 A, 
o  with fuse links:           160 A 
 Minimum rated conditional short‐circuit current with:   50 kA 

Fuse links 
 Infrequent operation with current:         200 minimum 
 Infrequent operation without current:       1,400 minimum 
 Minimum degree of protection from front:      IP 41 to IEC 60529 
 Rated making and breaking capacity:       AC 20B. 

44    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Marking 
The fuse switch shall  be  clearly marked with the name of the  manufacturer  or trademark and year of 
manufacture. 

HRC Fuse links 
HRC fuse links in DIN 00 format are required for the three pole LV fuse switches. The fuse links shall be 
supplied in two ratings: In=100 A and In=160 A.  

8.6.5.5 Testing 

The Supplier shall perform type (type tests are required only if no certificates of a recognized institution 
are provided), sample and routine tests as prescribed in IEC 60947. 

8.7 Distribution substations 

Usually 2‐pole distribution transformer structures are used for capacities up to 500 kVA. In exceptional 
cases transformer may be placed on masonry supports. In this case the minimum height should be 2 m 
with  a  protection  fence.  Pole  type  transformers  are  mounted  directly  on  steel  supports  and  shall 
comprise: 
 Required poles 
 Supporting structure 
 Transformer 
 Combined MV disconnector and dropout fuses 
 MV surge arresters 
 MV earthing 
 LV earthing on adjacent poles 
 LV control cabinet. 
The combined disconnector and dropout fuse unit shall be cross arm mounted above the transformers 
and positioned so that the fuses can be safely operated by pulling stick from a ladder or platform placed 
on the LV side of the transformer. 

The surge arrester shall be mounted adjacent to the drop out fuses and connected on the up steam side 
of the fuses. The surge arresters shall be directly earthing to the substation MV grid. 

The drop lead from the MV line, the connection to the surge arresters and also the drop lead to the MV 
bushings  shall  be  single  core  35 mm²  Al  XLPE  covered.  An  insulated  boot  shall  be  provided  over  the 
exposed metal parts of the MV bushing to protect against interruptions from bird, snakes, windblown 
debris etc. 

An LV cabinet shall be fixed to the structure at a height that does not obstruct pedestrian or other traffic 
but is still reasonably accessible for operational purposes. Twin single core copper XLPE LV cables as in 
the table below shall be used from the transformer bushings to the LV cabinet. The neutral shall be full 
size.  Where  these  cables  are  less  than  2.5 m  above  ground  suitable  mechanical  protection  shall  be 
provided. 
   

  Renewable Energy Guidelines  Nov. 2013 45
Volume 8 
Transmission & Distribution  

Table 8‐9: Cable sizing 
Transformer  No and size of 
capacity (kVA)  cables (mm²) 
500  3 x 300 
400  3 x 150 
315  2 x 150 
200‐250  1 x 150 
160  1 x 120 
100  1 x 70 
50  1 x 50 
Source: Own compilations 

Where underground LV cable is installed for the outgoing LV circuits the cable shall be routed from the 
LV cabinet and provided with suitable mechanical protection. 

All  cable  fixed  to  the  poles  shall  be  neatly  secured  by  stainless  steel  banding  at  intervals  of  not  more 
than 750 mm. 

8.7.1 Structure steel for distribution networks and substations 

Structure  steel  cross‐members  are  required  for  the  two  pole  distribution  transformer  substation  to 
support the lightening arresters (also called surge arresters) the combined disconnector/drop out fuses 
(also called fuse cut‐outs) and the distribution transformers. The cross – members shall be designed to 
adequately support the static load of the equipment plus the load of maintenance personnel.  

Suitable classes of steel for the cross – members are low tensile steel (yield point 220‐260 N/mm²) and a 
high tensile steel (yield point 300‐350 N/mm²). Steel shall comply with the requirements of ASTM A 143. 
All components / sub – items required to complete the distribution transformer substation assemblies 
shall be included. 

8.7.2 Cross arms 

8.7.2.1 Applicable standards 

The  cross‐arm  assemblies  supplied  shall  be  in  accordance  with  the  latest  editions  of  the  Standards 
specified below, or equivalent Standards. 
 BSEN 10113‐2 (1999#0)  Weldable fine grain structural steel. 
 B.S. 4360 (1990    Weldable structural steel 
 B.S. 4848 Parts IV & V  Hot rolled structural steel sections 
 B.S. 464 (1998)    Thimbles for wire ropes. 
 BSENISO 1461 (1999)  Hot dipped galvanized coating on steel. 

8.7.2.2 Basic features 

The  cross‐arm  assembly  shall  consist  of  three  parts:  (a)  steel  angle  cross‐arm;  (b)  flat steel bracing 
and (c) steel channel for transformer pole mounting. 

46    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.7.2.3 Grade and quality of steel 

The grade of steel used for the fabrication of cross‐arm assemblies shall be 43DD as per BS 4360 or 355N 
as  per  BSEN10113.  The  dimensional  tolerance  of  flat  steel  and  angle  steel  shall  be  as  stipulated  in 
BS4360 / BSEN 10113 and BS 4848 Part 4 respectively. The minimum thickness of the angle steel shall be 
7mm  and  for  channel  steel  shall  be  7mm.  The  chemical  composition  of  the  steel  used  shall  be  as 
stipulated in BS 4360 / BSEN10113 (Table 14 and Table 1 respectively). 

The steel used for the fabrication of cross‐arm assemblies shall be sound and free from any internal and 
external defects or surface flaws, which might preclude its fitness for purpose. 

8.7.2.4 Mechanical properties 

The  mechanical  properties  of  steel  including  the  minimum  Tensile  Strength,  Yield  Strength  and 
Elongation shall be  as stipulated in BS  4360 /BSEN  10113 (Table 15  and Table 3 respectively). 

8.7.2.5 Fabrication 

Cross‐arm  assemblies  shall  be  fabricated  from  the  following  types  of  steel  sections  manufactured in 
accordance with BS 4360 : 1990 / BSEN 10113 structural steel. 
a) Angle steel section 70mm x 70mm x 7mm (for cross‐arm) 
b) Channel Steel section of 120mm x 55mm x 7mm (for substations, pole mounted) 
c) Flat Steel section of 40 mm x 8mm (for bracing). 
The  channel  steel,  flat  steel  and  angle  steel  sections  shall  be  first  cleaned  and  made  rust  free  by 
shot/grit blasting, then necessary holes punched, cut to required sizes, then welding, bending, forging 
and identification marking shall be carried out. All components of the cross‐arm assemblies shall be hot 
dipped galvanized. 

Position and size of holes on the cross‐arms, bracings and channel steel shall be precisely in accordance 
with the requirements. 

8.7.2.6 Components 
a) The components comprising a Pin Cross‐arm are as follows: 
o Angle Steel Cross‐arm ‐ 70 mm x 70 mm x 7 mm ‐ 1 No. 
o Flat Steel Bracing (40 mm x 8 mm) ‐ 2 Nos. 
b) The components comprising a Tension Cross‐arm are as follows:   
o Angle Steel Cross‐arm ‐ 70 mm x 70 mm x 7 mm ‐ 2 Nos.  
o Flat Steel Bracing (40 mm x 8 mm) ‐ 4 Nos. 
c) Bolts, Nuts and Washers necessary for the Pin and Tension Cross‐arm  assemblies are not required 
to be supplied. 

8.7.2.7 Routine tests 

The  following  routine  tests  shall  be  carried  out  on  all  the  cross‐arm  assemblies  manufactured. 
a) Visual inspection 
b) Dimensional check 
c) Galvanizing. 

  Renewable Energy Guidelines  Nov. 2013 47
Volume 8 
Transmission & Distribution  

8.7.3 Pole fittings 

The following pole fitting for overhead lines shall be provided: 
 Single crossarms, complete with two crossarm braces and all necessary nuts, bolts and washers for 
attachment to the pole 
 Double  crossarms,  complete  with  two  crossarm  braces,  spacers,  and  all  necessary  nuts,  bolts  and 
washers for attachment to the pole 
 Distribution  transformers  pole  mounting  steelwork,  complete  with  all  necessary  nuts,  bolts  and 
washers for attachment to the pole 
 Line post insulator attachment fittings. 
The  fitting  shall  not  compromise  the  strength  of  the  pole  and  if  required  spacers  shall  be  installed  to 
avoid compression of the pole. 

Pole fittings shall be manufactured from the materials specified. They are to be supplied complete with 
all necessary nuts, bolts and washers to attach the respective equipment to the pole. 

Line  post  insulator  fittings  are  to  enable  line  post  insulators  to  be  mounted  at  an  angle  of  15  degree 
from horizontal. The fitting shall be designed to support a 4 kN vertical load and 3 kN horizontal load. 

8.7.4 Nuts and bolts 

Nuts and bolts shall conform to ISO recommendation, for metric threads and spring washers to ISO 630 
strength 41 kg/mm² or more. Nuts and heads of all bolts shall be of the hexagonal type and of outline 
dimension. 

All  washers  are  to  be  included  under  this  contract,  including  locking  devices  and  anti‐vibration 
arrangements,  which  are  to  be  subject  to  the  approval  of  the  employer.  The  washers  shall  be  of 
adequate  thickness  to  abridge  the  projection  of  the  shaft  and  the  commencement  of  the  in  readed 
portion. 

Nuts shall be finger tight on the bolt and will be rejected if they are considered to have an excessively 
loose or tight fit. Bolts with re‐cut threads after galvanizing will be rejected. 
   

48    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.8 Concrete poles 

8.8.1 General 

This  specification  includes  the  design,  manufacture,  testing,  and  delivery  to  site  of  concrete  support 
poles. The types of poles that may be used are: 
 R/f concrete poles of square, rectangular, or round cross section manufactured in one piece 
The  supplier  should  provide  poles  that  are  of  a  standard  design  and  which  best  meet  or  exceed  the 
requirements  set  out  in  this  specification.  All  material  shall  be  new  and  conform  to  the  relevant 
standard specifications referred to in this specifications in all respects. 

8.8.2 Standards 

The equipment supplied shall conform to the latest edition of the appropriate recognized international 
standards. In particular: 
 ISO 3839    classification by compressive strength. 

8.8.3 Inspection and testing 

The manufactured items will be inspected at the manufacture’s plant by a representative appointed by 
the  employer.  Tests  shall  be  performed  in  accordance  with  this  specification  and  with  the  relevant 
standards. The following definitions apply to this specification: 
a) Failure:  inability  of  the  pole  when  under  test  to  support  future  load  or  when  deformation  or 
buckling of the pole renders it unserviceable. 
b) Longitudinal direction: the horizontal direction parallel to the run of the conductors. 
c) Transverse direction: the horizontal direction at right angles to the run of the conductors. 
d) Ultimate strength: the strength at which the pole will not accept any further applied force or when 
deformation or duckling or the pole renders it unserviceable. 

8.8.4 Manufacture of concrete poles 

The poles shall be made of r/f watertight concrete with minimum strength of 37 kN /mm² (C 30/37). The 
surface of finished poles shall be smooth. A few cracks with a width of less than 0.1 mm may be present. 
Pores  in  the  surface  may  be  present  depending  on  the  manufacturing  method.  The  total  area  of  the 
pores should be less than 5 cm². The mean depth of the pores shall be less than 3 mm. All poles shall be 
made in a professional manner in a factory with continuous quality control. 

8.8.5 Construction of concrete poles 

The deflection of the construction caused by horizontal and vertical loads shall be considered during the 
dimensioning. These loads including own weight should be multiplied by the safety factor of three (3). 
The deflections shall be verified by practical scale tests. The smallest thickness of covering concrete coat 
at reinforcement should be 25 mm. 

All poles should be made in a professional manner. The surfaces should be reasonably smooth and free 
from burrs or sharps objects. 

  Renewable Energy Guidelines  Nov. 2013 49
Volume 8 
Transmission & Distribution  

8.8.6 Concrete mixing 

All  concrete  shall  be  mixed  in  power  driven  mixers  and  the  concrete  making  materials  shall  be 
accurately measured to ensure the  production of  uniform batched of concrete. Volume  measurement 
shall  be  carried  out  using  well‐proportioned  gauge  boxes  or  automatic  weight  measuring  equipment. 
The  gauge  boxes  shall  be  loose  filled  with  the  material  being  measured  then  struck  off  level  with  a 
straight edge then discharged into the mixer. 

8.8.7 Consolidation of concrete 

All concrete shall be consolidated in the moulds using high frequency internal or external vibrators. The 
amount of vibration shall be uniform along the length of the mould and shall be carefully controlled so 
that  adequate  consolidation  of  the  concreter  is  achieved  without  causing  segregation  of  the  mix 
ingredients by over vibration.  

8.8.8 Protection and curing of concrete 

During the initial stage of hardening the concrete shall be protected from the direct rays of the sun and 
from  draying  winds.  The  moulds  containing  the  hardened  concrete  shall  not  be  disturbed  or  shifted 
unless  it  can  be  shown  that  such  movements  will  not  impact  any  damaging  stress  to  the  hardening 
concrete. All concrete shall be cured in an environment that ensures that it remains saturated or nearly 
saturated during the curing period. 

8.8.9 Dimensional tolerance of concrete poles 

The permitted variation from stated dimension or cross –sectional shape of the finished pole shall be as 
follows  
 Length:   +  50,  ‐10 mm  (allowances  shall  be  made  during  design  for  length  reduction  due  to 
prestress) 
 Straightness: +15 mm (deviation from a straight line joining the top and the widest dimensions at the 
butt) 
 Holes:   Size – 0+2 mm, Relative position +‐ 5 mm. 

8.8.10 Pole length, shape and design loading 

Each pole shall be manufactured in one piece. All holes for the mounting of equipment shall be made 
during production. 

The assembled standard overall length of the poles manufactured shall be 12 m.  

The standard design working loads in the transverse direction shall be as follows. 
   

50    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Table 8‐10: Concrete poles 
Height of pole  Buried length   Working Load*  Purpose 
(m)  (m)  (kg) 
12  1.8  400  MV, single circuit, small angles 
12  1.8  800  MV, tension, large angles,  
double circuit 
sub‐station 
Source: Own compilations 
*: Applied 300 mm below pole top 

Each pole shall be able to resist an independent load in the longitudinal direction of at least 25% of the 
transverse  loading.  The  ultimate  pole  top  load  to  be  used  for  designing  each  class  of  pole  shall  be  a 
factor of safety (F.O.S.) times the appropriate standard design working load. Ultimate design forces to 
be used for the pole design shall result from this load applied to the pole when held in the standard test 
frame specified in the pole testing section of this specification. The factor of safety shall be 2.5. 

8.8.11 Deflection 

The maximum to deflection under the design working load applied in accordance with the pole testing 
section of this specification shall be H/25 where H= total pole length. 

8.8.12 Testing of poles 

The tests given below apply to all concrete pole types. 

8.8.12.1 Type tests (destruction tests) 

These shall be carried out periodically to check the consistency of the standard of manufacture. 

8.8.12.2 Testing arrangement 

Poles shall be tested in the horizontal position in a testing bed. The pole shall be tested between two 
reaction posts of a width of not more than 300 mm. The lower reaction posts is to be located below the 
ground line mark, which is 1/6 of the total length of the pole. The upper reaction post is to be located 
bellow the ground line  mark, which is 1/6 of the total length of  pole. The  pole shall be loaded with  a 
suitable  device  300 mm  from  the  top  of  the  pole.  The  testing  arrangement  shall  be  provided  with 
sufficient  supports  to  ensure  that  bending  moments  developed  by  the  self‐weight  of  the  pole  are 
minimal.  These  supports  shall  be  detailed  to  give  no  horizontal  resistance  to  the  applied  loads.  The 
accuracy of all load and deflection measuring equipment shall be +/‐2 percent. 

8.8.12.3 Test  

These shall be carried out before full‐scale manufacture of a class of pole commences; after any change 
are made to the approved design of a class of pole. 

A  sample  consisting  of  three  poles  selected  at  random.  similar  in  all  essential  features  of  design  and 
construction  to  those  purchases,  shall  be  subjected  to  the  type  test  and  must  give  evidence  that  the 
poles comply with the acceptance criteria of this specification. The test shall be carried out in 2 stages. 

  Renewable Energy Guidelines  Nov. 2013 51
Volume 8 
Transmission & Distribution  

1st stage: 
The load shall be gradually and uniformly applied in increments of 10% of the ultimate design load up to 
120%  of  the  design‐working  load.  At  each  increment  of  load  the  deflection  of  the  pole  type  shall  be 
measured.  

The 120% loading shall be maintained for 5 minutes. The load shall then be gradually reduced to zero 
and the amount of permanent deflection of the pole tip recorded. 

2nd stage: 
The  test  load  shall  be  gradually  reapplied  up  to  the  design  working  load  and  the  deflection  recorded. 
The  load  shall  then  be  increased  in  10%  increments  until  failure  accrues.  At  each  load  increment  the 
load and deflection shall be recorded.  

The following particulars shall be recorded for each test made: 
 Manufactures name and plant location 
 Pole classification and type 
 Dimensions of the pole 
 Date manufactured 
 Date tested 
 Increments of load 
 Deflections at each increment of load 
 Permanent deflection after removal of 1st stage loading 
 Load at failure  
 Nature of failure 
 Colour photographs along the axis of the pole at design working and ultimate loads plus photographs 
of the failure zone on the pole. 
The poles shall be considered acceptable if: 
 Permanent deflection of the tip of the pole, after the 1st stage loading is removed, does not exceed 
1 mm per meter of pole length. 
The average failure load of the three poles tested equals or exceeds the ultimate design load and the 
failure load of any single pole is not less than 0.90 times the ultimate design load. 

This shall be  carried out on poles selected at random by  the  Employer at the rate of per  100% of the 


design‐working load. 

The  poles  will  be  considered  acceptable  if  the  defection  at  each  load  increment  and  the  permanent 
deflection upon removal of load does not exceed by more than 15% the average of the acceptable tests 
of the corresponding values for 1st stage loading of the type tests. 

Failure to satisfy acceptance criteria  
In the event that a pole does not satisfy any of the above acceptance the Supplier shall modify his pole 
design or construction procedure to increase the strength of the pole. Poles manufactured in the same 
manner as those that have failed the acceptance tests may be rejected. 

52    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.9 Wooden poles 

8.9.1 Applicable standards 

The  treated  wooden  poles  shall  be  in  accordance  with  the  latest  editions  of  the  standards  specified 
below and amendments thereof. 
 ANSI 05.1 2002 ‐ Specifications & Dimensions for Wood Poles 
 ASTM D 1036‐58 1990 ‐ Standard Test Methods of Static Tests Wood Poles 
 BS 1990 ‐ Specification for Wood Poles for overhead lines (Power & Telecommunication Lines). Part 1 
‐1984 ‐ Specification for Soft Wood Poles. 
 BS 144 ‐ Wood Preservation using coal tar creosotes. Part I: (1990) ‐ Specification for preservative; 
Part II: (1990) ‐ Methods for timber treatment. 
 AWPA C1 ‐ All timber Products‐ Preservative Treatment by Pressure Process 
 AWPA C4 ‐Poles‐ Preservative Treatment by Pressure Process. 

8.9.2 Pole species 

Poles  shall  be  made  of  wood  and  will  have  a  minimum  fibre  strength  of  45  N/mm2.  Species  of  wood 
poles shall preferably be as given in the above mentioned American National Standard but local wood 
poles  of  the  species  Pine  (Pinus  Sylvestris),  Siberian  Pine  (Pinus  Sibirica)  and  Siberian  Larch  (Larix  Si‐
birica) shall be acceptable if they comply with this specification. Any refractory species offered (such as 
Douglas  Fir,  in  general  the  larches)  must  be  incised  at  the  ground  line  section.  For  refractory  species, 
only strength tests after incision shall be valid. 

8.9.3 Defects 

8.9.3.1 Prohibited defects 

In  all  poles,  the  width  of  sapwood  from  the  butt  of  the  pole  to  1m  above  the  proposed  ground  level 
must be a minimum of 25mm and for the rest of the pole not less than 20mm.Poles shall be free from 
rot, cracks and defects that may reduce the strength of the pole, render it difficult to climb or make it 
visually unacceptable. Elliptical poles shall not be accepted. 

Specifically, the following defects shall be prohibited: 
 cross breaks (cracks); 
 decay except as indicated in 2.2.4 and 2.2.5 for firm red heart, defective butt and decayed knots; 
 evidence of fungal fruiting bodies or mycelium in a pole shall be considered as evidence of decay and 
the pole shall be permanently rejected as non‐conforming; 
 dead streaks; 
 holes, open or plugged, other than those provided for in the specification or drilled for test purposes, 
which shall be treated and plugged with treated plugs; 
 defective butts and hollow butts or tops, except as permitted under pith centres; 
 marine borer damage; 
 nails, spikes, and other metal not specifically authorised by the Purchaser; 
 double sweep; 
 mechanical damage; 
 insect damage. 

  Renewable Energy Guidelines  Nov. 2013 53
Volume 8 
Transmission & Distribution  

8.9.3.2 Permitted defects 
The following defects may be permitted: 
 firm red heart provided that it is not present in more than 10 % of the cross section and that it is not 
accompanied by softening or other signs of disintegration or decay of the wood; 
 hollow  pith  centres  in  tops,  butts  and  knots  are  permitted  in  poles  that  are  to  be  given  full  length 
preservative treatment; and 
 sap stain that is not accompanied by softening or other disintegration or decay of the wood. 

8.9.3.3 Limited defects 

The following defects are permitted to the degrees stated: 
 bark  inclusions:  depressions  containing  bark  inclusions  provided  they  are  not  deeper  than  50  mm, 
measured from the surface of the pole; 
 defective butts: hollowing in the butt caused by splinter pulling in felling the tree is permitted, pro‐
vided that the area of such a hollow is less than 10 % of the butt area; 
 knots: individual knots with diameters less than one sixth of the pole girth at that point in the pole 
are acceptable. The sum of diameters of sound knots in the worst 150mm length of pole should not 
exceed one third of the pole girth at that point; 
 scars: a scar is the result of injury to the living tree which has begun to compartmentalise and a sign 
that the injury is being contained. 
 sound scars on the pole surface are permitted, provided the damage was not done after the tree was 
cut, provided the scars are smoothly trimmed and do not interfere with the cutting of any grain and 
provided that: 
 the  circumference  at  any  point  on  trimmed  surfaces  located  between  the  butt  and  600 mm  below 
the ground line is not less than the minimum circumference specified at 1.5 m from the butt for the 
class and length of the pole; and that 
 the depth of the trimmed scar is not more that 50 mm if the diameter is 250 mm or less, or 20% of 
the pole diameter at the location of the scar if the diameter is more than 250 mm. 
 However, no pole shall have a scar or turpentine cut face located within 600 mm of the ground line. 
Turpentine  scars  need  be  trimmed  only  to  the  extent  necessary  to  examine  evidence  of  fungus  in‐
fection and insect damage; 
 shakes: shakes in the butt surface which are not closer than 50 mm to the side surface of the pole are 
permitted, provided they do not extend to the ground line. 
 shakes or a combination of connected shakes which are closer than 50 mm to the side surface of the 
poles are permitted provided they do not extend further than 600 mm from the butt surface and do 
not have an opening wider than 3 mm. 
 However,  shakes  in  the  top  surface  are  permitted  in  poles  that  are  to  be  given  fully  length  pre‐
servative treatment, provided that the diameter of the shake is not greater than half the diameter of 
the top of the pole and that it is not closer than 50 mm from the surface; 
 splits and checks: two checks of approximately the same width, each check terminating at the pith 
centre and separated by 12.5 mm or less of wood fibre at any point on the pole circumference, shall 
be considered a single continuous check. 
Splits and checks shall be permitted provided that: 

 a split or a combination of two single checks on pole top (each check terminating at the pith centre 
and  separated  by  not  less  than  one  sixth  of  the  length  of  the  circumference)  having  one  or  both 
portions located in a vertical plane within 30° of the top bolt hole shall not extend downward along 
the pole more than 150 mm. All other splits or combination checks shall not extend downward along 
the pole more than 300 mm; and that 
 a split or a combination of two single checks on the butt of the pole, shall not extend upward along 

54    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

the pole, in its entirety, more than 600 mm. 

8.9.4 Inclination 

The  maximum  deviation  from  the  vertical  allowed  is  25 mm  for  each  3 m  of  length  between  the 
respective measuring point for more than 90% of the batch. In the rest of the batch, the poles may have 
a maximum deviation of 25 mm for each 1.8 m of length measured as above. 

8.9.5 Dimensions 

The wooden poles shall be made of the standard size of wood poles shown in Table 8‐11. The poles shall 
conform to the following dimensional requirements. 

Table 8‐11: Pole dimensions 
Pole Class  Nominal Pole  Min. Pole Top Diameter  Min. Dia. 1.5m from 
Length (m)  (mm)  Butt (mm) 
Light  6.0  95  125
  7.2  120  200
  9.2  135  230
Medium  6.0  120  160
  7.2  150  235
  9.2  150  250
Stout  6.0  120  185
  7.2  170  255
  9.2  170  270
Note: All wooden poles are to be mounted onto concrete supports above ground. 
Source: Own compilations

8.9.6 Tolerances 

All measurements are under bark and 5 mm shall be allowed for dressing. Lengths shall be measured to 
the short end of the slope and diameters at the minor axis. Poles shall be not more than 75 mm shorter 
or 150 mm longer than the nominal length. 

8.9.7 Preservative treatment 

Long life is a prerequisite for poles and preservative treatment is essential. It is recommended that poles 
complying  with  this  standard  have  an  average  life  of  30  years.  All  wood  poles  supplied  shall  be 
preserved by means of either 
 Coal Tar Creosote Type 2 according to latest issue of BS:144; or 
 Copper/Chromium/Arsenic Compositions (CCA) ‐ according to latest issue of BS:4072. 
Before either of the two preservative treatments is applied, the poles shall be seasoned. Poles may be 
partially conditioned by natural air seasoning or by forced air circulation, and further conditioned by kiln 
drying. 
For  air  seasoning,  the  poles  shall  be  segregated  according  to  their  species  and  stacked  to  leave  a 
minimum  ground  clearance  of  300 mm.  On  completion,  the  stacks  should  appear  level  and  balanced. 
The runners between each deck must support each other. In the construction and dismantling of stacks, 
poles shall be rolled to and from handling machinery. Under no circumstances are poles to be pulled in a 
ramp from an intermediate floor. All poles must be stacked within two weeks of delivery. 

  Renewable Energy Guidelines  Nov. 2013 55
Volume 8 
Transmission & Distribution  

Air seasoned poles dried by natural air circulation shall be checked to the heartwood. The final moisture 
content  before  preservative  treatment  shall  be  measured  by  a  resistance  meter,  both  at  a  depth  of 
38 mm (1.5 in.) and at the sapwood line, and in neither case shall it exceed 28 %. Extreme care shall be 
taken to ensure that air seasoned poles do not have pre‐treatment decay in them. The poles shall not be 
heavily stained. 
The company's inspector may have all dry poles subjected to a piece by piece inspection, immediately 
prior to preservative treatment, during which all poles shall be rolled. Samples shall be taken up to the 
pith centre to determine whether the poles have been sterilised before or during treatment. 
Before preservative treatment, all poles shall be dressed, drilled and marked. 

Coal tar creosote for wood preservation 
The preferred preservative treatment is creosoting. Both the specifications of the coal tar creosotes and 
the treatment process must be in accordance with the latest issue of BS 144: Wood preservation using 
coal  tar  creosotes  and  BS  913:  Wood  preservation  by  means  of  pressure  creosoting.  Alternatively  a 
treatment  according  to  AWPA  C1 and  AWPA  C4 should  be  acceptable.  In  both  cases,  preservative  net 
retention shall be, at least, 160 kilograms per cubic meter. 
The creosote shall not contain more than 3 % water when in use and it shall be kept at a temperature 
between 85 °C and 100 °C during the pressing period. 
Sample  boring  shall  be  taken  from  each  charge  and,  if  found  satisfactory,  the  batch  will  be  accepted. 
After treatment, the poles shall be stacked as outlined above and held for sufficient time to ensure the 
supply of dry poles. 

Copper/chrome/arsenate composition for wood preservation 
The preservation treatment for wood poles is by means of Copper/Chrome/Arsenate composition (CCA). 
Both  the  specifications  of  Copper/Chrome/Arsenate  composition  (CCA)  and  the  treatment  process, 
pressure impregnating must be in accordance with the latest issue of BS 4072. Copper is the fungicide 
and  Arsenic  the  insecticide.  Chrome  acts  as  s  fixing  agent,  reacting  with  the  Copper  and  Arsenic  once 
impregnated  into  the  timber.  Then  it  forms  non‐soluble,  leach‐resistant  compounds  affording 
permanent protection to the timber. 
Preservative net retention shall be, at least, 20 kilogram per cubic metre. After treatment by means of 
CCA ‐ Tanalith, the poles shall be re‐dried and they shall be used only after, at least, fourteen days to 
ensure use of dry poles. 
After  treatment,  a  boring  or  borings  shall  be  undertaken  with  a  test  borer  not  less  than  1.5  m  from 
either  end  of  each  pole  of  a  sample  of  the  poles  in  the  charge.  The  extent  of  penetration  of  the 
preservative shall be determined in accordance with latest issue of BS 5666: part 2. If found satisfactory, 
the whole batch will be accepted. 

Temperature and pressure gauges 
The  temperature  and  pressures  in  the  cycle  must  not  be  exceeded  in  both  methods  of  wood 
preservation. They shall be recorded on a recording chart and shall be verified by visual observations of 
the  direct  reading  gauges,  at  least  hourly  throughout  the  treating  cycle,  by  the  treating  operator  or 
Purchaser's inspector. 
In addition, all temperature and pressure gauges shall be serviced annually and be certified that they are 
in good working order. They shall also be calibrated at regular intervals, as per the Contractor's quality 
assurance  programme.  One  copy  of  the  service  and  calibration  certificates  must  be  submitted  to 
Purchaser by the Contractor together with the Tender or bid documents. 
   

56    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.10 Lattice steel poles  

8.10.1 Scope of supply 

Suppliers  are  called  upon  to  deliver  lattice  steel  poles  and  cross‐arm  for  the  installation  of  medium 
voltage (11 kV), distribution network. 

The Japanese Industrial Standards (JIS) are to be considered in the design, manufacture and testing of 
the above mentioned materials. Similar or equivalent international standards such as BS or DIN shall be 
treated likewise. Specifications and quantities are stated in the following items. 

8.10.2 Technical specification 

8.10.2.1 Technical requirements 

System data 

The system data are compiled in the Table below. 

Table 8‐12: System requirements 
Item  Value 
Nominal voltage  11 kV 
Maximum voltage  12 kV 
Conductor  3‐phase, 3‐wire, delta, 
120/20 mm² ACRS 
Pole spacing  80 m 
Max sagging  2 m 
Pole height  12 m above ground 
Short circuit breaking current  25 kA  
Source: Own compilations 

Material 

The poles shall be made from hot rolled I‐joists and angle‐steel sections with steel plates specified in JIS‐
G‐3101  (STK‐51)  or  in  accordance  with  BS  4360  (Steel  52)  or  in  DIN  17100  or  in  accordance  with  any 
international equivalent standard with considering the design factor of safety equals to (2.0) having the 
following properties: 
   

  Renewable Energy Guidelines  Nov. 2013 57
Volume 8 
Transmission & Distribution  

Table 8‐13: System requirements 
Item  Unit*  STK‐51  St 52 (BS 4360)  St 52 (DIN 17100) 
Tensile strength  N  510  520  5230 
Yield strength  N  360  360  345 
Design bending stress  N  255  260  260 
Source: Own compilations 
*: at 2 min 

Materials for A‐clamps used at the top of (12 m lattice steel poles) and cross‐arms shall be made of hot 
rolled structural carbon steel in accordance with the same specifications above but either STK‐51, Steel‐
52 (to BS or DIN) having the following mechanical properties:  

8.10.2.2 Lattice‐steel poles 

Each  medium  voltage  lattice  steel  pole  shall  be  made  out  of  two  Nos.  I‐steel  joists  which  are  to  be 
welded together and cross‐braced with angle iron size (30×30×3) of steel (ST‐41) or (ST‐37) or any equiv. 
forming the shape of latter (A) as shown in drawings No. (2). I‐steel sizes for low voltage is as follows: ‐ 
 (140×66×5.7x8.6) ST‐52 according to DIN‐17100 
 150×75×5.5x9.5) STK‐51 according to JIS‐G‐3101. 
 Any equivalent sections ST‐51, ST‐52 according BS‐4360. 
And any other size having the same modulus of section shall be acceptable. 

Maximum working loads is 7 kN. 

The underground portion of the steel pole shall be at minimum 2 m 

The whole pole shall be hot‐dip galvanized according to BS 729. 

Each of the lattice steel poles shall have an earthing hole (18 mm dia.) located at the center of the lower 
plate for earthing purposes. 

Every  steel  lattice  ole  shall  be  supplied  with  (11  Nos.)  electrically  galvanized,  high  stress,  hexagonal 
headed (M‐16) fully threaded bolt (35 mm) length of screw with nut, plain washer & spring washer as 
they are used as follows. 
 (10 Nos.) for the 2 rows of (5x18 mm) dia. holes of each pole 
 (1 No.) for the (18 mm) dia. earthing.  
All bolts, nuts etc. shall be firmly tightened in their places on the poles at 

The poles shall be supplied with 5% spare bolts, nuts, etc.  

8.10.3 Testing 

All  materials  under  contract  shall  be  tested  at  the  manufacturing  works  to  verify  compliance  to  our 
specifications.  

Mill  certificates  shall  submitted  for  all  steel  material  like  joist,  angel‐steel,  steel  plates,  channel  steel, 
bolts, nuts, etc. 

Dimensional  tests  in  quantities  not  less  than  (5%)  of  the  quantity  of  each  batch,  taking  into 
consideration that eccentricity between top and bottom part of the pole shell not exceed 1/1000. 

58    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Loading tests (type test) 

Table 8‐14: Loading test 
Load  Measuring item  Acceptance criteria 
Work load (Ps)  Specified working load  No any defect 
Permanent load  Ps x 1.5 load  No any defect; 13 mm allowable 
inclination 
Breaking load  Ps x 2.0 load  destruction 
Source: Own compilations 
*: at 2 min 

The load test shall be carried out on 1% per each batch of 500 nos. 

8.10.3.1 Alternative design: 

The Supplier may offer an alternative design for the lattice poles, but the new design shall comply with 
the above standards and minimum requirements. 

8.10.4 Cross‐arms 

The  cross‐arm  shall  be  used  to  support  insulators  carrying  bare  aluminum  conductors  on  the  medium 
voltage poles (12 m). 

The crossarms shall be made of section (channel steel) (ST‐41), (ST‐42), (ST‐44) or any equiv.  

Flat steel, bolts, nuts and washers according to (JIS‐G‐3101 and JIS‐G‐1186) or equivalent. All steel work 
shall be hot dip galvanized to BS 729 but bolts nuts; washers shall be electrically galvanized. 

As an option the poles could be painted type with two anti‐oxide (red laite) paint layers with cross arms. 
All bolts and nuts to be electrically galvanized. 
   

  Renewable Energy Guidelines  Nov. 2013 59
Volume 8 
Transmission & Distribution  

8.11 Distribution transformers 

8.11.1 Scope of work 

This  specification  covers  the  design,  manufacture,  factory  testing,  packing,  delivery  and  installation  of 
oil‐filled  three‐phase  distribution  transformers  with  a  rated  capacity  of  50  –  500 kVA  for  outdoor 
installation. The transformer shall be designed for outdoor operation and continuous service.  

The  equipment  and  materials  to  be  supplied  in  accordance  with  this  specification  shall  conform  to  all 
latest applicable standards of sponsor organization as follows: 

Unless specified otherwise or modified herein, all IEC standard directly or indirectly applicable including 
parts and addenda. Specific Standards include, but are not necessarily limited to the following: 

IEC 60076  Power transformers 

IEC 60137  Insulating bushings for alternating voltages above 1000 V 

IEC 60296  Specification for unused mineral insulating oils for transformers and switchgear 

IEC 60722  Guide to the lightning impulse and switching impulse testing of power transformers and 
reactors. 

8.11.2 Testing and inspection 

8.11.2.1 General notes for test 

The inspection and test listed hereinafter shall be carried out in accordance with the provisions in the 
applicable IEC standard supplement by the specific requirements indicated hereinafter. 

In the absence of IEC standards, the inspection and tests shall be carried out in such manner as to be at 
least  equivalent  to  conditions,  provisions  and  definitions  set  out  in  one  of  the  standards  listed  in  this 
specification. 

8.11.2.2 Acceptance test 

The acceptance test procedure for any delivery of the equipments is as follows: 

Visual inspection 
 Inspection of the complete equipment 
 Checking of the result of the routine and type test 
 Carrying out all or part of tests mentioned in the routine test 
 Checking of conformity to specification. 

8.11.2.3 Routine test 

These tests shall be carried out on each individual of the equipment supplied, at the manufacture’s work 
to ensure that the product is in accordance with the equipment on which the type has been carried out. 
The  manufacturer  shall  supply  a  certificate  giving  the  result  of  the  entire  test  carried  out  on  the 
equipment. 

These tests shall include: 
 Power‐frequency test (insulation testing) 

60    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 Resistance test 
 No‐load test 
 Short‐circuit test 
 Measurement of transformation ratios 
 Certification of the absence of PCB 
A test report containing the test results is to be drawn up for each transformer. 

8.11.2.4 Type test 

The  following  tests  are  to  be  performed  on  the  specimens  produced  in  accordance  with  these 
specifications or certified through relevant Type Test Certificates issued by a recognized institution: 
 Temperature‐rise test 
 Noise tests with frequency analysis on all four sides 
 Verification of short‐circuit strength, 3 tests for each leg lasting 0.5 sec. 
 Impulse voltage test with full wave and with chopped impulse wave 
 Leak test on the tank (leak test of the transformer for 24 h) 
 Resistance test 
 Measurement of transformation ratios 
 No‐load test 
 Short‐circuit test 
 Insulation testing (testing with applied power‐frequency withstand voltage) 
 Induced‐voltage test (testing with induced power‐frequency withstand voltage). 

8.11.3 Specific requirements 

8.11.3.1 Design 

The  transformers  supplied  shall  be  of  hermetic  design.  All  active  parts  –  e.g.  the  core,  windings  and 
internal  connections  –  must  be  immersed  in  insulating  liquid.  The  connections  are  to  be  executed  as 
follows: 

HV side:  Outdoor bushing conforming to standards 

LV side:   Outdoor bushing conforming to standards with flat connector 

The  operating  pressure  of  the  hermetic  transformers  shall  not  exceed  0.3  bars  as  measured  at  the 
standpipe.  In  addition,  the  dimensions  of  the  tank  must  also  take  into  account  the  case  that  under 
normal operating conditions the transformers will be run at a load of 140% of the rated power SN. The 
difference  between  the  maximum  operating  pressure  and  the  burst  pressure  of  the  tank  must  be  at 
least 0.3 bars. The standpipe and other filling plugs are to be welded to the tank cover. 

Cooling method 
ONAN (oil‐natural, air natural cooling). 

Windings 
 US  Winding made of Cu or Al, strip winding 
 OS  Layer or coil winding made of Cu or Al wire with varnish insulation. 

  Renewable Energy Guidelines  Nov. 2013 61
Volume 8 
Transmission & Distribution  

Degree of protection 
IP54 with IP00 terminal connections. 

Interconnecting cables 
No  riveted,  screwed  or  soft‐solder  connections  may  be  used  in  the  wiring  and  cabling  between  the 
winding and the points of connection of the bushing or an off‐circuit tap changer. 

Tank 
 Material: Sheet steel 
 Hermetically sealed elastic corrugated walls 
 The  changes  in  volume  of  the  liquid  coolant  occurring  during  operation  must  be  reliably 
accommodated. 

Cover 
Screw design 
Sheet thickness:   6.0 mm (opposite surface about 4 mm) 
Seals:  Asbestos‐free, oil‐resistant, resistant to heat and insulating liquid. 
The seals on the bushings may not be larger than the bearing areas of the 
bushings 
Links:  2 pieces for cable attachment (cable grip). 

Tank bottom 
 Thickness of tank bottom: less than 4 mm 
 Oil drain device 
 Pursuant to IEC 60076. 

Equipment and accessories 
The transformers are to be fitted with the following accessories: 
 Earth connections 
 Lifting eyes 
 Oil level indicator 
 Fillers 
 Pocket for contact thermometer 
 Spark gaps on the HV bushing 
 Locking device for the off‐circuit tap changer. 
The terminal connections are to be marked as follows: 
 Embossed brass plates on the cover assigned to the connections, coated together with the cover. 
 Marking for the HV side:  A  B  C 
 Marking for the LV side:  a  b  c  0. 

Corrosion protection 
Hot  galvanising  (including  all  metal  mounting  parts)  and  an  additional  priming  coat.  The  intermediate 
and top coats are to be in iron mica coating (light grey; total coat thickness: 150 µm) or powder coating 
of the same quality. All sealing surfaces are to be furnished with durable corrosion protection. This is to 
be certified in a suitable manner. 

62    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

External connecting elements, mounting parts and small accessories (e.g. bolts, screws, nuts, as well as 
external  parts  of  the  off‐circuit  tap  changer)  must  all  be  made  of  non‐corroding  material,  preferably 
stainless steel. No galvanised screws are to be used. 

Insulating liquids 
The  transformers  may  only  be  filled  by  the  manufacturer  with  one  insulating  liquid  each.  Mixing 
different products or products from different suppliers is not permissible. Insulating liquid free of PCB 
which  can  be  mixed  with  insulating  oil  corresponding  to  a  common  standard  is  to  be  used.  The 
manufacturer and type of insulating liquid used are to be indicated for each transformer, e.g. in the test 
report. The type of insulating liquid, e.g. “Mineral oil‐based insulating oil pursuant to DIN VDE 0370” is 
to be indicated on the rating plate of each transformer.  

Certification of the absence of PCB is to be submitted for each transformer. 

Other requirements 
The design of the transformers must also observe the following: 
 After delivery, the transformers must be ready for use without any additional preparation (such as 
tightening seals etc.) 
 The transformers must be guaranteed maintenance‐free for at least three years following delivery 
 All  components,  materials  and  accessories  used  must  conform  with  the  relevant  standards  or 
demonstrably comply with the recognised state of the art 
 The transformers may not include any substances containing PCB or asbestos; nor may they contain 
any halogenated hydrocarbons. The absence of such substances must be stated on the rating plate. 

8.11.3.2 Labeling and marking 

Transformers shall be provided with a rating plate, which can be moved and affixed to any side of the 
transformer.  It  shall  be  written  in  English  language.  All  information  has  to  be  clearly  and  indelibly 
marked or engraved. The following information shall be given: 
 Manufacturer name 
 Type 
 Year of manufacture 
 Serial number  
 Operating mode 
 Cooling method 
 Rated frequency 
 Transformation ratios 
 Rated current LV and HV 
 Rated power 
 Connection symbol 
 Total weight 
 Mass of insulating oil 
 Oil type. 

  Renewable Energy Guidelines  Nov. 2013 63
Volume 8 
Transmission & Distribution  

8.11.4 Electrical DATA 

8.11.4.1 Short circuit currents 

The  transformers  shall  withstand  the  thermal  and  mechanical  effects  of  any  short‐circuit  that  can 
appear at the terminal of any winding. The short‐time current (1 sec rms) rating shall be 22 kA. 

8.11.4.2 Insulation level 

The transformers shall be designed for the following insulation levels: 
 Highest equipment Voltage: 12 kV 
 Basic impulse level as per IEC 76: 
 Impulse Test Voltage 1.2/50ys: 95 kV 

8.11.4.3 Rated power 

The rated output at +45°C maximum ambient temperature is chosen from the respective reports: 

8.11.4.4 Rated voltage 

Three Phase: 11.000/400 V 

The rated secondary voltage shall be 400/230 V. 

8.11.4.5 Off‐load tap changer 

The  high  voltage  windings  shall  be  provided  with  an  off‐load  tap  changer  providing  a  neutral  position 
and 4 positions. Each step shall be 2.5%; total ratio selection is ±5% in 5 steps. The off load tap changer 
shall  have  an  external  mechanism  for  manual  operation.  Tap  positions  shall  be  clearly  identified.  The 
operating mechanism shall have an effective blocking device for locking of tap changer at any desired 
position. 

8.11.4.6 Vector group 

The vector group shall be Dyn5. 

8.11.4.7 Losses 

Subject  to  compliance  with  the  technical  requirements,  commercial  conditions  and  delivery 
requirements,  tenders  will  be  assessed  on  the  basis  of  the  least  “Present  Worth”  of  capital  cost  plus 
guaranteed losses 

The acceptance of transformers yielding component losses higher than the guaranteed values shall be 
governed by the following: 
Case A  Component losses in excess of guaranteed values, but within the tolerances 
permitted under IEC 76‐1. 

Transformers  under  Case  A  shall  be  acceptable  subject  to  full  compliance  with  all  other  technical 
particulars  including  temperature  rises  at  continuous  maximum  rating  and  subject  to  the  Supplier 
accepting the imposition of penalty charges for each kW or part thereof component losses in excess of 
the guaranteed values, at the loss evaluation rates mentioned above. 

64    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Case B  Component losses in excess of guaranteed values and exceeding the tolerances 
  permitted under IEC 76‐1. 

The acceptance of transformers under Case B shall be entirely at the discretion of the Client and subject 
to the Tenderer accepting the imposition of penalty charges of each kW or part thereof of component 
losses in excess of the guaranteed values, at the loss evaluation rates mentioned above. 

In  the  case  of  transformers  yielding  component  and  total  losses  which  are  equal  to  or  below  the 
guaranteed  values,  the  Supplier  will  not  be  entitled  to  any  premium  in  respect  of  reduction  in  losses 
below the guaranteed values. 

No load losses USD 6,500 per kW 

Load loss USD 1,500 per kW. 

Rejection 
The Purchaser shall reject any transformer if during tests any of the following conditions arise: 
 No load loss exceeds the guaranteed value by 15% or more. 
 Load loss exceeds the guaranteed value by 15% or more. Combined loss exceeds beyond guaranteed 
value by 10% increase or more. 
 Impedance value exceeds the guaranteed value by + 10% or more. 
 Oil or winding temperature rise exceeds the specified value. 
 Transformer fails on impulse test. 
 Transformer fails on power frequency voltage withstand test. 
 Transformer is proved to have been manufactured not in accordance with the agreed specification. 

8.11.4.8 Impedance 

The percentage impedance at 75°C shall be 4% for transformer rating up to 630 kVA and shall be 6% for 
transformer rating more than 1,250 kVA subject to tolerance as per IS IEC‐76‐1, Table‐1 at normal tap. 

8.11.4.9 Flux density  

Flux density:   

Flux density at normal voltage and frequency at any tap shall not exceed for high grade CRGO, (Grade‐
MOH or better), Silicon Steel Laminations: 1.60 Tesla. 

Over fluxing: 

Over flux in the transformer core shall be limited to 12.5% to ensure that in the event of over‐voltage to 
the extent of 12.5%, the core is not saturated. The maximum flux density in any part of the CRGO core 
under such condition shall not exceed 1.9 Tesla. Necessary design data shall be supplied in this regard. 

8.11.4.10 No load current 

No  load  current  at  100%  voltage  shall  not  be  more  than  2.5  %  of  the  full  load  current  and  shall  be 
subject to tolerance as per IEC. No load current at 12.5% over voltage shall not exceed 4%. The supplier 
shall furnish necessary design data in support of this stipulation. 

  Renewable Energy Guidelines  Nov. 2013 65
Volume 8 
Transmission & Distribution  

8.11.4.11 Protection against transients 

In order to ensure that the transformers will withstand lightning/ disturbances, the impulse withstand 
strength of transformers windings shall not be less than 95 kV peak for 11 kV. 

The high voltage bushings of all transformers shall be provided with single gap arcing horns (adjustable).  

8.11.4.12 Overloading 

The transformer shall be capable of being overloaded as per IEC‐354 up to 150% of rated load. The safe 
overload capacity of the transformer and duration of over load for satisfactory operation at site under 
maximum temperature conditions shall be clearly stated in the offer. The temperature limits under the 
specified  over  load  capacity  should  also  be  stated  &  there  shall  be  no  limitation  for  over  loading 
imposed by bushing, tap changer etc. or any other associated equipment. 

Bushings 
High  voltage  bushings  shall  be  created  to  withstand  the  highest  system  voltage  (12 kV).  It  shall  be 
possible to change the bushings without removing the transformer cover. Each bushing will be marked 
with  manufacturer  and  type.  The  out  creepage  distance  of  the  bushings  shall  be  not  less  than 
23 mm/kV.  The  insulation  levels  of  the  bushings  shall  be  at  least  equal  to  those  specified  for  the 
windings.  The  neutral  connection  shall  have  permanent  special  marking  which  is  different  from  the 
phase  connections.  For  pole  type  transformers  HV  bushings  shall  be  located  at  the  tank  side  remote 
from  the  pole.  The  HV  transformer  bushings  shall  be  equipped  with  line  clamps  suitable  for  the 
connection of ACSR conductors sized from 70 to 150 mm². The LV bushing shall be equipped with line 
clamps suitable to aluminum conductor XLPE insulated single core cables as below. The damps shall be 
complete with necessary screws, washers and nuts. 

8.12 Customer current meter boxes 

8.12.1 General requirements 

The  Meter  Boxes  (MBs)  are  for  use  in  the  low  voltage  distribution  system  to  achieve  simple  and  cost 
effective means of providing single phase and three phase connections to the customers. Meter boxes 
will be installed at poles from the secondary network to provide service connections to small groups of 
houses in their vicinity. 

They  shall  be  suitable  for  mounting  on  a  secondary  pole  or  wall  or  on  a  cast  concrete  plinth.  All 
necessary mounting bolts and wall plugs shall be supplied with the MBs. 

The meter boxes shall be suitable for outdoor use in the service condition stipulated in this specification.  

Single phase and three phase energy meters, bottom connected, shall be provided separately.  

8.12.2 Quality of materials 

All materials, whether fully specified herein or not, shall be of first class quality particularly with regard 
to  manufacture,  strength,  ductility  and  durability  and  shall  conform  to  the  best  modern  practice  and 
comply in all respects with these Specifications. 

All  material  shall  be  inspected  and  tested  in  full  to  prove  compliance  with  the  requirements  of  the 
Specifications.  The  testing  shall  be  carried  out  according  to  the  relevant  Standard  approved  by  the 
Engineer. 

66    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.12.3 Surface coating and galvanising 

All  iron  and  steel  used  shall  be  protected  against  corrosion  effects,  after  the  whole  fabrication  is 
completed, by galvanisation, metallization or paint applications. 

The surface coating shall be uniform, clean and smooth. The formulation and application procedure shall 
be as recommended by the manufacturer for the appropriate exposure conditions. 

The  preparation  for  surface  coating  and  the  coating  itself  shall  not  distort  or  adversely  affect  the 
mechanical properties of the materials. 

The colour of all top coats shall be approved by the PO if not described in detailed specification below. 

If  any  coated  part  is  found  to  be  imperfect,  such  part  must  be  replaced.  The  whole  of  the  expense 
involved in the replacement of the imperfect part shall be borne by the Supplier. 

8.12.4 Details of meter boxes 

8.12.4.1 Applicable Standards 

The  items  and  components  supplied  shall  be  in  accordance  with  the  later  editions  of  the  standard 
specified below and amendments thereof. 

IEC 60947 ‐ Low voltage switchgear and control gear. 
 Part 1 ‐1988 ‐ General Rules 
 Part 3 ‐1990 ‐ Switches, disconnectors, switch‐disconnectors and fuse‐combination units. 

8.12.4.2 Basic features 

The Meter Boxes (MBs) are used in the low voltage distribution system. 

The  box  shall  be  suitable  for  outdoor  mounting  on  house  walls,  poles  or  on  cast  concrete  plinth.  All 
necessary mounting parts as bolts, nuts, washers, pegs, screws shall be supplied with the MBs. 

Two types of meter boxes are foreseen: Meter box with three and six meter places.  

Meter boxes shall be equipped with  
 Metal  housing  (meter  box)  with  wiring  for  single  or  three  phase  kWh  meters  according  to  Bill  of 
Quantity 
 An installed three pole Mini Circuit Breaker (MCB) of 40 A at the incoming side 
 Installed mounting rails for meter  
 Installed phase, neutral and ground buses. 
 Terminal fittings 
 DIN rails for mounting of MCB and power limiter 
 Incoming supply and outgoing service cable connections 
 Mini circuit breaker for each outgoing service line. 
All of the above parts shall be pre‐mounted in the box, wired and ready for operation. In addition 
sufficient space for the installation of power limiters shall be foreseen. 

8.12.4.3 Design 

The meter boxes consist of a detachable metal box with hinged door on either side of the broad side. 

  Renewable Energy Guidelines  Nov. 2013 67
Volume 8 
Transmission & Distribution  

The  incoming  service  cable  is  connected  to  the  distribution  terminal  blocks  through  the  MCB  using 
suitable cable lugs terminations. Distribution cable terminations shall be mounted on either side of an 
insulated board and both termination shall be connected through a detachable link. 

The MBs shall locate three and six meter seats. The meter shall be equally connected to each incoming 
phase. 

8.12.4.4 Housing 

The  housing  shall  be  made  of  sheet  steel  with  a  minimum  thickness  of  BWG  16.  It  shall  provide 
protection class IP54 according to IEC 60529. 

All equipment shall be surface mounted on an interior panel, and shall be accessible from the front and 
protected by covers. 

A standard mounting rail shall be provided for MCB installation. 

The housing shall be equipped with a minimum 2 screened openings for ventilation. 

8.12.4.5 Terminals 

The terminal blocks shall be of the bolted type, with terminals of bronze or brass, suitable for stranded 
copper cable, up to 25 mm². 

There  shall  be  three  separate  terminal  blocks:  one  for  the  utility  cables  (Phases  A,  B,  C),  one  for  the 
customer cables, one for neutral and one for grounding. Each shall be fitted with a screwed, insulating, 
protective cover in the respective standard colour (green/yellow for grounding, blue for neutral). 

The  temperature  in  the  contacts  and  terminals  shall  be  within  the  specified  limit  as  per  IEC  947,  and 
shall not cause any damage of a nature which impairs the performance of the equipment. MBs shall be 
pre‐wired.  

The equipment shall be supplied complete with terminal fittings suitable for connecting PVC/XLPE 4*16 
to  4*25 mm²  Al  insulated  concentric  cables  for  the  incoming  connection  and  for  PVC/XLPE  2*8  to 
4*16 mm² Al isolated cables for customer connection. 

When  a  cable  termination  uses  two  fasteners,  the  order  of  tightening  shall  not  be  detrimental  to  the 
termination. If torque limiting devices are not used, the manufacturer shall mark the required tightening 
torque adjacent to the terminal fastener. 

The cable termination fasteners shall have hexagon heads of 12 to 18 mm across flats and be accessible 
using standard socket spanners. 

All metal parts under load shall be covered to prevent touching. 

8.12.4.6 Incoming main supply cable connections 

It shall have the provision for main supply cable from the secondary distribution network. Termination 
of the incoming cable and outgoing cables shall be suitable for use with cable lugs. 

8.12.4.7 Outgoing service cable connections 

The  conductor  terminals  and  the  fuse  contacts  shall  be  designed  and  proportioned  as  to  carry 
continuously its rated current without exceeding the maximum temperature as indicated in the relevant 
standards. 

68    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.12.4.8 Mounting rails 

Galvanised mounting rails shall be provided for mounting meters of bottom connected type, the MCB 
and eventually the power limiter. Galvanising shall conform to EN ISO 1461 or equivalent. 

8.12.4.9 Conduit clamps 

Cable  entry  shall  be  through  bottom  entry  conduits,  conduit  clamps,  galvanised  EN  ISO  1461  or 
equivalent, shall be provided. Sufficient traction relief shall be ensured for the cables.  

8.12.4.10 Locking devices 

Doors  are  to  be  fitted  with  padlock  holders  to  prevent  unauthorized  entry.  Triangular  headed  locking 
bolts shall be recessed and protected to exclude opening, except by use of key. Keys to fit these bolts 
shall be provided. 

8.12.4.11 Grounding 

The  MBs  shall  be  equipped  with  a  defined  grounding  point  for  connection  of  grounding  cable  of  10‐
35 mm² size. The  grounding connection shall be  marked with the grounding symbol. All  bolts washers 
shall be delivered with the MB. 

8.12.4.12 Testing 

The routine tests shall follow DIN VDE 0100, part 610. Test certificates shall be provided. 
   

  Renewable Energy Guidelines  Nov. 2013 69
Volume 8 
Transmission & Distribution  

8.13 Mini circuit breaker 

8.13.1 Scope 

Mini Circuit Breakers are installed to protect the electronic meter and the outgoing service cables until 
the in‐house fuses. They also allow to de‐energize the house connections for repair and maintenance. 

8.13.2 Basic features 

8.13.2.1 Scope of supply 

The  mini  breakers  are  used  in  the  low  voltage  distribution  system.  They  shall  be  pre‐mounted  in  the 
meter box and shall be delivered with all necessary mounting parts. 

8.13.2.2 Applicable standards 

The applicable standards are DIN VDE 0660/9.92 and IEC/EN 60947‐2. 

8.13.2.3 Design 

The MCBs shall be of modular type, (moulded compact case‐type) and designed of one piece type, be 
removable and interchangeable. The operating mechanism of the MCB shall be mechanically trip free.  

Insulated parts of the units shall be of a suitable reinforced plastic material which has, in addition, a high 
resistance to solar radiation. 

Any  current  carrying  parts  shall  be  of  non‐ferrous  metal  adequate  for  the  rated  current  capacity. 
Padlocking facilities shall be provided to accommodate the circuit breaker in an open position. 

MCB for customer shall have nominal currents of 40 A for incoming cables and of 24 A for single phase 
service and 40 A for three‐phase service connections and a minimum 10 kA breaking capacity, according 
to IEC 60947‐2 Low ‐ voltage switchgear and control gear ‐ circuit breakers. 

Rated Impulse Voltage shall be 6 kV and power withstand voltage shall be 2 kV 50 Hz 1 min. 

The  MCB  shall  have  thermal  and  magnetic  tripping  unit.  Tripping  characteristics  are  K  for  all  3‐Phase 
MCBs and Z for all single phase MCBs.  

The MCBs shall be mounted on DIN rail in the enclosure. 

The MCBs shall be pre‐equipped with terminals for cable connection. 

The Supplier shall provide all the characteristics, curves, dimensions of the MCBs used. 

Testing  and  inspection  will  be  carried  out  according  to  the  general  specifications.  Materials  and 
equipment will be inspected in the manufacturer's factory. 
   

70    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Table 8‐15: MCB‐Characteristics 
Item  230 V/1 phase  400 V/3 phase 
Rated voltage  230 V AC  400 V AC 

Frequency  50 to 60 Hz 
Cable capacity   Up to 25 mm² 
Life expectancy  >5,000 operations 
Maximum tightening torque  3 Nm 
Ambient temperature  ‐25°C to +55°C 
Nominal current  25 A  40 A 
Tripping characteristic  B  K 
Breaking capacity  6 kA  6 kA 
Source: Own compilations 

8.13.3 Additional requirements 

8.13.3.1 Packing 

All items shall be suitable packed to prevent damage due to rough handling. 

8.13.3.2 Documentation 

The Supplier shall supply along with the equipment relevant drawings and technical literature including 
installation, operation and maintenance instructions. 
   

  Renewable Energy Guidelines  Nov. 2013 71
Volume 8 
Transmission & Distribution  

8.14 LV aerial bundled conductors (ABC) 

8.14.1 General 

This specification applies to LV aerial bundled conductors. The aluminium standard cross sections are: 
 3x35 (phases) + 35 (Neutral messenger) mm² 
 3x50 (phases) + 50 (Neutral messenger) mm² 
 3x70 (phases) + 70 (Neutral messenger) mm² 
 3x95 (phases) + 70 (Neutral messenger) mm² 
 3x120 (phases) + 95 (Neutral messenger) mm². 
With  respect  to  electric  load  size  of  neutral  messenger  may  be  reduced  from  70 mm²  phase  size 
onwards. However, the Bidder has to justify that mechanical strength is sufficient to carry the cable load 
at the given average support distances (poles) of about 50 m.  
ABC cable are delivered in three types: 
1. ABC cables with all self‐suspension conductors are equally made out of insulated Aluminum with 
the same cross section. All four conductors are equally taking the line tension. 

2. ABC  cables  with  insulated  suspension  conductor  (mainly  the  neutral  or  messenger  is  used  for 
this). The 3 phase conductors are made of aluminium while the messenger is made of aluminium 
alloy. Only the neutral conductor takes line tension. 

3. ABC cables with bare suspension conductor (mainly the neutral or messenger) and three isolated 
equal phase conductors. The 3 phase conductors are made of aluminium while the messenger is 
made of aluminium alloy. Only the neutral conductor takes line tension. 
All three types are applicable. But is has to make sure that at least one conductor can take the tension 
load appearing at the chosen pole span and considering wind and other additional loads. Otherwise, a 
25 mm² steel wire shall be used for fixing the ABC cable and shall be included in the unit price. 

8.14.2 Applicable standards 

The  equipment  supplied  shall  confirm  the  latest  edition  of  appropriate  IEC  specifications  and/or 
recognized  international  standards.  In  particular:  DIN  VDE  0274,  IEC  60889,  IEC  509,  DIN  57  207,  DIN 
512210660/9.92 and IEC/EN 60947‐2. 

The  preferred  design  of  bundled  conductors  is  one  of  self‐supporting  phases  and  neutral  bundles, 
designated NFA2X and manufactured to VDE 0274, where the designation stands for: 

N  VDE standard 

F  overhead cable 

A  aluminium conductor 

2X  XLPE insulation. 

However,  other  designs,  such  as  a  bundle  with  a  magnesium  and  silicon  alloy  aluminium  catenary 
doubling up as neutral, stranded and or compacted Al conductor with Al alloy messenger, hard drawn Al 
conductor  and  messenger,  Al  stranded  conductor  with  steel  messenger,  not  manufactured  to  VDE 
standards  shall  also  be  considered,  as  shall  other  bundled  conductors  designed  and  constructed  to 
different international standards. However, in very case the Bidder has to justify and show that electric 
and mechanic strength are sufficient for the required electric and mechanic loads. 

72    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.14.3 Electrical characteristics 

Nominal voltage of ABC cables is 0.6/1 kV. 
 Dielectric strength: Cores shall be designed to withstand without breakdown the application of 10 kV 
voltage during 1 minute. 
 Impulse  withstand:  Cores  shall  be  designed  to  withstand  without  breakdown  a  standard  impulse 
voltage sequence 1.2/50µs of positive and negative polarity with a peak value equal to 20 kV. 
 Routine test: 4 kV/15 minutes 

8.14.4 Cable structure conductors 

The conductor cross sectional area shall be circular. 

The strands of phase and neutral conductors shall consist of hard drawn aluminum alloy according to IEC 
60 889 

The aluminum strands used for the construction of phase and neutral conductors for bundles shall have, 
before stranding, an ultimate tensile stress at least equal to 120 MPa. 

Insulating Sheath: The insulation sheath shall consist of an extruded sheath of cross‐linked polyethylene 
conforming to IEC 502 and shall be black‐coloured. It shall easily be removed. Insulation XLPE thickness 
is 1.5 mm. 

8.14.5 Markings 

Each individual conductor comprising a bundle shall have sufficient markings indicating: 
 Manufacturer's  identification.  As  an  alternative,  a  thread  beneath  the  insulation  with  a  stable  and 
permanent colouring in accordance with the manufacturer's trade mark will be acceptable. 
 Year of manufacture: last two digits are sufficient 
 Designation of conductor type: for example 3 x 35 + 35 
 Rated voltages class: 0.6/1 kV. 

8.14.6 Maximum permissible temperatures 

The maximum permissible temperatures for the Conductor are as follow: 
 90°C during normal operation, 
 120°C under a short duration overload (a total 24 hours a year in separate periods of 3 hours at the 
most) 
 250°C under multi‐phase short circuit conditions. 
These temperatures are based on the intrinsic properties of the insulating materials. These values can 
only be used for calculating permissible current ratings. 

8.14.7 Tests 

The inspection and test listed hereinafter shall be carried out in accordance with the provisions in the 
applicable  IEC  standard  supplemented  by  the  specific  requirements  indicated  hereinafter.  In  the 
absence of IEC standards, the inspection and tests shall be carried out in such manner as to be at least 
equivalent  to  conditions,  provisions  and  definitions  set  out  in  one  of  the  standards  listed  in  this 
specification. 

  Renewable Energy Guidelines  Nov. 2013 73
Volume 8 
Transmission & Distribution  

Unless  expressly  stated  otherwise,  the  ambient  temperature  for  routine  tests  as  well  as  voltage  tests 
shall  be  15+10°C  and  15+5°C  for  all  other  tests.  The  frequency  of  the  alternating  test  voltage  shall  be 
40 Hz to 62 Hz. The voltage waveform shall be near to sinusoidal. 

8.14.7.1 Type tests 

The  test  sample  shall  be  10 m  to  15 m  in  length.  All  cores  of  the  bundle  shall  be  tested.  The  test 
sequence shall be as follows. Type tests can be omitted if a certificate issued by a recognized institution 
is provided. 
 Insulation resistance at ambient temperature; 
 Insulation resistance at operating temperature; and 
 AC voltage test. 
The insulation resistance test at operating temperature shall be conducted in a water bath at 80°C and 
in conformity with VDE 0472. 

In addition to the tests just described, the routine tests and sample tests listed below shall also be the 
object of type tests. 

8.14.7.2 Routine tests 

The following measurements or tests shall be carried out on all drums and coils of bundled conductor: 
 Conductor resistance; and 
 Voltage test. 

8.14.7.3 Sample tests 

The following sample check, measurements and tests shall be applied: 
 Measurement of insulation wall thickness; 
 Measurement of outside diameter; 
 Thermal expansion test; 
 Check of physical characteristics; and 
 Tensile strength of the conductor individual wires. 
These tests should be carried out on one length from each production batch of the same type. 

   

74    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.15 Accessories for LV aerial bundled conductor 

8.15.1 General 

The  following  accessories  for  LV  Aerial  Bundled  Conductors  shall  be  supplied:  single  anchor  assembly, 
stain clamp, suspension assembly, insulated facade saddle, insulation piercing connector, pre‐insulated 
compression sleeve for LV aerial bundled conductors as well as service aerial clamps. 

8.15.1.1 Definitions 
 Anchor  assembly:  A  bracket  and  a  strain  clamp  designed  to  terminate  mainline  bundled  conductor 
and to transfer its tensile loading to the supporting structure. 
 Suspension  assembly:  A  bracket  and  a  clamp  designed  to  support  the  bundled  conductor  at 
intermediate positions and light angle positions (45° maximum line deviation). 
 Large angle or double dead end: When the deviation of the line is > 45°, called large angle, a bracket 
will be used with two strain clamps. 
 For a double anchor system, two brackets will be used with two strain clamps. 
 Insulated facade saddle: A saddle designed to support an ABC cable at regular intervals on a surface 
and which provides a secondary insulation for the bundle. 
 Service aerial clamp: A clamp designed to terminate an aerial service conductor bundled to a pole or 
a wall anchor. 
 Insulation piercing connector: A tap connector which is designed to be applied to the conductor of 
bundled ABC without removing the insulation. 
 Pre‐insulate  compression  sleeve:  A  pre‐insulated  junction  sleeve  designed  to  joint  ABC  with  other 
ABC. Neutral sleeve is full tensioned. 

8.15.1.2 Design 

All items shall be suitable for the whole range or part of the range of ABC, as well as for the conductor 
materials used. The service clamps shall be used for all ABC services lines. 

All  items  shall  be  designed  to  meet  the  performance  requirements  of  the  various  sections  of  this 
specification. They must be adequately rated for their intended application and retain this rating their 
normal lifetime in an outdoor environment. 

All items shall be free from defects which could cause them to be incorrectly assembled or to perform 
unsatisfactorily in service. Finish shall be such that outer surface are free of sharp edges and burrs which 
could result in damage to adjacent material or personnel. 

Items  comprising  different  component  shall  be  so  designed  that  they  can  be  applied  without 
disassembly, the installation of all items shall be possible by one man working alone. 

8.15.1.3 Materials 

The materials used for manufacturing the lifting, accessories and apparatus covered by this specification 
shall be compatible with the materials of the ABC such that the reliability of either will not be impaired 
by their association. 

Materials shall be resistant to climatic stress. All insulation materials shall be ultraviolet stabilised and 
coloured  black.  Steel  parts  shall  be  hot  dip  galvanized  (other  treatment  is  possible  if  the  protection 
against  corrosion  is  equivalent  or  better  than  hot  dip  galvanisation)  or  made  in  stainless  steel.  Other 
metallic parts shall be non‐corrosive type. 

  Renewable Energy Guidelines  Nov. 2013 75
Volume 8 
Transmission & Distribution  

8.15.1.4 Identification markings 

All items shall be legibly and indelibly marked with: 
 Manufacturer logo or symbol 
 Identification set 
 Manufacture code 
 Standard. 
Special marking for pre‐insulated junction sleeves and pre‐insulated lugs: 
 Position and order of compression (cripping) 
 Removing insulated Length 
 Grove index. 
Indelibly test: Each marking shall be rubbed with a rag with water during 15 seconds and rubbed again 
with a rag saturated with  water during 15 seconds  and rubbed  again with a  rag saturated with  petrol 
during 15 seconds. After this test, the marking shall be legible. 

8.15.1.5 Tests 

The  inspection  and  tests  shall  be  carried  out  in  accordance  with  the  provisions  in  the  applicable  IEC 
standard  supplemented  by  the  specific  requirements  indicated  hereinafter.  In  the  absence  of  IEC 
standards, the inspection and tests shall be carried out in such manner as to be at least equivalent to 
conditions, provisions and definitions set out in one of the standards listed in this specification. 

8.15.2 Anchor assembly 

8.15.2.1 Description 

Each assembly includes: 
 1 tension bracket made of Aluminium Alloy 
 1 wedge type dead end clamp. 
Brackets shall be made of Aluminium Alloy suitable for attachment to the used type of oole by two M14, 
M16 bolts or two stainless steel strap of 20 mm width and 1 mm thickness max. The distance between 
the two straps shall be 70 mm. The hook point for clamps shall be 10 cm (+1‐2) from pole. 

Clamps  shall  be  designed  to  anchor  ABC  with  the  respective  neutral  messenger.  The  clamps  shall  be 
Wedge type. They shall be made of mechanical and weather resisting material. No bolt for clamping the 
neutral messenger and no losely parts are allowed. 

Also no tools shall be required for installation. The clamp must be supplied with a flexible attachment 
into the above bracket by means of stainless steel flexible braid or hook. Parts directly in contact with 
the  neutral  messenger  shall  be  made  of  insulated  material  to  provide  secondary  insulation  between 
conductors and metal parts. 

Bracket  and  wedges  clamp  shall  be  specified  together  to  ensure  an  excellent  compatibility  between 
materials to reduce all mechanical and climatic stresses. 

8.15.2.2 Tests 

All loading tests shall be carried out with 50 mm² neutral messenger. For the clamp dielectric, tensile, 
and slip tests, and for the bracket mechanical tests are to be certified. 

76    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.15.3 Suspension assemblies  

8.15.3.1 Description 

Each assembly includes: 
 1  Suspension  bracket  made  of  Aluminum  Alloy  for  securing  to  all  types  of  structures  and  shall  be 
feasible indistinctly with one stainless steel strap. 
 1  Suspension  bracket  clamp  and  movable  articulate  link  made  of  thermoplastic  without  any  steel 
component.  
The suspension damp and articulated link is a device where no bolt for tightening the conductor and no 
loose parts are allowed. Clamping of the neutral messenger shall be of controlled slippage. This device 
must  have  the  capacity  for  the  suspension  and  tightening  of  messenger  to  50 mm².  Both  suspension 
clamps and articulated link must be made entirely and exclusively of mechanical and weather material. 
Parts  directly  in  contact  with  the  neutral  messenger  shall  be  made  of  insulated  material  to  provide 
secondary insulation between conductors and metal parts. Not bolt for clamping the neutral messenger 
and no loose parts are allowed. Also no tool shall be required for installation of the clamp in the field. 

Bracket and suspension clamp shall be specified together to ensure an excellent compatibility between 
materials to reduce all mechanical and weathering stresses. 

8.15.3.2 Tests 

For  the  clamp  dielectric,  tensile  and  slip  tests  shall  be  performed  and  documented;  for  the  brackets 
mechanical tests. The suspension assembly shall be subject to fatigue test. 

8.15.4 Insulated facade saddle 

8.15.4.1 Description 

Saddle shall be used for securing ABC on walls. These saddles can be rapidly fixed onto a wall be means 
of a screw or a nail. Saddles are to be supplied complete with the screw (or the nail) and the integral 
plug. The distance from the wall is required to be kept 1 cm. They should be able to secure all ABC of the 
required cross‐section. Their design must provide a secondary insulation between the conductor and a 
facade  or  any  metal  part  of  the  saddle  attaching  to  the  facade.  The  design  must  permit  them  to  be 
attached  to  the  facade  before  ABC  is  fitted.  They  must  be  used  on  concrete  or  wooden  facades. 
Afterwards  the  ABC  must  be  releasable  without  removal  of  the  first  bundle.  The  insulating  saddle 
material must be ultraviolet stabilized, be black in colour, resistant to degradation due to pollution or 
weathering. Exposed steel parts must be hot dip galvanizing or equal or better protection surfacing. The 
ABC shall be installable without special tool. 

8.15.4.2 Tests 

The tests shall include dielectric and mechanical tests. 

8.15.5 Service aerial clamp/anchoring assembly for service cable 

8.15.5.1 Description 

Service aerial clamps shall be designed to fix conductor bundles  at poles and  at buildings.  The  clamps 


shall  be  wedge  type.  They  shall  be  made  of  mechanical  and  weather  resisting  material.  No  bolt  for 
clamping the bundles and no losely parts are allowed. Also no tool shall be required for installation of 

  Renewable Energy Guidelines  Nov. 2013 77
Volume 8 
Transmission & Distribution  

the clamp in the field. Parts directly in contact with the bundle shall be made of insulated materials to 
provide secondary insulation between conductors and metal parts. 

The clamp must be supplied with an attachment of stainless steel braid or hook (aluminum is accepted). 
One service aerial clamp shall accept the different bundle thereafter: 
 2x 8 mm² Al 
 2x10 mm² Al 
 2x16 mm² Al 
 2x 25 mm² Al 
 4x 16 mm² Al. 

8.15.5.2 Tests 

The tests shall include dielectric and slip tests. 

8.15.6 Insulation piercing connectors 

8.15.6.1 Description 
 Implementation range: connection of service drop conductors to ABC network and tee‐offs of main 
bundled conductors. 
 Description: waterproof, high mechanical and climate resistant, insulated structure connector. 
The  connector  shall  be  insulated  and  suitable  for  use  on  live  or  deadlines.  The  insulation  piercing 
connector shall not have lose components that are liable to be lost during installation. The housing shall 
be  made  entirely  of  mechanical  and  weather  resistant  plastic  insulation  material  and  no  metallic  part 
outside the housing is acceptable except for the tightening system. The housing shall be an integral part 
of  the  connector.  The  bolts  shall  include  an  overtorque  shear  head  made  of  suitable  material  which 
allows  a  clamping  torque  in  conformity  with  the  recommendation  of  the  manufacturer,  without  the 
need of any special tool. 

It is absolutely necessary that none of the energized parts of the connector can be reached directly by 
the  operator  during  connector  installation.  Insulation  piercing  connectors  shall  be  dielectrically 
waterproofed in the same manner as the relevant cable. It shall withstand 6 kV while immersed under 
water (30 cm depth) for 1 minute. The number and the length of the teeth shall be adequate enough to 
penetrate  the  relevant  bundled  conductor  insulation  to  establish  proper  contact  without  any  contact 
resistance  and  without  the  need  to  strip  the  bundled  conductor  insulation.  To  achieve  the  required 
water tightness a special rubber seal shall be provided around the teeth of the present connector. The 
bolt washers shall be of corrosion resistant type. 

The  current  rating  of  the  connectors  shall  be  according  to  rating  of  the  specific  cables.  Two  types  of 
connectors are provided and are summarized as follows. 
a) Tee off connector for main network ABC 
ABC main and tee‐off connectors shall be of insulation piercing type on the main conductor. The tap 
conductor  may  be  disconnected  for  easy  fault  location  and  operation.  These  connectors  shall  be 
with separate tightening. 
o Application: ABC to ABC, separate tightening 
o Cross section main conductor: As required and specified 
o Cross section tap conductor: As required and specified. 
b) Tee off connector for service line to ABC network 

78    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

ABC  service  connectors  shall  be  of  simultaneous  insulation  piercing  type  on  main  and  tap 
conductors. Service lines can be made of Aluminium (ABC), Copper (insulated conventional wire) or 
Concentric Copper. These connectors shall be with simultaneous tightening 1 bolt, 1 tap. 
o Application: service line to Main ABC 
o Cross section main conductor (ABC): As required and specified 
o Cross section service tap: 8 to 25 mm² 
o Application: house connections, temporarily connections 
o Cross section main conductor (ABC): As required and specified 
o Cross section service ABC tap: 8 ‐ 25 mm² Al core. 

8.15.6.2 Tests 

The tests shall include dielectric and water tightness tests and tensile tests on main and tap conductor. 
   

  Renewable Energy Guidelines  Nov. 2013 79
Volume 8 
Transmission & Distribution  

8.16 Single‐phase and three‐phase electronic kWh meters 

8.16.1 Standards 

For  the  purpose  of  design,  manufacture,  quality  of  new  material,  test  and  manufacturing,  the 
equipment  shall  meet  this  Specification  and  the  following  International  Electro‐technical  Commission 
(IEC) standards and recommendations: 

EN  62052‐11:  Electricity  metering  equipment  (AC)  ‐  General  requirements,  tests  and  test  conditions  ‐ 
Metering equipment  

EN  62053‐21:  Electricity  metering  equipment  (AC)  ‐  Particular  requirements  ‐  Static  meters  for  active 
energy (classes 1 and 2) 

EN 62053‐31: Electricity  metering equipment (AC) ‐ Particular requirements ‐ Pulse output devices for 
electro‐mechanical and electronic meters (two wires only) 

EN 62053‐23: Electricity metering equipment (AC) ‐ Particular requirements ‐ Static meters for reactive 
energy (classes 2 and 3) or 

EN 61000: Electromagnetic compatibility (EMC) 

EN 61268: Alternating current static VAr‐hour meters for reactive energy (classes 2 and 3)  

EN  62053‐61:  Electricity  metering  equipment  (AC)  ‐  Particular  requirements  ‐  Part  61:  Power 
consumption and voltage requirements 

EN  61358:  Acceptance  inspection  for  direct  connected  alternating  current  static  watt‐hour  meters  for 
active energy (classes 1 and 2) 

EN 62056‐21: Electricity metering ‐ Data exchange for meter reading, tariff and load control ‐ Direct local 
data exchange 

EN 60529: Specification for degrees of protection provided by enclosures (IP code). 

The  above  mentioned  standards  do  not  exclude  other  known  national  or  international  standards.  The 
Supplier shall indicate in his offer to which standards his equipment is manufactured and submit to the 
Employer with his offer a copy of these standards. 

8.16.2 Basic characteristics 

8.16.2.1 Characteristics 
a) Electronic kWh‐meters shall be of one element for single and three phase installation 
b) Nominal voltage and service type shall be 230/400 V for 3 phase meters and 230 V for single phase 
meters.  Operating  range  shall  be  ±  15%  of  rated  voltage.  Autoprogrammable  on  range  of  120‐
480 V AC should be also acceptable. 
c) Nominal frequency: 50 Hz ± 5 % 
d) Nominal current is 10 A (single phase) and 20 A (three‐phase) 
e) Maximum current is 30 A (single phase) and 80 A (three phase) 
f) The meters are directly connected. 
g) Bottom connected 

80    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

h) Accuracy class; 2 (Standard IEC 62053‐21) or better. 

8.16.2.2 Requirements for measurement 
a) Meters  shall  measure,  by  mean  of  digital  sampling  or  any  other  recognized  method  the  energy 
consumption 
b) Digital algorithm for measurements processing shall take into account the presence of harmonics. 

8.16.2.3 Protection class 

Meter shall be able to operate in a closed metal box mounted outdoor. Minimum protection class shall 
be IP53 according to IEC 60529. 

8.16.2.4 Reading of meters 

In case of interruption of electricity supply, electronic meter register shall retain in non‐volatile memory 
all metered values. Reading shall be performed through direct reading from display as basic method. 

8.16.2.5 Display 

All  information  registered  by  meter  shall  be  shown  on  a  liquid  crystal  display  with  alphanumeric 
displaying. Minimum number of digits on display shall be 6. Display format for values shall be selected 
by programming (number of integers and decimals). 

8.16.2.6 Nameplate 

Meter shall have the following minimum information printed in English or Urdu language in indelible ink: 
a) Manufacturer's name or trademark 
b) Meter serial number. If serial number is marked on a plate fixed to cover, the number shall also be 
marked on meter base. 
c) Meter type 
d) Meter class 
e) Nominal voltage operating range 
f) Base current and maximum current 
g) Frequency 
h) Accuracy class 
i) Watt‐hour constant 
j) Year of manufacturing 
k) Identification of system service (number of wires and connection). 

8.16.2.7 Meter cover, terminal block and meter case 

Meter case 
The meter shall have a case made of polycarbonate (PC) or of material with equivalent performance for 
this purpose.  

  Renewable Energy Guidelines  Nov. 2013 81
Volume 8 
Transmission & Distribution  

Meter cover 
The  meter  cover  shall  be  made  of  ultraviolet‐stabilized  polycarbonate  or  material  of  equivalent 
performance  for  this  purpose.  It  shall  be  so  constructed  and  arranged  that  any  non‐permanent 
deformation shall not prevent the satisfactory operation of the meter. 

Terminal block 
The terminal block shall be made of polycarbonate (PC) or material of equivalent performance and rated 
for  the  specified  purpose.  At  the  terminal  block,  the  meter  leads  for  direct  connection  are  to  be 
connected at the terminals using a brass current bus bar and screws in accordance with the standards 
EN 62053–21 and EN 62052–11, for connection to the CTs respectively. Auxiliary and control terminals 
have to be made according to the "PLUG IN" principle or using adequate terminals. All terminals shall be 
arranged  in  one  terminal  block  and  be  suitable  for  front  connection  having  adequate  insulating 
properties and mechanical strength. The manner of fixing the conductors to the terminals shall ensure 
firm and durable contact and be secured against loosening to prevent undue heating of the conductors 
or  the  terminals.  The  material  of  the  terminal  block  shall  be  capable  of  passing  the  tests  given  in 
standard ISO 75 for a temperature of 135°C and the glow wire test at 960°C. The terminals shall permit 
the  connection  of  both  solid  and  stranded  aluminium  conductor  of  a  cross  sectional  of  10‐16 mm². 
Terminal layout should comply with DIN 43856 / BS7856‐1996 / IEC 61354 and the connection scheme 
should be clearly indicated underneath the terminal.  

8.16.2.8 Sealing facilities 

The meter design shall have provisions for the sealing of meter electronics housing and terminal cover 
by  using  seal  wire  and  lead  seal.  The  active  part  of  the  meter  shall  be  factory‐sealed.  It  shall  not  be 
possible to remove or open the meter without irreparable damage of the seals. 

8.16.2.9 Metering, recording and display features 

General 
The meter shall provide the following measurements: 
 Exported active energy for 3‐ph meters 
 Exported active energy for 1‐ph meters.  

Operating reserve 
Meter function must not be disrupted for 3‐ or 1‐phase power outages of less than 500 ms. For a power 
cut exceeding 500 ms all non‐stored data shall be stored in a non‐volatile (EEPROM) memory. 

Back‐up power supply 
In case of power outage, RTC shall be supplied by a super capacitor or battery so that RTC retains date & 
time until power comes back. The super‐capacitor must have at least a capacity of 7 days in continuous 
operation  of  supply  of  RTC  and  an  overall  lifetime  of  min.  15  years.  Recharge  of  the  super‐capacitor 
should  happen  as  soon  as  the  power  comes  back  and  should  not  take  more  than  24  hours  for  a 
complete  recharge.  Where  a  backup  battery  is  used,  it  shall  have  a  minimum  3‐year  capacity  at 
continuous operation under normal temperature conditions and expected life time of at least 10 years. 
The exchange of the battery shall be possible without removing the seal. 

82    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Other capabilities 
The meter shall comply with the above technical specifications but other additional features should be 
welcomed for future upgrading or retrofit. Description of the possible characteristics such as time of use 
metering or automatic meter reading, modem, etc. shall be included on the bid.  

8.16.3 Instruction manuals 

For each meter supplied, one (1) complete set of the following instruction manuals shall be provided: 
 Mounting, connection and operation manuals,  
 Parts manual, 
 Installation. 
Manuals shall be written in English language. The descriptions shall be clear  and precise.  If necessary, 
they should be accompanied by sketches, diagrams, etc. 

8.16.4 Tests 

8.16.4.1 Type test 

The following type tests shall be conducted in accordance with the latest IEC 62052‐11. 
 Heating 
 Insulation 
 Output elements 
 Functional requirements and tests 
 Electromagnetic compatibility (EMC) 
 Radio interference suppression 
 Others according to manufacturer's standard. 
The above type tests may be omitted if a record of tests, confirmed by respective certificates issued by a 
recognized institution, can be supplied made on the same type and having identical characteristics. 

8.16.4.2 Acceptance test 
 Each batch of tariff meter shall be acceptance tested in accordance with IEC 61358. 
 The Supplier shall submit samples of meters to be checked and accepted by the Purchaser 
 Sample inspection using the variable inspection method shall apply. 
 If unsatisfactory results occur due to meter errors not being normally recognized and accepted, then 
the meters may be inspected by attributes. A different sample selection of tariff meters shall be used 
if the batch is inspected by random. 
 If unsatisfactory results occur using the inspection by random method, then either 100% of all meters 
supplied shall be tested or the entire batch will be rejected. 
 The supplier of the equipment shall submit at delivery all protocols and test results (type tests and 
routine tests) performed on equipment according to international standards. 

8.17 MV combined disconnector and fuse cut‐outs 

This specification covers the design, manufacture, testing, supply, delivery and installation requirements 
of  11 kV  pole  mounted,  single  phase,  rod  operated,  combined  disconnector  and  fuse  cut  out.  The 

  Renewable Energy Guidelines  Nov. 2013 83
Volume 8 
Transmission & Distribution  

technical performance characteristics of the combined disconnector/cut out fuse are compiled in Table 
18‐16. 

Table 8‐16: Combined disconnector/fuse cut out 
Nominal system voltage  11 kV 
Maximum system voltage  12 kV 
Rated frequency  50 Hz 
Rated current  100 A 
Rated short time current  8 kA 
Minimum creepage distance  350 mm 
Power frequency 50 Hwithstand voltage  45 kV 
Impulse withstand voltage  110 kVp 
Source: Own compilations 

8.17.1 MV disconnector 

8.17.1.1 Scope 

This  specification  covers  the  general  requirements  of  design,  manufacture  and  testing  of  high  voltage 
11 kV disconnectors for high voltage overhead networks. 

8.17.1.2 Applicable standards 

The  equipment  and  the  components  supplied  shall  be  in  accordance  with  the  latest  edition  of  the 
standards specified below and amendments thereof. 
 IEC 60129 (1984) ‐ Alternating current disconnectors and earthing switches 
 IEC 60265‐1 (1983) ‐ High‐voltage switches for rated voltages above 1 kV and less than 52 kV 
 IEC 60694 (1996) ‐ Common clauses for high voltage switchgear and control gear standards 
 IEC  60273  (1990)  ‐  Characteristics  of  Indoor  &  Outdoor  Post  Insulators  for  Systems  with  Nominal 
Voltage greater than 1000 V. 
 ISO 898 ‐1 & 2 (1988) ‐ Mechanical Properties of Fasteners 
 EN ISO 1461(1999) ‐ Hot dip galvanized coatings on iron and steel articles. 

8.17.1.3 Design 

The disconnecting switches shall be of three phase type, suitable for outdoor use. 

They  shall  be  used  for  isolating  spur  line/distribution  substation  from  the  energised  section  and  they 
shall be of the single side break type isolation with manual gang operated mechanism. 

The  disconnector  shall  be  able  to  break  a  small  current  of  1.5 A  at  0.8  PF  and  necessary  replaceable 
auxiliary arcing contacts shall also be provided. 

The  disconnector  shall  have  the  feature  for  install  a  load  interrupter  switch  for  20 A.  The  load 
interruption shall be achieved by providing a parallel circuit for re‐directing the load current path from 
the main isolator contacts. An arc chute shall be provided for each switched pole and circuit interruption 
shall take place within the arc‐chute. Insulating barriers between the phases and outer phase with the 
enclosure shall be included. 

84    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

8.17.1.4 Construction 

The construction of the whole unit complete with adjustable support brackets, clamp plates, bolts, nuts 
and washers shall be compact, lightweight and robust.  

The mechanical design and strength of the unit and components shall be able to bear the mechanical 
forces  on  the  terminals  when  installed  and  on  operation.  They  should  withstand  the  electrodynamics 
forces without reduction of reliability or current carrying capacity of the Disconnectors. 

The insulators incorporating the breaking arm shall be securely fixed to the phase coupling bar so as to 
achieve a positive closing or opening operation of the three phases simultaneously. 

8.17.1.5 Insulators 

The  insulators  shall  be  of solid  core  post  type.  They  shall  be  made  of  high  quality  insulating  porcelain 
utilising clean aero‐dynamic sheds giving extended creepage distances and excellent performance even 
under conditions of heavy atmospheric pollution. 

8.17.1.6 Stationary and moving contacts 

The fixed and moving contacts shall be made out of copper alloy and the contact surface shall be silver 
plated. The fixed contacts shall be fitted with stainless steel compression springs to provide the required 
contact pressure. 

8.17.1.7 Terminals 

Clamp type terminals, suitable for vertical/horizontal terminal take off, made of aluminum alloy castings 
shall be provided to accommodate 4 mm to 20 mm dia. aluminum conductors (ACSR) and Al XLPE cable. 

8.17.1.8 Operating mechanism 

It shall be suitable for manual operation with padlocking facilities only in the fully opened or fully closed 
position. 

The  operating  mechanism  shall  be  suitable  for  left  hand  or  right  hand  mounting  of  the  line  post 
structure. The direction of operation, ON and OFF position shall be clearly and indelibly marked on the 
disconnector operating mechanism. 

The phase coupling bar shall be positioned, clamped and secured to the base frame for positive direct 
drive.  The  drive  lever  shall  be  suitable  for  vertical  mounting.  Stainless  steel  piercing  screws  shall  be 
provided to secure the lever once positioned and clamped. 

The vertical drive rod shall be of 8 metres length and facility for extending or reducing the length of the 
vertical drive rod by 1 m shall be provided. Necessary threaded couplings and operating rod guides shall 
also be supplied with each operating mechanism. 

The complete operating mechanism with operating handle shall be arranged for steady hand operation 
from ground level. Non ageing and UV treated insulation shall be provided to the holding parts of the 
operating handle for safety. 

The  bearings  of  the  mechanism  shall  be  of  permanently  sealed  corrosion  proof,  anti‐friction  type  and 
free from maintenance. 

All  bolts  and  nuts  to  conform  to  the  standard  specified.  The  nuts  and  heads  of  all  bolts  to  be  of 
hexagonal type. 

  Renewable Energy Guidelines  Nov. 2013 85
Volume 8 
Transmission & Distribution  

8.17.1.9 Mounting arrangement 

The  combined  system  shall  be  suitable  for  horizontal  mounting  on  steel  crossarms  of  two  poles 
transformer substations. 

8.17.1.10 Galvanizing 

All  steel  components  such  as  the  base  section,  phase  coupling  bar,  drive  lever,  vertical  drive  rod, 
mounting attachments, operating rod guide clamp, operating mechanism, bolts nuts and washers shall 
be of hot dip galvanized. 

Except  where  specified  to  the  contrary  all  iron  and  steel  parts  shall  be  galvanized  after  the  processes 
such as sawing, shearing, drilling, punching, filling, bending and machining. 

Galvanizing shall be applied by hot dip process to comply with EN ISO 1461: 1999 for all parts other than 
threaded  work  and  shall  have  a  mean  coating  (minimum)  thickness  not  less  than  85 pm.  All  threaded 
sections shall have a mean coating (minimum) thickness not less than 45 pm. 

All items shall be treated with Sodium Dichromate solution after galvanizing to prevent the formation of 
white rust. 

8.17.1.11 Tools 

Any special tools or devices necessary for operation and maintenance of the unit shall be supplied with 
the unit and the cost of such tools shall be included in the price quoted for the equipment. Any other 
spares recommended by the manufacturer shall also be indicated separately with the prices. 

8.17.1.12 Rating plate 

The  rating  and  data  of  the  Disconnectors  shall  be  engraved  or  embossed  on  a  weather  and  corrosion 
proof metal plate. The rating plate containing the following information shall be positioned at the base 
supporting frame of the post insulator and shall be prominently visible. 

Manufacturer's Identification: 
a) Country of Manufacture and Year of Manufacture. 
b) Number and the Year of the standard adopted. 
c) Designation of Type, Class etc. and Serial Number. 
d) Rated voltage and frequency (kV & Hz) 
e) Rated 1 minute power frequency withstand voltage (kV) wet. 
f) Rated lightning impulse withstand voltage (kV) 
g) Rated continuous current (A) 
h) Rated short time withstand (1 sec.) current (KA)  
i) Rated mechanical terminal load (N) 
j) Mass (kg). 

8.17.1.13 Testing 

Type tests 

86    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

The  following  Certificate  of  Type  Tests  carried  out  in  accordance  with  the  lEC  60129  (1984)  and  lEC 
60694(1996). 

Dielectric tests 
 Lightning impulse withstand voltage tests 
 Power frequency wet withstand voltage tests 
 Artificial pollution tests 
 Temperature‐rise tests 
 Measurement of the resistance of the main circuit. 
 Short‐time withstand and peak withstand current tests 
 Mechanical endurance tests 
Routine test 

The following routine tests as per lEC 60129 (1984) shall be carried out on all the disconnectors ordered 
and the routine test report shall be made available for the observation of the CEB Inspector at the time 
of inspection. 
 Power frequency voltage withstand tests 
 Measurement of the resistance of the main circuit. 
 Mechanical operating test 

8.17.2 Fuse cut out 

8.17.2.1 Design 

The fuse cut‐outs shall be capable of being opened on load by means of a built in load‐breaking device 
of an arc chute type. 

In general, the fuse cut‐outs will be installed for the protection of distribution ground mounted and pole 
mounted transformers. The fuse cut‐outs offered shall be class 2 as defined in IEC 60282‐2. 

The 10 kV load break fuse cut‐outs offered shall be in accordance with IEC 60282‐2 or ANSI C37.41 and 
C37.42. Other equivalent standards may also be considered. 

The 20 kV load break fuse cut‐outs described in this specification are intended to correspond to typical, 
expulsion  type  fuse  cut‐out  devices.  However,  the  Supplier  is  free  to  propose  alternative  equipment 
provided there is no reduction in the operating characteristics required. Preferred alternatives are such 
with  enhanced  operating  characteristics,  such  as  load  break  fuse  cutouts,  which  would  avoid  the 
necessity of operators having to use load breaking tools; or fuse cut‐outs in which all three fuse tubes 
drop at the same time when one or two fuse elements melt as a result of an earth fault or a two phase 
short circuit. 

A de‐rating of the continuous current rating of the load break fuse cut‐outs due to altitude, along the 
lines  of  IEC  60282‐2,  will  be  acceptable,  but  the  de‐rating  factor  shall  be  given  in  the  technical  data 
schedule. 

8.17.2.2 Technical data 

The technical data to be met are compiled in Table XXXX (4‐11) 

  Renewable Energy Guidelines  Nov. 2013 87
Volume 8 
Transmission & Distribution  

8.17.2.3 Temperature rise limits 

The assemblies shall be rated 105°C for normal circuit conditions. The complete load break fuse cutouts 
shall  be  able  to  carry  continuously  its  rated  current  without  exceeding  the  temperature  rise  limits  set 
out in IEC 60282‐2, or equivalent 

8.17.2.4 Fuse link range and class 

The 11 kV load break fuse cut‐outs shall be suitable in all respects for all standard fuse links within the 
range 1 A to 50 A as per IEC and NEMA standards. 

8.17.2.5 Interchangeability 

The fuse holder of a HV load break fuse cut‐out shall be dimensionally compatible with a universal fuse 
tube of a corresponding rating and with the corresponding range of universal fuse links. 

8.17.2.6 Insulators 

The  insulators  supporting  the  load  break  fuse  cut‐outs  shall  be  rated  for  operation  at  a  maximum 
voltage of 12 kV respectively. The insulators shall be of solid core glazed porcelain of high strength and 
arc resistivity type and shall be bird proof. They shall meet the electrical and mechanical characteristics 
specified in IEC 60383. 

The bidder shall also give the following information in the technical data schedule: 
 The minimum dry flashover voltage value; 
 The minimum wet flashover voltage value; and 
 The 50 Hz puncture voltage of insulators. 

8.17.2.7 Radio influence voltage 

The  maximum radio influence voltage  shall be 250 µV measured at 1 MHz and in accordance with  IEC 


60437. 

8.17.2.8 Clearances 

The bidder shall give the following information in the technical data schedule for 10 kV load break fuse 
cut‐outs: 
 Minimum phase to phase clearance; and 
 Minimum phase to earth clearance 
 Minimum creepage distances. 

8.17.2.9 Fuse links 

The fuse links are required to give protection against short circuits. They shall conform to lEC, NEMA and 
ANSI standards or equivalent and they shall be so rated; and shall have such melting characteristics as to 
be suitable for selective operations with the fuse links at present in use on the system, namely type K ‐ 
fast fuse links and type T ‐ slow fuse links, in conformity with NEMA SG‐2 and ANSI C37.42. 

In addition, the fuse links shall be suitable for use on 10 kV systems on outdoor, single vented, drop out 
fuse tubes with or without arc shortening rods. They shall be compatible with all universal fuse tubes. 

The preferred rating of fuse links shall be: 

88    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 11 kV: 4 A, 10, 20 and 50 A. 
The  rated  current  of  the  fuse  link  is  the  maximum  current,  which  it  will  carry  continuously  without 
deterioration  and  undue  heating.  The  bidder  shall  state  on  the  technical  data  schedule  the  maximum 
temperature in °C attained by the fuse link after continuous operation at maximum rating. 

The time‐current characteristics shall conform to NEMA type K and type T. The bidder shall submit with 
the  bid  the  time‐current  performance  characteristics  of  all  the  distribution  fuse  links  on  offer.  The 
performance characteristics of the fuse links shall include: 
 Melting time‐current characteristics; and 
 Total clearing time‐current characteristics. 
The time‐current characteristics shall be presented as curves. 

The Supplier shall state the minimum and maximum melting currents required to melt the fuse links at 
the three appropriate time points (0.1 s, 10 s and 300 s or 600 s; melting‐currents for type‐K (fast) fuse 
links) according to ANSI C37.42. 

Fuse links shall be of the removable button head type. The fusible element shall be preferable of silver 
but  silver‐copper  alloy  it  is  acceptable.  Fusible  elements  of  tin  are  not  acceptable.  The  bidder  shall 
completely describe the composition of the fuse link and of the fusible element. 

The diameter of the button head cap on the fuse link shall be 19.1 mm up to 50 A. 

Fuse  links  shall  be  capable  of  withstanding  a  tension  pull  of  44.5 N  when  tested  cold  (20°C  to  25°C) 
without mechanical or electrical damage to any part of the fuse links. 

The bidder shall completely describe the composition of the fuse tube surrounding the fusible element, 
its resistance to compression, collapse or twisting when being installed and the degree of fuse tube wall 
swelling when wet. 

The bidder shall also provide information on the precautions to be taken to avoid damage to the fuse 
link and to what extent the time‐current characteristics change over time, making fuse links unreliable 
on overload. 

Each fuse link shall be legibly and indelibly marked with the following information: 
 Manufacturers name or trade mark; 
 Type designation (K or T); and 
 Continuous current rating. 

8.17.2.10 Tests 

Routine tests 

Routine tests for fuse cut‐outs shall be selected from the type tests listed in IEC 60282 or ANSI C37.41. 
The bidder shall include, with the bid, sample test reports of routine tests to be carried out and shall list 
them in the test certificates schedule. 

Type tests 

The following type tests shall be carried out on the fuse cut‐outs: 
 Dielectric tests; 
 Interrupting tests; 
 Radio interference tests; 

  Renewable Energy Guidelines  Nov. 2013 89
Volume 8 
Transmission & Distribution  

 Temperature rise tests in accordance with IEC 60060; 
 Load break tests to ANSI C37.41, if applicable; 
 Time‐current tests; 
 Porosity test; and 
 Corrosion performance tests. 
Where fault  making  tests  have been performed on  the  model being offered, the  test  certificates shall 
also be attached. 

The following tests shall be carried out on the fuse links: 
 Interrupting tests; 
 Temperature rise tests; and 
 Time‐current tests. 
To confirm the interruption capacity of the fuse links, four tests of test series number 5 shall be carried 
out with the characteristics set out in Table IVA of IEC 60282‐2 or, alternatively, four tests of test series 
number 5 with the characteristics of table 3 of ANSI C37.41. The test load shall have the X/R ratio given 
in table 6 of the same ANSI standard. 

The  temperature  rise  of  the  cut‐outs,  containing  the  fuse  links  being  tested  in  accordance  with  ANSI 
C37.41, shall not go above the limits set out on table 2 of C37.40 

For the time‐current tests, comprising melting time‐current tests and total time‐current clearing tests, 
the minimum melting‐current characteristics of any fuse link shall agree with the values set out in table 
6 of ANSIC37.42. 

Corrosion performance tests 

Performance shall be tested after the load break cut‐out has been subjected to 1,000 hours of corrosive 
salt  spray,  in  conformity  with  IEC  60507.  An  equivalent  field  experience  in  coastal  sites  shall  be 
acceptable. 

The  bidder  shall  confirm  that  the  current  carrying  contacts  shall  meet  the  temperature  rise 
requirements after approximately 20 years of coastal exposure and that other metal parts shall retain 
their mechanical strength. 

8.17.2.11 Operating tools 

The load break fuse cut‐outs will be operated by means of standard operating rod. The load break fuse 
cut‐outs offered shall not impede this means of operation. 

8.17.3 Assembly 

8.17.3.1 Main assembly 

The combined system will be installed on 2 poles transformer substation as described above. Top and 
bottom contact subassemblies and mounting fittings shall be potted into the porcelain insulators. The 
upper fixed contact assembly shall be shielded and positively latch. 

All  contacts  shall  be  designed  to  give  permanent  current  carrying  capacity  at  rated  current,  after 
exposure to the Afghan climate for up to 20 years. All current carrying components shall be of copper or 
copper  alloy.  Terminals  shall  be  of  copper  or  heavily  tinned  bronze,  suitable  for  both  copper  and 
aluminum  conductor  up  to  120 mm²  ACSR  and  compressed  palm  lugs.  Contacts  shall  be  heavily  silver 
clad on each side of each interface. Embossed surfaces with wiping action are preferred. 

90    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

The upper contact shall have safety latch to prevent upper contact from dropping due to vibration and 
mounted with stainless steel back up spring to ensure the contact pressure between stationary contact 
and the movable contact of the fuse. 

The  lower  contact  shall  house  a.  stainless  steel  back  up  spring  to  ensure  high  contact  pressure  with 
positive contribution to release of the toggle connection. 

Ferrous  components  shall  be  made  preferably  of  stainless  steel  or  galvanized  to  BS  729.  The 
manufacturer shall state the mass and thickness of zinc coating on the technical data schedule. 

The load break fuse cut‐out shall be designed such that the fuse tube can be closed without using undue 
care even when the closing force is applied at an angle. The angle of fuse tube relative to the vertical 
shall  be  stated  in  on  the  attached  technical  data  schedule  and  it  shall  be  less  than  20°.  The  cut  out 
insulators shall preferably be marked with the rated voltage and with the basic impulse level insulation. 

8.17.3.2 Fuse tube assembly 

The fuse tubes in the 11 kV load break fuse cut‐outs shall be capable of accepting lEC or NEMA fuse links 
up to a maximum continuous current rating of 50 A. 

The toggle mechanism shall provide a locking action to protect the fuse link from shock. A stainless steel 
spring‐assisted flipper shall assist arc interruption by withdrawal of the fuse tail. 

The  fuse  tube  cap  may  be  of  the  expendable  type.  The  arc  shortening  rods,  if  provided,  shall  be 
permanently attached to the fuse tube cap. The Fuse tube shall be made of high strength synthetic fibre 
to lessen moisture absorption inside the tube and to extend the life of the fuse holder. Fuse tube shall 
be heavily coated with enamel to provide protection against ultra violet rays. 

A lifting eye shall be provided on the fuse tube and designed for use with a standard operating rod. 

The fuse tubes shall be permanently marked with the following: 
 Name of manufacturer and/or trade mark; 
 Model; 
 Rated voltage; 
 Continuous current rating; and 
 Rms, symmetrical, rated interrupting capacity. 
   

  Renewable Energy Guidelines  Nov. 2013 91
Volume 8 
Transmission & Distribution  

8.18 Surge arresters 

8.18.1 General 

This  specification  covers  the  design,  manufacture,  testing,  supply,  delivery  and  performance 
requirements of 10 kV nonlinear, metal oxide resistor type surge arresters, without spark gaps, required 
by the networks described. 

While IEC 60099‐4 is quoted throughout this specification, comparable international standards such as 
ANSI/IEEE C62.11 or NEMA LA1 will be acceptable, but in any discrepancy, this specification shall take 
precedence. 

8.18.2 Performance characteristics 

The surge arresters shall meet the performance characteristics shown in Table 8‐17, consistent with an 
ungrounded delta system at high voltage (10 kV) and a four wire solidly grounded neutral system and he 
low voltage side. 

Table 8‐17 Surge arrester performance characteristics 
Surge arrester type MOX  11 kV 
Rated frequency (Hz)  50 
Nominal system voltage (kV)  11 
Maximum system voltage (kV;rms)  12 
creepage distance (mm)  350 
Short circuit rating at 50 Hz, 0.2 s (kA)  20 
Long duration impulse current  at 200 µs (A)  200 
Minimum 10 seconds power frequency wet withstand (kV   60 
Normal discharge current 8/20µs current wave (kAp)  10 
High discharge current 4/10µs current wave (kAp)  100 
Source: Own compilations 

The  metal  oxide  resistor  type  shall  be  housed  in  porcelain  or  polymeric  containers  and  shall  be 
hermetically sealed.  

8.18.3 Terminals 

Terminals of surge arresters covered by this specification shall be constructed that conductors of copper 
or aluminum may be attached thereto without danger of corrosion. To this end, the arrester terminals 
shall  be  cadmium  plated  or  given  alternative  treatment  which  meets  with  the  project  manager's 
approval. 

Full  particulars  of  such  alternative  treatment  shall  be  submitted  at  the  time  of  tendering,  and  must 
receive the written approval of the project manager. 

The  phase  and  earth  terminals  shall  include  a  conductor  clamp  and  all  necessary  bolts,  lock‐nuts  and 
washers.  The  terminal  material  shall  preferably  be  either  stainless  steel  or,  alternatively,  a  plated 
nonferrous metal, suitable for connection of ACSR in a corrosive salt laden atmosphere. 

The  arrester  terminals  shall  be  suitable  for  use  with  a  palm  lug  non  tension  conductor  terminals  and 
with the following ranges of conductor sizes: 

92    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 Aluminum conductor: 25 mm² to 120 mm². 

8.18.4 Mounting arrangement 

Surge Arresters shall be suitable for vertical or horizontal mounting. 

Mounting brackets shall be provided to facilitate mounting of arresters on channel iron type cross‐arms. 
Other mounting arrangements will also be considered. 

Alternatively, the surge arrestors may be fixed on the HV disconnection switch.  

Details of the mounting arrangements shall be supplied. 

8.18.5 Tests 

8.18.5.1 Routine tests 

The minimum requirement for routine tests shall be: 
 Measurement of reference voltage; 
 Residual  voltage  test  for  lightning  impulse  current  in  the  range  between  0.01  and  2  times  the 
nominal discharge current; 
 Check for absence from partial discharges and contact noise, in conformity with IEC 60270; 
 Current leakage tests; and 
 Leakage check on the housing seals. The bid shall describe the sensitive checking method adopted by 
the manufacturer. 
These tests shall be carried out in conformity with IEC 60099‐4. 

The  reference  voltage  of  each  arrester  shall  be  measured  at  the  reference  current  selected  by  the 
manufacturer. 

In addition to tests specified in IEC 60099‐4, the surge arresters shall be subjected to a measurement of 
the leakage current at voltages corresponding to 100%, 60% and 40% of the rated voltage. 

8.18.5.2 Type tests 

The following type tests shall be carried out in conformity with IEC 60099‐4: 
 Insulation withstand tests, including lightning impulse voltage test and power frequency voltage test; 
 Residual  voltage  tests,  including  steep  current  impulse  residual  voltage  test,  lightning  impulse 
resid¬ual voltage test and switching impulse residual voltage test; 
 Long duration current impulse withstand tests; 
 Operating  duty  tests,  including  accelerated  ageing  test  to  determine  voltage  levels  for  duty  tests, 
heat  dissipation  behaviour  test,  either  high  current  impulse  operating  duty  test  or  switching  surge 
operating duty test and tests to verify thermal stability; 
 Pressure  relief  tests,  where  applicable,  including  high  current  pressure  relief  test  and  low  current 
pressure relief test; 
 Tests of arrester disconnectors, if applicable; 
 Artificial pollution tests; 
 Partial discharge tests; and 
 Seal leakage tests. 
Before proceeding with the long duration current impulse withstand test, the lightning impulse residual 
voltage at nominal discharge current of each test sample shall be measured for evaluation purposes. 

  Renewable Energy Guidelines  Nov. 2013 93
Volume 8 
Transmission & Distribution  

After the long duration current impulse withstand test has been carried out, and after the sample has 
cooled  to  near  ambient  temperature,  the  residual  voltage  tests  which  were  made  before  the  long 
duration  current  test  shall  be  repeated  and  the  test  specimens  shall  be  judged  by  their  physical 
conditions and by comparison of the oscillograms taken during both sets of residual voltage tests. 

The values of residual voltage shall not have changed by more than 5% and visual examination of the 
samples  shall  reveal  no  evidence  of  puncture,  flashover,  cracking  or  other  significant  damage  of  the 
metal oxide resistors. 

Artificial pollution testing shall be carried out on surge arresters, in accordance with IEC 60099‐3 and IEC 
60507 to simulate relevant pollution conditions representative of those occurring in service. 

Pollution  flashover  of  the  surge  arrester  surface  is  a  serious  matter  operationally  and  performance  in 
this respect shall also be determined. 

The manufacturer shall elaborate on the effect of pollution on the performance of the surge arresters 
offered. 

The bidder shall state the standard to which the seal leakage tests have been carried out. 

8.18.5.3 Acceptance tests 

Acceptance  tests  shall  be  carried  out,  in  conformity  with  IEC  60099‐4,  on  the  nearest  lower  whole 
number to the cube root of the number of surge arresters to be supplied. The following tests shall be 
carried out: 
 Measurement  of  power  frequency  voltage  on  the  complete  arrester  at  the  reference  current 
measured at the bottom of the arrester. 
 Lightning  impulse  residual  voltage  on  the  complete  arrester  at  nominal  discharge  current  or  at  a 
suitable lightning impulse current, depending on the manufacturer's choice of routine test procedure 
 Partial  discharge  test.  The  discharge  intensity  shall  not  exceed  50 pC  at  1.05  times  the  continuous 
operating voltage of the surge arresters. 
A  special  thermal  stability  test  as  per  IEC  60099‐4  may  be  requested  by  the  purchaser  prior  to  the 
commencement of arrester assembly. 

The  bidder  shall  include  details  of  any  acceptance  tests  recommended  on  housings  and  will  include  a 
sample test report. 

8.19 11 kV cable 

8.19.1 Technical requirements 

The cable design offered shall meet the following requirements: 

Triple extruded dielectric single core cable having: 
 Stranded circular copper conductor 
 Dry‐cured cross‐linked polyethylene insulation 
 Non‐magnetic wire armour 
 Outer high density polyethylene (HDPE) or polyvinyl chloride (PVC) serving. 
The  outer  serving  shall  be  capable  of  withstanding  a  10 kV  DC  test  voltage  for  five  minutes  after 
installation  and  annually  thereafter.  Current  ratings  shall  be  calculated  in  accordance  with  IEC  287 

94    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

"Calculation of the continuous current rating of cables with 100% load factor". The cable design offered 
for use shall meet the following requirements. 

8.19.2 Conductors 

The conductor shall be stranded copper circular compacted, Class 2 as per IEC‐228 . 

8.19.2.1 Conductor sizes 

The following conductor sizes will be used: 35 mm². 

8.19.2.2 Conductor shield 

The  conductor  shield  shall  consist  of  an  extruded  black  thermosetting  semi‐conducting  material. 
Conductor shield thickness shall meet the requirements of AEIC 5 Table D1. 

8.19.3 Insulation 

The insulation shall consist of cross‐linked polyethylene, XLPE. Insulation thickness shall conform to IEC‐
502, Table IV. 

8.19.3.1 Insulation shield 

The  insulation  shield  shall  be  an  extruded  thermosetting  semi‐conducting  material  extruded 
simultaneously with the conductor screen and insulation (triple extrusion). The shield colour shall be in 
contrast  to  that  of  the  XLPE  insulation  so  that  any  particles  of  insulation  shield,  adhering  to  the 
insulation, after stripping, will be visible. Shield thickness shall meet the requirements of AEIC 5, Table 
D2. The insulation shield shall be plainly identified as a semi‐conducting material at 300 mm intervals. 
The following legend, or its equivalent shall be printed on the insulation shield: "SEMI‐CONDUCTING  ‐ 
RE¬MOVE WHEN SPLICING OR TERMINATING". 

The  shield  shall  meet  the  "strippability"  test  requirements  of  a  National  or  International  standard, 
details of which shall be submitted by Bidder. 

Where a special tool is required for stripping, details of such tool, shall be provided. 

8.19.3.2 Metallic shielding (core screens) 

The  screen  shall  consist  of  copper  wires  and  one  or  two  copper  conducting  tape  spirals.  The  screen 
wires shall lie in a long lay directly over, and in intimate  contact with,  the insulation screen. The tape 
spirals shall be applied in counter helix over, and in electrical contact with, the screen wire(s). 

The shield cross sectional area shall be 35 mm². 

Screen  wire  and  tape  dimensions,  electrical  characteristics  and  geometry  shall  comply  with  the 
requirements of DIN VDE 0273, Clause 5.9. 

8.19.3.3 Fillers and binding tape 

The three (3) individual cores with copper tape screen shall be laid up together. The cores shall be laid 
up with a right‐hand direction of lay. The interstices shall be filled with suitable non‐ hygroscopic fillers 
to give the completed cable a substantially circular cross‐section. A suitable binding tape shall be applied 
over the laid up cores and the filler material. 

  Renewable Energy Guidelines  Nov. 2013 95
Volume 8 
Transmission & Distribution  

8.19.3.4 Core bedding 

The  core  shall  be  covered  with  an  extruded  bedding  of  PVC  compound  which  shall  be  formed  tightly 
around the cable. The thickness of the bedding shall comply with the requirements of IEC 502, Clause 
6.6. 

8.19.3.5 Armour 

The  armour  shall  be  applied  helically  in  a  layer  of  non‐magnetic  wire  over  the  armour  bedding  layer. 
Armour shall comply with the requirements of IEC 502, Clause 11. 

8.19.3.6 Oversheath 

An  oversheath  of  red  coloured  PVC  shall  be  applied  over  the  armour  wires.  The  oversheath  shall  be 
embossed  at  regular  intervals  as  per  clause  12.4  of  this  specification  and  shall  comply  with  the 
requirements of IEC 502, Clause 12. 

8.19.4 Core identification 

The cores shall be identified on the non‐metallic part of the insulation screen by legible numbering along 
the whole length of each conductor. Cores shall be numbered 1, 2, 3. 
   

96    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

9 Spare parts, tools and site consumables  

9.1 Spare parts 

All  spare  parts  to  be  supplied  shall  be  interchangeable  with  the  corresponding  parts  of  all  the  works 
supplied under these specifications and shall be of the same material and workmanship. They shall be 
replaceable without cutting or destruction of adjacent components. 

Each Supplier shall submit completely filled in lists of specified spare parts and tools according to the Bill 
of  Quantities.  Moreover,  lists  of  recommended  spare  parts  shall  be  included  to  each  bid,  comprising 
those  spare  parts  which  are  recommended  to  store  for  a  period  of  at  least  three  (3)  years,  for 
maintenance purposes mainly. These lists shall stipulate detailed descriptions and prices. 

After mutual discussion, it shall be finally decided which of the specified or recommended spare parts or 
tools shall be included in the scope of supply. 

All  spare  parts  shall  be  protected  against  corrosion  /  decay  and  shall  be  marked  with  identification 
labels.  All  spare  parts,  tools  and  materials  shall  be  delivered  in  marked  boxes  of  sufficient  sturdy 
construction to withstand long term storage. 

About 5%, but at least two pieces of all types of bolts, screws, nuts, washers, spanner rings and cotters 
shall  be  provided  and  hand  over  to  the  operator.  Other  spare  parts  shall  be  provided  for  a  period  of 
three (3) years of operation after the date of the completion of the project. 

9.2 Tools and appliances 

All customary and special tools, as well as auxiliary devices including lifting devices, ropes etc. necessary 
for total assembly and disassembly and repair of all parts of the supplied works shall be provided to the 
operator. All lifting devices and wire ropes slings to be used at site shall be tested at works. 

Suitable toolboxes shall also be included in the delivery. An itemized list and description of all provided 
tools, auxiliary devices etc. shall be fixed in each toolbox.  

9.3 Site consumables, lubricating oil and grease for first filling 

5% of the quantity of painting material, but at least one liter, in new sealed containers, for later repair 
works and 330% of lubricating oils, insulating oils and greases etc. required for first filling in the plant 
and equipment supplied be supplied (sufficient for the first three fillings and for preparatory works). 

9.4 Specified spare parts and tools 

The following spare parts and tools to be handed over to the Employer shall be supplied for the various 
equipment and installations subject to the scope of the works. 

9.4.1 Distribution transformers 

 Primary standard porcelain bushings for outdoor pole‐mounted and indoor distribution transformers. 
 Primary plug‐in bushings for compact substation type transformers. 
 Low voltage bushings. 
 Fire percent of total oil quantity of supplied transformers delivered in drums specially sealed for site 
conditions. 

  Renewable Energy Guidelines  Nov. 2013 97
Volume 8 
Transmission & Distribution  

9.4.2 Tools 

9.4.2.1 Scope 

The  tools  and  equipment  shall  comply  with  this  specification.  The  pictures  that  are  included  in  this 
chapter are for reference of the tools and equipment only. 

The materials and equipment supplied shall conform to appropriate norms and international standards. 
In the absence of recommendations, the supplier shall give detailed information about the equipment. 

Minimum  of  one  year  warranty  for  any  manufacturing  defects  shall  be  provided  for  all  tools  and 
equipment. 

9.4.2.2 Cable cutter for copper and AAAC conductors 

This  conductor  cutter  shall  be  capable  of  cutting 


aluminum,  aluminum  alloy  and  copper  conductors  of 
240 mm²  maximum  cross  section.  This  mechanical 
cutter  shall  be  ratchet  type  or  direct  type.  For  a 
ratchet  type  this  cutter  shall  have  an  ergonomic 
handle for one hand use. For a direct type, this cutter shall have approximately a length of lever handle 
of 700 mm. This system is delivered in a carrying case.  

9.4.2.3 Cable cutter for ACSR conductors 

This  conductor  cutter  shall  be  capable  of  cutting  ACSR 


conductors  of  185/30 mm²  maximum  cross  section.  This 
mechanical cutter shall be ratchet type or direct type. For 
a ratchet type this cutter shall have an ergonomic handle 
for one hand use. For a direct type, this cutter shall have a 
minimum length of lever handle of 700 mm. This system shall be delivered in a carrying case.  

9.4.2.4 Cable cutter for EHS guy wire 

This  conductor  cutter  shall  be  capable  of  cutting  12 mm 


Extra  Strength  (EHS)  and  standard  guy  wire  and  12 mm 
mild steel rods and bolts. This mechanical cutter shall be 
ratchet or direct type. For a ratchet type this cutter shall 
have an ergonomic handle for one hand use. For a direct 
type, this cutter shall have a minimum length of lever handle of 700 mm. This system shall be delivered 
in a carrying case.  
   

98    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

9.4.2.5 Hand operated hydraulic ACSR cable cutter  

This  cable  cutter  shall  be  capable  of  cutting  ACSR  cables  of 
19 mm  diameter  (including  aluminum  and  copper  cable).  The 
length  of  the  cutter  shall  not  be  less  than  500 mm.  This 
equipment  shall  be  delivered  in  a  carrying  case.  The  supply 
include  hydraulic  cable  cutter,  cutter  blade  and  fixed  cutter 
head. This equipment shall be delivered in a carrying case. 

9.4.2.6 Hand operated hydraulic cable cutter 

This conductor cutter shall be capable of cutting aluminum and copper cables of 85 mm diameter. This 
manual  hydraulic  cutter  shall  be  supplied  with  a  revolving  head.  The  hydraulic  pump  shall  be  double 
stage type. This equipment shall be delivered in a carrying case. 

9.4.2.7 Hand Operated Hydraulic Press 4.5 Ton Minimum Capacity with Dies for Main and 
Service ABC 

The hydraulic press shall be hand‐operated, having an output capacity of 4.5 tons minimum and suitable 
for  making  all  compression  type  pre‐insulated  joints  for  LV  ABC network  or  other  insulated  conductor 
from  4 mm²  up  to  150 mm².  The  press  must  be  supplied  with  “H”  revolving  with  quick  opening  and 
closing head. The pressure relieve shall be automatically actuated when the compression is completed. 

A complete set of hexagonal dies for making all joints shall be supplied. The dies must be made of tool 
steel  which  shall  possess  high  strength  to  withstand  the  mechanical  stresses  to  which  the  dies  are 
subjected in use without damage. The steel part shall be suitably protected against corrosion. 

The die sizes shall be of international standard type(s). 

This Hand operated hydraulic press shall be delivered with a ring for attachment and a carrying case able 
to accommodate the press and all the necessary dies. 

9.4.2.8 Hand operated hydraulic press 12 ton capacity with dies for MV overhead network 

The hydraulic press shall be hand‐operated, having an output capacity 
of 12 tons or more and suitable for making all compression type joints 
for  MV  overhead  network.  The  press  must  be  supplied  with  “C” 
revolving  head.  The  pressure  relieve  shall  be  automatic  when  the 
compression is completed. 

A complete set of hexagonal dies for making all joints (AAAC and ASCR 
conductors)  for  cross  sections  between  25  and  240 mm²  shall  be 
supplied.  In  addition,  a  complete  set  of  dies  for  LV  ABC  shall  be 
supplied.  The  dies  must  be  made  of  tool  steel,  which  shall  possess 
high  strength  to  withstand  the  mechanical  stresses  to  which  the  dies  are  subjected  in  use  without 
damage.  The  steel  part  shall  be  suitably  protected  against  corrosion.  The  die  sizes  shall  be  of 
international standard type(s). 

This Hand operated hydraulic press shall be delivered with a carrying case able to receive the press and 
all the necessary dies.  

9.4.2.9 Electro‐ hydraulic high pressure pumps 700 bar and set of accessories  

  Renewable Energy Guidelines  Nov. 2013 99
Volume 8 
Transmission & Distribution  

a) Electro‐hydraulic pump 
The  hydraulic  pump  of  700  bars  shall  be  powered  by  an  electric 
motor of 500 W at 220 V AC, 50 Hz. A 5 m long connecting cable is 
suitable.  It  shall  be  able  to  supply  hydraulic  energy  to  a 
compression  head  of  20 kN  of  output  force  located  on  a  pole  of 
12‐meter height.  

An  excess‐pressure  valve  shall  protect  the  high‐pressure  pump 


against  overload.  The  pressure  relieve  shall  be  automatically 
operated when the compression is completed. 

A carrying case shall be supplied. 
b) Pluggable hydraulic compression head 
This  compression  tool  of  "U"  type  head  with  tilting  arms  shall  be  used 
with  the  single  action  pump  described  in  a).  It  shall  have  a  minimum 
output force of 120 kN. The return of the internal jack shall be driven by a 
spring.  

This  tool  shall  allow  compression  of  joints  and  connectors  for  MV 
overhead networks (copper, AAAC, ACSR) and MV/LV underground networks (copper and aluminum). A 
carrying case shall be supplied. 
c) Hydraulic hoses 
3 hydraulic hoses of 3‐meter length and 2 hydraulic hoses of 6‐meter length shall be supplied. They shall 
be  equipped  with  male  and  female  quick  couplers  locked  by  balls.  These  hoses  shall  be  capable  of 
withstanding a working pressure of 700 bars. A carrying case or bag shall be supplied. 
d) Dies 
A complete set of dies for junction sleeves, anchor sleeves, lugs, connectors for MV overhead network 
of  copper,  AAAC  and  ACSR  (50  up  to  185/30  mm²)  and  MV  /  LV  underground  network  of  copper  and 
aluminum  cable  (16  up  to  300  mm²)  shall  be  supplied.  Carrying  cases  for  each  type  of  dies  shall  be 
supplied. 

9.4.2.10 80 kN hydraulic crimping tool with rechargeable battery 

Hydraulic Crimping Tool with rechargeable battery shall be used for indentation or hexagon crimping of 
the following connectors: 
 “C”, from C10 to C50 
 XCT,  XCT.C,  XCT.EQ  copper  tubular  lugs  and  XG7T  copper  joint 
sleeves from 6 to 240 mm² 
 DIN46235 copper Lugs & Sleeves from 10 to 185 mm² 
 DPD7 forged terminal lugs and XL7/XG7 copper terminals from 16 
to 240 mm² 
 INDUSAL ACX and ACX.C terminal lugs from 35 to 240 mm² 
 LV insulated line connectors from 16 to 150 mm² 
 LV‐MV bare overhead line connectors from 6 to 240 mm². It is also 
able to round the conductors with 7R dies. 

100    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 The  design  shall  be  compact,  self‐contained  and  rapid    electro  hydraulic  tool  for  crimping  of 
connectors  from  6  to  240  mm2,  ergonomic  design  and  balanced  weight  allow  crimping  to  be  done 
one handed and reduce wrist fatigue, shoulder strip for easy handling 
 Automatic release with an audible "click" when force of 80 kN is reached. Return of piston by release 
trigger. 
The operation with rechargeable battery for 100 to 150 crimps operations possible before recharging. 
Light indicator gives the state of the charge, shows the end of the crimping. 

A complete set of dies for junction sleeves, anchor sleeves, lugs, connectors for MV overhead network 
of  copper,  AAAC  and  ACSR  (50  up  to  185/30 mm²)  and  MV  /  LV  underground  network  of  copper  and 
aluminum  cable  (16  up  to  300 mm²)  shall  be  supplied  according  a  technical  specifications  for 
conductors, cables and accessories specified in the bidding documents.. Carrying cases for each type of 
dies shall be supplied. 
Accessories: 
 Batteries, plus one spare 
 Chargers 
 Metallic carrying case. 

9.4.2.11 Stripping tool for XLPE cable  

The tool shall cover: Stripping outer sheet, Stripping semi conductor and Stripping XLPE insulation. Extra 
blades  for  the  tool  shall  also  be  delivered.    The  tool  shall  cover 24 kV  cables  with  dimensions  1x50  to 
1x240 mm2, 0.6/1 kV cable 4x50 to 4x150 mm2. 

9.4.2.12 Micro‐ohm meter 

This  micro‐ohmmeter  is  required  for  metering  low  resistance,  such  as  contact  resistance  of  switching 
equipment (breakers, isolators, switches or bus /line joints) according to IEC 60054‐6. It shall be capable 
of  being  carried  to  any  particular  site  substations,  customers'  premises  for  the  purpose  mentioned 
above. 

It shall allow changing the direction of the current if there are voltages that interfere with the accuracy 
of the measurement are present. 

The switch covers any measurement range and a current corresponds to each range which is selected 
automatically from 0.1 mA to 100 A. The measuring range of the apparatus shall be 1 up to 200 m. 

The  indications  appear  on  a  liquid  crystal  display  of  4  digits  LED  0.5  high,  with  decimal  point  and 
negative (‐) sign. The time required for the display to stabilize will be of 10 seconds or less. 

This  apparatus  includes  an  alarm  warning  if  the  measurement  is  impossible:  (open  circuit,  protective 
fuse on the instrument blown). 

The instrument shall not be used on live systems; however, it shall be protected against a voltage of 30 
V peak between any of the Rx terminals. 

This instrument uses 120/240 V; 50/60 Hz frequency, with battery. 

The minimum dielectric strength will be 1500 V protected by a fuse. 

The degree of protection shall be IP 543 according to standard IEC 60529, the safety class II as per IEC 
60348 and in keeping with IEC 61010.  

  Renewable Energy Guidelines  Nov. 2013 101


Volume 8 
Transmission & Distribution  

The accuracy class shall be ±1% of reading + the 2 least significant digits (range 50 A to 100 A) and ± 2% 
of reading + the 1 least significant digit (range 10 A to 20 A).  

The maximum ambient temperature °C will be 40°C and a maximum relative humidity (%) 85%. 

It will be presented in a plastic work‐site case with a handle and weight shall less than 20 kg.  

A  complete  set  of  cables  for  current  2*15  m,  a  standard  grounding  cable,  a  current  shunt  and  an 
instruction manual and other specific accessories will be included.  

9.4.2.13 Electronic voltage detector for bare conductors 
Voltage detector 

This  electronic  voltage  detector  with  acoustic  and  optical  signal  shall  be  suitable  for  bare  MV 
conductors. The voltage detecting range shall be from 5 up to 36 kV. 

The live conductor shall be signaled by a powerful buzzer and a red LED. 

This  equipment  shall  be  totally  insensitive  to  the  electrical  fields  and  shall  detect  voltage  on  contact 
only. It shall be equipped with an integral‐testing device. A luminous signal shall indicate the automatic 
testing of the apparatus all along operation. It shall be supplied with a complete set of contact probes. 

This voltage detector shall be suitable to be fixed with a universal fitting and it shall be delivered in a 
carrying case. 

One universal fitting, telescopic and insulating, 2 meter minimum stick shall be supplied. 

9.4.2.14 Electronic voltage detector for separable connector capacitive dividers 

This  electronic  voltage  detector  with  acoustic  and  optical  signal  shall  be  suitable  for  detection  of 
voltages from 5 up to 36 kV capacitive dividers installed on MV separable connectors. 

The live separable connector shall be signaled by a powerful buzzer and a red LED. 

This equipment shall be totally insensitive to electrical fields and shall detect voltage on contact only. It 
shall be equipped with an integral testing device. A luminous signal shall indicate the automatic testing 
of the apparatus all along operation. It shall be supplied with specific probe for capacitive divider. 

This voltage detector shall be suitable to be fixed with a universal fitting and it shall be delivered in a 
carrying case. 

One universal fitting, telescopic and insulating, 2 meter minimum stick shall be supplied. 

9.4.2.15 Phasing tester for MV overhead distribution circuit 

This MV voltmeter shall allow the measure of voltage level and phasing between overhead conductors. 
It  shall  be  composed  of  two  fiberglass  testers  with  high  impedance,  two  contact  pieces  and  housing 
containing a voltmeter. The connection between the two testers shall be made with an insulated flexible 
cable. 

The  range  of  the  apparatus  shall  be  from  5  up  to  24  kV.  It  shall  be  supplied  with  a  complete  set  of 
contact probes. 

This phasing tester shall be suitable to be fixed with a universal fitting. 

It shall be delivered in a carrying case. 

102    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Two universal fitting insulating sticks of 3 meter length shall also be supplied. 

9.4.2.16 Insulator puncture detector 

This portable system is used to detect internal cracking on porcelain insulators prior to total failure; it 
shall be capable of testing suspension type insulators onto a standard hot stick for energized lines. This 
system shall be readily handled by one line man and shall be safe to use on 24 kV network. The result of 
the test shall be easily indicated to the line man with an audible or lighting signal. 

This system shall be delivered with all facilities needed to charge the line capacitor from a VDC battery. 
It shall be delivered with universal fittings to be fixed on sticks for overhead network; necessary stick(s) 
of 3 meter length with universal fittings shall be supplied. 

All this equipment shall be delivered in a carrying case. 

9.4.2.17 Line fault locator 

This portable system shall be used to monitor the status of underground cable, and detect pinpoint fault 
on underground cable. This equipment shall be based on an audible signal injected in the cable by an 
audio frequency generator. This equipment shall consist of four units: 
 a line locator to locate a buried cable, 
 a fault locator to locate the fault (with a fault location resistance up to one M), 
 a transmitter unit to power the audio frequency signal in three frequency bands (approx. 0.5 kHz, 1 
kHz and 10 kHz). 
 a receiver with earphones. 
This equipment shall be delivered with a carrying case and batteries. 
   

  Renewable Energy Guidelines  Nov. 2013 103


Volume 8 
Transmission & Distribution  

9.4.2.18 Portable multi‐meter 

This  portable  multi‐meter  shall  be  of  clamp  type  and  shall  be  used  to  measure 
current and other electric important values without the need to break the current 
circuit. 

This clamp multi‐meter shall be capable of measuring: 
 Current through the use of Hall effect sensors in the magnetic circuit, the true 
RMS  values  can  be  measured  up  to  1500  A  AC.  The  accuracy  class  shall  be  < 
1.5%. 
 Voltage,  the  true  RMS  value  can  be  measured  up  to  600V  AC and  1000V  DC. 
The accuracy class shall be < 1%. 
 Active power measurement,  
 Apparent power measurement, 
 Power factor measurement, 
 Frequency measurement, 
 Auto‐ranging for each function, 
The indications shall appear on a liquid crystal display. 

The clamp of the multi‐meter shall be able to measure current on 55 mm diameter cable. 

The  degree  of  protection  shall  be  IP40,  the  safety  class  II  6  kV  as  per  IEC  60348  and  it  shall  be  in 
accordance with IEC 61010 1.600V CAT III. This equipment shall be supplied with all accessories, battery 
and in a carrying case. 

9.4.2.19 Three phase portable earthing kit for 24 kV  

Three  phase  portable  earthing  kit  for  24  kV  shall  be  complete  with  all  leads,  clamps,  earth  spike  and 
carrying bag for use on Medium Voltage overhead lines and cables. 

9.4.2.20 Lead 

Lengths  to  be  sufficient  for  overhead  lines  with  phase  distance  2  m.  The  leads  are  to  be  50  mm2  Cu 
earthing strap with transparent plastic‐insulation. 

Clamps for lead are to be suitable for connection to both ACSR line and bolts.  

Clamps shall be operated with Bayonet socket type of tool. 

9.4.2.21 Earth 

Lengths shall be sufficient for overhead lines at 12 m above ground. The earth is to be 50 mm2 flexible 
Cu earthing strap with transparent plastic‐insulation. Clamps should be of universal type. 
Operating rod 

Operating rod should be  a glass‐fiber reinforced operating  pole for outdoor use with rain skirts and it 


should at least have insulation level for 24 kV. It shall also have a warning axle for marking of 600mm 
insulated length. The rod shall operate Bayonet socket type of clamp. 

9.4.2.22 Non‐contact phase sequence indicator 

The phase sequence indicator is for use in low voltage system. 

104    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 Noncontact detection of phase sequence. 
 Self‐adjusting to correct phase if line frequency varies. 
 Auto shutoff for maximum battery life. 
 Proximity sensor means safe, noncontact sequence. 
 Accessories included: (1) 9V battery, case. 

9.4.2.23 Cable length meters (600 m) 
Feature: 
 Direct read length measurements up to 600 m in different sizes 
of  copper  or  aluminum  insulated  cable  up  to  500  kcmil  (240 
mm2). 3‐1/2 digit LCD read‐out. 
 Calibration  coil  included  for  compensation  of  temperature 
coefficients. 
The supply shall be included all necessary accessories. 
 Capacity 1.5 ‐ 240 mm2 
 Cable Size – Cross Section 
 1.5, 2.5, 4, 6, 10, 16, 25, 50, 70, 120, 185 & 240 mm2 
 Measuring Length 600 m  
 Accuracy, 2%. 
 Batteries 2 – 9V, included. 

9.4.2.24 Cable length meters (2000 m) 
 Easy  to  operate,  calibrate  and  set  for  cable  being 
measured. 4‐1/2 digit LCD read‐out. 
 Calibration coil included for compensation of temperature 
coefficients. 
The supply shall be included all necessary accessories. 
 Cable Size – Cross Section 
 1.5 to 500 mm2 
 Measuring Length 
 5 meters through 2000 meters in 1/10 meter increments; 
 Accuracy, 2%. 
 Batteries included with charger 

9.4.2.25 Portable infrared thermometer 

Portable infrared thermometer for non‐contact temperature measurement is 
for  use  in  medium  voltage  and  low  voltage  system,  over  head  line  and 
underground system. 

The infrared thermometer shall be have the following futures:  
Sighting methods: Laser to define the center of the measurement area. 
 
Working distance: 5 cm to 20 m  
Temperature range: ‐10º C to 600º C 

  Renewable Energy Guidelines  Nov. 2013 105


Volume 8 
Transmission & Distribution  

Temperature resolution: 0.1º C to 600º C 
Accuracy: 1% of the reading / +‐ 2% for reading below ‐10º C  

Temperature  mode:  Current  temperature,  average  temperature,  maximum/minimum  temperature, 


differential temperature, temperature unit selection (°C or °F), memory and playback allow scrolling of 
memorized temperature. 

Temperature display: LCD, 4 digits, automatic backlighting. 

Controls:  Power  ON  (auto  power  OFF  with  no  loss  of  memory),  Up/Down  scroll  keys,  and  Laser 
disengage key. 

Power source: 9V NiMH rechargeable 

Battery life: 40 hours without laser (9V replaceable battery) 

Ambient temp. range: Operating 0° to 50°C, storage –20° to 60° C 

Mounting: 1/4 ‐20 thread for tripod mount 

Accessories:  Carrying  case,  replaceable  battery,  operating  manual,  charger  battery,  NiMH  Battery, 
communicator software. 

9.4.2.26 Heavy‐duty rotary hammer with accessories 

The electrical rotary hammer shall be for use bit of the 35 mm diameter minimum, with two operating 
modes: hammer with rotation and hammer only. This hammer is for use in concrete poles. 

The hammer shall be designed with isolation system to reduce operator fatigue and increases comfort 
and  control.  Both  handles  "float"  to  absorb  hammering  action.  Dial  speed  control  for  rpm  and  bpm 
allows user to match hammer speed and power to application.  

The supply shall include 10 sets the followings bits: 

Diameter (mm)/max. drilling depth (mm) 
14        25 
22        25 
22        35 
   

106    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

9.4.2.27 Heavy‐duty 12 mm drill  

The electrical drill shall be heavy‐ duty type, with variable control speed, 
two mode operations (hammer with rotation and rotation only), and 360° 
Positive Lock Side Handle. 230 V AC, 50 Hz. 

The supply shall be included 10 set complete the bits: 5 mm to 12 mm. 

All this equipment shall be delivered in a carrying case. 

9.4.2.28 Ratchet hoist 

Ratchet hoist is to be used for pulling overhead conductors. 

They shall be of link chain style with a pulling load of 2000 daN (safety coefficient = 5). At nominal load 
the effort exerted on the lever shall not exceed 30 daN. 

The  single  fall  chain  shall  be  made  of  high  strength  alloy  steel  with  a  minimum  working  length  of  1.5 
meter and it shall be supplied with hooks in accordance with the nominal load. 

9.4.2.29 Insulating ladder 

This one section straight insulating ladder shall be made of fiberglass and polyester. The steps could be 
made  of  aluminum.  The  length  shall  be  4  meters.  They  shall  have  a  high  mechanical  resistance  to 
bending and twisting and high resistance against climatic conditions and corrosive elements. 

The insulation between two steps shall be more than 22 kV. 

   

  Renewable Energy Guidelines  Nov. 2013 107


Volume 8 
Transmission & Distribution  

10 Annexes  
Annex 1:  Technical Data Sheets .................................................................................................. 109 
Annex 2:  Drawings ...................................................................................................................... 125 
Annex 3:  Design Examples .......................................................................................................... 228 
 

108    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Annex 1: Technical data sheets 
Technical  data  sheets  should  be  filled  by  the  supplier.  It  provides  a  fast  overview  on  critical  technical 
parameters. It can also be used to compare offers from different suppliers. 

The  completeness  of  and  the  way  how  the  data  sheets  are  filled  is  also  a  good  indicator  of  the 
professionalism of the supplier.  
   

  Renewable Energy Guidelines  Nov. 2013 109


Volume 8 
Transmission & Distribution  

Annex 1.1 11 kV Overhead conductor 
Description / Details  Unit  Specified  Offered 

Overhead Conductor       

Manufacture       

Manufacturer's Code       

Type     ACSR    

Nominal area of conductor  mm²  120    

Stranding ‐ aluminium  mm²  26/2.44    

Stranding steel  mm²  7/1.9    

Maximum current rating  A    

Conductor resistance  ohm/km  0.2345    

Conductor impedance  ohm/km    

Conductor inductance  mH/km    

Conductor capacitance  µF/km    

Short circuit rating       

               t= 1.0 seconds  A    

               t= 3.0 seconds  A    

Conductor weight  kg/km  494    

Maximum drum wound lengths  m    

Full drum maximum weight  kg       

 
   

110    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Annex 1.2 ABC cable and accessories 
Description / Details  Unit  Specified  Offered 

Aerial Bundled Conductor (ABC) 

Manufacture 

Manufacture's Code 

Type 

Nominal voltage rating  kV  0.6/1.0 

Number and nominal size of core  mm² 

Material phase conductor   

Material neutral conductor  mm 

Neutral conductor insulated  Yes/No 

Insulation thickness  mm 

Maximum conductor temp. rating  Cº 

Maximum current rating  A 

Conductor resistance  ohm/km 

Conductor impedance  ohm/km 

Conductor inductance  mH/km 

Conductor capacitance  µF/km 

Short circuit rating 

t= 1.0 seconds  kA 

t= 3.0 seconds  kA 

Ultimate tensile strength  kN 

Cable weight  kg/km 

Maximum drum wound length 

Full drum maximum weight  kg 
 
   

  Renewable Energy Guidelines  Nov. 2013 111


Volume 8 
Transmission & Distribution  

Annex 1.3 LV cables and accessories 
Description / Details  Unit  Specified  Offered 

LV Cables       

Manufacturer       

Manufacturer's Code Nº       

Number of cores       

Nominal conductor area  mm²    

Type of Conductor     Al    

Stranding  Nº/mm    

Voltage rating  kV  0.6/1.0    

Insulation thickness       

 ‐ phase  mm    

 ‐ neutral  mm    

Insulation material     XLPE    

Sheath material     HDPE    

Sheath thickness  mm    

Ultimate tensile strength  kN    

Weight  kg/mm    

Conductor resistance at 20 ºC  ohm/km    

Maximum continuous load current  amps    

Maximum short‐circuit rating       

t= 0.1 seconds  kA    

t= 0.2 seconds  kA    

t= 0.3 seconds  kA    

t=1.0 seconds  kA    

Maximum drum wound length  m  >500    

Drum diameter maximum  mm  2500    

Drum width maximum  mm  1400    

Full drum weight maximum  kg/mm  3000    

Minimum Bending Radium  mm    

Maximum Pulling Tension  kN    

Earthing Conductor       

Manufacturer       

Manufacturer's Code Nº       

112    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Description / Details  Unit  Specified  Offered 

Number of cores     1    

Nominal conductor area  mm²  35    

Conductor material     Cu    

Stranding  mm    

Voltage rating  kV  0.6/1.0    

Insulation thickness  mm    

Insulation material     PVC / XLPE    

Weight  kg/mm    

Conductor resistance at 20 ºC  ohm/km    

Maximum continour load current       

Maximum short‐circuit rating       

             t= 0.1 seconds  A    

             t= 0.2 seconds  A    

             t= 0.3 seconds  A    

             t= 1.0 seconds  A    

Maximum drum wound length  m    

Full drum weight maximum  kg       

For each size one data sheet shall be filled        

 
   

  Renewable Energy Guidelines  Nov. 2013 113


Volume 8 
Transmission & Distribution  

Annex 1.4 Insulators 
Description / Details  Unit  Specified  Offered 

Line Post Insulators 

Manufacturer 

Manufacturer's Code Nº 

Type  Post 

System Voltage  kV  20 

Material of Insulator 

Designation (ANSI C29.6) 

Cantilever strength  kN 

Nominal diameter  mm  150 

Nominal height  mm  305 


Minimum nominal creepage 
mm  630 
distance 
Min. power frequency flashover 
voltage 
                  dry  kV 

                  wet  kV 

………. 

………….. 

…………… 

                  ‐ length  mm 

Pin height  mm 

Weight  kg 

String Insulators 

Manufacturer 

Manufacturer's Code Nº 

Type  Disc 

Material of Insulator 

Designation (IEC 60305)  U 70 BL 

Mechanical failing load  kN 

Nominal diameter  mm  255 

Nominal spacing  mm  146 


Minimum nominal creepage 
mm  280 
distance 
Altitude factor used for 2.000 m 

114    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Description / Details  Unit  Specified  Offered 


Min power frequency flashover 
voltage 
                 ‐ dry  kV  78 

                 ‐ wet  kV  45 

Puncture voltage  kV  110 

Ball and socket couplings (IEC 60120)  mm  16 

Weight  kg 

Guy Wire Insulators 

Manufacturer 

Manufacturer's Code Nº  Guy Wire 

Type 

Material of Insulator  90 

Mechanical failing load  kN 

Nominal size  mm  60 


Minimum nominal creepage 
mm 
distance 
Min. power frequency flashover 
voltage 
                 ‐ dry  kV  35 

                 ‐ wet  kV  18 

Weight  kg 

For each size one data sheet shall be filled        

 
   

  Renewable Energy Guidelines  Nov. 2013 115


Volume 8 
Transmission & Distribution  

Annex 1.5 Distribution transformers 
Description / Details  Unit  Specified  Offered 
Three Phase 11/0.4 kV Distribution Transformers Pole Mounted     

Manufacturer       

Manufacturer's Code Nº       

Rated output  kVA  50 100 160 250 315 400 630    

Number of phases     3    

Rated frequency  Hz  50    

Rated primary voltage  kV  20    

Rated no‐load secondary voltage     400/230    

Vector group     Dny5    
Highest primary voltage of primary 
kV  12    
windings 

Insulation levels     LI125/AC50/AC3    
Temperature insulation class (IEC 
   A    
6000076) 

Type of cooling     ONAN    

Maximum temperature rises       

                      ‐ windings  ºC  65    


                      ‐ top oil with 
ºC  60    
conservator 
                      ‐ top oil without 
ºC  55    
conservator 

Type of primary tapping off‐load  %   +10. +7.5 .+ 5.0 +2.5    

       0,‐2.5.‐5.‐7.5.‐10    

Impedance  %       

NO‐LOAD LOSSS  Watts    
LOAD LOSSES at rated load and 75 
Watts    
ºC 
Magnetising current at nominal 
Amp    
voltage 

Efficiency at 75 ºC and:       

                100% load     PF 1.0  %    

                    PF 0.8  %    

                75% load     PF 1.0  %    

                    PF 0.8  %    

                50% load     PF 1.0  %    

116    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Description / Details  Unit  Specified  Offered 

                    PF 0.8  %    

                25% load     PF 1.0  %    

                    PF 0.8  %    

Regulation at full load and:       

                    PF 0.8  %    

                    PF 1.0  %    

Total weight maximum       

Type of oil       

Material of windings       

Dimensions       

                   Width  mm    

                   Length  mm    

                   Height  mm    

Type of breather       
Is the transformer hermetically 
Yes/No  yes   
sealed? 
Does the transformer already have 
Yes/No       
type test certificates? 

Certification of PCB free oil    yes   
For each size one data sheet shall 
        
be filled 

 
   

  Renewable Energy Guidelines  Nov. 2013 117


Volume 8 
Transmission & Distribution  

Annex 1.6 MV surge arrestor 
Description / Details  Unit  Specified  Offered 

Manufacturer       

Manufacturer's Code Nº       

Type    MOX  

System voltage  kV  11    

Rated voltage  kV  12    

BIL  kV  >95    

Weight  kg       

 
   

118    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Annex 1.7 LV equipment 
Description / Details  Unit  Specified  Offered 

LV Moulded Case Circuit Breakers     

Manufacturer       

Manufacturer's Code Nº        

Type       

Number of poles       

Rated current  A    

Maximum rated current  A    

Short time capacity (1 min)  A    

Rated voltage  V    

Breaking capacity (rms)  A    

Making capacity (peak)       

Time/current characteristics     Hydraulic+electromagnetic or    

      thermal + electromagnetic    

      Non‐ignitable high impact    

Dimensions  mm    

Weight  kg    

Type of control       

Material of casing       

Terminal sizes (Aluminium 
   70 ‐ 300 mm²    
conductor) 

For each size one data sheet shall be filled 
 
   

  Renewable Energy Guidelines  Nov. 2013 119


Volume 8 
Transmission & Distribution  

Annex 1.8 Low voltage electronic meters 
Description / Details  Unit  Specified  Offered 

Single Phase 5 (20) A Meter       

Manufacturer       

Model        

Rated voltage  V    

Frequency  Hz    

Nominal current  A    

Maximum current  A    

Measurement method       
Accuracy class according to IEC 62053‐
%    
21 
Error limits:       

 Nominal load %    

 Inductive load Cos PHI <p = 0.5      

 Minimum load, <0.05 In      

Service type       

Connection form       

Starting current  mA    

Burden       

 Voltage circuit VA    

 Current circuit VA    

     

Protection class acc. to IEC 60529       

Environmental influences:       

 Temperature range for operation °C    

 Temperature range for storage °C    

 Humidity %    

Dimensions (length x width x depth)  mm    

Weight  kg    

120    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Display:       

 Number of digits for quantities      

 Size of digit         

Three Phase 10 (40) A Meter       

Manufacturer       

Model        

Rated voltage  V    

Frequency  Hz    

Nominal current  A    

Maximum current  A    

Measurement method       
Accuracy class according to IEC 62053‐
%    
21 
Error limits:       

 nominal load %    

 inductive load Cos PHI <p = 0.5      

 minimum load, <0.05 In      

Service type       

Connection form       

Starting current  mA    

Burden       

 Voltage circuit VA    

 Current circuit VA    

     

Protection class acc. to IEC 60529       

Environmental influences:       

 Temperature range for operation °C    

 Temperature range for storage °C    

 Humidity %    

Dimensions (length x width x depth)  mm    

  Renewable Energy Guidelines  Nov. 2013 121


Volume 8 
Transmission & Distribution  

Weight  kg    

Display:       

 Number of digits for quantities      

 Size of digit      

For each size one data sheet shall be filled        

 
   

122    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Annex 1.9 11 kV combined disconnector and cut out fuse 
Description / Details  Unit  Specified  Offered 
Name of manufacturer/Country of 
     
origin 
Applicable standard (number & year)       

Type       

• Outdoor/indoor     outdoor   

• Double break/single break       

• Side break/vertical break       

Catalogue no./model no.       

Rated voltage  kV  12    

Rated frequency  Hz  50    

Rated continuous current  A  100    

Rated short‐time current/duration  kA/sec.  3s    

Rated short time current  kA  20    

Rated peak withstand current  kA  50   

Rated insulation level:       
• Lightning impulse withstand 
kV   110    
voltage (1.2/50 us) 
• Power frequency withstand at 50 
Hz 
kV     
- Wet
- - dry
• Power frequency flashover voltage 
kV    
at 50 Hz 
Total creepage distance (phase to 
mm    
earth) 
Dimensions of operating rod/pipe 
     
(vertical) 
• Diameter  mm     

• Length  mm     

Distance between phase centres  mm    

Separation between open contacts  mm    
Applicable range of sizes of 
mm    
conductors to the terminals 
Is the facility provided for locking of 
operating mechanism in fully open  Yes/No    
or fully closed position? 

  Renewable Energy Guidelines  Nov. 2013 123


Volume 8 
Transmission & Distribution  

Is the "ON" and "OFF" position and 
direction of operation of the 
Yes/No    
operating mechanism clearly 
marked? 
Is the holding part of the operating 
Yes/No    
handle insulated? 
Total weight  kg    

For each size one data sheet shall be filled       

 
   

124    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

Annex 2: Drawings  
 
   

  Renewable Energy Guidelines  Nov. 2013 125


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  INDEX
 
Transmission & Distribution Networks DATE PAGE NO.

1. DISTRIBUTION CONSTRUCTION MATERIALS


1.1 MV CABLES / ACCESSORIES
1.1.1 T1 OUTDOOR TERMINATION KIT 11kV, XLPE insulation
1.1.2 T2 INDOOR TERMINATION KIT 11kV, XLPE insulation
1.1.3 J1 STRAIGHT JOINT KIT 11kV, XLPE insulation
1.1.4 C2 SHRINK CAP, XLPE insulation
1.2 OVERHEAD MV CONDUCTOR / ACCESSORIES
1.2.1 C6 ALUMINIUM CONDUCTOR STEEL REINFORCED (ACSR)
1.2.2 S1 COMPRESSION SPLIES, full tension for ACSR
1.2.3 S2 REPAIR SLEEVE, for ACSR conductors
1.2.4 C7 COMPRESION TAP CONNECTOR, Type H
1.2.5 S3 COMPRESSION STIRRUP CONNECTOR for ACSR
1.2.6 C8 HOT LINE CLAMP, for installation on compression stirrups
1.3 ABC LV CABLES & ACCESSORIES
1.3.1 C9-1 ABC CABLES (QUADRUPLEX) 0.6/1V, aluminium conductor
1.3.2 C9-2 ABC CABLES (QUADRUPLEX) 0.6/1V, aluminium conductor
1.3.3 C9-3 ABC CABLES (QUADRUPLEX) 0.6/1V, aluminium conductor
1.3.4 S4 SPIRAL (PIG TAIL) HOOK
1.3.5 N1-1 NUT HOOK
1.3.6 N1-2 NUT HOOK
1.3.7 N2 NUT HOOK (EXTERNAL ANGLE)
1.3.8 C10 SUSPENSION CLAMP, ABC, small angles
1.3.9 C11 SUSPENSION CLAMP, ABC, tension, dead end, large angles
1.3.10 C12 SUSPENSION CLAMP (UP TO 30º), ABC
1.3.11 C13 TENSION SUPPORT CLAMP, ABC
1.3.12 C14 DEAD-END CLAMP, ABC, for non-insulated neutral AAAC with cutting
1.3.13 C15 DEAD-END CLAMP, ABC, for non-insulated neutral AAAC without cutting
1.3.14 C16 SUSPENSION CLAMP (UP TO 30º)
1.3.15 Y1 YOKE UNIVERSAL
1.3.16 S5 PRE-INSULATED SLEEVES
1.3.17 S6 COMPRESSION SLEEVES (FULL TENSION)
1.3.18 C17 INSULATION PIERCING CONECTOR
1.3.19 C18 SEALING CAP 0.6/1kV
1.3.20 C19 TRANSITION CONNECTOR, ABC to LV
 
Comment

   

126    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  INDEX
 
Transmission & Distribution Networks DATE PAGE NO.

1.4 INSULATORS & ACCESSORIES


1.4.1 I1 SUSPENSION INSULATOR, porcelain, ball& socket
1.4.2 I2 PIN TYPE INSULATOR, porcelain
1.4.3 I3 GUY INSULATOR, porcelain
1.4.4 C20 WEDGE TYPE TENSION CLAMP
1.4.5 C21 WEDGE TYPE TENSION CLAMP, for ACSR conductor with current loop
1.4.6 B4 BALL CLEVIS
1.4.7 N3 EYE NUT
1.4.8 E1 SOCKET EYE STRAIGHT
1.4.9 P1 POLE TOP PIN
1.4.10 P2 SHORT SHANK PIN
1.4.11 P3 OFFSET POLE TOP PIN
1.4.12 P4 DOUBLE ARMING PLATE
1.5 MISCELLANEOUS
1.5.1 A1 SURGE ARRESTER
1.5.2 B1 DOUBLE ARMING BOLT
1.5.3 B2 MACHINE BOLT
1.5.4 B5 BUCKLE FOR STRAPS
1.5.5 C22 COPPER CONDUCTOR
1.5.6 C23 GROUND STUD CONNECTOR (SPILT BOLT)
1.5.7 G1 GROUND WIRE MOULDING GUARD
1.5.8 R1 GROUND ROD
1.5.9 S7 STRAP
1.5.10 S8 STRAPS
1.5.11 S9 FACADE SADLES
1.5.12 W1 ROUND WASHER
1.5.13 W2 SQUARE WASHER
1.5.14 W3 SPRING LOCK WASHER
1.6 GUY
1.6.1 A2 CONE ANCHOR, concrete
1.6.2 G2 GUY HOOD, ductile iron, hot dip galvanized
1.6.3 G3 GUY END, galvanized steel
1.6.4 G4 TAPERED GUY (GUARD)
1.6.5 N4 THIMBLEYENUT, galvanized steel
1.6.6 R3 THIMBLEYE ANCHOR ROD, galvanized steel
1.6.7 R4 TWINEYE ANCHOR ROD, galvanized steel
1.6.8 S12 SPLIT BOLT, copper to galvanized
1.6.9 W4 GUY WIRE

 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 127


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS INDEX
 
 
DATE PAGE NO.
Transmission & Distribution Networks

2. ASSEMBLIES
2.1.1 AS-01 SINGLE CROSSARM STEEL (2000 mm)
2.1.2 AS-02 SINGLE CROSSARM STEEL (3200 mm)
2.1.3 AS-03 DOUBLE CROSSARM STEEL (2000 mm)
2.1.4 AS-04 DOUBLE CROSSARM STEEL (3200 mm)
2.1.5 AS-05 SINGLE SUPPORT ON CROSSARM (TANGENT)
2.1.6 AS-06 DOUBLE SUPPORT ON CROSSARM (ANGLE)
2.1.7 AS-07 SINGLE SUPPORT ON TOP POLE
2.1.8 AS-08 DOUBLE SUPPORT ON TOP POLE
2.1.9 AS-09 DEAD-END ON CROSSARM
2.1.10 AS-10 DEAD-END ON POLE
2.1.11 AS-11 LV-SINGLE SUPPORT
2.1.12 AS-12 LV-SINGLE DEAD-END
2.1.13 AS-13 LV-SINGLE DEAD-END (existing spiral hook)
2.1.14 AS-14 LV-DOUBLE SUPPORT (angle up to 60º)
2.1.15 AS-15 LV-SINGLE SUPPORT (external angle)
2.1.16 AS-16 LV-DERIVATION SUPPORT
2.1.17 AS-17 LV-SINGLE SERVICE DROP
2.1.18 AS-18 LV-MULTIPLE SERVICE DROP
2.1.19 AS-19 LV-SERIVE CONNECTION CUSTOMER WALL
 
3. MV STRUCTURES
3.1.1 MV-301C STRUCTURE M1, ALIGNMENT
3.1.2 MV-302C STRUCTURE M2, ALIGNMENT, SMALL ANGLE
3.1.3 MV-303C STRUCTURE M3, TENSION, LARGE ANGLE
3.1.4 MV-304C STRUCTURE M4, TENSION, BRANCH
3.1.5 MV-305C STRUCTURE M5, TENSION, DEAD-END
3.1.6 MV-306C STRUCTURE M6, TENSION, SHACKLE
3.1.7 MV-601C STRUCTURE MM1, ALIGNMENT, DOUBLE CIRCUIT
3.1.8 MV-602C STRUCTURE MM², ALIGNMENT, SMALL ANGLE, DOUBLE CIRCUIT
3.1.9 MV-603C STRUCTURE MM3, TENSION, LARGE ANGLE, DOUBLE CIRCUIT
3.1.10 MV-604C STRUCTURE MM4, TENSION, BRANCH, DOUBLE CIRCUIT
3.1.11 MV-605C STRUCTURE MM5, TENSION, DEAD-END, DOUBLE CIRCUIT
3.1.12 MV-606C STRUCTURE MM6, TENSION, SHACKLE, DOUBLE CIRCUIT
3.1.13 TR-01 POLE MOUNTED TRANSFORMER

4. SUB-STATION STRUCTURES
4.1.1 SS-101 POLE MOUNTED TRANSFORMER
4.1.2 SS102 ELECTRICAL SCHEME OF SUB-STATION
4.1.3 LV-101 CONTROL AND DISTRIBUTION CUBICLE
4.1.4 LV-102 WIRING DIAGRAM CONTROL AND DISTRIBUTION CUBICLE
4.1.5 LV-101 AIR CIRCUIT BREAKER - MOUNTING FRAME)
4.1.6 LV-102 AIR CIRCUIT BREAKER - INSTALLATION
4.1.7 LV-101 SURGE ARRESTER - INSTALLATION
4.1.8 LV-102 FUSE CUT OUT – MOUNTING PLATFORM
4.1.9 SS-110 FUSE CUT OUT – INSTALLATION
4.1.10 SS-111 EARTHING - SUB-STATION
4.1.11 SS-112 EARTHING - DISTRIBUTION
 
5. LV STRUCTURES
5.1.1 LV-101 STRUCTURE L1, ALIGNMENT (angle 0º to 30º)
5.1.2 LV-102 STRUCTURE L2, TENSION, SHACKLE
5.1.3 LV-103 STRUCTURE L3, TENSION, BRANCH
5.1.4 LV-104 STRUCTURE L4, TENSION, SHACKLE & BRANCH
5.1.5 LV-105 STRUCTURE L5, ALIGNMENT, LARGE ANGLE (angle 30º to 60º)
5.1.6 LV-106 STRUCTURE L6, TENSION, RIGHT ANGLE (angle 60º to 90º)
5.1.7 LV-107 STRUCTURE L7, TENSION, DEAD-END

128    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
  DISTRIBUTION CONSTRUCTION MATERIALS
PPAF – TECHNICAL GUIDELINES AND MANUALS
  INDEX
 
Transmission & Distribution Networks DATE PAGE NO.

6. SWITCHING EQUIPMENT
6.1.1 PR-01 RECLOSER WITH BYPASS SWITCH
6.1.2 PR-02 RECLOSER WITHOUT BYPASS SWITCH
6.1.3 PR-03 LOAD BREAK SWITCH
6.1.4 PR-04 SINGLE SUPPORT ON CROSSARM DISCONNECTING SWITCH
6.1.5 CT-1 MV CABLE TERMINATION TO OVERHEAD LINE FROM TRANSFORMER
6.1.6 CT-2 MV CABLE TERMINATION TO OVERHEAD LINE FROM GRID/ JUNCTION
7.
8. MISCELLANEOUS
8.1.1 M-001 CONDUIT INSTALLATION
8.1.2 M-002 PAD-MOUNTED FEEDER PILLER & METER BOX
9. GUY
9.1.1 AN-S1 ANCHOR WITH THIMBLEYE ROD
9.1.2 AN-D1 ANCHOR WITH TWINEYE ROD
9.1.3 GU-S1 SINGLE GUY
9.1.4 GU-01 SINGLE OVERHEAD GUY
9.1.5 GU-101C SINGLE DOWN GUY FOR LOW VOLTAGE
9.1.6 GU-102C SINGLE DOWN GUY FOR MEDIUM VOLTAGE
9.1.7 GU-401C SINGLE OVERHEAD GUY
10. CABLES & CONDUCTORS
10.1.1 C-001 TABLE OF CABLE AND CONDUCTORS ASSIGNATION
10.1.2 C-002 OVERHEAD LINE DESIGN CRITERIA
10.1.3 C-003 WEATHER CASE
10.1.4 C-004 SAG TENSION CALCULATIONS – EXAMPLE
11. DESIGN EXAMPLES – GOLAN ASTORE
 

 
Comment

 
   

  Renewable Energy Guidelines  Nov. 2013 129


Volume 8 
Transmission & Distribution  

 
  DISTRIBUTION CONSTRUCTION
PPAF – TECHNICAL GUIDELINES AND MANUALS MATERIAL
  MV CABLES/ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

 
 
T1
OUTDOOR TERMINATION KIT 11 KV, XLPE insulation
 
For cable size
a) all sizes
 
 
 
 
 
 
 
 
Used for outdoor MV termination cable
 
 
 
T2
INDOOR TERMINATION KIT 12 KV, XLPE insulation
 
For cable size
a) all sizes
 

 
Used for indoor MV termination cable
 
'

Comment

 
   

130    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
  DISTRIBUTION CONSTRUCTION MATERIALS
PPAF – TECHNICAL GUIDELINES AND MANUALS
  MV CABLES/ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

J1 
STRAIGHT JOINTS KIT 11 KV, XLPE insulation
  For cable size
a)  All sizes
 
 
 

Used for joint MV cable

C2 
SHRINK CAP, XLPE insulation
  For cable size
a)  All sizes
 
 
 

Used for protection of cable

 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 131


Volume 8 
Transmission & Distribution  

 
  DISTRIBUTION CONSTRUCTION MATERIALS
PPAF – TECHNICAL GUIDELINES AND MANUALS
  OVERHEAD MV CONDUCTOR/ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

C6 
ALUMINUM ALLOY CONDUCTOR STEEL REINFORCED (ACSR)
Overall Breaking
Code Weight
diameter load
a) 70/12 11.5 mm 284 kg/km 26800 N
b) 120/20 15.5 mm 493 kg/km 45650 N
c) 185/30 19.0 mm 741 kg/km 66200 N

Used for transport energy in Medium Voltage

S1 
COMPRESSION SPLICE, full tension for ACSR conductor 
Conductor size Overall diameter

a) 70/12 mm² 11.5 mm


b) 120/20 mm² 15.5 mm
c) 185/30 mm² 19.0 mm

Used for joint conductor ACSR

S2 
REPAIR SLEEVE, for ACSR conductor 
Conductor size Overall diameter

a) 70/12 mm² 11.5 mm


b) 120/20 mm² 15.5 mm
c) 185/30 mm² 19.0 mm

Used for repair conductor ACSR

 
Comment

   

132    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS OVERHEAD MV
  CONDUCTOR/ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

C7 
COMPRESSION TAP CONNECTOR, Type H 
Main conductor
Tap conductor (diameter)
(diameter)
a) 70/12 mm² (11.5 mm) 70/12 mm² (11.5 mm)
b) 120/20 mm² (15.5 mm) 120/20 mm² (15.5 mm)
c) 185/30 mm² (19.0 mm) 185/30 mm² (19.0 mm)
d) 120/20 mm² (15.5 mm) 70/12 mm² (11.5 mm)
e) 185/30 mm² (19.0 mm) 70/12 mm² (11.5 mm)
f) 185/30 mm² (19.0 mm) 120/20 mm² (15.5 mm)

Used for joint conductor ACSR

S3 
COMPRESSION STIRRUP CONNECTOR, for ACSR conductor, casting aluminum alloy and stirrup copper rod
Stirrups
Casting for conductor
section
Size Diameter
a) 70/12 11.5 mm 284 kg/km
b) 120/20 15.5 mm 493 kg/km
c) 185/30 19.0 mm 741 kg/km
H min = 95 mm and B min = 100 mm
Used for protect conductor of electric arcing

C8 
HOT LINE CLAMP, for installation on compression stirrups 
Main Tap

a) 4 - 10 mm 4 - 10 mm

Used for installation on energized conductor

 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 133


Volume 8 
Transmission & Distribution  

PPAF – TECHNICAL GUIDELINES AND MANUALS DISTRIBUTION CONSTRUCTION MATERIALS


 
  ABC LV CABLES AND ACCESSORIES
Transmission & Distribution Networks DATE PAGE NO.

C9‐1 
ABC CABLES (QUADRUPLEX) 0.6/1 KV, aluminum conductor; bare messenger in Al alloy, messenger diameter adjusted 
Phases Neutral
conductor messenger
a) 3 x 50 mm² 1 x 50 mm²
b) 3 x 95 mm² 1 x 70 mm²
c) 3 x 120 mm² 1 x 70 mm²

Used for transport energy in low voltage overhead line

C9‐2 
ABC CABLES (QUADRUPLEX) 0.6/1 KV, aluminum conductor; all insulated, all load bearing, equal diameter 

Phases Neutral
conductor messenger
a) 3 x 50 mm² 1 x 50 mm²
b) 3 x 95 mm² 1 x 95 mm²
c) 3 x 120 mm² 1 x 120 mm²
Used for support low voltage cables

C9‐3 
ABC CABLES (QUADRUPLEX) 0.6/1 KV, aluminum conductor; all insulated, all load bearing; messenger adjusted diameter 

Phases Neutral
conductor messenger
a) 3 x 50 mm² 1 x 50 mm²
b) 3 x 95 mm² 1 x 70 mm²
c) 3 x 120 mm² 1 x 70 mm²
Used for support low voltage cables

 
 
Comment

 
   

134    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  ABC LV CABLES AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

S4 
ABC CABLES (QUADRUPLEX) 0.6/1 KV, aluminum conductor 
Dimensions
Diameter Length
a) M16 300 mm
b) M16 360 mm

Used for support low voltage cables

N1‐1 
Bolt HOOK (EXTERNAL ANGLE), for non-insulated neutral
  For bolt

a)  M16
 
 
 
Used Used for support low voltage cables

N1‐2 
NUT HOOK (EXTERNAL ANGLE), for non-insulated neutral AAAC
  For bolt

a)  M16
 
 
 
Used for support neutral messenger in low voltage overhead line
 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 135


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  ABC LV CABLES AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

C10 
Clamp, complete set for wall connection, small angles, for ABC
 
a)  35 mm²
b)  50 mm²
c)  70 mm²
d)  95 mm²
e)  120 mm²
Used for support ABC cable in low voltage overhead line

C11 
Suspension clamp for ABC cable, DEAD-END CLAMP, tension poles, dead end and large angles
 
a)  10-25 mm²
b)  35-50 mm²
c)  70-95 mm²
d)  95-150 mm²
 
Used for ABC cable in low voltage overhead line

C12 
SUSPENSION CLAMP (UP TO 30º), for ABC cable, medium angles
  Neutral section
a)  10-50 mm²
b)  50-95 mm²
d)  95-150 mm²
 
Used for support neutral messenger in low voltage overhead line

C13 
Tension support clamp, for ABC cable,
 
a)  50-95 mm²
b)  95-120 mm²
 
 
Used for support ABC cable in low voltage overhead line
 
Comment

   

136    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  ABC LV CABLES AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

C14 
DEAD-END CLAMP, for non-insulated neutral AAAC with cutting
  Neutral section
a)  35 mm²
b)  50 mm²
c)  70 mm²
d)  95 mm²
e)  120 mm²
Used for support neutral messenger in low voltage overhead line

C15 
DEAD-END CLAMP, for non-insulated neutral AAAC without cutting
  Neutral section
a)  35 mm²
b)  50 mm²
c)  70 mm²
d)  95 mm²
e)  120 mm²
Used for support neutral messenger in low voltage overhead line

C16 
SUSPENSION CLAMP (UP TO 30º), for non-insulated neutral AAAC
  Neutral section
a)  35 mm²
b)  70 mm²
d)  95 mm²
e)  120 mm²
Used for support neutral messenger in low voltage overhead line

Y1 
YOKE UNIVERSAL, with two suspension clamps (line angles up to 60º)
  Neutral section
a)  35 - 120 mm²
 
 
 

Used for support neutral messenger in low voltage overhead line


 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 137


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
 
  ABC LV CABLES AND ACCESSORIES

Transmission & Distribution Networks DATE PAGE NO.

S5 
PRE-INSULATED SLEEVES, for Aluminum conductor according to Chapter F (Technical Specification)
  Conductor section
a) 50 mm²
b) 95 mm²
c) 120 mm²

Used for joint conductor LV

S6 
COMPRESSION SLEEVES (FULL TENSION), for ABC cable: non insulated cable
  Conductor section
a) 35 mm²
b) 70 mm²

 
Used for joint ABC cable

C17 
INSULATION PIERCING CONNECTOR, for insulated overhead lines 
Main range Branch range

a) 25-95 mm² AL 25-95 mm² AL


b) 50-120 mm² AL 50-120 mm² AL
c) 25-95 mm² AL 4-70 mm² CU

d) 50-120 mm² AL 10-95 mm² CU

Used for branch conductor

 
Comment

   

138    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  ABC LV CABLES AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

C18 
SEALING CAP 0.6/1 KV
 

 
Used for protection cables LV

C19 
TRANSITION CONNECTOR, between LV ABC and bare LV line 
Main conductor Tap conductor

a) ------- 11.5 mm

Used for repair conductor ACSR

 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 139


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  INSULATOR AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

I1 
SUSPENSION INSULATOR, porcelain, ball and socket
Mechanical
Disc diameter Spacing
failing load
a) 175 mm 110 mm 40 kN

Used for support conductor Medium Voltage

I2 
PIN TYPE INSULATOR, porcelain
Mechanical
Diameter Height
cantilever load
a) 238 mm 158 mm 20 kN

Used for support conductor Medium Voltage

I3 
GUY TYPE INSULATOR, porcelain
Mechanical
Diameter Height
tensile strength
a) 73 mm 140 mm 53 kN

Used for Guy wire (max. wire diameter: 16 mm)

C20 
WEDGE TYPE TENSION CLAMP, for ACSR conductor without current loop
Conductor size Overall diameter

a) 70/12 mm² 11.5 mm


b) 120/20 mm² 11.5 mm
c) 185/30 mm² 19.0 mm

Used for support conductor ACSR


 
Comment

   

140    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  INSULATOR AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

C21 
WEDGE TYPE TENSION CLAMP, for ACSR conductor with current loop
Conductor size Overall diameter

a) 70/12 mm² 11.5 mm


b) 120/20 mm² 11.5 mm
c) 185/30 mm² 19.0 mm

Used for support conductor ACSR

B4 
BALL CLEVIS, galvanized steel for suspension insulator
  Minimum Breaking strength
a) 130 kN

 
Used for support conductor ACSR 

N3 
EYE NUT, galvanized steel
For bolt Diameter Minimum Breaking strength
a) M16 130 kN

Used for support conductor ACSR

E1 
SOCKET EYE STRAIGHT, galvanized steel for suspension insulator
  Minimum Breaking strength
a) 130 kN

 
Used for support conductor ACSR 
 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 141


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
 
  INSULATOR AND ACCESSORIES

Transmission & Distribution Networks DATE PAGE NO.

P1 
POLE TOP PIN, galvanized pressed steel for pin type insulator
L H S Hole diameter Slotted hole
a) 500 mm 280 mm 200 mm 18 mm 18 x 32 mm

Used for support conductor on pole Medium Voltage

P2 
POLE TOP PIN, galvanized pressed steel for pin type insulator
Dimensions
A B C Shank diameter
a) 180 mm 40 mm 75 mm M20

Used for support conductor on crossarm Medium Voltage

P3 
POLE TOP PIN, galvanized pressed steel for pin type insulator
Dimensions
L A B S Hole diameter
a) 550 mm 110 mm 300 mm 200 mm 18 mm

Slotted hole 
18 x 32 mm

Used for support conductor on pole Medium Voltage

P4 
DOUBLE ARMING PLATE, hot dip galvanized short shank pin P2
Dimensions
L A B S Hole diameter
a) 600 mm 370 mm 50 mm 100 mm 22 mm

Used for mounting short shank insulator pin


 
Comment

   

142    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  INSULATOR AND ACCESSORIES
 
Transmission & Distribution Networks DATE PAGE NO.

A1 
SURGE ARRESTER, type gapless, grey, silicon rubber, insulated bracket 
Rated
Rated max Rated
continuous
operation discharge Rated frequency
operating
voltage current (peak)
voltage
a) 24 kV 19 kV 10 kA 50 Hz

Used for overvoltage protection

B1 
DOUBLE ARMING BOLT, metric thread, 4 hexagonal nut, galvanized steel
Dimensions Minimum
Diameter Length breaking strength
a) M16 250 mm 55 kN
b) M16 300 mm 55 kN
c) M16 350 mm 55 kN
d) M16 400 mm 55 kN
e) M20 300 mm 80 kN
f) M20 350 mm 80 kN
g) M16 500 mm 55 kN
h) M16 550 mm 55 kN
Used for assemblies double crossarm

B2 
DOUBLE ARMING BOLT, metric thread, 4 hexagonal nut, galvanized steel
Dimensions Minimum
Diameter Length breaking strength
a) M10 50 mm 19 kN
b) M10 125 mm 19 kN
c) M12 50 mm 35 kN
d) M12 150 mm 35 kN
e) M12 250 mm 35 kN
f) M12 300 mm 35 kN
g) M16 200 mm 55 kN
h) M16 250 mm 55 kN
i) M16 300 mm 55 kN
j) M20 250 mm 80 kN
k) M20 300 mm 80 kN
l) M20 350 mm 80 kN
m) M20 50 mm 80 kN
n) M12 475 mm 35 kN
o) M12 525 mm 35 kN
Used for assemblies single crossarm, pole top pin

 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 143


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
 
  MISCELLANEOUS

Transmission & Distribution Networks DATE PAGE NO.

B5 
BUCKLE FOR STRAPS, stainless steel
Dimensions
  L
a) 21 mm

 
Used for attach cables protection

C22 
COPPER CONDUCTOR, stranded; yellow-green insulation for earthing
Conductor size Overall diameter
a) 25 mm² 6.40 mm
b) 35 mm² 7.60 mm

Used for earthing electrical system

C23 
GROUND STUD CONNECTOR (SPLIT BOLT), copper bonded
Stud diameter Conductor range
a) 12 mm 25 mm²
b) 12 mm 35 mm²

Used for connect ground lug pole inside to external ground

G1 
GROUND WIRE MOLDING GUARD, plastic, grey color
Dimension
a Length
a) 12 mm 2400 mm

Used for protecting of ground wire

R1 
GROUND WIRE MOLDING GUARD, plastic, grey color
Dimension
Diameter Length
a) 12 mm 1500 mm
b) 16 mm 1800 mm
Used for connect earth wire to the ground

 
Comment
   

144    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  MISCELLANEOUS
 
Transmission & Distribution Networks DATE PAGE NO.

S7 
STRAP, hot dip galvanized, include plastic anchor and slotted hex head with washer head screw

Anchor and
For guard
slotted length
a) 12 mm 25 mm

strap Slotted Anchor


Used for protecting ground wire

S8 
STRAPS, stainless steel

Dimensions Breaking
a) 20 mm x 0.4 mm 70 daN/mm²

Used for attach cables protection

S9 
FACADE SADDLES, include a plastic support, a plastic plug, a standard plastic tie and galvanized steel

For cable size


a) ABC 3 x 120 mm² + 1 x 70 mm²

Used to install LV insulated overhead line on a building

W1 
ROUND WASHER, galvanized steel
For Bolt diameter Outside diameter Thickness
a) M12 35 mm 6 mm
b) M16 45 mm 6 mm
c) M20 50 mm 6 mm

Used for miscellaneous assemblies

W2 
SQUARE WASHER, galvanized steel
For Bolt diameter Outside diameter
a) M12 35 mm
b) M16 45 mm
c) M20 50 mm

Used for miscellaneous assemblies


 
Comment
   

  Renewable Energy Guidelines  Nov. 2013 145


Volume 8 
Transmission & Distribution  

 
PPAF – TECHNICAL GUIDELINES AND MANUALS DISTRIBUTION CONSTRUCTION MATERIALS
 
  GUY
Transmission & Distribution Networks DATE PAGE NO.

A2 
CONE ANCHOR, concrete

Ultimate For Rod


Area Weight
strength Diameter

a) 161300 mm² 380 N 130 kN 20 mm

Used for guy assembly

G2 
GUY HOOD, ductile iron, hot dip galvanized
Guy end Thru Ultimate strength
diameter bolt rating
a) 7.0 mm M16 39 kN
b) 11.0 mm M20 95 kN

Used for guy assembly

G3 
GUY END, galvanized steel  
For guy
Ultimate strength rating
diameter
a) 7.0 mm 36 kN
b) 11.0 mm 101 kN

Used for guy assembly guy assembly

 
Comment

   

146    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND MANUALS DISTRIBUTION CONSTRUCTION MATERIALS
 
  GUY

Transmission & Distribution Networks DATE PAGE NO.

G4 
TAPERED GUY (GUARD), half round steel with top clamp  

For guy range


Length
diameter
a) 6-0 - 11 mm 2400 mm

Used for protecting guy wire

N4 
THIMBLEYENUT, galvanized steel
Minimum
For bolt Guy end
breaking
diameter diameter
strength
a) M16 7.0 mm 110 kN
b) M20 11.0 mm 130 kN

Used for guy assembly

R3 
THIMBLEYE ANCHOR ROD, galvanized steel with nut included
ultimate
Diameter Length
strength rating
a) M16 2000 mm 70 kN
b) M20 2400 mm 100 kN

Used for attach cables protection

R4 
TWINEYE ANCHOR ROD, galvanized steel with nut included
ultimate
Diameter Length strength
rating
a) M20 2400 mm 100 kN

Used for attach cables protection


 
Comment

   

  Renewable Energy Guidelines  Nov. 2013 147


Volume 8 
Transmission & Distribution  

  DISTRIBUTION CONSTRUCTION MATERIALS


PPAF – TECHNICAL GUIDELINES AND MANUALS
  GUY
 
Transmission & Distribution Networks DATE PAGE NO.

S12 
SPLIT BOLT, copper to galvanized steel, high strength, high copper, alloy body, electrotined nut, spacer and
pressure bar
Guy strand
Copper strand diameter
diameter
a) 7.0 mm 6.40 mm
b) 11.0 mm 7.60 mm

Use Used for connect guy wire to the ground

W4 
GUY WIRE, zinc-coated steel stranded, 1300 grade
ultimate
Strand
Wire size strength
diameter
rating
a) 7 X 2.00 mm 7.0 mm 39 kN
b) 7 X 3.65 11.0 mm 95 kN

Used for guy assembly

W3 
SPRING LOCK WASHER, galvanized steel
Inside diameter
For Bolt diameter
Min Max
a) M10 10.5 mm 10.7 mm
b) M12 12.7 mm 13.0 mm
c) M16 16.9 mm 17.3 mm
d) M20 20.1 mm 20.7 mm
Used for keep a bolt-nut in tension

 
Comment

 
 
   

148    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
 
 
2.  ASSEMBLIES 
 
2.1 AS-01 SINGLE CROSSARM STEEL (2000 mm)
2.2 AS-02 SINGLE CROSSARM STEEL (3200 mm)
2.3 AS-03 DOUBLE CROSSARM STEEL (2000 mm)
2.4 AS-04 DOUBLE CROSSARM STEEL (3200 mm)
2.5 AS-05 SINGLE SUPPORT ON CROSSARM (TANGENT)
2.6 AS-06 DOUBLE SUPPORT ON CROSSARM (ANGLE)
2.7 AS-07 SINGLE SUPPORT ON TOP POLE
2.8 AS-08 DOUBLE SUPPORT ON TOP POLE
2.9 AS-09 DEAD-END ON CROSSARM
2.10 AS-10 DEAD-END ON POLE
2.11 AS-11 LV-SINGLE SUPPORT
2.12 AS-12 LV-SINGLE DEAD-END
2.13 AS-13 LV-SINGLE DEAD-END (existing spiral hook)
2.14 AS-14 LV-DOUBLE SUPPORT (angle up to 60º)
2.15 AS-15 LV-SINGLE SUPPORT (external angle)
2.16 AS-16 LV-DERIVATION SUPPORT
2.17 AS-17 LV-SINGLE SERVICE DROP
2.18 AS-18 LV-MULTIPLE SERVICE DROP
2.19 AS-19 LV-SERIVE CONNECTION CUSTOMER WALL
 

 
Drawing:
PPAF – TECHNICAL GUIDELINES  
AND MANUALS Medium Voltage Miscellaneous Assemblies
   

Transmission & Distribution Networks U AS-00


Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 149


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


B2a 2 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M10 x 50 mm  
B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M12 x REQ`D  
LENGTH
B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 x REQ`D  
LENGTH
B6a 2 FLAT CROSSARM BRACE 40 mm X 8 mm, LENGTH 760 mm  
C20a 1 STEEL CROSSARM 70 mm X 70 mm X 7 mm, LENGTH 2000 mm  
W2b 1 SQUARE WASHER, 60 mm X 60 mm X 8 mm, FOR BOLT M12  
W2c 1 SQUARE WASHER, 75 mm X 75 mm X 8 mm, FOR BOLT M16  
W3a 2 SPRING LOCK WASHER, FOR BOLT M10  
W3b 1 SPRING LOCK WASHER, FOR BOLT M12  
W3c 1 SPRING LOCK WASHER, FOR BOLT M16  
   
PPAF – TECHNICAL Single Crossarm Steel (2000 mm) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
Transmission & Distribution U AS-01
Date: Revision: Scale: -
Networks
   

150    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


B2a 2 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M10 x 50 mm  
B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M12 x REQ`D  
LENGTH
B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 x REQ`D  
LENGTH
B6b 2 FLAT CROSSARM BRACE 40 mm X 8 mm, LENGTH 1000 mm  
C20c 1 STEEL CROSSARM 70 mm X 70 mm X 7 mm, LENGTH 3200 mm  
W2b 1 SQUARE WASHER, 60 mm X 60 mm X 8 mm, FOR BOLT M12  
W2c 1 SQUARE WASHER, 75 mm X 75 mm X 8 mm, FOR BOLT M16  
W3a 2 SPRING LOCK WASHER, FOR BOLT M10  
W3b 1 SPRING LOCK WASHER, FOR BOLT M12  
W3c 1 SPRING LOCK WASHER, FOR BOLT M16  
   
PPAF – TECHNICAL Single Crossarm Steel (3200 mm) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-02
Transmission & Distribution
Date: Revision: Scale: -
Networks
 
   

  Renewable Energy Guidelines  Nov. 2013 151


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


B1 3 DOUBLE ARMING BOLT, METRIC THREAD, 4 HEXAGONAL NUT M16 x REQ`D  
LENGTH
B2a 4 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M10 x 50 mm  
B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M12 x REQ`D  
LENGTH
B6a 4 FLAT CROSSARM BRACE 40 mm X 8 mm, LENGTH 760 mm  
C20a 2 STEEL CROSSARM 70 mm X 70 mm X 7 mm, LENGTH 2000 mm  
W3a 4 SPRING LOCK WASHER, FOR BOLT M10  
W3b 1 SPRING LOCK WASHER, FOR BOLT M12  
W3c 10 SPRING LOCK WASHER, FOR BOLT M16  
 
 
   
PPAF – TECHNICAL Double Crossarm Steel (2000 mm) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-03
Transmission & Distribution Date: Revision: Scale: -
Networks

   

152    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


B1 3 DOUBLE ARMING BOLT, METRIC THREAD, 4 HEXAGONAL NUT M16 x REQ`D  
LENGTH
B2a 4 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M10 x 50 mm  
B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M12 x REQ`D  
LENGTH
B6b 4 FLAT CROSSARM BRACE 40 mm X 8 mm, LENGTH 1000 mm  
C20c 2 STEEL CROSSARM 70 mm X 70 mm X 7 mm, LENGTH 3200 mm  
W3a 4 SPRING LOCK WASHER, FOR BOLT M10  
W3b 1 SPRING LOCK WASHER, FOR BOLT M12  
W3c 10 SPRING LOCK WASHER, FOR BOLT M16  
 
 
   
PPAF – TECHNICAL Double Crossarm Steel (3200 mm) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-04
Transmission & Distribution
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 153


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


I2 1 PIN TYPE INSULATOR, 238 mm (DIAMETER) X 158 mm (HEIGHT)  
P2 1 SHORT SHANK PIN, FOR POLE TOP INSULATOR I2  
W3d 1 SPRING LOCK WASHER, FOR BOLT M20  
 
 
 
 
 
 
 
   
PPAF – TECHNICAL Single Support on Crossarm (Tangent) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-05
Transmission & Distribution Date: Revision: Scale: -
Networks

 
   

154    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


B2m 2 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M20 x 50 mm  
I2 2 PIN TYPE INSULATOR, 238 mm (DIAMETER) X 158 mm (HEIGHT)  
P2 2 SHORT SHANK PIN, FOR POLE TOP INSULATOR I2  
P4 1 DOUBLE ARMING PLATE, FOR SHORT SHANK PIN P2  
W3d 4 SPRING LOCK WASHER, FOR BOLT M20  
 
 
 
 
 
   
PPAF – TECHNICAL Double Support on Crossarm (Angle) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-06
Transmission & Distribution Date: Revision: Scale: -
Networks

   

  Renewable Energy Guidelines  Nov. 2013 155


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


B2 2 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 x REQ`D  
LENGTH
I2 1 PIN TYPE INSULATOR, 238 mm (DIAMETER) X 158 mm (HEIGHT)  
P1 1 POLE TOP PIN, 500 mm X 280 mm X 200 mm  
W2 2 SQUARE WASHER, 75 mm X 75 mm X 8 mm, FOR BOLT M16  
W3c 2 SPRING LOCK WASHER, FOR BOLT M16  
   
PPAF – TECHNICAL Single Support on Top Pole Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-07
Transmission & Distribution
Date: Revision: Scale: -
Networks
   

156    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


B2 2 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 x REQ`D  
LENGTH
I2 2 PIN TYPE INSULATOR, 238 mm (DIAMETER) X 158 mm (HEIGHT)  
P3 2 OFFSET POLE TOP PIN, 550 mm X 110 mm X 200 mm  
W3c 2 SPRING LOCK WASHER, FOR BOLT M16  
 
   
PPAF – TECHNICAL Double Support on Top Pole Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
Transmission & Distribution U AS-08
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 157


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


B4 1 BALL CLEVIS, FOR SUSPENSION INSULATOR I1  
C16 1 WEDGE TYPE TENSION CLAMP, FOR ACSR CONDUCTOR  
E1 1 SOCKET EYE STRAIGHT, FOR SUSPENSION INSULATOR I1  
I1 3 SUSPENSION INSULATOR, BALL AND SOCKET 175 mm (DISC. DIAMETER) X 110 mm  
(SPACING)
N3 1 EYE NUT, FOR BOLT M16  
   
PPAF – TECHNICAL Dead-end on Crossarm Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
Transmission & Distribution U AS-09
Date: Revision: Scale: -
Networks
   

158    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


B1 1 DOUBLE ARMING BOLT, METRIC THREAD, 4 HEXAGONAL NUT M16 x REQ`D  
LENGTH
B4 1 BALL CLEVIS, FOR SUSPENSION INSULATOR I1  
C16 1 WEDGE TYPE TENSION CLAMP, FOR ACSR CONDUCTOR  
E1 1 SOCKET EYE STRAIGHT, FOR SUSPENSION INSULATOR I1  
I1 3 SUSPENSION INSULATOR, BALL AND SOCKET 175 mm (DISC. DIAMETER) X 110 mm  
(SPACING)
N3 1 EYE NUT, FOR BOLT M16  
W2c 2 SQUARE WASHER, 75 mm X 75 mm X 8 mm, FOR BOLT M16  
W3c 2 SPRING LOCK WASHER, FOR BOLT M16  
 
 
   
PPAF – TECHNICAL Dead-end on Pole Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies MV
U AS-10
Transmission & Distribution Date: Revision: Scale: -
Networks

   

  Renewable Energy Guidelines  Nov. 2013 159


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


C12 1 SUSPENSION CLAMP, for ABC cable, various kinds  
S4 1 SPIRAL (PIG TAIL) HOOK, WITH SQUARE WASHER, SPRING LOCK WASHER AND NUT  
   
PPAF – TECHNICAL Single Support Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
U AS-11
Transmission & Distribution
Date: Revision: Scale: -
Networks
   

160    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


C10 2 DEAD-END CLAMP, FOR ABC, VARIOUS KINDS  
S4 1 SPIRAL (PIG TAIL) HOOK, WITH SQUARE WASHER, SPRING LOCK WASHER AND NUT  
   
PPAF – TECHNICAL Single Dead-end Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
Transmission & Distribution U AS-12
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 161


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


C10 1 DEAD-END CLAMP, FOR ABC, VARIOUS KINDS  
N1 1 NUT HOOK FOR BOLT M16  
   
PPAF – TECHNICAL Single Dead-end (Existing Spiral Hook) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
Transmission & Distribution U AS-13
Date: Revision: Scale: -
Networks
   

162    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


C12 2 YOKE UNIVERSAL,WITH COMPLETE SPIRAL HOOK or TENSION CLAMPS FOR ABC  
Y1 1  
   
PPAF – TECHNICAL Double Support (Angle Up to 60º) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
Transmission & Distribution U AS-14
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 163


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION CODE


B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 x REQ`D  
LENGTH
C12 1 SUSPENSION CLAMP, FOR ABC VARIOUS KINDS  
N2 1 NUT HOOK (EXTERNAL ANGLE) FOR BOLT M16  
W2c 1 SQUARE WASHER, 75 mm X 75 mm X 8 mm, FOR BOLT M16  
   
PPAF – TECHNICAL Single Support (External Angle) Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
Transmission & Distribution U AS-15
Date: Revision: Scale: -
Networks
   

164    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

   
PPAF – TECHNICAL Cable Support: Derivation from LV suspension Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
U AS-16
Transmission & Distribution
Date: Revision: Scale: -
Networks

 
   

  Renewable Energy Guidelines  Nov. 2013 165


Volume 8 
Transmission & Distribution  

   
PPAF – TECHNICAL Single Service Drop Support Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
U AS-17
Transmission & Distribution
Date: Revision: Scale: -
Networks

 
   

166    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


B2 1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 x REQ`D  
LENGTH
C12 1 SUSPENSION CLAMP, FOR ABC VARIOUS KINDS  
N2 1 NUT HOOK (EXTERNAL ANGLE) FOR BOLT M16  
W2c 1 SQUARE WASHER, 75 mm X 75 mm X 8 mm, FOR BOLT M16  
   
PPAF – TECHNICAL Multiple Service Support Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
Transmission & Distribution U AS-18
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 167


Volume 8 
Transmission & Distribution  

   
PPAF – TECHNICAL Sercie Connection at Customer Walls Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies LV
U AS-19
Transmission & Distribution Date: Revision: Scale: -
Networks

   

168    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

3.  MV STRUCTURES 
 
3.1 MV-301C STRUCTURE M1, ALIGNMENT
3.2 MV-302C STRUCTURE M2, ALIGNMENT, SMALL ANGLE
3.3 MV-303C STRUCTURE M3, TENSION, LARGE ANGLE
3.4 MV-304C STRUCTURE M4, TENSION, BRANCH
3.5 MV-305C STRUCTURE M5, TENSION, DEAD-END
3.6 MV-306C STRUCTURE M6, TENSION, SHACKLE
3.7 MV-601C STRUCTURE MM1, ALIGNMENT, DOUBLE CIRCUIT
3.8 MV-602C STRUCTURE MM², ALIGNMENT, SMALL ANGLE, DOUBLE CIRCUIT
3.9 MV-603C STRUCTURE MM3, TENSION, LARGE ANGLE, DOUBLE CIRCUIT
3.10 MV-604C STRUCTURE MM4, TENSION, BRANCH, DOUBLE CIRCUIT
3.11 MV-605C STRUCTURE MM5, TENSION, DEAD-END, DOUBLE CIRCUIT
3.12 MV-606C STRUCTURE MM6, TENSION, SHACKLE, DOUBLE CIRCUIT

   
PPAF – TECHNICAL Medium Voltage Drawing:
GUIDELINES AND MANUALS Structures
U MV-00
Transmission & Distribution
Date: Revision: Scale: -
Networks

   

  Renewable Energy Guidelines  Nov. 2013 169


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-01 1 Single crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-05 2 Single support on crossarm (tangent)   3  Preformed distribution ties for ACSR 
AS-07 1 Single support on top pole      
 
Structure M1 - Drawing:
PPAF – TECHNICAL GUIDELINES AND MANUALS
Alignment (Angle 0-5°)
U MV-301C
Transmission & Distribution Networks Date: Revision: Scale: -

   

170    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-03 1 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-06 2 Double support on crossarm (angle)   6  Preformed distribution ties for ACSR 
AS-08 1 Double support on top pole      
 
PPAF – TECHNICAL GUIDELINES AND Structure M2 - Alignment Small Angle Drawing:
MANUALS (Angle 5°-15°)
U MV-302C
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 171


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-01 1 Single crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-03 1 Double crossarm steel (2000 mm)   3  Preformed distribution ties for ACSR 
AS-05 3 Single support on crossarm (tangent) C7  3  Compression tap connectors, H type for ACSR, 
 as requested 
AS-09 6 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure M3 - Tension,
Large Angle
U MV-303C
Transmission & Distribution Networks Date: Revision: Scale: -

   

172    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-01 1 Single crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-03 1 Double crossarm steel (2000 mm)   3  Preformed distribution ties for ACSR 
AS-05 3 Single support on crossarm (tangent) C7  3  Compression tap connectors, H type for ACSR, 
 as requested 
AS-07 1 Single support on top pole      
AS-09 3 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure M4 - Tension,
Branch
U MV-304C
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 173


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-03 1 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-09 3 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure M5 - Tension, Dead-End
U MV-305C
Transmission & Distribution Networks Date: Revision: Scale: -

   

174    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-03 1 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-05 3 Single support on crossarm (tangent)   1  Preformed distribution ties for ACSR 
AS-09 3 Dead-end on crossarm C7  3  Compression tap connectors, H type for ACSR, 
 as requested 
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure M6 - Tension, Shackle
U MV-306C
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 175


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-01 1 Single crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-03 1 Double crossarm steel (2000 mm)   6  Preformed distribution ties for ACSR 
AS-05 6 Single support on crossarm (tangent)      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure MM1 - Alignment,
Double Circuit
U MV-601C
Transmission & Distribution Networks Date: Revision: Scale: -

   

176    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-03 1 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-04 1 Double crossarm steel (3200 mm)   12  Preformed distribution ties for ACSR 
AS-06 6 Double support on crossarm (angle)      
 
PPAF – TECHNICAL GUIDELINES AND Drawing:
Structure MM2 - Alignment,
MANUALS
Small Angle, Double Circuit
U MV-602C
Transmission & Distribution Networks Date: Revision: Scale: -

  Renewable Energy Guidelines  Nov. 2013 177


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-03 2 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-04 2 Double crossarm steel (3200 mm)   6  Preformed distribution ties for ACSR 
AS-05 6 Single support on crossarm (tangent) C7  6  Compression tap connectors, H type for ACSR, as 
requested 
AS-09 3 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure MM1 - Alignment,
Double Circuit
U MV-603C
Transmission & Distribution Networks Date: Revision: Scale: -

   

178    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-01 1 Single crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-02 1 Single crossarm steel (3200 mm)   6  Preformed distribution ties for ACSR 
AS-03 1 Double crossarm steel (2000 mm) C7  3  Compression tap connectors, H type for ACSR, as 
requested 
AS-05 6 Single support on crossarm (tangent)      
AS-09 3 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Structure MM4 - Tension, Branch Drawing:
Double Circuit
U MV-604C
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 179


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-03 1 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-04 1 Double crossarm steel (3200 mm)      
AS-09 6 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Structure MM5 - Tension Dead-End Drawing:
Double Circuit
U MV-605C
Transmission & Distribution Networks Date: Revision: Scale: -

   

180    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-03 1 Double crossarm steel (2000 mm) MATERIAL QT. DESCRIPTION
AS-04 1 Double crossarm steel (3200 mm)   2  Preformed distribution ties for ACSR 
AS-05 2 Single support on crossarm (tangent) C7  6  Compression tap connectors, H type for ACSR, as 
requested 
AS-09 6 Dead-end on crossarm      
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Structure MM6 - Tension, Shackle Drawing:
Double Circuit
U MV-606C
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 181


Volume 8 
Transmission & Distribution  

 
4.0 SUB-STATION STRUCTURES

4.1 SS-101 POLE MOUNTED TRANSFORMER


4.2 SS-102 ELECTRICAL SCHEME OF SUB-STATION
4.3 SS-103 CONTROL AND DISTRIBUTION CUBICLE
4.4 SS-104 WIRING DIAGRAM CONTROL AND DISTRIBUTION CUBICLE
4.5 SS-105 AIR CIRCUIT BREAKER - MOUNTING FRAME
4.6 SS-106 AIR CIRCUIT BREAKER - INSTALLATION
4.7 SS-107 SUSPENSION INSULAOR – MOUNTING FRAME
4.8 SS-108 SUREG ARRESTER - INSTALLATION
4.9 SS-109 FUSE CUT OUT – MOUNTING PLATFORM
4.7 SS-110 FUSE CUT OUT – INSTALLATION
4.8 SS-111 EARTHING – SUB-STATION
4.9 SS-112 EARTHING - DISTRIBUTION

   
PPAF – TECHNICAL GUIDELINES 11/0.4 kV Sub-Station Drawing:
AND MANUALS
U SS-00
Transmission & Distribution Networks Date: Revision: Scale: -

   

182    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Pole Mounted Transformer
U SS-101
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

  Renewable Energy Guidelines  Nov. 2013 183


Volume 8 
Transmission & Distribution  

Transformer 11/0.4 kV 
Class S11 oder better 
Un= 11 kV ±5%, Uk=4‐0%

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Electrical scheme of Sub-Station

U SS-102
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

184    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Control and Distribution Cubicle
U SS-103
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 185


Volume 8 
Transmission & Distribution  

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
Electrical Circuit Control and
MANUALS
Distribution Cubicle
U SS-104
Transmission & Distribution Networks Date: Revision: Scale: -

   

186    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
Air Circuit Breaker – Mounting
MANUALS
Frame
U SS-105
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

  Renewable Energy Guidelines  Nov. 2013 187


Volume 8 
Transmission & Distribution  

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Air Circuit Breaker – Installation
U SS-106
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

188    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
Suspension Insulator – Mounting
MANUALS
Frame
U SS-107
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

  Renewable Energy Guidelines  Nov. 2013 189


Volume 8 
Transmission & Distribution  

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Surge Arrester - Installation
U SS-108
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

190    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Fuse Cut Out – Mounting Frame
U SS-109
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 191


Volume 8 
Transmission & Distribution  

 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Fuse Cut Out - Installation
U SS-110
Transmission & Distribution Networks Date: Revision: Scale: -

 
   

192    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Earthing – Sub-Station
U SS-111
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 193


Volume 8 
Transmission & Distribution  

 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Earthing – Distribution
U SS-112
Transmission & Distribution Networks Date: Revision: Scale: -

   

194    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
 

 
5.0 LV STRUCTURES

5.1 LV-101 STRUCTURE L1, ALIGNMENT (angle 0º to 30º)


5.2 LV-102 STRUCTURE L2, TENSION, SHACKLE
5.3 LV-103 STRUCTURE L3, TENSION, BRANCH
5.4 LV-104 STRUCTURE L4, TENSION, SHACKLE & BRANCH
5.5 LV-105 STRUCTURE L5, ALIGNMENT, LARGE ANGLE (angle 30º to 60º)
5.6 LV-106 STRUCTURE L6, TENSION, RIGHT ANGLE (angle 60º to 90º)
5.7 LV-107 STRUCTURE L7, TENSION, DEAD-END

   
PPAF – TECHNICAL Low Voltage Construction Drawing:
GUIDELINES AND MANUALS
U LV-00
Transmission & Distribution Date: Revision: Scale: -
Networks

   

  Renewable Energy Guidelines  Nov. 2013 195


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-11 1 Single support MATERIAL QT. DESCRIPTION
  3  Cable ties, self locking (black) 
     
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure L1 - Alignment
(Angle 0°-30°)
U LV-101
Transmission & Distribution Networks Date: Revision: Scale: -

   

196    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-12 1 Single dead-end MATERIAL QT. DESCRIPTION
AS-13 1 Single dead-end (existing spiral hook)   3  Cable ties, self locking (black) 
     
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure L2 - Tension, Shackle
U LV-102
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 197


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-11 1 Single support MATERIAL QT. DESCRIPTION
AS-13 1 Single dead-end (existing spiral hook)   4  Cable ties, self locking (black) 
C7  1  Compression tap connectors, H type for AAAC, as 
requested 
C13  3  Insulation piercing connectors, as requested 
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure L3 - Tension, Branch
U LV-103
Transmission & Distribution Networks Date: Revision: Scale: -

   

198    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-12 2 Single dead-end MATERIAL QT. DESCRIPTION
AS-13 1 Single dead-end (existing spiral hook)   5  Cable ties, self locking (black) 
C7  1  Compression tap connectors, H type for AAAC, as 
requested 
C13  3  Insulation piercing connectors, as requested 
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure L4 - Tension, Shackle &
Branch
U LV-104
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 199


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-14 1 Double support (angle up to 60º) MATERIAL QT. DESCRIPTION
  3  Cable ties, self locking (black) 
     
     
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure L5 - Alignment, Large
Angle(Angle 30°-60°)
U LV-105
Transmission & Distribution Networks Date: Revision: Scale: -

   

200    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION


AS-12 2 Single dead-end MATERIAL QT. DESCRIPTION
  4  Cable ties, self locking (black) 
C7  1  Compression tap connectors, H type for AAAC, as 
requested 
C13  3  Insulation piercing connectors, as requested 
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Structure L6 - Tension, Right Angle Drawing:

(Angle 60°to 90°)


U LV-106
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 201


Volume 8 
Transmission & Distribution  

NO. QT. DESCRIPTION


AS-12 1 Single dead-end MATERIAL QT. DESCRIPTION
  2  Cable ties, self locking (black) 
 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Structure L7 - Tension, Dead-End
U LV-107
Transmission & Distribution Networks Date: Revision: Scale: -

   

202    Renewable Energy Guidelines  Nov. 2013 


Volume 8 
 Transmission & Distribution 
   

 
7.  SWITCHING EQUIPMENT 
7.1 PR-01 RECLOSER WITH BYPASS SWITCH
7.2 PR-02 RECLOSER WITHOUT BYPASS SWITCH
7.3 PR-03 LOAD BREAK SWITCH
7.4 PR-04 SINGLE SUPPORT ON CROSSARM DISCONNECTING SWITCH
7.5 CT-1 MV CABLE TERMINATION TO OVERHEAD LINE FROM TRANSFORMER
7.6 CT-2 MV CABLE TERMINATION TO OVERHEAD LINE FROM GRID/JUNCTION

   
PPAF – TECHNICAL Switching Equipment and Cable Drawing:
GUIDELINES AND MANUALS Terminations to Overhead Line

Transmission & Distribution U PR-00
Date: Revision: Scale: -
Networks

  Renewable Energy Guidelines  Nov. 2013 203


Volume 8 
  Transmission & Distribution 

   
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS RECLOSER WITH BY-PASS SWITCH
U PR-01
Transmission & Distribution Networks
Date: Revision: Scale: -

   

204  Renewable Energy Guidelines  Nov. 2013   


Volume 8 
 Transmission & Distribution  

 
   
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS RECLOSER WITH BY-PASS SWITCH
U PR-02
Transmission & Distribution Networks
Date: Revision: Scale: -

   

  Renewable Energy Guidelines Nov. 2013  205 


Volume 8 
  Transmission & Distribution 

 
   
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS LOAD BREAK SWITCH
U PR-03
Transmission & Distribution Networks
Date: Revision: Scale: -

206  Renewable Energy Guidelines  Nov. 2013   


Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND MANUALS Drawing:
Single Support On Crossarm
Disconnecting Switch
U PR-04
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 207


Volume 8 
  Transmission & Distribution

 
PPAF – TECHNICAL GUIDELINES AND Assembly No. CT-1 Drawing:
MANUALS MV Cable Termination to Overhead Line from Indoor
or Overhead Plinth Transformer Station
U CT-01
Transmission & Distribution Networks Date: Revision: Scale: -

   

208  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

PPAF – TECHNICAL GUIDELINES AND Assembly No. CT-02 Drawing:


MANUALS MV Cable Termination to Overhead Line of
MV Feeders from Grid/Switching Stations
U CT-02
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 209


Volume 8 
  Transmission & Distribution

8.  MISCELLANEOUS 
 
8.1 M-001 CONDUIT INSTALLATION
8.2 M-002 PAD-MOUNTED FEEDER PILLER & METER BOX
8.3 M-003 METER BOX: 3 SEATS
8.4 M-004 METER BOX: 6 SEATS

 
PPAF – TECHNICAL Drawing:
GUIDELINES AND MANUALS MISCELLANEOUS
U M-00
Transmission & Distribution
Date: Revision: Scale: -
Networks

   

210  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

PPAF – TECHNICAL GUIDELINES AND Drawing:


MANUALS Conduits Installation
U M-001
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 211


Volume 8 
  Transmission & Distribution

 
 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Pad - Mounted Feeder Pillar and Meter Box
U M-002
Transmission & Distribution Networks Date: Revision: Scale: -

212  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Meter Box 3 Seats
U M-003
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 213


Volume 8 
  Transmission & Distribution

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Meter Box – 6 Seats
U M-004
Transmission & Distribution Networks Date: Revision: Scale: -

   

214  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

 
 

9.  GUY 

9.1 AN-S1 ANCHOR WITH THIMBLEYE ROD


9.2 AN-D1 ANCHOR WITH TWINEYE ROD
9.3 GU-S1 SINGLE GUY
9.4 GU-01 SINGLE OVERHEAD GUY
9.5 GU-101C SINGLE DOWN GUY FOR LOW VOLTAGE
9.6 GU-102C SINGLE DOWN GUY FOR MEDIUM VOLTAGE
9.7 GU-201C TWO DOWN GUYS FOR LOW / MEDIUM VOLTAGE
9.8 GU-202C TWO DOWN GUYS WITH ONE ANCHOR
9.9 GU-301C THREE DOWN GUYS FOR MEDIUM VOLTAGE
9.10 GU-401C SINGLE OVERHEAD GUY

   
PPAF – TECHNICAL Guys Miscellaneous Assemblies Drawing:
GUIDELINES AND MANUALS

Transmission & Distribution U GA-00
Date: Revision: Scale: -
Networks

   

  Renewable Energy Guidelines  Nov. 2013 215


Volume 8 
  Transmission & Distribution

Assembly AN-S1.1 AN-S1.2


NO. QT. QT. DESCRIPTION CODE
A2 1 1 CONE ANCHOR, CONCRETE AREA (161,300 mm²)  
R3a 1 THIMBLEYE ANCHOR ROD, M16 X 2000 mm, 70 kN  
R3b 1 THIMBLEYE ANCHOR ROD, M20 X 2400 mm, 100 kN  
W2c 1 SQUARD WASHER 75 mm x 75 mm x 8 mm for bolt M16  
W2d 1 SQUARD WASHER 100 mm x 100 mm x 10 mm for bolt M20  
   
PPAF – TECHNICAL GUIDELINES Drawing:
Anchor with Thimbleye Rod
AND MANUALS Miscellaneous Assemblies
U AN-
Transmission & Distribution Networks Date: Scale: - S1
Revision:

   

216  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

NO. QT. DESCRIPTION CODE


A2 1 CONE ANCHOR, CONCRETE AREA (161,300 mm²)  
R4 1 TWINEYE ANCHOR ROD, M20 x 2400 mm  
W2d 1 SQUARD WASHER 100 mm x 100 mm x 10 mm for bolt M20  
 
   
PPAF – TECHNICAL Anchor with Twineye Rod Drawing:
GUIDELINES AND MANUALS Miscellaneous Assemblies
U AN-D1
Transmission & Distribution
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 217


Volume 8 
  Transmission & Distribution

Ass GU- GU-


embly S1.1 -S1.2
NO. QT. QT. DESCRIPTION CODE
B2g 1   MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 X 200 mm  
B2j   1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M20 X 250 mm  
G2a 1   GUY HOOK FOR GUY STRAND DIAMETER 7 mm, THRU BOLT M16, 39 kN ULTIMATE  
STRENGTH
G2b   1 GUY HOOK FOR GUY STRAND DIAMETER 11 mm, THRU BOLT M20, 95 kN ULTIMATE  
STRENGTH
G3a 2   GUY END FOR GUY STRAND DIAMETER 7 mm, 36 KN ULTIMATE STRENGTH  
G3b   2 GUY END FOR GUY STRAND DIAMETER 11 mm, 101 KN ULTIMATE STRENGTH  
S12a 1   SPLIT BOLT FOR GUY STRAND DIAMETER 7 mm AND GROUND WIRE DIAMETER 6.4  
mm
S12b   1 SPLIT BOLT FOR GUY STRAND DIAMETER 11 mm AND GROUND WIRE DIAMETER 7.6  
mm
W2c 1   SQUARE WASHER, 75 mm X 75 mm X 8 m, FOR BOLT M16  
W2d   1 SQUARE WASHER, 100 mm X 100 mm X 10 mm FOR BOLT M20  
W3c 1   SPRING LOCK WASHER, FOR BOLT M16  
W3d   1 SPRING LOCK WASHER, FOR BOLT M20  
W4a -   GUY WIRE, STRAND DIAMETER 7 mm, ULTIMATE STREGHT 39 kN (REQ'D LENGTH)  
W4b   GUY WIRE, STRAND DIAMETER 11 mm, ULTIMATE STREGHT 95 kN (REQ'D LENGTH)  
1  1 GUY INSULATOR  
PPAF – TECHNICAL GUIDELINES   Drawing:
Single Guy
AND MANUALS Miscellaneous Assemblies
Transmission & Distribution GU-S1
Networks Date: Revision: Scale: -

   

218  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

Ass GU- GU-


embly S1.1 -S1.2
NO. QT. QT. DESCRIPTION CODE
B2g 1   MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M16 X 200 mm  
B2j   1 MACHINE BOLT, METRIC THREAD, HEXAGONAL HEAD AND NUT M20 X 250 mm  
G3a 2   GUY END FOR GUY STRAND DIAMETER 7 mm, 36 kN ULTIMATE STRENGTH  
G3b   2 GUY END FOR GUY STRAND DIAMETER 11 mm, 101 kN ULTIMATE STRENGTH  
N4a 2   THIMBLEYENUT for bolt M16 AND GUY STRAND DIAMETER 7 mm, 130 kN  
ULTIMATE STRENGTH
N4b   2 THIMBLEYENUT for bolt M20 AND GUY STRAND DIAMETER 11 mm, 130 kN  
ULTIMATE STRENGTH
S12a 1   SPLIT BOLT FOR GUY STRAND DIAMETER 7 mm AND GROUND WIRE DIAMETER  
6.4 mm
S12b   1 SPLIT BOLT FOR GUY STRAND DIAMETER 11 mm AND GROUND WIRE DIAMETER  
7.6 mm
W2c 2   SQUARE WASHER, 75 mm X 75 mm X 8 m, FOR BOLT M16  
W2d   2 SQUARE WASHER, 100 mm X 100 mm X 10 mm FOR BOLT M20  
W3c 3   SPRING LOCK WASHER, FOR BOLT M16  
W3d   3 SPRING LOCK WASHER, FOR BOLT M20  
W4a -   GUY WIRE, STRAND DIAMETER 7 mm, ULTIMATE STREGHT 39 kN (REQ'D  
LENGTH)
W4b   GUY WIRE, STRAND DIAMETER 11 mm, ULTIMATE STREGHT 95 kN (REQ'D  
LENGTH)
PPAF – TECHNICAL GUIDELINES   Drawing:
Single Overhead Guy
AND MANUALS Miscellaneous Assemblies
Transmission & Distribution U GU-O1
Date: Revision: Scale: -
Networks
   

  Renewable Energy Guidelines  Nov. 2013 219


Volume 8 
  Transmission & Distribution

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Single Down Guy for Low Voltage
U GU-101C
Transmission & Distribution Networks Date: Revision: Scale: -

   

220  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

 
 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Single Down Guy for Low Voltage
U GU-102C
Transmission & Distribution Networks Date: Revision: Scale: -

  Renewable Energy Guidelines  Nov. 2013 221


Volume 8 
  Transmission & Distribution

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Single Overhead Guy
U GU-401C
Transmission & Distribution Networks Date: Revision: Scale: -

   

222  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution 
   

10.  CABLES & CONDUCTORS 
 
10.1 C-001 TABLE OF CABLE AND CONDUCTORS ASSIGNATION
10.2 C-002 OVERHEAD LINE DESIGN CRITERIA
10.3 C-003 WEATHER CASE
10.4 C-004 SAG TENSION CALCULATIONS - EXAMPLE

   
PPAF – TECHNICAL Cable and Conductors Drawing:
GUIDELINES AND MANUALS

Transmission & Distribution U C-00
Date: Revision: Scale: -
Networks

 
   

  Renewable Energy Guidelines  Nov. 2013 223


Volume 8 
  Transmission & Distribution

TABLE OF CABLE AND CONDUCTORS ASSIGNATION


 
Cables and Conductors  Assigned to
Conductor ACSR 70/12 mm² MV overhead line
Conductor ACSR 120/20 mm²  MV overhead line
Covered Conductor XLPE/AAAC 35 – 240 mm² MV cables (connection to transformer)
   
Cable ABC various sizes LV overhead line
   
Cable NYCWY quadruplex core, various sizes, 0.6/1
LV Feeder Pillars to meter boxes
kV

Cables NYY-J 2 x 8 RE, 0.6/1 kV  Services Cables / Meter boxes to consumers 
Cables NYY-J 2 x 10 RE, 0.6/1 kV  Services Cables / Meter boxes to consumers 
Cables NYY-J 2 x 16 RE, 0.6/1 kV  Services Cables / Meter boxes to consumers 
   
Cables NYY-J 4 x 10 RE, 0.6/1 kV  Services Cables / Meter boxes to consumers 
Cables NYY-J 4 x 16 RE, 0.6/1 kV  Services Cables / Meter boxes to consumers 
Cables NYY-J 4 x 25 RM, 0.6/1 kV  Services Cables / Meter boxes to consumers 
   
NYY-J 2 x 8 SM Duplex 0.6/1 kV  Meter Box to Consumers (Overhead) 
NYY-J 2 x 10 SM Duplex 0.6/1 kV  Meter Box to Consumers (Overhead) 
NYY-J 4 x 25 SM Q’plex 0.6/1 kV  Meter Box to Consumers (Overhead) 

Cable NYY 1 x 120 RM, 0.6/1 kV LV bushings transformer to LV Switchboard


Cable NYY 1 x 240 RM, 0.6/1 kV LV bushings transformer to LV Switchboard

Conductor Cu 55 mm² stranded / soft drawn Earth system in LV and consumers


Conductor Cu 35 mm² stranded / soft drawn Earth system in MV (pole to crossarm, earth rod, etc)
 
Conductor Cu 35 mm² stranded / medium hard drawn OHL to transformers or capacitors banks

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Table of Cable and Conductors Assignation
U C-001
Transmission & Distribution Networks Date: Revision: Scale: -

224  Renewable Energy Guidelines  
Nov. 2013
Volume 8 
 Transmission & Distribution   

OVERHEAD LINE DESIGN CRITERIA 
MV Cond.  Alignment  Tension/Angl Ruling  Max. Sag  MoD 
S#  LINE TYPE  Description  MV Circuit/s  LV Circuit/s  Remarks 
Arrangement  Poles *  e Poles  Span (m)  (m)  (deg)** 

MV1  MV Single Circuit  ACSR 120/20  Delta  ‐  P1  P2  80  2  15  Main 



  Branch to sub‐
MV Single Circuit  ACSR 70/12  Delta  ‐  P1  P2  80  2  20 
stations 

2  2xMV1  MV Double Circuit  2 x ACSR 120/20  Fig U‐MV‐601  ‐  P1  P2  60  1.2  8  Feeders 

3  MV + LV  MV/LV Combined  ACSR 120/20  Delta  ABC 120  P1  P2  50  2  10  Main / Feeders 

4  MV + 2xLV  MV/LV Combined  ACSR 120/20  Delta  2 x ABC 95  P1  P2  50  2  8  Main / Feeders 

5  LV1  LV Single Circuit      ABC 120  P3  P3  50  1.3  15  LV Feeders 

6  2xLV  LV Double Circuit      2 x ABC 120  P3  P3  50  1.3  10  LV Feeders 

Abbreviations
Poles Conductors or
P1 MV Pole: 12 m, 4 kN ABC 120 ABC 3x120 + 1x70 ABC 120 ABC 4x120
P2 MV Pole : 12 m, 8 kN ABC 95 ABC 3x95 + 1x70 ABC 95 ABC 4x95
P3 LV Pole: 7 m, 3 kN ABC 70 ABC 3x70 + 1x70 ABC 70 ABC 4x70
ABC 50 ABC 3x50 + 1x35 ABC 50 ABC 4x50
ABC50 ABC 3x35 + 1x35 ABC 35 ABC 4x35

* More than 5 deg angles not allowed for Alignment poles.


** MoD : Maximum angle allowed at tension poles without guy 
 
   
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Overhead Line Design Criteria
U C-002
Transmission & Distribution Networks Date: Revision: Scale: -

 
Renewable Energy Guidelines Nov. 2013  225 
Volume 8 
  Transmission & Distribution

TABLE OF CABLE AND CONDUCTORS ASSIGNATION

Temperature Ice thickness  Wind 


Case 
ºC  (cm)  (km/h) 
1. EDS (Every day stress)  25  0.0  0 
2. Cold  ‐10  0.0  0 
3. Cold + ice  ‐10  0.5  0 
4. Cold + ice + wind  ‐10  0.5  40 
5. Max wind  15  0.0  120 
6. Hot  40  0.0  0 
7. Hot (*)  70  0.0  0 

(*) Conductor Temperature, Only for MV


 
 
 
MV overhead line
Conductor ACSR 120/20 mm²
Conductor ACSR 70/12 mm²
 
 
 
 
 
LV overhead line
 
Cable ABC various sizes
ABC 120 ABC 3x120 + 1x70 ABC 120 ABC 4x120
ABC 95 ABC 3x95 + 1x70 ABC 95 ABC 4x95
ABC 70 ABC 3x70 + 1x70 ABC 70 ABC 4x70
ABC 50 ABC 3x50 + 1x35 ABC 50 ABC 4x50
ABC50 ABC 3x35 + 1x35 ABC 35 ABC 4x35

 
 

 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Weather case
U C-003
Transmission & Distribution Networks Date: Revision: Scale: -

   

226  Renewable Energy Guidelines  Nov. 2013  


Volume 8 
 Transmission & Distribution 
   

Sag-Tension Calculations - Example

 
 
PPAF – TECHNICAL GUIDELINES AND Drawing:
MANUALS Sag Tension Calculations - Example
U C-004
Transmission & Distribution Networks Date: Revision: Scale: -

   

  Renewable Energy Guidelines  Nov. 2013 227


Volume 8 
  Transmission & Distribution

Annex 3: Design examples (Golain Astore MHP) 
 

228  Renewable Energy Guidelines  Nov. 2013  


Volume 8 
 Transmission & Distribution  

  Renewable Energy Guidelines  Nov. 2013  229 


Volume 8 
  Transmission & Distribution 

 
   

230  Renewable Energy Guidelines  Nov. 2013   


Volume 8 
 Transmission & Distribution  

 
wire / Load load* Section Sec. CB Min. RL Ik3max
S Load Length cable sums length load Current Cross-Section (mm²) Vdrop Vdrop CB Sel size RL sums Ik1min
[kVA] kW m kW kWm kWm A calc. selected V % Therm A A mm² Ohm Ohm A
TF1 50 38,0 1.311 120 38 20.498 29.045 100 0,365 0,365 664
1.1 1.1.1 0,0 235 c 12 401 7.956 20 35 50 4 1,0% 40 40 10 0,334 0,334 314
1.1.2 0,0 199 c 11 495 7.555 18 35 35 4 1,1% 0,403 0,737 199
1,0 158 c 10 592 7.060 16 35 35 3 0,8% 0,320 1,056 154
1,5 30 c 9 933 6.468 14 35 35 1 0,1% 0,061 1,117 148
1,5 24 c 7 969 5.535 12 35 35 0 0,1% 0,049 1,166 143
1,0 33 c 6 679 4.566 9 35 35 0 0,1% 0,067 1,233 137
1,0 57 c 5 736 3.887 8 35 35 1 0,1% 0,115 1,348 128
1,0 31 c 4 767 3.151 6 35 35 0 0,1% 0,063 1,411 124
1,5 55 c 3 1.233 2.384 4 35 35 0 0,1% 0,111 1,522 116
1,0 329 c 1 1.151 1.151 2 35 35 1 0,2% 0,666 2,188 86
1.1.1 1,5 32 c 2 48 48 3 35 35 0 0,0% 0,065 0,399 287
1.1.2 1,0 61 c 1 61 61 2 35 35 0 0,0% 0,123 0,860 179
1.2 1,5 62 c 17 93 4.612 28 35 35 2 0,5% 40 40 10 0,125 0,125 447
1,5 63 c 15 188 4.519 25 35 35 2 0,5% 0,127 0,253 355
1.2.1 0,0 66 c 14 797 4.331 23 35 35 2 0,5% 0,134 0,387 292
1,5 37 c 11 342 3.535 18 35 35 1 0,2% 0,075 0,461 265
1,5 41 c 9 404 3.193 15 35 35 1 0,2% 0,083 0,544 241
1,5 37 c 8 459 2.789 13 35 35 1 0,1% 0,075 0,619 223
1.2.3/4 1,5 60 c 6 1.719 2.330 10 35 35 1 0,2% 0,121 0,741 198
0,5 30 c 2 198 611 3 35 35 0 0,0% 0,061 0,801 188
1,0 17 c 1 413 413 2 35 35 0 0,0% 0,034 0,836 183
1.2.1 1,5 59 c 3 89 224 5 35 35 0 0,1% 0,119 0,506 252
1,5 31 c 2 135 135 3 35 35 0 0,0% 0,063 0,569 235
1.2.3 1,5 27 c 2 41 41 3 35 35 0 0,0% 0,055 0,795 189
1.2.4 1,5 21 c 2 32 32 3 35 35 0 0,0% 0,042 0,783 191
1.3 1.3.1 0,0 232 c 10 2.432 7.931 16 35 70 2 0,6% 40 40 10 0,237 0,237 364
1,5 38 c 5 405 5.499 8 35 50 0 0,1% 0,054 0,291 334
1,5 1.408 c 3 2.517 5.094 5 35 50 6 1,6% 2,001 2,292 83
1,5 40 c 2 2.577 2.577 3 35 35 0 0,0% 0,081 2,373 80
1.3.1 0,5 26 c 5 13 1.272 8 35 35 0 0,1% 0,053 0,290 335
1.3.1.1 0,0 99 c 5 399 1.259 8 35 35 1 0,2% 0,200 0,490 257
0,5 50 c 3 88 860 5 35 35 0 0,1% 0,101 0,591 229
1,0 44 c 3 219 773 4 35 35 0 0,1% 0,089 0,680 210
0,5 28 c 2 124 554 3 35 35 0 0,0% 0,057 0,737 199
0,5 63 c 1 155 430 2 35 35 0 0,0% 0,127 0,864 178
0,5 240 c 1 275 275 1 35 35 0 0,1% 0,486 1,350 128
1.3.1.1 1,0 71 c 2 71 212 3 35 35 0 0,1% 0,144 0,634 220
0,5 210 c 1 141 141 1 35 35 0 0,1% 0,425 1,059 154
>  
 

  Renewable Energy Guidelines  Nov. 2013  231 


Volume 8 
  Transmission & Distribution 

 
wire / Load load* Section Sec. CB Min. RL Ik3max
S Load Length cable sums length load Current Cross-Section (mm²) Vdrop Vdrop CB Sel size RL sums Ik1min
[kVA] kW m kW kWm kWm A calc. selected V % Therm A A mm² Ohm Ohm A  
TF2 50 21,5 5.146 w 22 204.040 4.396 4.761 50 163 40,7% 100 7,315 7,315 33
2.1 2.1.1/2 1,5 45 c 16 395 2.258 26 35 35 1 0,4% 40 40 10 0,091 0,091 481
1,5 33 c 11 117 1.863 18 35 35 1 0,2% 0,067 0,158 419
2.1.3 1,5 34 c 9 423 1.746 15 35 35 1 0,2% 0,069 0,227 371
1,5 47 c 6 239 1.323 10 35 35 1 0,1% 0,095 0,322 319
1,5 38 c 5 296 1.085 8 35 35 0 0,1% 0,077 0,399 287
0,5 24 c 3 111 789 5 35 35 0 0,0% 0,049 0,447 270
1,0 30 c 3 251 679 4 35 35 0 0,0% 0,061 0,508 251
1,5 34 c 2 428 428 3 35 35 0 0,0% 0,069 0,577 233
2.1.1 1,5 49 c 2 74 117 3 35 35 0 0,1% 0,099 0,190 395
0,5 38 c 1 44 44 1 35 35 0 0,0% 0,077 0,267 347
2.1.2 1,5 35 c 2 53 53 3 35 35 0 0,0% 0,071 0,162 416
2.1.3 1,5 58 c 2 87 87 3 35 35 0 0,0% 0,117 0,344 309
2.2 2.1.1 1,0 225 c 6 510 2.138 10 35 35 3 0,7% 40 40 10 0,455 0,455 267
2.2.2 1,0 60 c 4 619 1.628 7 35 35 1 0,1% 0,121 0,577 233
0,5 129 c 2 207 1.010 3 35 35 1 0,1% 0,261 0,838 182
0,5 85 c 2 250 803 3 35 35 0 0,1% 0,172 1,010 160
0,5 33 c 1 266 553 2 35 35 0 0,0% 0,067 1,077 152
0,5 42 c 1 287 287 1 35 35 0 0,0% 0,085 1,162 144
2.1.1 0,5 43 c 1 22 60 2 35 35 0 0,0% 0,087 0,542 242
0,5 34 c 1 39 39 1 35 35 0 0,0% 0,069 0,611 225
2.2.2 0,5 33 c 1 17 49 2 35 35 0 0,0% 0,067 0,644 217
0,5 31 c 1 32 32 1 35 35 0 0,0% 0,063 0,706 205  

232  Renewable Energy Guidelines  Nov. 2013   


Volume 8 
 Transmission & Distribution  

 
 
Golain T&D
LS [kW] S [kVA] Dist. [m] LMS [kWm Ik3[A]
TF1 38 100 1311 20498 664
Line TL [m] LMS [kWm I [A] VDm [%] A [mm2] Ik1min [A] CB [A]
1.1 12 1244 7956 20 3,70% 50 86 40 >>l=1151m
1.2 16 551 4612 28 2,30% 35 183 40
1.3 10 2549 7931 16 2,20% 70 80 40 >>l=1718m

LS [kW] S [kVA] Dist. [m] LMS [kWm Ik3[A]


TF2 22 100 5146 4396 660
Line TL [m] LMS [kWm I [A] VDm [%] A [mm2] Ik1min [A] CB [A]
2.1 16 465 2258 26 1,10% 35 232 40
2.2 6 715 2138 10 1,10% 35 144 40

Circuit Breaker calculated based on branch current.


40 A 5

Circuit Breaker selected in Excel sheet.


40 A 5

Cable length per size


35 mm2 3,6 km
50 mm2 1,7 km
70 mm2 0,2 km
5,5 km Total
 
 
 
 

  Renewable Energy Guidelines  Nov. 2013  233 