Professional Documents
Culture Documents
Scope of Operations
To:
Quality Safety Standard work Number of Pcs of TAKT Time Net Time Operation
+
Check Precaution in process standard WIP Number
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Date: Observer:
Process for
Observation Time Observation Sheet
Time Observer:
Number Component Tasks 1 2 3 4 5 6 7 8 9### 11##################### Component task time Points Observed
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Product part number Process Identification
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Process Design Analysis Sheet
Process Date
Current Proposed
Measure
No. Of operators
No. Of support
Standard WIP
Units/labor Hr.
Cost/piece
5 S rating
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten,
reproduced, or published
Process Capacity Table
Net Operating time (i)= Daily requirement
Date Part Number Page 1 of
Mach. No. Auto time Mach. Cycle Time # Pcs. Per chg. Time per piece. Total time Total Capacity
Step No. Process description A B C=A+B D Time to change E F=E/D G=C+F H=I/G Comments
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Standard Work Combination Sheet
Page ______________of__________________ Operator
Date Shift Process
Part # Time study person
Part name Qty. per Shift TAKT time
###
###
###
###
###
###
###
###
###
###
###
###
5
Totals
Manual Machine------------- Walking Waiting
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Part Service Production Capacity Analysis Sheet
Operators: sally and fred Part Number/ Service Provided: invoice Incoming supplier
Min Sec Min Sec Min Sec Min Sec Min Sec
1
2
3
4
5
6
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Standard Operations Routine Sheet
Part Number: Part Description:
No. Required: Cycle Time:
Manual Machine 5" 10" 15" 20" 25" 30" 35" 40" 45" 50" 55" 1' 1'05" 1'10" 1'15" 1'20" 1'25" 1'30" 1'35" 1'40" 1'45" 1'50" 1'55" 2' 2'05" 2'10" 2'15" 2'20" 2'25" 2'30" 2'35" 2'40" 2'45" 2'50" 2'55" 3'
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Product or Service Process Identification/Family
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Process Observation ECP Matrix
Estimated
Distance from Estimated Estimated
Step Description Queue
last step Task time Yield
time
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Work area:
Part family relationship matrix
Processes
Products
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Impact of
Power/ Project on Current/Desired Support
Influence Stakeholder Strongly Strongly
Key Stakeholder Role in Organization Category (H, M, L) Opposed Opposed Neutral Supportive Supportive Reasons for Resistance or Support
10
11
12
13
14
15
16
17
18
19
20
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
LOW Influence Over Project HIGH
HIGH
C A
Power in Organization
D B
LOW
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Who They Influence
Influential Stakeholder ▼ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X
Instructions:
Enter stakeholder names in column C. Each stakeholder has a number to the left of their name. Corresponding number appear across the top.
In matrix area, enter a lower case letter to indicate how strong the influence over another stakeholder. Use h for high, m for medium, and l for low.
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published
Stakeholder Action Plan
Perceived Method of Communication Tips and Anticipated Questions and Your
Rank Stakeholder Leverageable Allies WIIFS
Disc Communication Reminders Responses
10
11
12
13
14
15
© Breakthrough Management Group International. All rights reserved. No portion may be copied, rewritten, reproduced, or published