CA.

NO: CEJZ/JSLR/ OF 2017-18 SERIAL PAGE NO:


 

Tele: (0291) – 2515113/2511518 Military Engineer Services


(Email id: cezjp2-mes@nic.in) Headquarters
Chief Engineer Jodhpur Zone
ECHS Complex Jodhpur
Jodhpur - 342010

800419/ 21 /E8 09 Aug 2017

M/S _____________
_________________
_________________

CORRIGENDUM NO - 2
PROVISION OF 3 MW SOLAR POWER PLANT (JOB No SC/MW/1256) AT JAISALMER.
(TENDER ID 2017_MES_129652_1)

Dear Sir(s)

1. Reference tender documents for the above subject work published on the e-
tendering site vide this HQ letter No. 800419/ 10 /E8 dated 13 July 2017 and
Corrigendum no.-01 uploaded vide 800419/ 18 /E8 dated 02 Aug 2017.

2. Please carryout amendments to the tender documents as per Appendix ‘A’


attached herewith.This letter along with Appendix ‘A’ now uploaded shall form
part of the tender documents.

3. Existing complete BOQ has been Cancelled in to-to & replace It by new revised
complete BOQ containing Sr. Page no 44(RR) to 69(RR), 69RR(A) , 69RR(B)
and 69RR(C) respectively attached herewith.
4. Please note that Bid submission start date, submission end date and Bid
opening date have been changed, therefore:-
(a) Bid submission start Date 11 Aug 2017 at 11.00 AM is postponed and
the fresh date shall be 14 Aug 2017 at 11.00 AM.

(b) Bid submission End Date 18 Aug 2017 at 06.00 PM is postponed and
the fresh date shall be 21 Aug 2017 at 06.00 PM.

(b) Bid Opening Date 19 Aug 2017 at 10.00 AM is postponed and the fresh
date shall be 22 Aug 2017 at 10.00 AM.
5. All other details remain unchanged.

Yours faithfully,

(Vipin Kumar Meena)


Asst. Dir. (Contracts)
For Accepting Officer
Signature of contractor
Dated :
Uploaded Docs :
(i) 29 Revise pages
CA.NO: CEJZ/JSLR/ OF 2017-18 SERIAL PAGE NO:
 

APPENDIX ‘A’ to this HQ’s    
 Letter No. 800419/ 21   /E8 
Date 09 August 2017 
CORRIGENDUM TO TENDER DOCUMENT

Sr Page Location Particulars


No No
1 2 3 4
1 11 NOTICE OF TENDER For : For Phase I - 365 days, For Phase-II 5 years after
(NOT) APPX ‘A’ completion of Phase-I.
Period of completion Read : For Phase-I, 12months, For Phase-II 66 months
after completion of Phase-I.

2 16 SCHEDULE ‘A’ Notes For : “Phase-II:- The work of Manning & operation
PERIOD OF mentioned in BOQ under Sl item no 57.00 & 57.01 to
COMPLETION: 57.05. The Phase-II works will commence only after
Note No.06 satisfactory completion of Phase-I Work & run for a
period of 60 (sixty) Months as mentioned under
respective items of Manning & operation.”

Read : “Phase-II:- The work of Manning & operation


mentioned in BOQ under Sl item no 60.00 & 60.01 to
60.07. The Phase-II works will commence only after
satisfactory completion of Phase-I Work & run for a
period of 66 (sixty six) Months as mentioned under
respective items of Manning & operation.”

44(R)
4. BOQ Existing complete BOQ has been Cancelled in to-to &
to replace It by new Re-Revised BOQ attached herewith.
69(R)
PARTICULAR SPECIFICATIONS
9 213 Clause no 31.8.2.4, FOR:- “150 kmph”
last line READ:- “170 kmph”
10 214 Clause no 31.8.3.3, FOR:- “150 kmph”
last line READ:- “170 kmph”
11 215 Clause no 31.8.4.3, FOR:- “150 kmph”
last line READ:- “170 kmph”
11 216 Clause no 31.9.1.6, FOR:- “300Wp”
last line READ:- “315Wp”
11 216 Clause no 31.9.1.14 FOR:- “150 kmph”
last line READ:- “170 kmph”

Asst. Dir (Contracts)


For Accepting Officer
Signature of contractor