You are on page 1of 3

Customer Contract #

Location Project
Contractor EPS Job #
EPS Ltd, Riyadh Site test record RM6 Doc. Ref.

RING MAIN UNIT – RM6


1.GENERAL DATA AND INFORMATION:
Rated Voltage Location
Service Voltage Circuit Reference
Rated Short time current Drawing No. 004
Rated making current Indoor Outdoor
Extensible Non-Extensible √ SL.NO:

2. VISUAL CHECK:
BAY1 BAY2 BAY3 BAY4 BAY5 BAY6
I I I I I I
D D D D D D
Q Q Q Q Q Q
B B B B B B

RATING
1.Rated Current
2.Fuse/Prot. Type
3.Fuse/ Prot. Rating
4.Rating of contd. transformer
VISUAL CHECK:
1.Cable termination done
2.Type of termination
3.Check for proper termination
4.MV cable clamp supported
5.MV cable shield grounding
6.Control cable termination
7.Fuse centering device fixed
OPERATION TEST
1. Open/Close of switch or CB**
2. Open/Close of Earth switch**
3. Interlock test with in unit **
4.Interlock test ext. to unit**
5.Opening of switch by striker
fuse operation
6. CB trip test by EXT. trip from
transfo (DGPT)
7. E/F indicator Aux. Supply and
CT connection

Test performed by Test witnessed by Test approved by Date of test


SCHNEIDER ELECTRIC

Name

Signature

RMU-
Customer Contract #
Location Project
Contractor EPS Job #
EPS Ltd, Riyadh Site test record RM6 Doc. Ref.

RING MAIN UNIT –RM6 :

** For Operation and interlock test please refer instruction given in operation manual (“ Instruction for
use”).

3. ELECTRICAL TEST:
INSULATION RESISTANCE TEST:

Insulation Resistance, T
5kv dc megger for 1 min.
**open all earth switches R-E Y-E B-E R-Y Y-B B-R
1. Test with all switch/CB closed
2. Test across open switch/CB contacts by BAY1
one end grounded.
BAY2

BAY3

BAY4

BAY5

BAY6

CONTACT RESISTANCE TEST: IDC = 100AMPS


Measured voltage in mV Measured Resistance in micro Ohms
Circuit Reference
R Y B R Y B

**If HV Test is to be carried out on the RMU, the cable termination to be done after completion of HV
Test.

Test performed by Test witnessed by Test approved by Date of test


SCHNEIDER ELECTRIC

Name

Signature

RMU-
Customer Contract #
Location Project
Contractor EPS Job #
EPS Ltd, Riyadh Site test record RM6 Doc. Ref.

RING MAIN UNIT –RM6 :

CIRCUIT / FUNCTION VERIFICATION:


Sl.
Function verification Yes No
no
Verify the MV fuse rating for given transformer rating (for fuse selection refer
1
manual “Instruction for use”)
Ensure the protective relay setting for given transformer rating (for recommended
2
setting refer manual “Instruction for use”)
3 Adopted CT/CS ratio (200:1/500:1) according to relay setting
4 Grounding of RMU body and earth bar done properly
5 No mechanical damage on the unit.
6 SF6 gas pressure gauge pointer is in green region:

COMMISSIONING CHECKS:

After the cables are energized ,check the neon voltage indicators are
glowing and check the phase sequence of both the supply from the socket
available at voltage indicator.

Before closing the loop, check phasing between two supplies from the socket
available at neon voltage indicator.

REMARKS:

Test performed by Test witnessed by Test approved by Date of test