Final Recommendations
Prepared For:
Mississippi Dept. of Transportation
September 16, 2014
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
TABLE OF CONTENTS
GENERAL SR 25 NOTES AND RECOMMENDATIONS ....................................................................................... 5
1. LAKELAND DRIVE (SR 25) AT PARKWAY BOULEVARD ............................................................................. 5
2. LAKELAND DRIVE (SR 25) AT JONES LANE ............................................................................................... 6
3. LAKELAND DRIVE (SR 25) AT HOWARD WILSON DRIVE ........................................................................... 7
4. LAKELAND DRIVE (SR 25) AT LAKELAND PARKWAY (GATEWAY TIRE) ...................................................... 7
5. LAKELAND DRIVE (SR 25) AT DAUGHDRILL STATION/RIDGE WAY ........................................................... 8
6. LAKELAND DRIVE (SR 25) AT LAKELAND COMMONS DRIVE/LAUREL PARK DRIVE (EXISTING SIGNAL) ...... 8
7. LAKELAND DRIVE (SR 25) AT MARKET STREET ........................................................................................ 9
8. LAKELAND DRIVE (SR 25) AT OLD FANNIN ROAD/EAST METRO PARKWAY (EXISTING SIGNAL) ................ 9
9. LAKELAND DRIVE (SR 25) AT DOGWOOD AVENUE/PROMENADE .......................................................... 10
10. LAKELAND DRIVE (SR 25) AT DOGWOOD FESTIVAL BOULEVARD (EXISTING SIGNAL) ............................. 11
11. LAKELAND DRIVE (SR 25) AT DOGWOOD PLACE/PROMENADE BOULEVARD ......................................... 12
12. LAKELAND DRIVE (SR 25) AT BELLE MEADE PLACE ................................................................................ 12
13. LAKELAND DRIVE (SR 25) AT LIBERTY PARK COURT .............................................................................. 12
14. LAKELAND DRIVE (SR 25) AT LUCKNEY ROAD (EXISTING SIGNAL) .......................................................... 13
15. LAKELAND DRIVE (SR 25) AT LAKELAND BOULEVARD/LAKESIDE LANE .................................................. 14
16. LAKELAND DRIVE (SR 25) AT COOPER/MANSHIP ROAD (EXISTING SIGNAL) .......................................... 14
17. LAKELAND DRIVE (SR 25) AT WIRTZ ROAD ........................................................................................... 15
18. LAKELAND DRIVE (SR 25) AT LAKELAND HEIGHTS BOULEVARD ............................................................. 15
19. LAKELAND DRIVE (SR 25) AT HUGH WARD BOULEVARD (EXISTING SIGNAL) ......................................... 16
20. LAKELAND DRIVE (SR 25) AT PRIMOS ROAD ......................................................................................... 17
21. LAKELAND DRIVE (SR 25) AT PLAZA DRIVE ........................................................................................... 17
22. LAKELAND DRIVE (SR 25) AT PLAZA DRIVE EXTENSION ......................................................................... 17
23. LAKELAND DRIVE (SR 25) AT GRANTS FERRY ROAD/CASTLEWOODS (EXISTING SIGNAL)........................ 18
24. LAKELAND DRIVE (SR 25) AT MILLCREEK DRIVE .................................................................................... 19
25. LAKELAND DRIVE (SR 25) AT VINE DRIVE (EXISTING SIGNAL) ................................................................ 20
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
26. LAKELAND DRIVE (SR 25) AT HIDDEN HILLS PARKWAY/NORTHWEST RANKIN ELEMENTARY ................. 20
27. LAKELAND DRIVE (SR 25) AT COUGAR DRIVE/NORTHWEST RANKIN HIGH (EXISTING SIGNAL) ............... 21
28. LAKELAND DRIVE (SR 25) AT GLENSVIEW DRIVE (EXISTING SIGNAL) ..................................................... 21
29. LAKELAND DRIVE (SR 25) AT PAW PRINT DRIVE/NORTHWEST RANKIN MIDDLE (ONE‐WAY SB) ............. 22
30. LAKELAND DRIVE (SR 25) AT HIGHLAND BLUFF ELEMENTARY (EXISTING SIGNAL) ................................. 22
31. LAKELAND DRIVE (SR 25) AT PINELAKE BOULEVARD ............................................................................ 23
32. LAKELAND DRIVE (SR 25) AT MARSHALL ROAD .................................................................................... 23
33. LAKELAND DRIVE (SR 25) AT SR 471 RAMP INTERSECTIONS .................................................................. 24
LIST OF FIGURES
1. MS‐25 AT PARKWAY BOULEVARD ......................................................................................................... FIGURE 1
2. MS‐25 AT JONES LANE ........................................................................................................................... FIGURE 2
3. MS‐25 AT HOWARD WILSON DRIVE ...................................................................................................... FIGURE 3
4. MS‐25 AT LAKELAND PARKWAY ............................................................................................................ FIGURE 4
5. MS‐25 AT DAUGHDRILL STATION/RIDGE WAY ...................................................................................... FIGURE 5
6. MS‐25 AT LAKELAND COMMONS DRIVE ............................................................................................... FIGURE 6
7. MS‐25 AT MARKET STREET .................................................................................................................... FIGURE 7
8. MS‐25 AT OLD FANNIN ROAD / E METRO PKWY. .................................................................................. FIGURE 8
9. MS‐25 AT DOGWOOD AVE / PROMENADE ............................................................................................ FIGURE 9
10. MS‐25 AT DOGWOOD FESTIVAL BLVD. .............................................................................................. FIGURE 10
11. MS‐25 AT DOGWOOD PLACE ............................................................................................................. FIGURE 11
12. MS‐25 AT BELLE MEADE PLACE ......................................................................................................... FIGURE 12
13. MS‐25 AT LIBERTY PARK COURT ........................................................................................................ FIGURE 13
14. MS‐25 AT LUCKNEY ROAD ................................................................................................................. FIGURE 14
15. MS‐25 AT LAKELAND BLVD./LAKESIDE LANE ..................................................................................... FIGURE 15
16. MS‐25 AT COOPER/ MANSHIP RD...................................................................................................... FIGURE 16
17. MS‐25 AT WIRTZ ROAD ...................................................................................................................... FIGURE 17
18. MS‐25 AT LAKELAND HEIGHTS BLVD. ................................................................................................ FIGURE 18
19. MS‐25 AT HUGH WARD BLVD. ........................................................................................................... FIGURE 19
20. MS‐25 AT PRIMOS ROAD ................................................................................................................... FIGURE 20
21. MS‐25 AT PLAZA DRIVE ...................................................................................................................... FIGURE 21
22. MS‐25 AT PLAZA DRIVE EXTENSION .................................................................................................. FIGURE 22
23. MS‐25 AT GRANTS FERRY ROAD/CASTLEWOODS .............................................................................. FIGURE 23
24. MS‐25 AT MILL CREEK DRIVE ............................................................................................................. FIGURE 24
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
25. MS‐25 AT VINE DRIVE / EASTSIDE DRIVE ........................................................................................... FIGURE 25
26. MS‐25 AT HIDDEN HILLS PKWY. ......................................................................................................... FIGURE 26
27. MS‐25 AT COUGAR DR./ NW RANKIN HIGH. ..................................................................................... FIGURE 27
28. MS‐25 AT GLENSVIEW DRIVE ............................................................................................................. FIGURE 28
29. MS‐25 AT NW RANKIN MIDDLE SCHOOL ........................................................................................... FIGURE 29
30. MS‐25 AT HIGHLAND BLUFF ELEMENTARY ........................................................................................ FIGURE 30
31. MS‐25 AT PINELAKE BLVD. ................................................................................................................. FIGURE 31
32. MS‐25 AT MARSHALL ROAD .............................................................................................................. FIGURE 32
33. MS‐25 AT MS‐471 RAMP INTERSECTIONS ......................................................................................... FIGURE 33
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
• The team determined that due to the general direction of the SR 25 study corridor running east
and west, for the purpose of this report, SR 25 will be referred to as an EB and WB route even
though it’s actually a NB and SB route.
• Decrease SR 25 speed limit to 50 mph from Airport Road to just east of Dogwood Promenade
• Provide signing and striping consistency across similar intersections
• Provide corridor consistency for median crossovers striping and signing
• Provide a single two-mile school zone from west of Vine to east of Marshall using “School Zone
next 2 Miles” signs on each side of SR 25
• Upgrade existing span wire signals to provide mast arms with back plates and FYA where
applicable
• Consider eliminating left turns from Parkway Boulevard onto SR 25 with directional median.
• Possible overhead sign on SR 25 EB
West of Airport Road intersection
informing motorists of lane drop
ahead.
• EB right turn lane lacks a Yield sign
entering Parkway Boulevard.
• Diagonal stripe the WB left shoulder between Parkway Boulevard and the beginning of the left
turn lane to Airport Road.
• Add left turn only legend to WB
left turn lane.
• SR 475 NB right turn lane west of
intersection has Parallel Lane
sign, then immediately after (±
215’) has legend striping for right
turn only.
• EB traffic frequently becomes
congested and occasionally
comes to stop near Airport Road
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
1.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
2.2 Recommendations
• Existing SB right turn has a Yield sign and short acceleration lane.
• If the acceleration lane is too short and can’t be properly extended, then adjust striping for yield
condition.
• Construct a directional median opening to only allow SR 25 left turns across median.
• This median is the only non-signalized one with an offset left turn lane along the corridor. Is this a
better or worse way to handle median turns? Crash data is positive.
• There is an existing Stop sign in the median; The MDOT standard is to only have Stop signs in
wider medians aligned perpendicular to the mainline.
• Consider a continuous weave lane to the East.
3.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
4.2 Recommendations
5.2 Recommendations
6. Lakeland Drive (SR 25) at Lakeland Commons Drive/Laurel Park Drive (Existing Signal)
• Yield sign probably not needed turning right from SR 25 EB onto Laurel Park Drive.
• No existing yield striping.
• Yield and Do Not Enter signs are back to back. Is this allowed as the different shapes could dull
the impact of the triangular Yield sign?
• Existing split phase signal.
• Parallel Lane sign for Laurel Park Dr. NB right turn onto SR 25 EB is twisted away from road.
• Extend WB left turn lane to increase storage.
• Extend median curb north on Laurel Park Dr. to keep SB traffic from turning left into El Potrillo.
• Look at closing driveway to Trustmark Bank without decreasing NB left turn storage just south of
intersection. The driveway provides redundant access and creates conflicts near signalized
intersection.
• Drivers observed to not utilize the SB right turn acceleration lane to SR 25 WB. Replace weave
lane with yield condition and signing.
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
6.2 Recommendations
7.2 Recommendations
8. Lakeland Drive (SR 25) at Old Fannin Road/East Metro Parkway (Existing Signal)
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
• Radius tight for dual concurrent lefts from SR 25 EB to north. Might need to shift stop bar.
• Better control of access along Old Fannin Road from retail businesses (too much access in
congested area).
• Consider adjusting location of Parallel Lane sign from SB Old Fannin Road to WB SR 25. The
Parallel Lane sign from NB East Metro Parkway to EB SR 25 is on a concrete island on driver
left-hand-side. With drivers yielding instead of utilizing the acceleration lanes, this would put the
sign more in the driver’s line of sight.
• Add supplemental poles/heads to potentially reduce crashes, red light running and/or sun glare
impact.
• There is faded striping throughout intersection.
• Replace weave lane with yield condition.
• Driver confusion whether yield or acceleration lanes.
• One team member stated that the intersection could be a candidate for an unconventional
intersection (such as a CFI) due to traffic volumes.
8.2 Recommendations
• Close the driveway to the west off Old Fannin between SR 25 and Promenade Boulevard
• Add supplemental poles/heads to improve visibility for SR 25 left turns
• Consider the feasibility of converting from free-flow entrances to yield condition
o Potential benefit of a reduction in the number of rear-end collisions that possibly result
from vehicles being hesitant to treat the channelized right turn lanes as free-flow despite
existing signage as observed in the site visits
o Potential capacity decrease with yield condition
• Closing median would be best due to crash history and narrow median, but reducing median
turning movements might be a doable and possibly sellable compromise.
• The SB approach features a single stop sign while the NB approach has two stop signs.
• Consider offsetting the SR 25 left turn lanes.
• Striping inconsistencies with acceleration lanes. SR 25 EB has skips, SR 25 WB has dots.
• Existing median has stop bars and Yield signs.
• Consider increasing the size of existing islands that are currently supplemented with striping.
• Driver confusion whether yield or acceleration lanes – suggest replacing weave with yield
condition.
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
9.2 Recommendations
10. Lakeland Drive (SR 25) at Dogwood Festival Boulevard (Existing Signal)
• Dogwood Festival Boulevard thru lanes don’t line up from one side of SR 25 to the other.
• Acceleration lanes look short; should check length and if necessary, add Parallel Lane sign for
the lengthened acceleration lane from Dogwood Festival Blvd. to SR 25 EB.
• Replace delineators on channelizing island in southwest quadrant.
• Add granular to SR 25 WB right turn lane shoulder to eliminate drop off from pavement edge.
• Paint curbs on channelized
islands.
• Add back plate on all signal
heads.
• Add supplemental signal
poles/heads to fight sun glare
problems.
• The existing signal is split
phase.
• Five section head is too far to
the right of the offset left turn
lanes. Look at addition of
supplemental signal poles.
• Offset left turn lane tapers are
too short (150’)
• Inconsistent striping with acceleration/deceleration/weave lanes.
• Three of the four channelized right turn lanes are signed as thru lanes, but NB right onto MS 25 is
not signed, with all four having continuous thru/acceleration lanes.
• Add a four section signal head on SB thru/left lane.
• There is a supplemental signal head for SB traffic on back of NB mast arm.
10.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
11.2 Recommendations
12.2 Recommendations
• Should SR 25 EB right turn lane onto SB Luckney Road be extended back to Liberty Park Court
for a continuous weave lane?
• Heavy congestion blocks entry.
• Consider offsetting the SR 25 left turn lanes.
• Sight distance a little limited east towards the signal.
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
• Existing conditions make it hard to determine if there are SR 25 right turn lanes or shoulder.
Stripe deceleration lane SR 25 EB.
• No existing median striping.
• Stripe right turn and left turn/thru lanes at Liberty Park Court (establish lane assignments)
13.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
14.2 Recommendations
• Close easternmost crossover between Cooper and Lakeland, including connection between SR
25 and Lakeside Lane
• Big AM inbound delay resulting from the Luckney Road signal.
• Consider offsetting the SR 25 left turn lanes.
• Is full access needed?
• Three crossovers in a row (counting this one) to the east. These three need to be evaluated
together for closures.
• Continuous striping along SR 25 thru the Lakeland Boulevard intersection.
• Radius return is striped back to edge line; this is not the case at all intersections.
• Make Lakeside Lane east of intersection a continuous frontage road. Currently approximately
500-foot of the existing roadway is in extremely poor condition and would require upgrade.
• Add SR 25 WB right turn lane.
• There is no existing median striping.
• Add yield bar for NB to SR 25 EB right turn.
• NB approach has a left turn only arrow – approach allows thru and left turn movement
15.2 Recommendations
• Connect two frontage roads north of SR 25 between Lakeland Boulevard and Cooper Road
• Close easternmost median crossover between Lakeland Boulevard and Cooper Road and the
connection road
• Add SR 25 WB right turn lane onto Lakeside Lane
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
16.2 Recommendation
• Add yield line and sign for both right turns onto SR 25 in NW and SE quadrants
17.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
18.2 Recommendations
19. Lakeland Drive (SR 25) at Hugh Ward Boulevard (Existing Signal)
• Pavement drop off – Appears surface lift of asphalt was not placed
• Existing NB to EB acceleration lane is short with a Yield sign in channelized right.
• Existing SB to WB acceleration lane is short without a Yield sign.
• Curb hopping occurring turning north from SR 25 WB.
• Is split phase for side roads necessary?
• Yellow and all red review might be needed to reduce rear ends
• Left turn lanes are offset but not fully neutral.
• Consider closing south Walgreens entrance to remove conflict points so close to SR 25.
• Look everywhere at changing acceleration lanes to yield conditions with 150’ taper
• SR 25 EB Signal Ahead sign is down.
19.2 Recommendations
• Add second NB receiving lane by removing most of the diagonal striped island and modify SR 25
WB right turn to yield condition
• Provide splitter island between Hugh Ward NB and SB lanes beyond Walgreen’s south entrance
so that entrance and future entrance for development west of Hugh Ward are right-in & right-out
• Consider the feasibility of converting from free-flow entrances to yield condition
o Potential benefit of a reduction in the number of rear-end collisions that possibly result
from vehicles being hesitant to treat the channelized right turn lanes as free-flow despite
existing signage as observed in the site visits
o Potential capacity decrease with yield condition
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
20.2 Recommendations
• Consider closing median or convert to directional median as future development to the North
increases.
21.2 Recommendations
• Non-standard median striping; diagonals striping out the middle of the crossover
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
22.2 Recommendations
23. Lakeland Drive (SR 25) at Grants Ferry Road/Castlewoods (Existing Signal)
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
• Upgrade signal to mast arms and configure mast arms for future Grants Ferry widening for six
lane project. Split phase hurts efficiency; increases rear ends
• NB to EB needs acceleration lane.
• Offset SR 25 left turn lanes.
• SB receiving lanes for Castlewoods south of intersection are poorly delineated, with the
pavement wide enough for three lanes.
• Add yield bar & sign at Castlewoods right turns to SR 25 EB and Grants Ferry to SR 25 WB.
23.2 Recommendations
• Upgrade signal to mast arms with back plates and configure for six-lane widening
• Construct centerline median curb 200-feet north along Grant’s Ferry Road
• Close gap in median island 230-feet south of SR 25 along Castlewoods
• Consider closing existing drive to the west off Castlewoods, 250-feet south of SR 25
• Consider the feasibility of converting from free‐flow entrances to yield condition
o Potential benefit of a reduction in the number of rear-end collisions that possibly result
from vehicles being hesitant to treat the channelized right turn lanes as free-flow despite
existing signage as observed in the site visits
o Potential capacity decrease with yield condition
24.2 Recommendations
• Establish gateway for two mile school zone on SR 25 EB, with signs placed between Mill Creek
and Vine Drive
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
25.2 Recommendations
26. Lakeland Drive (SR 25) at Hidden Hills Parkway/Northwest Rankin Elementary
• Improve right turn lane for SR 25 EB into NWR Elementary School. SB traffic queued onto SR 25
EB shoulder at 2 pm, making it impossible to complete a WB LT movement.
• Reduce number of movements across median (see about left turn only).
• Increase radius of Hidden Hills on SR 25 WB and add tapers.
• Explore improved school pick-up and drop-off options to decrease mainline queuing
• Restripe NWR Elementary side.
• Sign and/or stripe to identify acceleration lane and shoulder.
• Add “Only” and arrows on WB right turn lane.
• Offset SR 25 left turn lanes.
• NB left turn sight distance restricted.
• Possible WB acceleration lane?
• No existing median striping.
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
26.2 Recommendations
• Explore improved school pick-up and drop-off options including directional medians to decrease
mainline queuing
• Modify striping to demarcate right turn lane for SR 25 EB into NWR Elementary
27. Lakeland Drive (SR 25) at Cougar Drive/Northwest Rankin High (Existing Signal)
27.2 Recommendations
• Why is intersection signalized? Left turn counts-118 Lt turns at 7am (2011), Signal warranted.
• High number of signals in school zone area; consider re-routing traffic to reduce number of
signals and/or median openings through area.
• Elementary school dismissal is at 2 pm.
• Upgrade to mast arms and add signal head back plates.
• Offset SR 25 left turn lanes.
• No SR 25 EB right turn lane.
• Existing solid white striping delineating acceleration/right turn lane instead of skips.
• Restripe the northbound approach to left only, right only and change signal head accordingly.
o Remove unnecessary striping (Cat track, taper).
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
28.2 Recommendations
29. Lakeland Drive (SR 25) at Paw Print Drive/Northwest Rankin Middle (One-Way SB)
• J-turn island lines up with receiving lane from SR 25 EB right turn lane instead of left lane as
intended, causing drivers to drive over striped out island. Correct median island and consider
adding island channelizing for SR 25 EB right turn.
• Demo old striping at Paw Print entrance (can still see yellow lines from former 2-way operation).
• Reflectors on the diagonal diverter in the median are no longer in place.
29.2 Recommendations
• Correct median island to direct the left turns into the proper southbound receiving lane
• Add concrete island south of SR 25
30. Lakeland Drive (SR 25) at Highland Bluff Elementary (Existing Signal)
• SR 25 WB right turn lane into school may not be long enough (traffic has rutted out shoulder
material along taper).
• Add striping delineating the two lanes entering Highland School past the raised island.
• Upgrade to mast arms and add signal head back plates.
• SR 25 WB acceleration lane from school – change solid white lane to standard skip white
• Replace Yield sign with Parallel Lane sign for WB acceleration lane.
• Consider Lane Ends signing on WB acceleration lane or diagonal arrows close to lane’s end.
• Depending on left turn AM traffic, queue could affect sight distance; offset left turn lanes?
• Add Yield sign and yield bar to Saint Paul (south) EB right turn.
30.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
31.2 Recommendations
• Decrease skew to be more perpendicular with SR 25. Skew makes sight distance challenging
when completing left turn (must look over shoulder). Add double yellow bar to median.
• Line up Marshall Road with the crossover.
• Possible crossover closure with high left turns to WB SR 25 – force a right turn and a U-turn at
next crossover – however, this is a local road. Directional median openings would push EB
Pinelake traffic to use this intersection and WB to use Pinelake Boulevard.
• A daycare and Pinelake Church are accessed from this road.
• Improve SR 25 EB right turn radius.
• Doesn’t appear to have 150’ standard tapers.
• Drivers using shoulder for right turn onto Marshall – tight radius at curb location
• Add full width (12’) right turn lane on SR 25 EB.
• Good spacing for potential signal.
32.2 Recommendations
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
• Potential drainage issue in Old SR 471 median turn lanes north of SR 25 (Gravel accumulating in
road).
• Issues with how right turns are handled at the SR 25 WB off ramp – drivers are confused on how
to access Spillway Road (take the sweeping right to NB 471 or the second right with no radius).
• Add parallel lane to WB exit ramp utilizing
lane assignments to improve safety.
• Add directional sign on WB exit ramp detailing
the three available turning movements,
particularly the route to get to Spillway Road.
• Median opening opposite WB off ramp is wide
enough to appear that multiple cars can enter.
• Consider narrowing the receiving median to
match left turn lane to SR 471 SB.
• Looks like WB off ramp second right turn lane was added at a later date and might be cause of
geometric issues with median opening.
• Potential 5-leg roundabout for both ramps north of SR 25, SR 471, and Spillway Road to
eliminate interior conflicts.
• Existing bike lanes north of interchange on Old SR 471.
• No existing Stop bars for median left turn movements at EB ramp intersection.
• NB left turn striping for two movements (WB SR 25 and WB Spillway Road) is unclear.
• Might add bridge mounted overhead
signage to SR 471 NB to clarify
upcoming options.
• Turning conflicts in intersection.
• Does traffic making left turn from EB
off ramp have a free-flow lane once
they cross SB MS 471 traffic?
Pavement wide enough for two lanes
but not striped accordingly.
• Awkward left lane ending for SR 471
south of interchange.
• Cars that exited EB to go South on
SR 471 crossed over into left lane which is lane being dropped (Witnessed three).
• Add lane drop arrow for SR 471 South merge lane.
• Remove or shift Lane Ends Merge Right sign further south past left turn onto SR 25.
• Correct dip in median at SR 471 NB left turn to SR 25 WB entrance ramp
SR 25 Road Safety Audit
Final Recommendations
Proj. No.: HSIP‐0056‐01(074)/106633‐101000
33.2 Recommendations
• Provide overhead directional sign mounted on existing bridge to better define lane assignments
for SR 471 NB traffic
• Add yield striping and sign for SR 25 EB turn to SR 471 NB
• Add yield striping and sign for SR 471 SB turn to SR 25 EB
• Replace stop bars in median north of SR 25 grade separation with yield
• Improve signage for the three turn options on the SR 25 WB exit ramp
• Shift SR 25 WB to SR 471 SB median opening slightly south to better line up
• Provide longer radius curb for SR 25 WB to Old SR 471 NB turn to access Spillway Road
• Construct curb in existing striped median to prohibit left turns onto Spillway from the channelized
right turn from SR 25 WB exit ramp
• Correct dip in median at SR 471 NB left turn to SR 25 WB entrance ramp