CONSTRUCTORA E INMOBILIARIA EL TRILLO

CONTROL PROBETAS DE CONCRETO CURADAS A CONDICIONES DE LABORATORIO

OBRA: “CONSTRUCCIÓN DE RESIDENCIAL SAN FRANCISCO II”

CÓDIGO FECHA N° DÍAS FECHA DIAS RESISTEN


ITEM DESCRIPCIÓN CIA ESTADO ESTADO DIAMETRO
PROBETA EXTRACCIÓN ENSAYAR ROTURA FALTANTES DISEÑO
1 Zapata Módulo I Cuad 1 ZM1C1-1 10/11/2014 7 10/18/2014 -1431 dias 210 ENSAYADO E 15.03
2 Zapata Módulo I Cuad 1 ZM1C1-2 10/11/2014 7 10/18/2014 -1431 dias 210 ENSAYADO E 14.90
3 Vigas Cimentación Mod 1 Cuad 1 VCM1C1-1 10/16/2014 3 10/19/2014 -1430 dias 210 ENSAYADO E 15.00
4 Vigas Cimentación Mod 1 Cuad 1 VCM1C1-2 10/16/2014 3 10/19/2014 -1430 dias 210 ENSAYADO E 14.95
5 Placas y Columnas Mod 1 Cuad 1 PLCM1C1-1 10/17/2014 17 11/3/2014 -1415 dias 280 ENSAYADO E 15.00
6 Placas y Columnas Mod 1 Cuad 1 PLCM1C1-2 10/17/2014 17 11/3/2014 -1415 dias 280 ENSAYADO E 14.90
7 Zapata Módulo I Cuad 4 ZM1C4-1 10/21/2014 13 11/3/2014 -1415 dias 210 ENSAYADO E 15.15
8 Zapata Módulo I Cuad 4 ZM1C4-2 10/21/2014 13 11/3/2014 -1415 dias 210 ENSAYADO E 15.05
9 Zapata Módulo I Cuad 4 ZM1C4-3 10/21/2014 21 11/11/2014 -1407 dias 210 ENSAYADO E 15.35
10 Vigas Cimentación Mod 1 Cuad 4 VCM1C4-1 10/22/2014 12 11/3/2014 -1415 dias 210 ENSAYADO E 15.00
11 Vigas Cimentación Mod 1 Cuad 4 VCM1C4-2 10/22/2014 12 11/3/2014 -1415 dias 210 ENSAYADO E 15.50
12 Vigas Cimentación Mod 1 Cuad 4 VCM1C4-3 10/22/2014 20 11/11/2014 -1407 dias 210 ENSAYADO E 15.30
13 Placas y Columnas Mod 1 Cuad 1 PLCM1C1-3 10/23/2014 11 11/3/2014 -1415 dias 280 ENSAYADO E 15.50
14 Placas y Columnas Mod 1 Cuad 1 PLCM1C1-4 10/23/2014 11 11/3/2014 -1415 dias 280 ENSAYADO E 15.00
15 Placas y Columnas Mod 1 Cuad 1 PLCM1C1-5 10/23/2014 19 11/11/2014 -1407 dias 280 ENSAYADO E 15.31
16 Placas y Columnas Mod 1 Cuad 1 PLCM1C1-6 10/23/2014 19 11/11/2014 -1407 dias 280 ENSAYADO E 14.98
17 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-1 10/29/2014 6 11/4/2014 -1414 dias 280 ENSAYADO E 14.96
18 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-2 10/29/2014 6 11/4/2014 -1414 dias 280 ENSAYADO E 14.99
19 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-3 10/29/2014 15 11/13/2014 -1405 dias 280 ENSAYADO E 15.03
20 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-4 10/29/2014 15 11/13/2014 -1405 dias 280 ENSAYADO E 15.38
21 Zapata Módulo I Cuad 2 ZM1C2-1 10/31/2014 4 11/4/2014 -1414 dias 210 ENSAYADO E 14.96
22 Zapata Módulo I Cuad 2 ZM1C2-2 10/31/2014 4 11/4/2014 -1414 dias 210 ENSAYADO E 15.35
23 Zapata Módulo I Cuad 2 ZM1C2-3 10/31/2014 17 11/17/2014 -1401 dias 210 ENSAYADO E 15.05
24 Zapata Módulo I Cuad 2 ZM1C2-4 10/31/2014 17 11/17/2014 -1401 dias 210 ENSAYADO E 15.03
25 Vigas Cimentación Mod 1 Cuad 2 VCM1C2-1 11/1/2014 16 11/17/2014 -1401 dias 210 ENSAYADO E 15.10
26 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-5 11/5/2014 8 11/13/2014 -1405 dias 280 ENSAYADO E 15.01
27 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-6 11/5/2014 0 11/5/2014 -1413 dias 280 DESCARTADA D 0.00
28 Zapata Módulo I Cuad 2 ZM1C2-5 11/7/2014 10 11/17/2014 -1401 dias 210 ENSAYADO E 15.05
29 Zapata Módulo I Cuad 2 ZM1C2-6 11/7/2014 10 11/17/2014 -1401 dias 210 ENSAYADO E 15.05
30 Vigas Cimentación Mod 1 Cuad 2 VCM1C2-2 11/8/2014 0 11/8/2014 -1410 dias 210 DESCARTADA D 0.00
31 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-1 11/11/2014 6 11/17/2014 -1401 dias 280 ENSAYADO E 15.08
32 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-2 11/11/2014 6 11/17/2014 -1401 dias 280 ENSAYADO E 15.05
33 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-3 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.15
34 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-4 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.10
35 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-5 11/11/2014 14 11/25/2014 -1393 dias 280 ENSAYADO E 15.10
36 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-6 11/11/2014 14 11/25/2014 -1393 dias 280 ENSAYADO E 14.95
37 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-7 11/11/2014 21 12/2/2014 -1386 dias 280 ENSAYADO E 14.98
38 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-8 11/11/2014 21 12/2/2014 -1386 dias 280 ENSAYADO E 15.03
39 Dosificación 1:3.83 - 1 D-1:3.83-1 11/8/2014 3 11/11/2014 -1407 dias 280 ENSAYADO E 14.96
40 Dosificación 1:3.83 - 2 D-1:3.83-2 11/8/2014 3 11/11/2014 -1407 dias 280 ENSAYADO E 15.03
41 Dosificación 1:3.5 - 1 D-1:3.5-1 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.05
42 Dosificación 1:3.5 - 2 D-1:3.5-2 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.10
43 Dosificación 1:3.5 - 3 D-1:3.5-3 11/11/2014 14 11/25/2014 -1393 dias 280 ENSAYADO E 15.20
44 Dosificación 1:3.75 - 1 D-1:3.75-1 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.10
45 Dosificación 1:3.75 - 2 D-1:3.75-2 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.18
46 Dosificación 1:3.75 - 3 D-1:3.75-3 11/11/2014 14 11/25/2014 -1393 dias 280 ENSAYADO E 15.10
47 Dosificación 1:3.83 - 3 D-1:3.83-3 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 14.98
48 Dosificación 1:3.83 - 4 D-1:3.83-4 11/11/2014 7 11/18/2014 -1400 dias 280 ENSAYADO E 15.08
49 Dosificación 1:3.83 - 5 D-1:3.83-5 11/11/2014 14 11/25/2014 -1393 dias 280 ENSAYADO E 14.98
50 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-9 11/12/2014 7 11/19/2014 -1399 dias 280 ENSAYADO E 15.10
51 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-10 11/12/2014 7 11/19/2014 -1399 dias 280 ENSAYADO E 15.08
52 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-11 11/12/2014 14 11/26/2014 -1392 dias 280 ENSAYADO E 15.10
53 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-12 11/12/2014 21 12/3/2014 -1385 dias 280 ENSAYADO E 15.15
54 Dosificación 13:9 - 1 D-13:9-1 11/12/2014 7 11/19/2014 -1399 dias 280 ENSAYADO E 15.15
55 Dosificación 13:9 - 2 D-13:9-2 11/12/2014 7 11/19/2014 -1399 dias 280 ENSAYADO E 15.00
56 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-13 11/15/2014 10 11/25/2014 -1393 dias 280 ENSAYADO E 15.10
57 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-14 11/15/2014 10 11/25/2014 -1393 dias 280 ENSAYADO E 15.10
58 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-15 11/15/2014 14 11/29/2014 -1389 dias 280 ENSAYADO E 15.10
59 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-16 11/15/2014 14 11/29/2014 -1389 dias 280 ENSAYADO E 15.15
60 Zapatas Módulo I Cuad 3 ZM1C3-1 11/18/2014 3 11/21/2014 -1397 dias 210 ENSAYADO E 15.10
61 Zapatas Módulo I Cuad 3 ZM1C3-2 11/18/2014 3 11/21/2014 -1397 dias 210 ENSAYADO E 14.98
62 Zapatas Módulo I Cuad 3 ZM1C3-3 11/18/2014 7 11/25/2014 -1393 dias 210 ENSAYADO E 15.05
63 Zapatas Módulo I Cuad 3 ZM1C3-4 11/18/2014 7 11/25/2014 -1393 dias 210 ENSAYADO E 15.10
64 Zapatas Módulo I Cuad 3 ZM1C3-5 11/18/2014 14 12/2/2014 -1386 dias 210 ENSAYADO E 15.08
65 Zapatas Módulo I Cuad 3 ZM1C3-6 11/18/2014 14 12/2/2014 -1386 dias 210 ENSAYADO E 15.00
66 Zapatas Módulo I Cuad 3 ZM1C3-7 11/18/2014 21 12/9/2014 -1379 dias 210 ENSAYADO E 15.00
67 Zapatas Módulo I Cuad 3 ZM1C3-8 11/18/2014 21 12/9/2014 -1379 dias 210 ENSAYADO E 15.05
68 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-17 11/20/2014 5 11/25/2014 -1393 dias 280 ENSAYADO E 15.10
69 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-18 11/20/2014 5 11/25/2014 -1393 dias 280 ENSAYADO E 15.03
70 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-19 11/20/2014 8 11/28/2014 -1390 dias 280 ENSAYADO E 14.98
71 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-20 11/20/2014 8 11/28/2014 -1390 dias 280 ENSAYADO E 15.10
72 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-21 11/20/2014 14 12/4/2014 -1384 dias 280 ENSAYADO E 15.05
73 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-22 11/20/2014 14 12/4/2014 -1384 dias 280 ENSAYADO E 15.00
74 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-23 11/20/2014 21 12/11/2014 -1377 dias 280 ENSAYADO E 15.10
75 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-24 11/20/2014 21 12/11/2014 -1377 dias 280 ENSAYADO E 15.00
76 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-1 11/22/2014 3 11/25/2014 -1393 dias 280 ENSAYADO E 15.10
77 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-2 11/22/2014 3 11/25/2014 -1393 dias 280 ENSAYADO E 15.05
78 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-3 11/22/2014 7 11/29/2014 -1389 dias 280 ENSAYADO E 15.00
79 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-4 11/22/2014 7 11/29/2014 -1389 dias 280 ENSAYADO E 15.15
80 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-5 11/22/2014 14 12/6/2014 -1382 dias 280 ENSAYADO E 15.00
81 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-6 11/22/2014 14 12/6/2014 -1382 dias 280 ENSAYADO E 15.15
82 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-7 11/22/2014 28 12/20/2014 -1368 dias 280 ENSAYADO E 14.95
83 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-8 11/22/2014 28 12/20/2014 -1368 dias 280 ENSAYADO E 15.15
84 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-9 11/27/2014 4 12/1/2014 -1387 dias 280 ENSAYADO E 15.10
85 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-10 11/27/2014 4 12/1/2014 -1387 dias 280 ENSAYADO E 15.00
86 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-11 11/27/2014 7 12/4/2014 -1384 dias 280 ENSAYADO E 15.10
87 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-12 11/27/2014 7 12/4/2014 -1384 dias 280 ENSAYADO E 15.05
88 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-25 12/3/2014 3 12/6/2014 -1382 dias 280 ENSAYADO E 15.10
89 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-26 12/3/2014 3 12/6/2014 -1382 dias 280 ENSAYADO E 15.10
90 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-27 12/3/2014 7 12/10/2014 -1378 dias 280 ENSAYADO E 15.10
91 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-28 12/3/2014 7 12/10/2014 -1378 dias 280 ENSAYADO E 15.05
92 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-29 12/3/2014 14 12/17/2014 -1371 dias 280 ENSAYADO E 15.00
93 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-30 12/3/2014 14 12/17/2014 -1371 dias 280 ENSAYADO E 15.10
94 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-31 12/3/2014 28 12/31/2014 -1357 dias 280 ENSAYADO E 15.05
95 Placas y Columnas Mod 1 Cuad 2 PLCM1C2-32 12/3/2014 28 12/31/2014 -1357 dias 280 ENSAYADO E 15.05
96 Pavimentos Mod 1 Cuad 1.2 PVM1C1.2-1 12/6/2014 28 1/3/2015 -1354 dias 210 ENSAYADO E 15.10
97 Pavimentos Mod 1 Cuad 1.2 PVM1C1.2-2 12/6/2014 28 1/3/2015 -1354 dias 210 ENSAYADO E 14.95
98 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-1 12/9/2014 3 12/12/2014 -1376 dias 210 ENSAYADO E 15.05
99 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-2 12/9/2014 3 12/12/2014 -1376 dias 210 ENSAYADO E 15.05
100 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-3 12/9/2014 7 12/16/2014 -1372 dias 210 ENSAYADO E 15.05
101 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-4 12/9/2014 7 12/16/2014 -1372 dias 210 ENSAYADO E 15.05
102 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-5 12/9/2014 21 12/30/2014 -1358 dias 210 ENSAYADO E 15.15
103 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-6 12/9/2014 21 12/30/2014 -1358 dias 210 ENSAYADO E 15.05
104 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-7 12/9/2014 21 12/30/2014 -1358 dias 210 ENSAYADO E 15.10
105 Vigas Cimentación Mod 2 Cuad 2 VCM2C2-8 12/9/2014 21 12/30/2014 -1358 dias 210 ENSAYADO E 15.00
106 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-13 12/10/2014 7 12/17/2014 -1371 dias 280 ENSAYADO E 15.10
107 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-14 12/10/2014 7 12/17/2014 -1371 dias 280 ENSAYADO E 15.05
108 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-15 12/10/2014 28 1/7/2015 -1350 dias 280 ENSAYADO E 15.10
109 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-16 12/10/2014 28 1/7/2015 -1350 dias 280 ENSAYADO E 14.95
110 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-17 12/10/2014 28 1/7/2015 -1350 dias 280 ENSAYADO E 15.05
111 Placas y Columnas Mod 1 Cuad 3 PLCM1C3-18 12/10/2014 28 1/7/2015 -1350 dias 280 ENSAYADO E 14.95
112 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-1 12/12/2014 21 1/2/2015 -1355 dias 280 ENSAYADO E 15.05
113 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-2 12/12/2014 21 1/2/2015 -1355 dias 280 ENSAYADO E 15.05
114 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-3 12/12/2014 21 1/2/2015 -1355 dias 280 ENSAYADO E 14.95
115 Placas y Columnas Mod 1 Cuad 4 PLCM1C4-4 12/12/2014 21 1/2/2015 -1355 dias 280 ENSAYADO E 15.15
116 Platea Cimentación Mod 2 Cua 2 PCM2C2-1 12/19/2014 14 1/2/2015 -1355 dias 210 ENSAYADO E 14.95
117 Platea Cimentación Mod 2 Cua 2 PCM2C2-2 12/19/2014 14 1/2/2015 -1355 dias 210 ENSAYADO E 15.00
118 Platea Cimentación Mod 2 Cua 2 PCM2C2-3 12/19/2014 14 1/2/2015 -1355 dias 210 ENSAYADO E 15.10
119 Platea Cimentación Mod 2 Cua 2 PCM2C2-4 12/19/2014 21 1/9/2015 -1348 dias 210 ENSAYADO E 15.00
120 Platea Cimentación Mod 2 Cua 2 PCM2C2-5 12/19/2014 21 1/9/2015 -1348 dias 210 ENSAYADO E 15.05
121 Platea Cimentación Mod 2 Cua 2 PCM2C2-6 12/19/2014 21 1/9/2015 -1348 dias 210 ENSAYADO E 15.05
122 Platea Cimentación Mod 2 Cua 2 PCM2C2-7 12/19/2014 28 1/16/2015 -1341 dias 210 ENSAYADO E 15.00
123 Platea Cimentación Mod 2 Cua 2 PCM2C2-8 12/19/2014 28 1/16/2015 -1341 dias 210 ENSAYADO E 14.85
124 Losa Aligerada Mod 1 Cuad 1 LAM1C1-1 12/23/2014 7 12/30/2014 -1358 dias 210 ENSAYADO E 15.00
125 Losa Aligerada Mod 1 Cuad 1 LAM1C1-2 12/23/2014 7 12/30/2014 -1358 dias 210 ENSAYADO E 14.95
126 Losa Aligerada Mod 1 Cuad 1 LAM1C1-3 12/23/2014 7 12/30/2014 -1358 dias 210 ENSAYADO E 15.05
127 Losa Aligerada Mod 1 Cuad 1 LAM1C1-4 12/23/2014 14 1/6/2015 -1351 dias 210 ENSAYADO E 15.05
128 Losa Aligerada Mod 1 Cuad 1 LAM1C1-5 12/23/2014 14 1/6/2015 -1351 dias 210 ENSAYADO E 15.10
129 Losa Aligerada Mod 1 Cuad 1 LAM1C1-6 12/23/2014 14 1/6/2015 -1351 dias 210 ENSAYADO E 15.05
130 Losa Aligerada Mod 1 Cuad 1 LAM1C1-7 12/23/2014 28 1/20/2015 -1337 dias 210 ENSAYADO E 15.10
131 Losa Aligerada Mod 1 Cuad 1 LAM1C1-8 12/23/2014 28 1/20/2015 -1337 dias 210 ENSAYADO E 15.10
132 Placas y Columnas Mod 2 Cuad 2 PLCM2C2-1 1/3/2015 14 1/17/2015 -1340 dias 280 ENSAYADO E 15.10
133 Placas y Columnas Mod 2 Cuad 2 PLCM2C2-2 1/3/2015 14 1/17/2015 -1340 dias 280 ENSAYADO E 15.00
134 Placas y Columnas Mod 2 Cuad 2 PLCM2C2-3 1/3/2015 14 1/17/2015 -1340 dias 280 ENSAYADO E 15.05
135 Placas y Columnas Mod 2 Cuad 2 PLCM2C2-4 1/3/2015 21 1/24/2015 -1333 dias 280 ENSAYADO E 15.15
136 Placas y Columnas Mod 2 Cuad 2 PLCM2C2-5 1/3/2015 21 1/24/2015 -1333 dias 280 ENSAYADO E 15.07
137 Placas y Columnas Mod 2 Cuad 2 PLCM2C2-6 1/3/2015 21 1/24/2015 -1333 dias 280 ENSAYADO E 15.00
138 Placas y Columnas Mo1 Pi1 Cu1 PLM1C1P1-1 1/10/2015 7 1/17/2015 -1340 dias 280 ENSAYADO E 15.05
139 Placas y Columnas Mo1 Pi1 Cu1 PLM1C1P1-2 1/10/2015 7 1/17/2015 -1340 dias 280 ENSAYADO E 15.10
140 Placas y Columnas Mo1 Pi1 Cu1 PLM1C1P1-3 1/10/2015 7 1/17/2015 -1340 dias 280 ENSAYADO E 15.10
141 Placas y Columnas Mo1 Pi1 Cu1 PLM1C1P1-4 1/10/2015 28 2/7/2015 -1319 dias 280 DESCARTADA
142 Placas y Columnas Mo1 Pi1 Cu1 PLM1C1P1-5 1/10/2015 28 2/7/2015 -1319 dias 280 DESCARTADA
143 Placas y Columnas Mo1 Pi1 Cu1 PLM1C1P1-6 1/10/2015 28 2/7/2015 -1319 dias 280 DESCARTADA
144 Pavimentos Mod 1 Cuad 2 PVM1C2-1 1/16/2015 7 1/23/2015 -1334 dias 210 ENSAYADO E 15.10
145 Pavimentos Mod 1 Cuad 2 PVM1C2-2 1/16/2015 7 1/23/2015 -1334 dias 210 ENSAYADO E 15.05
146 Pavimentos Mod 1 Cuad 2 PVM1C2-3 1/16/2015 7 1/23/2015 -1334 dias 210 ENSAYADO E 15.20
147 Pavimentos Mod 1 Cuad 2 PVM1C2-4 1/16/2015 28 2/13/2015 -1313 dias 210 ENSAYADO E 15.10
148 Pavimentos Mod 1 Cuad 2 PVM1C2-5 1/16/2015 28 2/13/2015 -1313 dias 210 ENSAYADO E 15.10
149 Pavimentos Mod 1 Cuad 2 PVM1C2-6 1/16/2015 28 2/13/2015 -1313 dias 210 ENSAYADO E 15.00
150 Losa Aligerada Mo1 Pi1 Cu1 LAM1P1C1-1 1/17/2015 7 1/24/2015 -1333 dias 210 ENSAYADO E 15.15
151 Losa Aligerada Mo1 Pi1 Cu1 LAM1P1C1-2 1/17/2015 7 1/24/2015 -1333 dias 210 ENSAYADO E 15.08
152 Losa Aligerada Mo1 Pi1 Cu1 LAM1P1C1-3 1/17/2015 7 1/24/2015 -1333 dias 210 ENSAYADO E 15.20
153 Losa Aligerada Mo1 Pi1 Cu1 LAM1P1C1-4 1/17/2015 28 2/14/2015 -1312 dias 210 ENSAYADO E 15.10
154 Losa Aligerada Mo1 Pi1 Cu1 LAM1P1C1-5 1/17/2015 28 2/14/2015 -1312 dias 210 ENSAYADO E 15.05
155 Losa Aligerada Mo1 Pi1 Cu1 LAM1P1C1-6 1/17/2015 28 2/14/2015 -1312 dias 210 ENSAYADO E 14.98
156 Losa Aligerada Mod 1 Cuad 2 LAM1C2-1 1/28/2015 7 2/4/2015 -1322 dias 210 ENSAYADO E 15.05
157 Losa Aligerada Mod 1 Cuad 2 LAM1C2-2 1/28/2015 7 2/4/2015 -1322 dias 210 ENSAYADO E 14.95
158 Losa Aligerada Mod 1 Cuad 2 LAM1C2-3 1/28/2015 7 2/4/2015 -1322 dias 210 ENSAYADO E 15.15
159 Losa Aligerada Mod 1 Cuad 2 LAM1C2-4 1/28/2015 7 2/4/2015 -1322 dias 210 ENSAYADO E 14.98
160 Losa Aligerada Mod 1 Cuad 2 LAM1C2-5 1/28/2015 7 2/4/2015 -1322 dias 210 ENSAYADO E 15.10
161 Losa Aligerada Mod 1 Cuad 2 LAM1C2-6 1/28/2015 7 2/4/2015 -1322 dias 210 ENSAYADO E 15.00
162 Losa Aligerada Mod 1 Cuad 2 LAM1C2-7 1/28/2015 28 2/25/2015 -1301 dias 210 ENSAYADO E 14.85
163 Losa Aligerada Mod 1 Cuad 2 LAM1C2-8 1/28/2015 28 2/25/2015 -1301 dias 210 ENSAYADO E 14.65
164 Losa Aligerada Mod 1 Cuad 2 LAM1C2-9 1/28/2015 28 2/25/2015 -1301 dias 210 ENSAYADO E 14.88
165 Losa Aligerada Mod 1 Cuad 2 LAM1C2-10 1/28/2015 28 2/25/2015 -1301 dias 210 ENSAYADO E 14.80
166 Losa Aligerada Mod 1 Cuad 2 LAM1C2-11 1/28/2015 28 2/25/2015 -1301 dias 210 ENSAYADO E 14.81
167 Losa Aligerada Mod 1 Cuad 2 LAM1C2-12 1/28/2015 28 2/25/2015 -1301 dias 210 ENSAYADO E 14.84
168 Placas Módulo 1 Torre 1.2 PM1T3-1 1/28/2015 7 2/4/2015 -1322 dias 280 ENSAYADO E 15.10
169 Losa Aligerada Torre 1 y Torre 3 LAT1T3-1 2/6/2015 7 2/13/2015 -1313 dias 210 ENSAYADO E 15.00
170 Losa Aligerada Torre 1 y Torre 3 LAT1T3-2 2/6/2015 7 2/13/2015 -1313 dias 210 ENSAYADO E 15.00
171 Losa Aligerada Torre 1 y Torre 3 LAT1T3-3 2/6/2015 7 2/13/2015 -1313 dias 210 ENSAYADO E 15.10
172 Losa Aligerada Torre 1 y Torre 3 LAT1T3-4 2/6/2015 14 2/20/2015 -1306 dias 210 ENSAYADO E 14.86
173 Losa Aligerada Torre 1 y Torre 3 LAT1T3-5 2/6/2015 14 2/20/2015 -1306 dias 210 ENSAYADO E 14.87
174 Losa Aligerada Torre 1 y Torre 3 LAT1T3-6 2/6/2015 14 2/20/2015 -1306 dias 210 ENSAYADO E 14.85
175 Losa Aligerada Torre 1 y Torre 3 LAT1T3-7 2/6/2015 28 3/6/2015 -1292 dias 210 ENSAYADO E 14.86
176 Losa Aligerada Torre 1 y Torre 3 LAT1T3-8 2/6/2015 28 3/6/2015 -1292 dias 210 ENSAYADO E 14.85
177 Losa Aligerada Torre 1 y Torre 3 LAT1T3-9 2/6/2015 28 3/6/2015 -1292 dias 210 ENSAYADO E 14.95
178 Losa Aligerada Piso 01 Torre 4 LAP1T4-1 2/16/2015 7 2/23/2015 -1303 dias 210 ENSAYADO E 14.90
179 Losa Aligerada Piso 01 Torre 4 LAP1T4-2 2/16/2015 7 2/23/2015 -1303 dias 210 ENSAYADO E 14.86
180 Losa Aligerada Piso 01 Torre 4 LAP1T4-3 2/16/2015 7 2/23/2015 -1303 dias 210 ENSAYADO E 14.85
181 Losa Aligerada Piso 01 Torre 4 LAP1T4-4 2/16/2015 28 3/16/2015 -1282 dias 210 ENSAYADO E 14.89
182 Losa Aligerada Piso 01 Torre 4 LAP1T4-5 2/16/2015 28 3/16/2015 -1282 dias 210 ENSAYADO E 14.89
183 Losa Aligerada Piso 01 Torre 4 LAP1T4-6 2/16/2015 28 3/16/2015 -1282 dias 210 ENSAYADO E 14.86
184 Losa Aligerada Piso 01 Torre 2 LAP1T2-1 2/23/2015 7 3/2/2015 -1296 dias 210 ENSAYADO E 15.15
185 Losa Aligerada Piso 01 Torre 2 LAP1T2-2 2/23/2015 7 3/2/2015 -1296 dias 210 ENSAYADO E 14.98
186 Losa Aligerada Piso 01 Torre 2 LAP1T2-3 2/23/2015 7 3/2/2015 -1296 dias 210 ENSAYADO E 15.05
187 Losa Aligerada Piso 01 Torre 2 LAP1T2-4 2/23/2015 28 3/23/2015 -1275 dias 210 ENSAYADO E 14.97
188 Losa Aligerada Piso 01 Torre 2 LAP1T2-5 2/23/2015 28 3/23/2015 -1275 dias 210 ENSAYADO E 14.96
189 Losa Aligerada Piso 01 Torre 2 LAP1T2-6 2/23/2015 28 3/23/2015 -1275 dias 210 ENSAYADO E 15.00
190 Placas Piso 03 Torre 03.01 PP3T3.1-1 2/25/2015 14 3/11/2015 -1287 dias 210 ENSAYADO E 14.90
191 Placas Piso 03 Torre 03.01 PP3T3.1-2 2/25/2015 14 3/11/2015 -1287 dias 210 ENSAYADO E 14.82
192 Placas Piso 03 Torre 03.01 PP3T3.1-3 2/25/2015 14 3/11/2015 -1287 dias 210 ENSAYADO E 14.65
193 Placas Piso 03 Torre 03.01 PP3T3.1-4 2/25/2015 28 3/25/2015 -1273 dias 210 ENSAYADO E 14.81
194 Placas Piso 03 Torre 03.01 PP3T3.1-5 2/25/2015 28 3/25/2015 -1273 dias 210 ENSAYADO E 14.89
195 Placas Piso 03 Torre 03.01 PP3T3.1-6 2/25/2015 28 3/25/2015 -1273 dias 210 ENSAYADO E 14.82
196 Placas Piso 02 Torre 02 PP2T2-1 3/5/2015 7 3/12/2015 -1286 dias 280 ENSAYADO E 15.01
197 Placas Piso 02 Torre 02 PP2T2-2 3/5/2015 7 3/12/2015 -1286 dias 280 ENSAYADO E 15.00
198 Placas Piso 02 Torre 02 PP2T2-3 3/5/2015 7 3/12/2015 -1286 dias 280 ENSAYADO E 15.02
199 Placas Piso 02 Torre 02 PP2T2-4 3/5/2015 28 4/2/2015 -1265 dias 280 SE PASÓ
200 Placas Piso 02 Torre 02 PP2T2-5 3/5/2015 28 4/2/2015 -1265 dias 280 SE PASÓ
201 Placas Piso 02 Torre 02 PP2T2-6 3/5/2015 28 4/2/2015 -1265 dias 280 SE PASÓ
202 Losa Aligerada Piso 03 Torre 03 LAP3T3-1 3/7/2015 7 3/14/2015 -1284 dias 210 ENSAYADO E 14.86
203 Losa Aligerada Piso 03 Torre 03 LAP3T3-2 3/7/2015 7 3/14/2015 -1284 dias 210 ENSAYADO E 14.98
204 Losa Aligerada Piso 03 Torre 03 LAP3T3-3 3/7/2015 7 3/14/2015 -1284 dias 210 ENSAYADO E 14.99
205 Losa Aligerada Piso 03 Torre 03 LAP3T3-4 3/7/2015 28 4/4/2015 -1263 dias 210 SE PASÓ
206 Losa Aligerada Piso 03 Torre 03 LAP3T3-5 3/7/2015 28 4/4/2015 -1263 dias 210 SE PASÓ
207 Losa Aligerada Piso 03 Torre 03 LAP3T3-6 3/7/2015 28 4/4/2015 -1263 dias 210 SE PASÓ
208 Losa Aligerada Piso 03 Torre 01 LAP3T1-1 3/9/2015 7 3/16/2015 -1282 dias 210 ENSAYADO E 14.91
209 Losa Aligerada Piso 03 Torre 01 LAP3T1-2 3/9/2015 7 3/16/2015 -1282 dias 210 ENSAYADO E 14.80
210 Losa Aligerada Piso 03 Torre 01 LAP3T1-3 3/9/2015 7 3/16/2015 -1282 dias 210 ENSAYADO E 14.75
211 Losa Aligerada Piso 03 Torre 01 LAP3T1-4 3/9/2015 28 4/6/2015 -1261 dias 210 ENSAYADO E 15.10
212 Losa Aligerada Piso 03 Torre 01 LAP3T1-5 3/9/2015 28 4/6/2015 -1261 dias 210 ENSAYADO E 15.05
213 Losa Aligerada Piso 03 Torre 01 LAP3T1-6 3/9/2015 28 4/6/2015 -1261 dias 210 ENSAYADO E 14.98
214 Losa Aligerada Piso 02 Torre 04 LAP2T4-1 3/13/2015 7 3/20/2015 -1278 dias 210 ENSAYADO E 14.88
215 Losa Aligerada Piso 02 Torre 04 LAP2T4-2 3/13/2015 7 3/20/2015 -1278 dias 210 ENSAYADO E 14.89
216 Losa Aligerada Piso 02 Torre 04 LAP2T4-3 3/13/2015 7 3/20/2015 -1278 dias 210 ENSAYADO E 14.87
217 Losa Aligerada Piso 02 Torre 04 LAP2T4-4 3/13/2015 28 4/10/2015 -1257 dias 210 ENSAYADO E 15.03
218 Losa Aligerada Piso 02 Torre 04 LAP2T4-5 3/13/2015 28 4/10/2015 -1257 dias 210 ENSAYADO E 15.00
219 Losa Aligerada Piso 02 Torre 04 LAP2T4-6 3/13/2015 28 4/10/2015 -1257 dias 210 DESCARTADA
220 Losa Aligerada Piso 04 Torre 03 LAP4T3-1 3/23/2015 7 3/30/2015 -1268 dias 210 SE PASÓ
221 Losa Aligerada Piso 04 Torre 03 LAP4T3-2 3/23/2015 7 3/30/2015 -1268 dias 210 SE PASÓ
222 Losa Aligerada Piso 04 Torre 03 LAP4T3-3 3/23/2015 7 3/30/2015 -1268 dias 210 SE PASÓ
223 Losa Aligerada Piso 04 Torre 03 LAP4T3-4 3/23/2015 28 4/20/2015 -1247 dias 210 SE PASÓ SI
224 Losa Aligerada Piso 04 Torre 03 LAP4T3-5 3/23/2015 28 4/20/2015 -1247 dias 210 SE PASÓ SI
225 Losa Aligerada Piso 04 Torre 03 LAP4T3-6 3/23/2015 28 4/20/2015 -1247 dias 210 SE PASÓ SI
226 Losa Aligerada Piso 04 Torre 01 LAP4T1-1 3/25/2015 7 4/1/2015 -1266 dias 210 SE PASÓ
227 Losa Aligerada Piso 04 Torre 01 LAP4T1-2 3/25/2015 7 4/1/2015 -1266 dias 210 SE PASÓ
228 Losa Aligerada Piso 04 Torre 01 LAP4T1-3 3/25/2015 7 4/1/2015 -1266 dias 210 SE PASÓ
229 Losa Aligerada Piso 04 Torre 01 LAP4T1-4 3/25/2015 28 4/22/2015 -1245 dias 210 SE PASÓ SI
230 Losa Aligerada Piso 04 Torre 01 LAP4T1-5 3/25/2015 28 4/22/2015 -1245 dias 210 SE PASÓ SI
231 Losa Aligerada Piso 04 Torre 01 LAP4T1-6 3/25/2015 28 4/22/2015 -1245 dias 210 SE PASÓ SI
232 Losa Aligerada Piso 03 Torre 04 LAP3T4-1 3/30/2015 7 4/6/2015 -1261 dias 210 ENSAYADO E 15.15
233 Losa Aligerada Piso 03 Torre 04 LAP3T4-2 3/30/2015 7 4/6/2015 -1261 dias 210 ENSAYADO E 14.97
234 Losa Aligerada Piso 03 Torre 04 LAP3T4-3 3/30/2015 7 4/6/2015 -1261 dias 210 ENSAYADO E 14.95
235 Losa Aligerada Piso 03 Torre 04 LAP3T4-4 3/30/2015 28 4/27/2015 -1240 dias 210 SE PASÓ SI
236 Losa Aligerada Piso 03 Torre 04 LAP3T4-5 3/30/2015 28 4/27/2015 -1240 dias 210 SE PASÓ SI
237 Losa Aligerada Piso 03 Torre 04 LAP3T4-6 3/30/2015 28 4/27/2015 -1240 dias 210 SE PASÓ SI
238 12/30/1899 -43361 dias SE PASÓ
239 12/30/1899 -43361 dias SE PASÓ
240 12/30/1899 -43361 dias SE PASÓ
241 12/30/1899 -43361 dias SE PASÓ
242 12/30/1899 -43361 dias SE PASÓ
243 12/30/1899 -43361 dias SE PASÓ
244 12/30/1899 -43361 dias SE PASÓ
245 12/30/1899 -43361 dias SE PASÓ
EL TRILLO

TORIO FECHA 9/18/2018

RESISTENCIA RESISTENCIA Porcentaje CONTROL


ÁREA CARGA ENSAYADA ESPERADA Real/Espera CALIDAD
177.3041 36,080.00 203.4922 136.50 149% OK
174.3662 36,890.00 211.5662 136.50 155% OK
176.7146 35,380.00 200.2098 84.00 238% OK
175.5385 37,880.00 215.7932 84.00 257% OK
176.7146 26,750.00 151.3740 258.00 59% FALLÓ
174.3662 17,150.00 98.3562 258.00 38% FALLÓ
180.2665 28,330.00 157.1562 181.50 87% FALLÓ
177.8946 30,850.00 173.4172 181.50 96% FALLÓ
185.0575 42,900.00 231.8199 199.50 116% OK
176.7146 41,370.00 234.1063 174.00 135% OK
188.6919 49,620.00 262.9684 174.00 151% OK
183.8539 53,680.00 291.9710 198.00 147% OK
188.6919 27,400.00 145.2103 222.00 65% FALLÓ
176.7146 37,040.00 209.6035 222.00 94% FALLÓ
184.0943 36,970.00 200.8210 262.00 77% FALLÓ
176.2437 47,750.00 270.9317 262.00 103% OK
175.7734 45,890.00 261.0748 164.50 159% OK
176.4790 40,970.00 232.1522 164.50 141% OK
177.3041 46,900.00 264.5173 254.00 104% OK
185.6608 60,210.00 324.3012 254.00 128% OK
175.7734 22,410.00 127.4937 97.13 131% OK
185.0575 24,790.00 133.9584 97.13 138% OK
177.8946 34,930.00 196.3522 193.50 101% OK
177.3041 32,290.00 182.1165 193.50 94% FALLÓ
179.0786 38,970.00 217.6139 192.00 113% OK
177.0092 28,420.00 160.5566 192.00 84% FALLÓ
0.0000 0.00 1.0000 0.00 0% DESCARTADA
177.8946 32,040.00 180.1066 159.00 113% OK
177.8946 32,360.00 181.9054 159.00 114% OK
0.0000 0.00 0.0000 0.00 0% DESCARTADA
178.4862 48,320.00 270.7213 164.50 165% OK
177.8946 42,190.00 237.1628 164.50 144% OK
180.2665 50,070.00 277.7554 182.00 153% OK
179.0786 47,840.00 267.1452 182.00 147% OK
179.0786 58,190.00 324.9411 252.00 129% OK
175.5385 55,370.00 315.4295 252.00 125% OK
176.1260 67,230.00 381.7153 266.00 144% OK
177.3041 61,190.00 345.1132 266.00 130% OK
175.7734 27,030.00 153.7776 112.00 137% OK
177.4222 26,170.00 147.5013 112.00 132% OK
177.8946 29,320.00 164.8167 182.00 91% FALLÓ
179.0786 28,910.00 161.4375 182.00 89% FALLÓ
181.4584 37,360.00 205.8874 252.00 82% FALLÓ
179.0786 34,220.00 191.0892 182.00 105% OK
180.8620 36,880.00 203.9124 182.00 112% OK
179.0786 46,080.00 257.3171 252.00 102% OK
176.1260 35,720.00 202.8093 182.00 111% OK
178.4862 36,840.00 206.4026 182.00 113% OK
176.1260 39,770.00 225.8042 252.00 90% FALLÓ
179.0786 43,220.00 241.3465 182.00 133% OK
178.4862 42,790.00 239.7385 182.00 132% OK
179.0786 56,630.00 316.2298 252.00 125% OK
180.2665 56,870.00 315.4773 266.00 119% OK
180.2665 65,630.00 364.0720 182.00 200% OK
176.7146 61,140.00 345.9816 182.00 190% OK
179.0786 26,930.00 150.3809 212.00 71% FALLÓ
179.0786 24,790.00 138.4308 212.00 65% FALLÓ
179.0786 28,830.00 160.9907 252.00 64% FALLÓ
180.2665 32,320.00 179.2901 252.00 71% FALLÓ
179.0786 14,400.00 80.4116 84.00 96% FALLÓ
176.1260 14,620.00 83.0087 84.00 99% FALLÓ
177.8946 22,140.00 124.4557 136.50 91% FALLÓ
179.0786 22,750.00 127.0392 136.50 93% FALLÓ
178.4862 24,450.00 136.9854 189.00 72% FALLÓ
176.7146 27,560.00 155.9577 189.00 83% FALLÓ
176.7146 26,790.00 151.6004 199.50 76% FALLÓ
177.8946 28,150.00 158.2397 199.50 79% FALLÓ
179.0786 35,500.00 198.2369 147.00 135% OK
177.3041 39,450.00 222.4991 147.00 151% OK
176.1260 47,770.00 271.2262 192.00 141% OK
179.0786 43,030.00 240.2855 192.00 125% OK
177.8946 55,380.00 311.3078 252.00 124% OK
176.7146 39,730.00 224.8258 252.00 89% FALLÓ
179.0786 46,320.00 258.6573 266.00 97% FALLÓ
176.7146 59,690.00 337.7763 266.00 127% OK
179.0786 38,800.00 216.6646 112.00 193% OK
177.8946 35,810.00 201.2989 112.00 180% OK
176.7146 53,970.00 305.4077 182.00 168% OK
180.2665 35,350.00 196.0985 182.00 108% OK
176.7146 47,410.00 268.2857 252.00 106% OK
180.2665 42,430.00 235.3737 252.00 93% FALLÓ
175.5385 57,700.00 328.7029 280.00 117% OK
180.2665 56,970.00 316.0320 280.00 113% OK
179.0786 29,780.00 166.2957 129.50 128% OK
176.7146 27,450.00 155.3352 129.50 120% OK
179.0786 40,240.00 224.7058 182.00 123% OK
177.8946 36,340.00 204.2782 182.00 112% OK
179.0786 30,760.00 171.7681 112.00 153% OK
179.0786 32,650.00 182.3221 112.00 163% OK
179.0786 39,430.00 220.1826 182.00 121% OK
177.8946 35,650.00 200.3995 182.00 110% OK
176.7146 50,620.00 286.4506 252.00 114% OK
179.0786 47,610.00 265.8609 252.00 106% OK
177.8946 58,070.00 326.4292 280.00 117% OK
177.8946 50,050.00 281.3463 280.00 100% OK
179.0786 50,400.00 281.4406 210.00 134% OK
175.5385 45,000.00 256.3541 210.00 122% OK
177.8946 21,830.00 122.7131 84.00 146% OK
177.8946 23,420.00 131.6510 84.00 157% OK
177.8946 33,890.00 190.5060 136.50 140% OK
177.8946 33,400.00 187.7516 136.50 138% OK
180.2665 42,410.00 235.2627 199.50 118% OK
177.8946 47,420.00 266.5623 199.50 134% OK
179.0786 36,950.00 206.3339 199.50 103% OK
176.7146 41,440.00 234.5024 199.50 118% OK
179.0786 33,460.00 186.8453 182.00 103% OK
177.8946 30,520.00 171.5622 182.00 94% FALLÓ
179.0786 42,210.00 235.7065 280.00 84% FALLÓ
175.5385 41,760.00 237.8966 280.00 85% FALLÓ
177.8946 42,350.00 238.0622 280.00 85% FALLÓ
175.5385 42,710.00 243.3085 280.00 87% FALLÓ
177.8946 42,260.00 237.5563 266.00 89% FALLÓ
177.8946 51,440.00 289.1599 266.00 109% OK
175.5385 45,450.00 258.9176 266.00 97% FALLÓ
180.2665 50,530.00 280.3071 266.00 105% OK
175.5385 21,530.00 122.6512 189.00 65% FALLÓ
176.7146 26,200.00 148.2617 189.00 78% FALLÓ
179.0786 21,270.00 118.7746 189.00 63% FALLÓ
176.7146 36,110.00 204.3408 199.50 102% OK
177.8946 26,680.00 149.9764 199.50 75% FALLÓ
177.8946 25,030.00 140.7013 199.50 71% FALLÓ
176.7146 24,420.00 138.1889 210.00 66% FALLÓ
173.1980 30,520.00 176.2145 210.00 84% FALLÓ
176.7146 22,820.00 129.1348 136.50 95% FALLÓ
175.5385 19,940.00 113.5933 136.50 83% FALLÓ
177.8946 21,300.00 119.7338 136.50 88% FALLÓ
177.8946 27,000.00 151.7752 189.00 80% FALLÓ
179.0786 30,320.00 169.3111 189.00 90% FALLÓ
177.8946 28,150.00 158.2397 189.00 84% FALLÓ
179.0786 30,100.00 168.0826 210.00 80% FALLÓ
179.0786 32,020.00 178.8041 210.00 85% FALLÓ
179.0786 46,550.00 259.9417 252.00 103% OK
176.7146 42,110.00 238.2939 252.00 95% FALLÓ
177.8946 49,210.00 276.6244 252.00 110% OK
180.2665 48,580.00 269.4898 266.00 101% OK
178.3678 51,600.00 289.2899 266.00 109% OK
176.7146 46,700.00 264.2679 266.00 99% FALLÓ
177.8946 49,900.00 280.5031 182.00 154% OK
179.0786 46,970.00 262.2870 182.00 144% OK
179.0786 34,300.00 191.5360 182.00 105% OK
0.0000 #DIV/0! 280.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 280.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 280.00 #DIV/0! #DIV/0!
179.0786 30,480.00 170.2046 136.50 125% OK
177.8946 28,810.00 161.9498 136.50 119% OK
181.4584 30,580.00 168.5235 136.50 123% OK
179.0786 38,680.00 215.9945 210.00 103% OK
179.0786 43,910.00 245.1995 210.00 117% OK
176.7146 34,200.00 193.5324 210.00 92% FALLÓ
180.2665 38,200.00 211.9084 136.50 155% OK
178.6046 39,310.00 220.0952 136.50 161% OK
181.4584 34,760.00 191.5591 136.50 140% OK
179.0786 47,570.00 265.6375 210.00 126% OK
177.8946 50,310.00 282.8078 210.00 135% OK
176.2437 51,360.00 291.4147 210.00 139% OK
177.8946 36,930.00 207.5948 136.50 152% OK
175.5385 29,690.00 169.1367 136.50 124% OK
180.2665 39,000.00 216.3463 136.50 158% OK
176.2437 36,510.00 207.1564 136.50 152% OK
179.0786 25,660.00 143.2890 136.50 105% OK
176.7146 34,330.00 194.2681 136.50 142% OK
173.1980 35,460.00 204.7368 210.00 97% FALLÓ
168.5641 38,520.00 228.5184 210.00 109% OK
173.8985 32,400.00 186.3156 210.00 89% FALLÓ
172.0336 41,490.00 241.1738 210.00 115% OK
172.2662 39,890.00 231.5603 210.00 110% OK
172.9648 37,050.00 214.2055 210.00 102% OK
179.0786 36,360.00 203.0393 182.00 112% OK
176.7146 33,940.00 192.0611 136.50 141% OK
176.7146 32,150.00 181.9318 136.50 133% OK
179.0786 28,740.00 160.4882 136.50 118% OK
173.4313 35,190.00 202.9045 189.00 107% OK
173.6648 29,790.00 171.5373 189.00 91% FALLÓ
173.1980 31,120.00 179.6788 189.00 95% FALLÓ
173.4313 47,570.00 274.2873 210.00 131% OK
173.1980 50,310.00 290.4769 210.00 138% OK
175.5385 51,360.00 292.5855 210.00 139% OK
174.3662 34,590.00 198.3755 136.50 145% OK
173.4313 37,300.00 215.0707 136.50 158% OK
173.1980 33,380.00 192.7274 136.50 141% OK
174.1323 0.0000 210.00 0% FALLÓ
174.1323 0.0000 210.00 0% FALLÓ
173.4313 0.0000 210.00 0% FALLÓ
180.2665 34,260.00 190.0519 136.50 139% OK
176.2437 28,190.00 159.9490 136.50 117% OK
177.8946 29,350.00 164.9853 136.50 121% OK
176.0084 37,660.00 213.9670 210.00 102% OK
175.7734 34,900.00 198.5511 210.00 95% FALLÓ
176.7146 36,970.00 209.2074 210.00 100% FALLÓ
174.3662 41,850.00 240.0120 189.00 127% OK
172.4989 42,320.00 245.3349 189.00 130% OK
168.5641 39,490.00 234.2729 189.00 124% OK
172.2662 39,910.00 231.6764 210.00 110% OK
174.1323 37,280.00 214.0901 210.00 102% OK
172.4989 34,880.00 202.2042 210.00 96% FALLÓ
176.9503 39,940.00 225.7131 182.00 124% OK
176.7146 41,810.00 236.5962 182.00 130% OK
177.1861 42,120.00 237.7161 182.00 131% OK
0.0000 #DIV/0! 280.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 280.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 280.00 #DIV/0! #DIV/0!
173.4313 34,740.00 200.3099 136.50 147% OK
176.2437 39,370.00 223.3839 136.50 164% OK
176.4790 30,400.00 172.2584 136.50 126% OK
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
174.6004 29,990.00 171.7637 136.50 126% OK
172.0336 29,850.00 173.5126 136.50 127% OK
170.8732 33,680.00 197.1052 136.50 144% OK
179.0786 36,170.00 201.9783 210.00 96% FALLÓ
177.8946 29,460.00 165.6036 210.00 79% FALLÓ
176.2437 35,900.00 203.6953 210.00 97% FALLÓ
173.8985 29,740.00 171.0193 136.50 125% OK
174.1323 24,770.00 142.2482 136.50 104% OK
173.6648 28,830.00 166.0095 136.50 122% OK
177.4222 37,970.00 214.0094 210.00 102% OK
176.7146 45,250.00 256.0626 210.00 122% OK
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 136.50 #DIV/0! #DIV/0!
0.0000 #DIV/0! 136.50 #DIV/0! #DIV/0!
0.0000 #DIV/0! 136.50 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 136.50 #DIV/0! #DIV/0!
0.0000 #DIV/0! 136.50 #DIV/0! #DIV/0!
0.0000 #DIV/0! 136.50 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
180.2665 41,750.00 231.6015 136.50 170% OK
176.0084 34,720.00 197.2633 136.50 145% OK
175.5385 34,590.00 197.0508 136.50 144% OK
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! 210.00 #DIV/0! #DIV/0!
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
0.0000 #DIV/0! #N/A #DIV/0! #N/A
CONTROL DE CONCRETO

OBRA: "CONSTRUCCIÓN DE LA RESIDENCIAL SAN FRANCISCO II"

PLANOS
ELEMENTO FECHA CONCRETO BOLSAS CONCRETO RESISTENCIA DESENCOFRADO PROBETAS
OBRA PROYEC
1 Vaciado Zapatas (UNICON) 10/11/2014 95.00
2 Vigas Cimentación Mod 1 Cuad 1 10/16/2014 5.33 2.35 3.29 46
3 Placas y Columnas Mod 1 Cuad 1 (NPT -2.20) 10/17/2014 23.79 10.92 13.74 222
4 Zapatas (UNICON) 10/21/2014 95.00
5 Vigas Cimentación Mod 1 Cuad 4 10/22/2014 4.77 2.10 2.94 41
6 Placas y Columnas Mod 1 Cuad 1 (NPT -0.25) 10/23/2014 22.03 10.11 12.72 206
7 Placas y Columnas Mod 1 Cuad 4 (NPT varia) 10/29/2014 24.06 11.04 13.89 224
8 Zapata Módulo I Cuad 2 10/31/2014
9 Vigas Cimentación Mod 1 Cuad 2 11/1/2014
10 Placas y Columnas Mod 1 Cuad 4 (NPT varia) 11/5/2014
11 Zapata Módulo I Cuad 2 (UNICON) 11/7/2014
12 Vigas Cimentación Mod 1 Cuad 2 11/8/2014
13 Placas y Columnas Mod 1 Cuad 2 11/11/2014
ENERO
14 Placas Módulo 02 1/3/2015 28.00
15 Placas Torre 01 piso 01 1/7/2015 20.00
16 Placas Torre 02 piso 01 1/10/2015 26.00
17 Pavimento Módulo 01 Cuadrante 02 1/16/2015 50.00
18 Losa Aligerada Torre 01 1/17/2015 50.00
19 Losa Aligerada Torre 03 1/19/2015 43.00
20 Placas Torre 01 piso 02 1/22/2015 16.00
21 Losa Aligerada Modulo 01 Cuadrante 02 1/28/2015 100.00
22 Placas Torre 03 piso 02 1/29/2015 23.00
TOTAL 356.00
23 FEBRERO
Placas Torre 04 piso 01 2/3/2015 29.50 280.00
Techo 2do piso Torre 01 y 03 2/6/2015 84.32 210.00 2/27/2015
Placas piso 01 Torre 02 2/10/2015 29.00 280.00
Placa escalera Torre 02 2/12/2015 5.82 280.00
Placas 3er piso Torre 01+ESCALERA 2/14/2015 19.00 210.00
Techo 1er piso Torre 04 2/16/2015 43.00 210.00 3/9/2015
Techo 1er piso Torre 02 2/23/2015 41.00 210.00 3/16/2015
Placas 3er piso Torre 03 2/25/2015 37.00 210.00
TOTAL 288.64
23 MARZO
Placas Torre 04 piso 02 3/2/2015 24.00 280.00 ok
Placas Torre 02 piso 02 +Torre 06 piso 01 3/5/2015 22.00 280.00 ok
Placas Torre 02 piso 02 +Torre 06 piso 01 3/6/2015 13.00 280.00 ok
Techo Torre 03 piso 03 3/7/2015 43.00 210.00 3/28/2015 ok
Techo Torre 01 piso 03 3/9/2015 41.50 210.00 3/30/2015 ok
Calzaduras Torre 05 3/12/2015 17.00 210.00 ok
Placas Torre 03 piso 04 3/13/2015 24.17 210.00 ok
Techo Torre 04 piso 02 3/13/2015 42.50 210.00 4/3/2015 ok
Calzaduras Torre 05 3/14/2015 16.00 210.00 ok
Techo Torre 02 piso 02 3/16/2015 39.70 210.00 4/6/2015 ok
Placas Torre 01 Piso 04 3/18/2015 27.00 210.00 ok
Placas Torre 04 Piso 03 3/21/2015 24.40 210.00 ok
Placas Torre 06 Piso 01 3/23/2015 12.00 280.00 ok
Techo Torre 03 piso 04 3/23/2015 43.00 210.00 4/13/2015 ok
Techo Torre 01 piso 04 3/25/2015 40.00 210.00 4/15/2015 ok
Placas Torre 02 Piso 03 3/25/2015 28.15 210.00 ok
Placas Torre 03 Piso 05 3/30/2015 27.00 210.00 ok
Techo Torre 04 piso 03 3/30/2015 44.00 210.00 4/20/2015 ok
TOTAL 528.42
23 ABRIL
Placas Torre 01 piso 05 4/1/2015 28.20 210.00
Losa Torre 02 piso 03 4/1/2015 40.30 210.00 4/22/2015
Placas Torre 04 piso 04 4/8/2015 24.70 210.00
Losa Torre 03 piso 05 4/8/2015 42.50 210.00 4/29/2015
Escalera torre 02 piso 02 y torre 01 piso 04 4/8/2015 3.80 210.00
Dados Torre 02 piso 04 4/8/2015 0.60 210.00
Calzaduras Torre 05 4/8/2015 1.40 210.00
Placas Torre 02 piso 04 4/10/2015 16.00 210.00
Placa esc PL07 Torre 02 piso 04 4/11/2015 11.80 210.00
Losa Torre 01 piso 05 4/11/2015 40.00 210.00 5/2/2015
Dados de concreto ascensor 4/11/2015 0.20 210.00
Placas Torre 03 piso 06 4/15/2015 23.50 210.00
Losa Torre 06 piso 01 4/15/2015 38.56 210.00 5/6/2015
Losa Torre 04 piso 04 4/17/2015 43.00 210.00 5/8/2015
Placas Torre 01 piso 06 4/18/2015 26.94 210.00
Escalera torre 02 piso 03 4/18/2015 2.00 210.00
Dados Torre 06 piso 01 4/18/2015 0.06 210.00
Losa Torre 02 piso 04 4/21/2015 40.00 210.00 5/12/2015
Escalera torre 01 piso 05 4/21/2015 1.50 210.00
Placas Torre 06 piso 02 4/23/2015 10.98 280.00
Placas Torre 04 piso 05 4/23/2015 0.88 280.00
Placas Torre 04 piso 05 4/23/2015 23.00 210.00
Dados Torre 06 piso 01 4/23/2015 0.18 280.00
Dados Torre 04 piso 05 4/23/2015 0.46 280.00
Losa Torre 03 piso 06 4/23/2015 1.00 210.00 5/14/2015
Losa Torre 03 piso 06 4/24/2015 38.21 210.00 5/15/2015
Placas Torre 02 piso 05 4/24/2015 2.80 210.00
Placas Torre 06 piso 02 4/27/2015 9.50 280.00
Placas Torre 02 piso 05 4/27/2015 25.90 210.00
Escalera torre 06 piso 01 4/27/2015 0.50 280.00
Escalera torre 06 piso 01 4/27/2015 1.50 210.00
Dados Torre 03 piso 07 4/27/2015 0.60 210.00
Losa Torre 01 piso 06 4/28/2015 38.00 210.00 5/19/2015
Placas Torre 06 piso 02 4/28/2015 9.00 280.00
Placas Torre 03 piso 07 4/30/2015 23.50 210.00
Losa Torre 04 piso 05 4/30/2015 43.00 210.00 5/21/2015
Escalera Torre 02 piso 04 4/30/2015 2.00 210.00
TOTAL
MAYO
Placas Torre 01 Piso 07 5/5/2015 27.00 27.00 210.00
Dados Placas Torre 04 Piso 06 5/5/2015 0.50
Losa Torre 02 Piso 05 5/6/2015 40.00 40.00 210.00 5/27/2015
Losa Torre 06 Piso 02 5/7/2015 38.00 38.00 210.00 5/28/2015
Placas Torre 04 Piso 06 5/7/2015 6.50 210.00
Placas Torre 04 Piso 06 5/8/2015 17.00 210.00
Dados Placas Torre 02 Piso 06 5/8/2015 0.50 210.00
Losa Torre 03 Piso 07 5/12/2015 41.50 39.50 210.00 6/2/2015
Placas Torre 06 Piso 03 5/12/2015 10.00 10.00 280.00
Placas Torre 02 Piso 06 5/13/2015 24.80 210.00
Dados Placas Torre 03 Piso 08 5/13/2015 0.50 210.00
Losa Torre 01 Piso 07 5/13/2015 1.70 210.00 6/3/2015
Losa Torre 01 Piso 07 5/14/2015 36.50 210.00 6/4/2015
Escalera Torre 01 Piso 06 5/14/2015 2.00 210.00
Placas Torre 06 Piso 03 5/16/2015 19.50 280.00
Placas Torre 03 Piso 08 5/16/2015 23.80 210.00
Dados Placas Torre 01 Piso 08 5/16/2015 0.70 210.00
Losa Torre 04 Piso 06 5/18/2015 41.50 210.00 6/8/2015
Placas Torre 01 Piso 08 5/20/2015 27.00 210.00
Losa Torre 02 Piso 06 5/20/2015 38.50 210.00 6/10/2015
Escalera Torre 02 Piso 05 5/20/2015 2.00 210.00
Dados Placas Torre 04 Piso 07 5/20/2015 0.50 210.00
Placas Torre 04 Piso 07 5/26/2015 23.50 210.00
Dados Placas Torre 02 Piso 07 5/26/2015 0.50 210.00
Losa Torre 06 Piso 03 5/27/2015 42.50 38.50 210.00 6/17/2015 Se registró 02 m3 adicionales por no consid
Losa Torre 03 Piso 08 5/27/2015 42.00 41.50 210.00 6/17/2015 Se vació realmente con 41.5m3
Escalera Torre 06 Piso 02 5/27/2015 2.00 210.00
Placas Torre 02 Piso 07 5/29/2015 27.00 210.00
Losa Torre 01 Piso 08 5/30/2015 38.50 210.00 6/20/2015
JUNIO
Placas Torre 06 Piso 04 6/2/2015 11.70 ok
Dados Placas Torre 06 Piso 04 6/2/2015 0.30 ok
Placas Torre 03 Piso 09 6/3/2015 23.50 ok
Dados Placas Torre 06 Piso 04 6/3/2015 0.50 ok
Losa Torre 04 Piso 07 6/3/2015 42.00 ok
Placas Torre 06 Piso 04 6/5/2015 17.50 ok Sobró 0.3m3 de concreto
Placas Torre 01 Piso 09 6/6/2015 27.00 ok
Escalera Torre 01 Piso 08 6/6/2015 2.00 ok
Placas Torre 04 Piso 08 6/8/2015 6.50 ok
Losa Torre 02 Piso 07 6/8/2015 38.50 ok
Escalera Torre 02 Piso 06 6/8/2015 2.00 ok 60.00
Placas Torre 04 Piso 08 6/12/2015 17.00 ok 64.00
Losa Torre 03 Piso 09 6/12/2015 42.50 ok 105.00
Dados Placas Torre 02 Piso 08 6/12/2015 0.50 ok
Losa Torre 06 Piso 04 6/13/2015 43.00 ok
Escalera Torre 06 Piso 04 6/13/2015 2.00 ok
Placas Torre 02 Piso 08 6/15/2015 27.00 ok
Placas Torre 06 Piso 05 6/18/2015 11.00 ok
Losa Torre 01 Piso 09 6/18/2015 39.00 ok 7/9/2015
Placas Torre 06 Piso 05 6/20/2015 18.70
Dados Placas Torre 01 Piso 10 6/20/2015 0.30 61.50 saldo de 01 cubo
Losa Torre 04 Piso 08 6/20/2015 42.50 62.50
Placas Torre 01 Piso 10 6/24/2015 12.00 ok 117.00
Dados Placas Torre 04 Piso 09 6/24/2015 0.50 ok 55.50
Losa Torre 02 Piso 08 6/24/2015 39.00 ok
Escalera Torre 01 Piso 09 6/24/2015 2.00 ok
Escalera Torre 02 Piso 08 6/24/2015 2.00 ok
Placas Torre 04 Piso 09 6/26/2015 23.50 ok
Dados Placas Torre 04 Piso 09 6/26/2015 0.50 ok
Losa Torre 06 Piso 05 6/26/2015 43.00 ok Sobró 03m3
JULIO
Escalera Torre 01 Piso 10 7/2/2015 2.00
Placas Torre 02 Piso 09 7/2/2015 27.00
Losa Torre 04 Piso 09 7/2/2015 42.27
Dados Placas Torre 06 Piso 06 7/2/2015 0.23
Placas Torre 06 Piso 05 7/6/2015 29.50
Escalera Torre 06 Piso 05 7/6/2015 2.00
concreto calzaduras 06-07-15
Losa Torre 02 Piso 09 7/8/2015 37.00
Escalera Torre 02 Piso 09 7/8/2015 2.00
Losa Maciza Torre 01 Piso 10 7/11/2015 7.20
Dados Placas Torre 02 Piso 09 7/11/2015 0.30
Escalera Torre 06 Piso 05 7/11/2015 2.00
Losa Torre 06 Piso 06 7/11/2015 40.00
Placas Torre 02 Piso 09 7/16/2015 11.50
Placas Torre 06 Piso 07 7/16/2015 26.50
Escalera Torre 02 Piso 09 7/22/2015 2.00
Losa Torre 06 Piso 07 7/22/2015 38.50
Placas Torre 06 Piso 08 7/25/2015 26.50
AGOSTO
Losa Torre 06 Piso 08 8/1/2015 38.50 210.00
Placas Torre 05 Piso 01 8/1/2015 26.50 280.00
Dados Placas Torre 05 Piso 01 8/5/2015 0.30 210.00
Placas Torre 06 Piso 09 8/5/2015 26.70 210.00
Losa Maciza Torre 02 Piso 10 8/11/2015 7.50 210.00
Placas Torre 05 Piso 01 8/11/2015 4.50 280.00
Placas Torre 05 Piso 01 8/11/2015 4.00 210.00
Escalera Torre 06 Piso 08 8/11/2015 2.00 210.00
Losa Torre 06 Piso 09 8/11/2015 36.50 210.00
Placas Torre 05 Piso 00 8/12/2015 10.70 102.00 280.00
Placas Torre 05 Piso 00 8/13/2015 6.68 85.00 280.00
Placas Torre 05 Piso 00 8/15/2015 3.73 47.00 280.00
Escalera Torre 06 Piso 08 8/17/2015 2.00 18.00 210.00
Placas Torre 05 Piso 01 8/17/2015 0.96 11.00 280.00
Placas Torre 05 Piso 01 8/18/2015 7.71 89.00 280.00
Placas Torre 05 Piso 01 8/20/2015 18.22 200.00 280.00
24
537.50

Losa 329.50
Placas 195.40
Dado 2.60
Escalera 10.00
537.50
Tablas Proyecto
Relación Cemento Arena Piedra Relación Cemento Arena
Concreto f'c=175 01:08
Concreto f'c=210 01:06
Concreto f'c=280 01:04
Tarrajeo muros 01:05
Tarrajeo cielorraso 01:05
yecto
Piedra
CONSTRUCTORA E INMOBILIARIA EL TRILLO

CONTROL PROBETAS DE CONCRETO CURADAS A CONDICIONES DE OBRA

OBRA: “CONSTRUCCION DEL LABORATORIO Y TALLER DEL: COMPLEJO RECREACIONAL TURISTICO KOTOSH DE LA E.A.P DE TURISMO Y
NACIONAL HERMILIO VALDIZAN”.

CÓDIGO FECHA N° DÍAS LABORA


ITEM DESCRIPCIÓN FECHA ROTURA ESTADO ESTADO
PROBETA EXTRACCIÓN ENSAYAR DIAMETRO
1 12/30/1899 SE PASÓ
2 12/30/1899 SE PASÓ
3 12/30/1899 SE PASÓ
4 12/30/1899 SE PASÓ
5 12/30/1899 SE PASÓ
6 12/30/1899 SE PASÓ
7 12/30/1899 SE PASÓ
8 12/30/1899 SE PASÓ
9 12/30/1899 SE PASÓ
10 12/30/1899 SE PASÓ
11 12/30/1899 SE PASÓ
12 12/30/1899 SE PASÓ
13 12/30/1899 SE PASÓ
14 12/30/1899 SE PASÓ
15 12/30/1899 SE PASÓ
16 12/30/1899 SE PASÓ
17 12/30/1899 SE PASÓ
18 12/30/1899 SE PASÓ
19 12/30/1899 SE PASÓ
20 12/30/1899 SE PASÓ
21 12/30/1899 SE PASÓ
22 12/30/1899 SE PASÓ
23 12/30/1899 SE PASÓ
24 12/30/1899 SE PASÓ
25 12/30/1899 SE PASÓ
26 12/30/1899 SE PASÓ
27 12/30/1899 SE PASÓ
28 12/30/1899 SE PASÓ
29 12/30/1899 SE PASÓ
30 12/30/1899 SE PASÓ
RILLO

S DE OBRA FECHA

H DE LA E.A.P DE TURISMO Y HOTELERIA DE LA UNIVERSIDAD

LABORATORIO RESISTENCIA CONTROL


ÁREA CARGA RESISTENCIA ESPERADA CALIDAD
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
0.0000 #DIV/0! #N/A #N/A
CONTROL DE CONCRETO

OBRA: "CONSTRUCCIÓN DE LA RESIDENCIAL SAN FRANCISCO II"

PLANOS REAL
ELEMENTO FECHA DESENCOFRADO CONCRETO ARENA P.CH. CEMENTO BLS/M3 CONCRETO
m3 m3 m3 BLS m3
23 FEBRERO
Placas Torre 04 piso 01 2/3/2015 29.50 280.00 30.38
Techo 2do piso Torre 01 y 03 2/6/2015 84.32 210.00
Placas piso 01 Torre 02 2/10/2015 29.00 280.00
Placa escalera Torre 02 2/12/2015 5.82 280.00
Placas 3er piso Torre 01+ESCALERA 2/14/2015 19.00 210.00
Techo 1er piso Torre 04 2/16/2015 43.00 210.00
Techo 1er piso Torre 02 2/23/2015 41.00 210.00
Placas 3er piso Torre 03 2/25/2015 37.00 210.00
TOTAL 288.64
23 MARZO
Placas Torre 04 piso 02 3/2/2015 24.00
24
1,313.28

suma+proy 313.20 285


NOE 318.39
dados 5.19
REAL DIFERENCIA
CEMENTO BLS/M3 CONCRETO CEMENTO BLS/M3 CEMENTO
BLS m3 BLS m2 m3
0.00 0.00 0.00 0.00

287.37
339.37
C 1 p3 0.02831685 m3 0.11818182 m3
H 10 p3 0.28316847 m3 1.18181818 m3
0.31148531 1.3 m3

bls/m3 4.17355152
Hor/m3 1.18181818

Volumen Calzadura = 295 m3


Volumen Calzadura = 206.5 m3 PIEDRA=
Bolsas Cemento = 862 bls HORMIGON=

1 p3 0.02831685 m3 0.1 m3
12 p3 0.33980216 m3 1.2 m3
0.36811901 1.3 m3

bls/m3 3.53146667

Volumen Solado = 75.45 m3


Bolsas Cemento = 267 bls HORMIGON=

TOTAL cemento= 1129 bls 1185.45

TOTAL hormigón= 334.5854545 bls 351.314727

C 1 p3 0.02831685 m3 0.18571429 m3
H 6 p3 0.16990108 m3 1.11428571 m3
0.19821793 1.3 m3

bls/m3 6.55843811
Hor/m3 1.11428571

Volumen Calzadura = 295 m3


Volumen Calzadura = 206.5 m3 PIEDRA=
Bolsas Cemento = 1355 bls HORMIGON=

Dosificación f'c=210 c/PCH


C 1 p3 0.02831685 m3 0.21666667 m3
A 2 p3 0.05663369 m3 0.43333333 m3
P 3 p3 0.08495054 m3 0.65 m3
0.16990108 m3 1.3 m3
11
16.5 bls/m3 7.65151112
Volumen vaciado = 7.1 m3
Bolsas Cemento = 55 bls
Arena= 3.076666667 m3
Piedra Chancada= 4.615 m3

Dosificación f'c=210 c/PCH


C 1 p3 0.02831685 m3 0.24237288 m3
A 1.81818 p3 0.05148518 m3 0.44067797 m3
P 2.54545 p3 0.07207925 m3 0.61694915 m3
5.36364 p3 0.15188127 m3 1.3 m3

10.00 bls/m3 8.55931753


14.00

Volumen vaciado = 7.1 m3


Bolsas Cemento = 61 bls
Arena= 3.128813559 m3
Piedra Chancada= 4.380338983 m3

Dosificación f'c=280 c/PCH


C 1 p3 0.02831685 m3 0.26369168 m3
A 1.74 p3 0.04927131 m3 0.45882353 m3
P 2.19 p3 0.06201389 m3 0.57748479 m3
3.93 0.13960205 m3 1.3 m3

bls/m3 9.31218392
9.57
12.045 1.6
2.4 Volumen vaciado = 22.03 m3
8.8 Bolsas Cemento = 206 bls 226.6
13.2 Arena= 10.11 m3 11.1186706
Piedra Chancada= 12.72 m3 13.9941888

Dosificación f'c=280 c/PCH


C 1 p3 0.02831685 m3 0.14444444 m3
A 3.2 p3 0.09061391 m3 0.46222222 m3
P 4.8 p3 0.13592086 m3 0.69333333 m3
9 0.25485162 m3 1.3 m3

bls/m3 5.10100742
16
26.4 24
Volumen vaciado = 22.03 m3
26.4 40 Bolsas Cemento = 113 bls 124.3
Arena= 10.18 m3 11.2010311
Piedra Chancada= 15.27 m3 16.8015467

Dosificación f'c=280 c/PCH PROPUESTA


C 1 p3 0.02831685 m3 0.33333333 m3
A 1.4 p3 0.03964359 m3 0.46666667 m3
P 2.1 p3 0.05946538 m3 0.7 m3
3.5 0.12742581 m3 1.5 m3

bls/m3 11.7715556
7.7
11.55
Volumen vaciado = 19 m3
Bolsas Cemento = 224 bls 246.4
Arena= 8.87 m3 9.75333333
Piedra Chancada= 13.30 m3 14.63

PIES CÚBICOS f'c=280kg/cm2 PIES CÚBICOS f'c=280kg/cm2


DOSIFI 1:3.5 1:3.75 1:3.93 DOSIFI h-3.5
ARENA 1.4 1.5 1.74 ARENA 1p3 + 12cm
P.CH. 2.1 2.25 2.19 P.CH. 2p3 + 03cm

PALAS PIES CÚBICOS


DOSIFI 1:3.5 1:3.75 1:3.93 DOSIFI h-3.5
ARENA 7.00 7.50 8.70 ARENA 0p3 + 21cm
P.CH. 12.60 13.50 13.14 P.CH. 1p3 + 00cm

PIES CÚBICOS f'c=210kg/cm2 PIES CÚBICOS f'c=210kg/cm2


DOSIFI 1:5.0 DOSIFI h-1/5
ARENA 2.3 11.5 ARENA 2p3 + 09cm
P.CH. 2.7 16.2 P.CH. 2p3 + 21cm
27.7

PIES CÚBICOS f'c=175kg/cm2 PIES CÚBICOS f'c=175kg/cm2


DOSIFI 1:7.0 DOSIFI h-1/5
ARENA 2.8 14 ARENA 2p3 + 09cm
P.CH. 4.2 25.2 P.CH. 2p3 + 21cm
39.2

0.0621 m3 2.1930408 pie3 0.621


0.0729 m3 2.5744392 pie3 10 0.729
0.0283 m3 1 pie3
0.16331685 5.76748001 1.350
0.0641031 m3 2.26377953 pie3 0.64103098
0.07525146 m3 2.65748031 pie3 10 0.75251462
0.0283 m3 1 pie3 0.28316847
0.16767141 5.92125984 1.677

Dosificación f'c=210 c/PCH PROPUESTA


C 1 p3 0.02831685 m3 0.23333333 m3
A 2.3 p3 0.06512875 m3 0.53666667 m3
P 2.7 p3 0.07645549 m3 0.63 m3
6 0.16990108 m3 1.4 m3

bls/m3 8.2400889
12.65
14.85
Volumen vaciado = 19 m3
Bolsas Cemento = 157 bls 172.7
Arena= 10.20 m3 11.2163333
Piedra Chancada= 11.97 m3 13.167

1 0.028 m3 0.21848739
m3/bol 2.67 0.07476 m3 0.07560598 0.58336134
2.28 0.06384 m3 0.06456241 0.49815126
0.1666 m3 0.140168391 1.3
8.4033613445

Dosificación f'c=175 c/PCH PROPUESTA


C 1 p3 0.02831685 m3 0.15555556 m3
A 4.8 p3 0.13592086 m3 0.74666667 m3
P 3.2 p3 0.09061391 m3 0.49777778 m3
8 0.25485162 m3 1.4 m3

bls/m3 5.4933926
26.4
17.6
Volumen vaciado = 19 m3
Bolsas Cemento = 105 bls 115.5
Arena= 14.19 m3 15.6053333
Piedra Chancada= 9.46 m3 10.4035556

1 0.028 m3 0.21848739
m3/bol 2.67 0.07476 m3 0.07560598 0.58336134
2.28 0.06384 m3 0.06456241 0.49815126
0.1666 m3 0.140168391 1.3
8.4033613445
Dosificación C:A 1:4 mortero
C 1 p3 0.02831685 m3 0.25 m3
A 2.4 p3 0.06796043 m3 0.6 m3
P 1.6 p3 0.04530695 m3 0.4 m3
5 0.14158423 m3 1.25 m3

bls/m3 8.82866668

0.0213304
6.68
0.142487072 M3
1.42487072
f= 4.17355152

88.5 m3 92.925
244.045455 m3

f= 3.53146667

90.54 m3

f= 6.55843811

88.5 m3 92.925
230.1 m3

bls/m3= 7.65151112
7.65151112
bls/m3= 8.55931753
8.55931753

0.02831685
35.3146667

bls/m3= 9.31218392
9.31218392

11.8

bls/m3= 5.10100742
5.10100742

11.8
bls/m3= 11.7715556
11.7715556

11.7715556

S CÚBICOS f'c=280kg/cm2
h-3.75 h-3.93
1p3 + 15cm 1p3 + 22cm
2p3 + 07cm 2p3 + 05cm

PIES CÚBICOS
h-3.75 h-3.93
0p3 + 22.5cm0p3 + 26.5cm
1p3 + 3.5cm 1p3 + 03cm

S CÚBICOS f'c=210kg/cm2

S CÚBICOS f'c=175kg/cm2

8.2661405
10

bls/m3= 8.2400889
8.2400889

8.2400889

bls/m3= 5.4933926
5.4933926

5.4933926
bls/m3= 8.82866668
8.82866668