CLAVE CONCEPTO
EJE
LOCALIZACION
TRAMO TIPO Ø LARGO
NUM. DE
VAR ELEMENTO
2
0.25
2.5 3 4
0.384 0.557 0.996
5 6
1.56 2.25 3.975
8
CLAVE CONCEPTO
LOCALIZACION
EJE TRAMO TIPO Ø LARGO
NUM. DE
VAR ELEMENTO
2
0.25
2.5 3
0.384 0.557 0.996
4 5 6
1.56 2.25 3.975
8
EST-02 columna -1
1 A-G 3/8" 3.1 12 1 20.72
Acero de refuerzo en 2 D-G 3/8" 3.1 8 1 13.81
estructura diametro #3
fy=4200 kg/cm² incluye 4 D 3/8" 3.4 4 1 6.9
suministro, habilitado, 5 D-G 3/8" 3.1 16 1 27.62
armado, traslapes, silletas,
ganchos y desperdicios trabe-1
1 A-G 3/8" 1.26 146 1 183.96
4 C-D 3/8" 1.26 25 1 17.54
trabe-2
1 1--5 3/8" 1.26 72 1 50.53
B´ 1--2 3/8" 1.26 27 1 18.94
C 1--5 3/8" 1.26 62 1 43.51
D 1--5 3/8" 1.26 64 1 44.91
E 1--5 3/8" 1.26 66 1 46.32
F 2--5 3/8" 1.26 37 1 25.96
G 1--5 3/8" 1.26 64 1 44.91
TRABE-1
NUMEROS GENERADORES ESTIMACION No:
NOMBRE DE LA OBRA: LOCALIDAD: PERIODO DEL: AL:
CONTRATISTA: MPIO: FECHA:
CONTRATO No: FECHA DE CONTRATO: HOJA: DE:
CLAVE CONCEPTO
EJE
LOCALIZACION
TRAMO TIPO Ø LARGO
NUM. DE
VAR ELEMENTO
2
0.25
2.5 3 4
0.384 0.557 0.996
5 6
1.56 2.25 3.975
8
CLAVE CONCEPTO
EJE
LOCALIZACION
TRAMO TIPO Ø LARGO
VAR
NUM. DE
ELEMENTO
2
0.25
2.5 3
0.384 0.557 0.996
4 5 6
1.56 2.25 3.975
8
COLUMPIOS
1--2 1/2" 9.57 16 1 154.1
2--4 1/2" 16.87 11 1 184.82
4--5 1/2" 20.1 10 1 200.19
A-C 1/2" 2.37 15 1 35.4
B´-C 1/2" 3.72 18 1 66.69
C-D 1/2" 8.25 15 1 123.55
D-E 1/2" 8.2 20 1 163.34
E-F 1/2" 4.72 14 1 65.81
F-G 1/2" 4.57 24 1 109.24
BASTONES
1, B´-E 1/2" 0.81 17 2 27.49
2 C-D 1/2" 0.46 16 2 14.66
2 D-E 1/2" 0.89 21 2 37.23
2 E-F 1/2" 0.3 15 2 8.96
2 F-G 1/2" 0.89 26 2 46.09
3 E-F 1/2" 0.66 15 2 19.72
4 A-D 1/2" 0.43 30 2 25.69
A 4--5 1/2" 0.26 11 2 11.39
B´ 1--2 1/2" 0.25 17 2 8.46
C 1--2 1/2" 0.61 17 2 20.65
C 2--4 1/2" 0.61 12 2 14.58
C 4--5 1/2" 0.61 11 2 13.36
D 1--2 1/2" 0.83 17 2 28.1
D 2--5 1/2" 0.83 22 2 36.37
E 2--3 1/2" 0.6 6 2 7.17
E 3--5 1/2" 0.6 16 2 19.12
F 2--5 1/2" 1.02 22 2 44.7 ∑=5200.85