You are on page 1of 5

Project No. Doc.

No Edition
Summary Sheet of Unit
Process LPDC 7269D202 GY-00/D8

Luoyang Customer
Petrochemical Requirement
Engineering
Design,Co.,Ltd. Pump
Design Phase Detail Design Page 1 of 3

Name of Plant (Company) : Beijing E Solvent Technologies Corp.

Project: Asphalt Project 100.000 ton/year


Device and (or) Unit: Distillation Unit capacity 200.000 ton/year

Technique Date Equipment Date

Prepared by

Checked by

Verified by

Technical secrets Level C

Luoyang Petrochemical
Engineering Design,Co.,Ltd.

4
3
2
1
Edition
Description Date
Number

All contents of the document are strictly prohibited to be shared to the third party without prior written consent of LPDC
Project No. Doc. Number
LPDC 7269D202 GY-008/D8
Summary Sheet of Unit Client’s
Luoyang Petrochemical requirement
Process
Engineering Design
Design,Co.,Ltd. Page 2 of 3
Phase

Revision
Neutralization corrosion
1 Device Location No. V20207 Device Copy: 1
inhibitor injection facility

2 Injection Pump
Structural and auxiliary system
3 Operational and on-site requirements
requirements
Neutralization
4 Item Corrosion Unit Item Unit
Inhibitor pump
Driving
Operational Electrical
5 machine
requirements Machine
requirements
2 units (1 main
Code of
6 Qty of units unit and 1 for
machine
spare)
Continuous Machine
7 Operation Mode kw
operation capacity
8 Operating time 8000 h/a Voltage 380 V
Number of
9 Type of pump 3
Phase
Neutralization
Plunger seal
10 Operation value corrosion
type
inhibitor
Nozzle
Vent / drain /
11 Corrosion adapter
instrument port
requirements
Environmental Inlet
12 temperature: oC dimension mm
Max/Min (diameter)
Operation
Outlet
Temperature : o
13 Normal // C dimension mm
Normal/ Max/
(diameter)
Min
Specific weight
in normal Flange
14 ~1000 Kg/m3
operation standard
temperature
Viscosity in
normal
15 ~0.7 MPa.S Material specification
operation
temperature
Pump outlet
16 106 MPa(g) Components Materials
pressure
Pump inlet
17 Normal MPa(g) Pump body
pressure
18 Maximum Flow 0.0025 M3/h Pass-flow 304
All contents of the document are strictly prohibited to be shared to the third party without prior written consent of LPDC
components
Range of flow Valve and
19 0-100 % 316
adjustment valve seat
Flow
Manual Seal
20 adjustment
adjustment materials
mode
Diaphragm
21 Hydraulic power Kw
Material
Steam pressure
at normal
22 MPa(g)
operating
temperature
Installation
23 □Indoor ■Outdoor □Heated surface □ No-Heated surface
position
Explosion-proof
24 dIIBT4
grade
25 Dissolving Tank
26 Process operation data Mechanical design data
Neutralization
27 Item Corrosion Unit Item Unit
Inhibitor pump
Operational Design
28
requirements range
Design oC
29 Qty of units 1
temperature
Design
30 Operation Mode Continuous MPa(g)
Pressure
Neutralization
Material
31 Operation value Corrosion 304
quality
Inhibitor
Corrosion
32 Corrosion
tolerance
Operation
33 Temperature Normal// oC Lining type
Normal/Max/Min
Operation Installation
34 Normal MPa(g) By manufacture
Pressure form
Volume of Insulation
35 1 M3 mm
dissolving tank thickness
Heat tracing
36 Steam
medium
37 Agitator
Structural and auxiliary system
38 Operational and on-site requirements
requirements
Neutralization
39 Item Corrosion Unit Item Unit
Inhibitor pump
Operational
40 Agitator type
requirements
Code of YB3-80M-4
41 Qty of units
machine
Continuous Machine
42 Operation Mode 0.55 kw
operation capacity
Neutralization
43 Operation value Voltage 380 V
corrosion
All contents of the document are strictly prohibited to be shared to the third party without prior written consent of LPDC
inhibitor
Number of
44 Corrosion 3
Phase
Explosion-proof Installation
45 dIIBT4 Top
grade position
46
47 Note: Manufacturing provide along the body flange and the corresponding flange, bolts, gaskets.
48
49
50
51

Project No. Doc. Number


LPDC 7269D20 GY-008/D8
Client’s 2
Luoyang Summary Sheet of Unit require
Petrochemical Process ment
Engineering Design
Page 3 of 3
Design,Co.,Ltd. Phase

1 Chemical Dosing Device


2 Scope of Supply Nozzle Detail Rev
Size Pressure Flange
3 Device Unit Device (mm) level (MPa) Standard
Corrosion
4 inhibitor tank 1 Unit N3 Inlet DN25 HG20615-
2009

5 Agitator 1 Pcs N1 Outlet DN15 HG20615-


2009
N4 Steam
6 Metering pump 2 Unit DN20 HG20615-
Inlet 2009
N4
7 Buffer tank Pcs Condensed DN20 HG20615-
2009
water nozzle

8 Y type filter 2 Pcs

9 Pressure gauge 2 Pcs

10 Local level gauge 1 Pcs

11 control cabinet 1 Unit


12 Safety valve 2 Unit
Piping, valves and
equipment base
13 and other 1 Unit
supporting
facilities
14 Control cabinet dIIBT4
Manufacturing and
15 explosion-proof Weight
Manufacturing inspection
16 requirements Components Lifting Total weight Unit
specification: requirements weight
All contents of the document are strictly prohibited to be shared to the third party without prior written consent of LPDC
after filling
water
17 Dissolving tank kg
Inspection
18 Pump kg
standard

19 Surveyor Chemical Dosing


Device kg
20 Stress relief heat
21 Special
treatmentheat required/not-
22 X-ray
treatment
/ required
23 Other
ultrasonography
NDT %
24 Other remarks:
inspection
25
26
27 Summary Figure (For reference only,
28 manufacturers allows to revise or improve)
29

nozzle
Manhole/dosing
30 The scope inside dashdot of supply material from manufacturers

31
32
Steam Inlet
33
34 Steam outlet
35
36
37 Drain

38
39
40
41
42
43
44
45
46
47
48
Chemical inlet to device
49
50
51

All contents of the document are strictly prohibited to be shared to the third party without prior written consent of LPDC