You are on page 1of 20

OFF GRID

PV POWER SYSTEMS
SYSTEM INSTALL GUIDELINES
FOR THE PACIFIC ISLANDS
OFF GRID
PV POWER SYSTEMS
SYSTEM INSTALL GUIDELINES
FOR THE PACIFIC ISLANDS

These guidelines have been developed by the Sustainable Energy Industry Association of the Pacific Islands in
Collaboration with the Pacific Power Association
They represent latest industry BEST PRACTICE for the design and installation of Off Grid PV Systems.
© Copyright 2012

While all care has been taken to ensure this guideline is free from omission and error, no responsibility can be taken
for the use of this information in the installation or design of any off-grid system.
GENERAL
The performance of a reliable installation, that fulfils a customers needs, requires both careful design
and correct installation practice and conformance to relevant standards.

STANDARDS for INSTALLATION


Installation should follow any standards that are typically applied in the country or region where the solar
JOTUBMMBUJPOXJMMPDDVS5IFGPMMPXJOHMJTUTUIFSFMFWBOUTUBOEBSETJO"VTUSBMJB /FX;FBMBOEBOE64"5IFZBSF
listed because some Pacific island countries and territories do follow those standards.. These standards are
often updated and amended so the latest version should always be applied.

*O"VTUSBMJBBOE/FX;FBMBOEUIFNBJOTUBOEBSETSFRVJSFEBSFy
"4/;4 8JSJOH3VMFT
"4/;4 4UBOEBMPOFQPXFSTZTUFNT
"4 4FDPOEBSZCBUUFSJFTGPSTUBOEBMPOFQPXFSTVQQMJFT
"4/;4 17"SSBZ
"4 &MFDUSJDBM*OTUBMMBUJPOT
Supply Generating set
"4 &OFSHZNBOBHFNFOUQSPHSBNT
"4 /PJTFMFWFMMJNJUT
"4 -JHIUOJOH1SPUFDUJPO

*O64"17TZTUFNTNVTUCFJOBDDPSEBODFXJUIGPMMPXJOHDPEFTBOETUBOEBSET
&MFDUSJDBM$PEFT/BUJPOBM&MFDUSJDBM$PEF"SUJDMF4PMBS1IPUPWPMUBJD4ZTUFNTBOE/'1"
6OJGPSN4PMBS&OFSHZ$PEF   
#VJMEJOH$PEFT*$$ "4$&
6-4UBOEBSE'MBU1MBU1IPUPWPMUBJD.PEVMFTBOE1BOFMT
6- 4UBOEBSE   4UBOEBSE GPS *OWFSUFS  DPOWFSUFST  $POUSPMMFST BOE *OUFSDPOOFDUJPO 4ZTUFN
Equipment for use with Distributed Energy Resources

DOCUMENTATION
"MMDPNQMFYTZTUFNTSFRVJSFBVTFSNBOVBMGPSUIFDVTUPNFS0òHSJEQPXFSTZTUFNTBSFOPEJòFSFOU
5IFEPDVNFOUBUJPOGPSTZTUFNJOTUBMMBUJPOUIBUTIPVMECFQSPWJEFEJODMVEFy

-JTUPGFRVJQNFOUTVQQMJFE
Shutdown and isolation procedure for emergency and maintenance.
Maintenance procedure and timetable.
Commissioning records and installation checklist.
Warranty information.
System connection diagram.
Equipment manufacturers documentation and
handbooks for all equipment supplied.
Battery record logbook.
Generating set service logbook

0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4]
PV ARRAY
ORIENTATION AND INCLINATION
'PSCFTUZFBSSPVOEQFSGPSNBODFBöYFEBSSBZTIPVMECFNPVOUFEGBDJOHUSVFOPSUI  ¡
JO4PVUI1BDJöD
PS5SVF4PVUI  ¡
JO/PSUI1BDJöDBUBOJODMJOBUJPOFRVBMUPUIFMBUJUVEFBOHMFJOUIFUSPQJDTBOEMBUJUVEF
BOHMFQMVT¡UP¡PVUTJEFPGUIFUSPQJDT

#FUXFFOMBUJUVEFT¡4PVUIBOE¡/PSUIUIFBSSBZTIPVMECFUJMUFEBUBNJOJNVNPGEFHSFFT

However the correct tilt angle should be determined based on energy usage and also the local weather
DPOEJUJPOTBUEJòFSFOUUJNFTPGUIFZFBS'PSFYBNQMFJGBOJTMBOEUZQJDBMMZIBTWFSZDMPVEZDPOEJUJPOTJOPOF
QFSJPEPGUIFZFBS FHXFUTFBTPO
UIFOUIFBSSBZTIPVMECFUJMUFEUPTVJUUIFTVOTBMUJUVEFJOUIFTVOOZ
period of the year.

USVF/035) USVF4065)

PV Module
PV Module -"5*56%&"/(-&
FHGPS1"-6" -BU¡

-"5*56%&"/(-& 5IFUJMUBOHMFTIPVMECFBQQSPYJNBUFMZ¡)PXFWFS
FHGPS467" -BU¡4
because of the cloud cover in the wet season a tilt
5IFUJMUBOHMFTIPVMECFBQQSPYJNBUFMZ¡ BOHMFPG¡XPVMECFCFUUFS5IJTXPVMESFTVMUJO
a greater energy output from the array in the dry
season.

Figure 1 a Figure 1 b

"OBMUFSOBUJWFNPVOUJOHBSSBOHFNFOUDBOBMMPXTFBTPOBMBEKVTUNFOUPGBSSBZUJMUUPJODSFBTFUIFFOFSHZJOQVU

ROOF MOUNTING
*GUIFNPEVMFTVTFDSZTUBMMJOFDFMMTUIFOJUJTQSFGFSBCMFUPBMMPXTVóDJFOUTQBDFCFMPXUIFBSSBZ NN
PSJODIFT
GPSWFOUJMBUJPODPPMJOH5IJTXJMMCFTVCKFDUUPUIFDPOTUSBJOUTPGUIFDVTUPNFSPSBSDIJUFDU
It is important to allow sufficient clearance to facilitate self cleaning of the roof to prevent the build up of
leaves and other debris.
If fauna are a problem in the vicinity of the installation then consideration should be given to how to
QSFWFOUUIFNHBJOJOHBDDFTTVOEFSUIFBSSBZ TFFDBCMFQSPUFDUJPO

"MM TVQQPSUT  CSBDLFUT  TDSFXT BOE PUIFS NFUBM QBSUT TIPVME CF PG TJNJMBS NBUFSJBM PS TUBJOMFTT TUFFM UP
NJOJNJTFDPSSPTJPO*GEJTTJNJMBSNFUBMT CBTFEPOUIFJSHBMWBOJDSBUJOH
BSFVTFEUIFOUIFUXPTVSGBDFTPG
the metals should be separated by using rubber washes or similar.
8IFSFUJNCFSJTVTFEJUNVTUCFTVJUBCMFGPSMPOHUFSNFYUFSOBMVTFBOEöYFETPUIBUUSBQQFENPJTUVSF
DBOOPUDBVTFDPSSPTJPOPGUIFSPPGBOEPSSPUUJOHPGUIFUJNCFS5IFFYQFDUFESFQMBDFNFOUUJNFTIPVMECF
stated in the system documentation.
"OZSPPGQFOFUSBUJPOTNVTUCFTVJUBCMZTFBMFEBOEXBUFSQSPPGGPSUIFFYQFDUFEMJGFPGUIFTZTUFN*GUIJTJT
not possible then this must be detailed in Maintenance Timetable
"MMöYJOHTNVTUFOTVSFTUSVDUVSBMTFDVSJUZXIFOTVCKFDUUPUIFIJHIFTUXJOETQFFETGPSUIFSFHJPOBOE
MPDBMUFSSBJO5IJTNBZSFRVJSFTQFDJöDUFTUTPGUIFöYJOHTVCTUSBUFDPNCJOBUJPOPOUIBUSPPG
The installer shall ensure that the array frame that they install has applicable engineering certificates
verifying that the frame meets wind loadings for that particular location.

]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4
5IFJOTUBMMFSNVTUGPMMPXUIFBSSBZGSBNFTVQQMJFSTNBOVGBDUVSFSTSFDPNNFOEBUJPOTXIFONPVOUJOHUIF
array to the roof support structure to ensure that the array structure still meets wind loading certification.
"MMFYUFSOBMXJSJOHNVTUCFQSPUFDUFEGSPN67BOENFDIBOJDBMEBNBHFJOTVDIBNBOOFSUIBUJUXJMMMBTU
the life of the system..

FREE STANDING PV ARRAYS


These must be wind rated to meet the wind loading for the region.

BATTERY INSTALLATION
LAYOUT OF BATTERY ENCLOSURE
5IFNBJODPOTJEFSBUJPOTGPSUIFCBUUFSZFODMPTVSFBSFy
JUNVTUCFTBGF XJUISFTUSJDUFEBDDFTT JF1SFWFOUDIJMESFOFBTJMZBDDFTTJOHUIFCBUUFSJFT

all equipment must be readily accessible for maintenance


it must have adequate ventilation
it should be vermin proof

5IFNBJOTBGFUZDPOTJEFSBUJPOTBSFy
FYQMPTJPOEVFUPBTQBSLJOUIFQSFTFODFPGIZESPHFOCVJMEVQ
FYDFTTJWFDVSSFOUTDBVTFECZCBUUFSZTIPSUT
leakage of battery acid from battery cells
personal safety in the presence of acid

5POFHBUFUIFSJTLPGFYQMPTJPOUIFSFNVTUCFOPPQQPSUVOJUZGPSIZESPHFOUPCVJMEVQ5IJTSFRVJSFTBEFRVBUF
ventilation with no possibility of spark ignition.

VENTILATION (Metric Calculations)


Ventilation must be provided. The minimum area required for natural ventilation for both inlet and outlet
BQFSUVSFT GPSXFUMFBEBDJECBUUFSJFT
BSFHJWFOCZy
A = 100q cm²
v
Where q JTUIFNJOJNVNFYIBVTUWFOUJMBUJPOSBUF
v
in litres per second = 0.006 x n x I
and n = the number of battery cells
I = the charging rate in amperes

/05&5IFDIBSHJOHSBUFJOBNQFSFTJTUIFNBYJNVNPVUQVUSBUJOHPGUIFMBSHFTUDIBSHJOHTPVSDFPSUIFSBUJOH
of its output fuse or circuit breaker. Where two parallel battery banks are used, the charging rate is halved.

Best practice is to provide input ventilation vents below the level of battery and the output vents on the
opposite side of the batteries, as high as possible in the enclosure to prevent hydrogen build up.

0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4]
VENTILATION (Imperial Calculations)
Ventilation must be provided. . The minimum area required for natural ventilation for both inlet and outlet
BQFSUVSFT GPSXFUMFBEBDJECBUUFSJFT
BSFHJWFOCZy
A = 15.5q in²
v
Where q JTUIFNJOJNVNFYIBVTUWFOUJMBUJPOSBUF
v
in litres per second = 0.006 x n x I
and n = the number of battery cells
I = the charging rate in amperes

/05&5IFDIBSHJOHSBUFJOBNQFSFTJTUIFNBYJNVNPVUQVUSBUJOHPGUIFMBSHFTUDIBSHJOHTPVSDFPSUIFSBUJOH
of its output fuse or circuit breaker. Where two parallel battery banks are used, the charging rate is halved.

Best practice is to provide input ventilation vents below the level of battery and the output vents on the
opposite side of the batteries, as high as possible in the enclosure to prevent hydrogen build up.

VENTILATION- VALVE REGULATED (SEALED) BATTERIES


The charging rate I JO UIF WFOUJMBUJPO GPSNVMB JT " QFS "I BU UIF I SBUF $
PG EJTDIBSHF PG CBUUFSZ
capacity for lead acid batteries.

e.g. battery has CSBUJOHPG"IUIFSFGPSFUIFDIBSHFDVSSFOUVTFEJOWFOUJMBUJPOGPSNVMBJT


"I"I
Y""

/PUF 5IJT JT CBTFE PO UIF DIBSHFS FJUIFS TPMBS DPOUSPMMFS PS TFQBSBUF HSJE QPXFS CBUUFSZ DIBSHFS
 IBT BO
BVUPNBUJDPWFSWPMUBHFDVUPò*GOPUNBYJNVNDIBOHFDVSSFOUNVTUCFVTFE

SPARK IGNITION SOURCES


Electrical equipment or storage for other equipment should not be mounted above the battery bank.

Connection or disconnection of any equipment at the battery terminals must not occur where there is any
possibility of the presence of any hydrogen build up.

battery charging equipment should be hard wired, do not use temporary connection.
battery terminals should be shrouded to prevent inadvertent short circuits.
ensure sufficient clearance between battery terminals and metal walls
PSJOTVMBUFVTJOHOPONFUBMMJDTIFFU

NBYJNJTFTFQBSBUJPOCFUXFFOCBUUFSZUFSNJOBMT
use insulated tools during any battery work

Battery fusing preferably should not be in the same enclosure as the battery bank but if they are then they
TIPVMECFFJUIFSBNJOJNVNPGNNBXBZGSPNUIFCBUUFSJFTPSNNCFMPXUIFUPQPGUIFCBUUFSJFT
"OPUIFSNFUIPEUPLFFQUIFGVTFTFQBSBUFGSPNUIFCBUUFSZCBOLJTUPQMBDFBWFSUJDBMQBSUJUJPOCFUXFFOUIF
batteries and the fuse, thereby keeping the fuse as close to the batteries as possible but isolated from any
IZESPHFOCVJMEVQ*OBOZDBTFUIFNBJOCBUUFSZGVTJOHTIPVMECFMPDBUFECFMPXUIFCBUUFSZWFOUT /PSNBMMZ
CFMPXUIFUPQPGUIFCBUUFSJFT


]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4
PREVENTING EXCESSIVE CURRENT FROM BATTERIES
Battery shorts are prevented by shrouding terminals and ensuring safe separation between live terminals.
Battery shorts are controlled by using appropriate circuit protection.

0WFSDVSSFOUQSPUFDUJPOJTUPCFQSPWJEFEJOFBDICBUUFSZPVUQVUDPOEVDUPSFYDFQUXIFSFPOFTJEFPGUIFCBUUFSZ
CBOL JT FBSUIFE HSPVOE
 JO XIJDI DBTF POMZ UIF VOFBSUIFE VOHSPVOEFE
 DPOEVDUPS SFRVJSFT PWFSDVSSFOU
protection.

/PSNBMQSBDUJDFJTUPFJUIFSGVTFUIFQPTJUJWFBOEFBSUI HSPVOE
UIFOFHBUJWFPSGVTFBMMDPOEVDUPST

ACID LEAKAGE
Provision must be made to contain any spilled electrolyte. Battery trays should be able to hold at least the
electrolyte content of one cell of the battery bank.

ACID SPLASHES
" SFBEZ TVQQMZ PG XBUFS TIPVME CF BWBJMBCMF BOE BOZ QFSTPO XPSLJOH PO UIF CBUUFSJFT TIPVME XFBS SVCCFS
gloves, safety glasses and long sleeved protective clothing. Eye wash equipment should be available, in case
of accident.
8BMMTOFBSUIFCBUUFSJFTTIPVMECFQSPUFDUFECZBDJESFTJTUBOUQBJOUPSOPONFUBMMJDTIFFU

SAFETY AND WARNING SIGNS


"iCBUUFSZFYQMPTJPOXBSOJOHwTJHONVTUCFNPVOUFETPUIBUJUJTDMFBSMZWJTJCMFPOBQQSPBDIUPUIFCBUUFSZ
CBOL"OiFMFDUSPMZUFTBGFUZwTJHOTIPVMECFNPVOUFEBEKBDFOUUPUIFCBUUFSZCBOL

MAIN BATTERY PROTECTION


Overcurrent protection and the ability to readily isolate a battery bank must be provided.

5PTFMFDUUIFBQQSPQSJBUFNBJOCBUUFSZQSPUFDUJPOy

0CUBJO5JNF$VSSFOUDIBSBDUFSJTUJDTGPSUIFPWFSMPBEQSPUFDUJPOUPCFVTFE
 <"MMNBOVGBDUVSFSTQVCMJTIUJNFDVSSFOUJOGPSNBUJPOGPSUIFJSDJSDVJUCSFBLFSBOE)3$GVTFSBOHFT>

Obtain inverter manufacturers data


 $POUJOVPVTQPXFSSBUJOH 8BUUT

 UPTFDPOETVSHFSBUJOH 8BUUT

 "WFSBHFJOWFSUFSFóDJFODZ

'PSFBDIJOWFSUFSQPXFSSBUJOHEFUFSNJOFUIFDVSSFOUESBXOGSPNUIFCBUUFSZCBOLVTJOHy

I =  *OWFSUFS1PXFS3BUJOH 8

 JOWFSUFSFóDJFODZYOPNJOBMCBUUFSZWPMUBHF

/05&"MMPXBODFGPSBOZTJHOJöDBOU%$EFNBOENVTUCFJODMVEFEXIFOTJ[JOHUIFNBJOQSPUFDUJPO

$POTVMUUIF5JNF$VSSFOUDIBSBDUFSJTUJDUPEFUFSNJOFUIFBQQSPQSJBUFSBUJOH

0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4]
CABLE SELECTION-Metric Cables
"MMDBCMFTTIPVMECFTJ[FEUPNFFUUIFNBYJNVNDVSSFOU
$BCMFMPTTFTCFUXFFOUIF17BSSBZBOEUIFCBUUFSZCBOLTIPVMEOFWFSFYDFFE
$BCMFMPTTFTCFUXFFOUIFCBUUFSZCBOLBOEBOZ%$MPBETIPVMEOFWFSFYDFFE

5IFGPMMPXJOHTJ[JOHNFUIPET CBTFEPOWPMUBHFESPQT
DBOCFVTFEGPSBMMUZQFTPGDVSSFOUMZBWBJMBCMFDPQQFS
cable.

/05&UIFSBUFEWPMUBHFPSDVSSFOUDBSSZJOHDBQBDJUZ $$$
PGBOZDBCMFNVTUOFWFSCFFYDFFEFEFHTPNF
BVUPNPUJWFUZQFTBSFSBUFEBU7

 5IFWPMUBHFESPQ VdJOWPMUT


JTHJWFOCZy

Vd  Y-Y*Yɉ
÷"
 XIFSF -  SPVUFMFOHUIPGDBCMFJONFUSFT
  *  DVSSFOU "

  ɉ  SFTJTUJWJUZPG$VXJSF  NNN¤

    
  "  $SPTT4FDUJPOBM"SFB $4"
PGDBCMF NN¤

 7PMUBHFESPQJOWPMUTQFSNFUSFTPGSPVUFMFOHUIPGUXJODBCMF VTJOHUIFBCPWFGPSNVMB

Wire size mm² 2 3.2 5 7.5 15


"NQT CCC     
     
     
     
     
     
     
     
     
     
     
     
    
   
  
  
 

/PUFT$BCMFTJ[FBOE$$$GSPN1JSFMMJBVUPNPUJWFEBUB
4IBEFEBSFBTJOEJDBUFUIBUUIF$$$JTFYDFFEFE
3FGFSBMTP UP17NPEVMFBOE*OWFSUFSNBOVGBDUVSFSTSFDPNNFOEBUJPOT

]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4
 3PVUFMFOHUITUPQSPEVDFWPMUBHFESPQ 7TZTUFNT
GPSUXJODBCMF VTJOHUIFBCPWFGPSNVMB

Maximum Distance in metres to produce 5% voltage drop (12V system)


Current (A) 1mm2 1.5mm2 2.5mm2 4mm2 6mm2 10mm2 16mm2
       
       
       
       
       
       
       
       
       
       
       
       
      
      
      
      
     
     
     
     

CABLE SELECTION-Imperial Cables


"MMDBCMFTTIPVMECFTJ[FEUPNFFUUIFNBYJNVNDVSSFOU
$BCMFMPTTFTCFUXFFOUIF17BSSBZBOEUIFCBUUFSZCBOLTIPVMEOFWFSFYDFFE
$BCMFMPTTFTCFUXFFOUIFCBUUFSZCBOLBOEBOZ%$MPBETIPVMEOFWFSFYDFFE

5IFGPMMPXJOHTJ[JOHNFUIPET CBTFEPOWPMUBHFESPQT
DBOCFVTFEGPSBMMUZQFTPGDVSSFOUMZBWBJMBCMFDPQQFS
cable.

 5IFWPMUBHFESPQ VdJOWPMUT


JTHJWFOCZy
Vd  Y-Y*Yɉ
Ÿ
 XIFSF -  SPVUFMFOHUIPGDBCMFJONFUSFT
  *  DVSSFOU "

  ɉ  SFTJTUJWJUZPG$VXJSF  GU

/PUF3FTJTUJWJUZWBMVFTGPSDPQQFSXJSFBU¡$BSFMJTUFEJO$IBQUFS 5BCMFTBOEPGUIF64/BUJPOBM
&MFDUSJD$PEF5IFSFTJTUJWJUZWBMVFWBSJFTGPSDBCMFTXJUIEJòFSFOUDSPTTTFDUJPOBMBSFBT

0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4]
 7PMUBHFESPQJOWPMUTQFSGU N
PGSPVUFMFOHUIPGUXJODBCMF VTJOHUIFBCPWFGPSNVMB

Wire Size- AWG 14 12 10 8 6 4 2 1


(mm²) (2.08) (3.31) (5.26) (8.36) (13.29) (21.14) (33.61) (42.39)
Amps
0.5 0.16 0.10 0.06 0.04 0.02 0.02 0.01 0.01
1.0 0.31 0.20 0.12 0.08 0.05 0.03 0.02 0.02
1.5 0.47 0.30 0.19 0.12 0.07 0.05 0.03 0.02
2.0 0.63 0.40 0.25 0.16 0.10 0.06 0.04 0.03
2.5 0.79 0.50 0.31 0.19 0.12 0.08 0.05 0.04
3.0 0.94 0.59 0.37 0.23 0.15 0.09 0.06 0.05
4.0 1.26 0.79 0.50 0.31 0.20 0.12 0.08 0.06
5.0 1.57 0.99 0.62 0.39 0.25 0.15 0.10 0.08
7.5 2.36 1.49 0.93 0.58 0.37 0.23 0.15 0.12
10 3.14 1.98 1.24 0.78 0.49 0.31 0.19 0.15
15 4.71 2.97 1.86 1.17 0.74 0.46 0.29 0.23
20 6.28 3.96 2.48 1.56 0.98 0.62 0.39 0.31
25 7.85 4.95 3.10 1.95 1.23 0.77 0.49 0.39
30 9.42 5.94 3.72 2.33 1.47 0.92 0.58 0.46
40 12.56 7.92 4.96 3.11 1.96 1.23 0.78 0.62
50 15.70 9.90 6.20 3.89 2.46 1.54 0.97 0.77

/PUFT $$$EBUBGSPN/&$5BCMF #

BOESFTJTUJWJUZWBMVFTGSPN/&$$I 5BCMF
 4IBEFEBSFBTJOEJDBUFUIBUUIFDBCMFBNQBDJUZNJHIUCFFYDFFEFEBUIJHIUFNQFSBUVSFT
 3FGFSBMTP UP17NPEVMFBOE*OWFSUFSNBOVGBDUVSFSTSFDPNNFOEBUJPOT

]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4
 3PVUFMFOHUITUPQSPEVDFWPMUBHFESPQ 7TZTUFNT
GPSUXJODBCMF VTJOHUIFBCPWFGPSNVMB

Maximum Distance in feet to produce 5% voltage drop (12V system)


8JSF4J[F"8(        
NN¤









$VSSFOU "

        


        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        

0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4]
CABLE PROTECTION
"MMTVCDJSDVJUT JODMVEJOH17BSSBZBOEBVYJMJBSZDIBSHJOHDJSDVJUTTIPVMECFQSPUFDUFECZ)3$GVTFTPSDJSDVJU
CSFBLFST*OBEEJUJPOUIFTFDJSDVJUTCFJOHDBQBCMFPGCFJOHJTPMBUFEXJUIPVUUIFVTFPGUPPMT"OZDJSDVJUCSFBLFS
VTFEJO%$DJSDVJUTNVTUCFSBUFEGPSUIFBQQSPQSJBUF%$WPMUBHFBOECFOPOQPMBSJTFE

"MMDBCMFTVTFEJOUIFJOTUBMMBUJPOTIPVMECFTFDVSFMZöYFEJOQMBDFUPNJOJNJTFBOZNPWFNFOUPGUIFDBCMF
"OZFYQPTFEDBCMJOHXJMMCFQSPUFDUFEGSPN67BOENFDIBOJDBMEBNBHFFHSVOJODPOEVJU

Crimp style termination of wiring should use the appropriate crimping tool.

LICENCING
Extra Low Voltage ( ELV )
"MMFYUSBMPXWPMUBHFXJSJOHTIPVMECFQFSGPSNFECZBADPNQFUFOUQFSTPO XIJDIJTEFöOFEBTy

Low Voltage ( LV )
"MM-PX7PMUBHFXPSL 7"$7PS7%$
TIPVMECFVOEFSUBLFOJOBDDPSEBODFXJUIUIFSFHVMBUPSZ
requirements of the country..

]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4
INSTALLATION CHECKLIST
PV ARRAY EXTRA LOW VOLTAGE CABLING
$BCMJOHJTTJ[FEUPNJOJNJTFMPTTFT
17"SSBZPSJFOUBUJPO ¡ in accordance with these guidelines
"MMTVCDJSDVJUTBSFQSPUFDUFECZ
Solar array is securely mounted
appropriate fuses or circuit breakers
and supported
Timber used is suitable for SAFETY
FYUFSOBMVTFPSJTQSPQFSMZTFBMFE
Battery warning sign
/PEJTTJNJMBSNFUBMTBSFJODPOUBDU i%"/(&33JTLPG#BUUFSZ&YQMPTJPOi
with the array frames or supports
JTQFSNBOFOUMZöYFEPVUTJEFUIFCBUUFSZSPPN
Roof penetrations are suitably FODMPTVSFJOBQSPNJOFOUQPTJUJPO
sealed and weatherproof i&MFDUSPMZUF#VSOTiTJHOJTQFSNBOFOUMZ
17XJSJOHMPTTFTBSFMFTTUIBO öYFEJOBQSPNJOFOUQPTJUJPOBEKBDFOU
BUUIFNBYJNVNDVSSFOUPVUQVUPGUIFBSSBZ to the battery bank
"GSFTIXBUFSTVQQMZJTBWBJMBCMFGPS
PV wiring is protected by appropriate
eyewash and rinsing any acid spills
circuit breakers or fuses
8JSJOHJTQSPUFDUFEGSPN67BOE 110/230 VOLT (LV) INSTALLATION
mechanical damage
"MM-PX7PMUBHFXJSJOHIBTCFFOJOTUBMMFE
in accordance with local regulations
#"55&3:*/45"--"5*0/
Wiring is protected from mechanical damage

The batteries are installed in a This checklist is based on the Sustainable Energy
dedicated battery room, enclosure or *OEVTUSJFT"TTPDJBUJPOPGUIF1BDJöDJTMBOET
restricted access area Installation Guidelines. The guidelines demonstrate
Ventilation is in accordance with guidelines UIFMBUFTUJOEVTUSZiCFTUQSBDUJDFw

"DJEMFBLBHFDPOUBJONFOU "65)03*4"5*0/
Batteries are not in contact with the
øPPSPGUIFFODMPTVSFSPPN * yyyyyyyyyyyyyyyyyyyy
verify that the following system has been installed
"MMCBUUFSZJOUFSDPOOFDUTBOEUFSNJOBMTBSF to the standard indicated by these guidelines .
protected against accidental short circuit
/BNFPGUIFQFSTPOGPSXIPNUIFTZTUFNXBT
"MMDSJNQMVHTIBWFCFFOöUUFEVTJOH installed
an appropriate tool .......................................................................................................
#BUUFSZCBOLJTQSPUFDUFECZ$#PSGVTFT -PDBUJPOPGTZTUFN
.......................................................................................................
"MMFMFDUSJDBMFRVJQNFOUJTNPVOUFE
......................................................................................................
PVUTJEFUIFCBUUFSZFODMPTVSFSPPN
Signed ........................................................................................
5IFSFBSFOPFYQPTFEMJWFQBSUTPO
   %BUF
any installed equipment
"UUBDIBTFQBSBUFTIFFUEFUBJMJOHBOZEFQBSUVSFT

0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4]
Appendix 1
Table of Abbreviations and Acronyms

d.c. Direct current


a.c. "MUFSOBUJOHDVSSFOU
"4/;4 "VTUSBMJB4UBOEBSE/FX;FBMBOE4UBOEBSE
6- 6OEFSXSJUFST-BCPSBUPSZ
ICC International Code Council
/'1" /BUJPOBMöSF1SPUFDUJPO"TTPDJBUJPO
"4$& "NFSJDBO4PDJFUZPG$JWJM&OHJOFFST
IEEE Institute of Electrical and Electronics Engineers
Wh Watt hours
kWh Kilowatt hours
W Watts
WP Watts peak
H hours
V Volts
" "NQT
7" Volt amps
"I "NQIPVST
PV Photovoltaic
PSH 1FBLTVOIPVST L8IN

L8IN ,JMPXBUUIPVSTNFUSFTTRVBSFE
Voc 0QFODJSDVJUWPMUBHF WPMUT

Vmp .BYJNVNQPXFSQPJOUWPMUBHF WPMUT

Isc 4IPSUDJSDVJUDVSSFOU BNQT

Imp .BYJNVNQPXFSQPJOUDVSSFOU BNQT

-7 -PX7PMUBHF 7%$JO"VTUSBMJBO4UBOEBSET

&-7 &YUSB-PX7PMUBHF 7%$JO"VTUSBMJBO4UBOEBSET

67 6MUSBWJPMFUMJHIU
HRC High Rupturing Capacity
CCC Current Carrying Capacity
Vd Voltage drop
$4" $SPTT4FDUJPOBM"SFBPGDBCMF NN

Cu Copper
$# Circuit breaker

]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4
]0''(3*%17108&34:45&.4t4:45&.*/45"--(6*%&-*/&4