LOCAL AUTHORITIES / PERMANENT UTILITY CONNECTION FLOW CHART

DESIGN STAGE CONSTRUCTION PHASE PRE‐HANDOVER

Compilation of all  Approval of DM 


Power Plot  boundary   Final Demarcation  DM approved  Snag/Comments by DM  applicaition by the 
Temporary  Final Building Permit Dubai Municipality 1st 
DM APPROVALS

Full Building  Approval Excavation Permit Foundation/ Substructure   application for DM  drawings building  to be agree with WSP  Consultant. Final  31‐Mar‐19


Demarcation  Fence/Handing Permit DM inspection 
to visit Site permits & Block  and attain any Application for DM 
register inspection

EIFS Approval to be  DCD Second  DCD Second 


Dubai Civil Defence DCD Application for  DCD Application for  DCD First Site Testing  21‐Mar‐19
obtain prior to DCD  Application for  Application for 
DCD APPROVALS

Fire & Life Safety Strategy  inspection Submitted  inspection Submitted  Report Issued


inspection inspection Submitted  inspection Submitted 
Approval

Payment by client for DCD 
DCD 24x7 Dpl Application  Visit by DCD 24x7  Estimate by DCD 24x7 (with
for inspection Submitted  (with in 7 days after visit) in 7 days after visit)
24x7 panel installation  28‐Feb‐19
(Client)
ETISALAT/DU 
APPROVALS

Etisalat/Du Etisalat/Du Etisalat/Du


Etisalat/Du Etisalat/Du
Incoming Telecom Room  Client Line Connection Telecom Room Client 
Telephone Approval Incoming Telecom Room  21‐Marr‐19
Inspection Complete &  Application & Payment  Equipment Installation 
Inspection & Approval 
Comments Issued (Client) (Client)
DM DRAINAGE

DM Sewage Department
DM Drainage Department  DM Sewage Department   Dm Sewage Department 
External Dranage Network  01‐Apr‐19
Design Approval Installation works  Installation remedial works 
Complete & Approved 
inspections complete Final inspection
(Client)

Receive DEWA Trench  Submit inspection  2nd DEWA inspection by 


DEWA Electrical HV Layouts from  request for Civil works  DEWA comments to be  to be attained by 
DEWA Inspection
LON Design Approval Consultant for all Sub‐ for Sub‐Stations and LV  attained by Contractor Contractor
DEWA MV 
APPROVAL

Station  Rooms 
DEWA HV/LV Power 
LV Cable connections by 
External HV Cabling for all 
DEWA 
Sub‐stations Completed
Client Receive DEWA 
Client Payment for
LV/MV Power Application to  Estimation for all RMU's 
MV /LV connection fees (16 
DEWA and TX's weeks prior to Power On)
(Cllient Received)

Submit LV  DEWA LV Power
DEWA Electrical LV Revised Design NOC to be  LV Equipment Room  LV Panel delivery and  DEWA LV Power 
inspection request   Energization to LV  01‐Apr‐19
LON Design Approval issue by Engineer installation start on   installation start on  installation Inspection 
APPROVAL
DEWA LV 

to DEWA   Sub‐Stations