You are on page 1of 3

NPA MANAGEMENT-ACTION TO BE TAKEN FOR RECOVERY/UPGRADATION

Name of the report Column to be verified Action to be taken


S.No.
1. AGL accounts sanctioned up to Date of sanction 1.Recover the a/cs disb upto
30.04.2016 30.9.2015 immediately.
2.Recover the a/cs disb from
1.10.2015 to 31.10.2015 by
31.10.2018
3.Recover the a/cs disb from
1.11.2015 to 30.4.2016 by
30.11.2018
2. CCOD accounts with DP less than DP and Sanction limit Verify whether D.P. and sanction
sanction limit. limit are correct. If necessary
modify through ACLHM menu
3. CCOD accounts - Limit expiring on Limit expiry date 1.Renew all the a/cs that are due
or before 31.10.2018. up to 30.9.2018 immediately.
2.Take steps for renewal of a/cs
due between 1.10.2018 and
31.10.2018 as and when the a/cs
fell due
4 CKCC, JLG, RMG, CRPLN accounts Outstanding balance 1.Verify the status of the a/cs.
with outstanding balance of 2.a)If a/c status is NPA close the
Rs.1000/- and below. a/cs by collecting the due amount
or by transferring the credit
balance to the respective SB a/cs.
b)If the a/c status is PA and the
amount is disbursed upto
31.3.2016 recover/renew the a/cs
immediately.
5 Crop loans sanctioned up to Limit sanction date 1.Recover/renew immediately all
31.03.2016. the a/cs that are
a)disbursed upto 30.9.2015,
b)with o/s balance in debit
c) not renewed/recovered as on
today.
2.Recover/renew all the a/cs
disbursed from 1.10.2015 to
31.3.2016 by 31.10.2018
3.Close the a/c if another loan
account is opened and amount is
disbursed through the new a/c
6 Housing loans - Interest Demand Interest demand In case of a/cs with yearly
effective date up to 31.10.2018. effective date instalment
a) If the demand effective
date is 30.9.2018 ,
change the interest
demand effective date in
S option to next
instalment payment date.
b) If the demand effective
date is between 1.10.2018
to 31.10.2018 change the
demand effective date in S
option to next instalment
date on the succeeding date
of current instalment date.
7 Housing loan accounts details like OD balance, flows, 1.Verify that the details in the
scheme code, San Date, Limit flow amount, flow mentioned columns are correct or
expiry date etc frequency, flow start not. If data in any column is
date wrong inform the same to your
Regional Office for guidance.
2.Recover the OD amount
immediately.
8 Term loans (Other than housing OD balance, flows, 1.Verify that the details in the
loans) details like scheme code, flow amount, flow mentioned columns are correct or
San date, limit frequency, flow start not. If data in any column is
expiry date etc. date wrong inform the same to your
Regional Office for guidance.
2.Recover the OD amount
immediately.
9 Subsidy linked loan accounts with Limit sanction date If the flow start date is to be
gap in account open date and and disbursed date changed according to the
amount disburse disbursed date, seek guidance
date. from R.O. for rectification.

10 Loans disbursed to existing NPA Column No.I 1.Recover the existing NPA
borrowers. (existing NPA a/c ) account immediately
and J (existing npa 2. upgrade the percolated account
date) (mentioned in Column E)to PA
only after recovering the existing
NPA a/c.

You might also like