Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

Contents
CHAPTER-1 ..................................................................................................................................... 1
Introduction ....................................................................................................................................... 1
1.1 Invitation of Proposal ......................................................................................................... 1
1.2 Project Background of the study ........................................................................................ 1
1.3 Proposal Layout.................................................................................................................. 2
CHAPTER – 2 .................................................................................................................................. 3
Consultant references, Organization and Experience of Consulting Firms ...................................... 3
2.1 Introduction ........................................................................................................................ 3
2.2 The Consultant ................................................................................................................... 3
2.2.1 Smart Consult Pvt. Ltd. .................................................................................................. 3
2.2.3 Relevant Experience of the firm ..................................................................................... 4
CHAPTER - 3 ................................................................................................................................. 35
Comments and Suggestion, Project Appreciation and Understanding of ToR ............................... 35
3.1 Objective of the Study ...................................................................................................... 35
3.2 Scope of Services ............................................................................................................. 35
3.3 Duration of the Study and Reporting ............................................................................... 35
3.4 Comments on the Terms of Reference (ToR) .................................................................. 36
CHAPTER - 4 ................................................................................................................................. 38
Description on Approach and Methodology and work plan ........................................................... 38
4.1 General Approach ............................................................................................................ 38
4.2 Methodology .................................................................................................................... 39
4.3 Expected Output .............................................................................................................. 40
4.4 Application of Appropriate Technology and Innovative Ideas where applicable ........... 41
4.5 Innovativeness ................................................................................................................. 41
CHAPTER - 5 ................................................................................................................................. 42
Team Composition and Task Assignments of Key persons. .......................................................... 42
CHAPTER – 6 ................................................................................................................................ 44
Organization and Work Program .................................................................................................... 44
6.1 General ............................................................................................................................. 44
6.2 Organization for the Project ............................................................................................. 44
6.3 Work Program .................................................................................................................. 44
CHAPTER- 7 .................................................................................................................................. 45
Manning Schedule .......................................................................................................................... 45
7.1 General ............................................................................................................................. 45
7.2 Staffing and Manning Schedule ....................................................................................... 45
7.2.1 Team Composition .................................................................................................... 45
7.3 Activity Work schedule .................................................................................................... 46
7.4 Time Schedule for ProfessiOnal Staff .............................................................................. 47

(Smart Consult Pvt. Ltd )


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

CHAPTER-1
INTRODUCTION
1.1 INVITATION OF PROPOSAL
This technical proposal has been prepared by Smart Consult Pvt. Ltd Hereinafter called the
consultants in response to an invitation to local consultants by the Government of Nepal, Ministry
of Population and Environment, Alternative Energy Promotion Center, Renewable Energy for
Rural Livelihood Program (RERL) Khumaltar, Lalitpur hereinafter called the client, Preparation
of " Upgrading study of Ritha khola micro hydro project located in Baglung district
". The consultants/we have thoroughly studied the Terms of Reference (ToR) for the aforesaid job
prepared by the client and have included, in this proposal, all those information as asked for in the
ToR, which is deemed necessary to objectively judge the consultants understanding of the ToR
and the capability to complete the job in a desired fashion. The key information included in this
proposal are: the identification of various tasks to be completed, the proposed methodology to
complete those tasks, a detailed work schedule, proposed manpower with the manning schedule
and the detailed curriculum vitae of the proposed personnel. The consultant very much looks
forward to exhibit its technical competence if awarded this opportunity to serve client in this
particular assignment.

1.2 PROJECT BACKGROUND OF THE STUDY

Alternative Energy Promotion Centre (AEPC) is the apex government body under
the Ministry of Population and Environment established for promotion of Renewable Energy
Technologies. Under AEPC, UNDP‐GEF‐RERL, is a program that has been under
implementation, from 1st July, 2014 upon the successful completion of Rural Energy
Development Program (REDP). The objective of the program is to remove barriers to
increased utilization of renewable energy resources in rural Nepal in order to support
technical, economic, environmental and social development of people in the rural areas and to
reduce GHG emissions. RERL has been providing technical assistance to mini/micro hydro
power promotion activities for its sustainable operation. Linking surplus energy from
mini/micro hydro plant to nearby market centers through interconnected area grid could
increase sustainable operation of mini/ micro plants, as sale of electricity to the markets
generates good revenue.

Micro hydro plants in Baglung district has good potential of selling electricity to
towns connected by mid-hill highway. Mid- hill highway has created a number of
electricity hungry towns. For example, Burtibang bazzar is a town along mid-hill highway
that has huge demand for electricity. Close to Burtibang bazzar, a number of micro hydro
plants installed by the then REDP and AEPC are located. These plants have good
possibility to earn revenue by selling electricity to Burtibang Bazzar. This can be
achieved by (1) Connecting all the micro hydro plants in one network as local grid and
sell electricity under its existing capacity. (2) Upgrade some micro hydro plants and connect
in one network and sell electricity with increased capacity. In this regard, as according to (2),
RERL intends to conduct micro hydro upgrading study of a plant named Ritha Khola micro
hydro plant. Preliminary investigation shows that this site carries the possibility of upgrading
to higher installed capacity. Moreover, one very interesting feature of this plant is that it is
very close to Burtibang bazzar and carries potential to sell electricity to Burtibang bazzar
on its own even without being connected to an area grid network.

(Smart Consult Pvt. Ltd ) 1


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

1.3 PROPOSAL LAYOUT


The Technical Proposal, which specifies the services to be delivered by the consultant, if awarded
the contract, is mainly based on:

 Terms of References/RFP and included information;


 Discussion with concerned officials;
 Discussion with other relevant persons and individuals;
 The consultant’s technical know-how acquired in similar projects as well as specific
experience.
The consultants are confident that their Technical Proposal reflects a thorough understanding of
the project requirements and the requisite tasks as put forward in the Terms of Reference.

The Technical Proposal is presented in the following sequence consisting of Seven (7) chapters.

Chapter 1 : Introduction
Background to proposal for consulting services, proposal layout

Chapter 2 : Consultants reference, Organization and Experience of Firms


Brief description of consulting firms including background, organization,
services and resources of the firms; experience of consulting firms in
similar projects and similar geographical area; information on present work
load and staff deployment of consulting firms.

Chapter 3 : Comments and Suggestions, Project Appreciation and Understanding


Comments on ToR, Project appreciation, understanding of objectives,
Scope of Works, Reporting & Recommendations.

Chapter 4 : Description on Approach Methodology and Work Plan


General approach and methodology to be applied and technical details to be
considered in the execution of the consulting services.

Chapter 5 : Team Composition and Task Assignment of Key Persons


Brief description of proposed project team (Name, Position, Principle task
assign)

Chapter 6 : Organization and work Program


Consultant’s project organization and coordination arrangement, work
program etc.

Chapter 7 : Manning Schedule


Consultant’s proposed staffing, manning schedule, presentation of
consultant’s professional team, curriculum vitae of professional staff
proposed for the project.

Annexes

Annex - 1: Consultant’s Relevant Experience

Annex - 2: Curriculum Vitae of Proposed Professional Staff

Annex - 3: Company Registration, PAN, VAT, Tax Clearance

(Smart Consult Pvt. Ltd ) 2


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

Annex - 4: Company Profile

CHAPTER – 2
CONSULTANT REFERENCES, ORGANIZATION AND
EXPERIENCE OF CONSULTING FIRMS

2.1 Introduction
A brief description of our consulting firm including background, organization, services, staffing
resources, facilities as well as past and present relevant experience and in areas and conditions
similar to project road are presented in the following sections of this chapter. The present work
load and staff deployment of our firm is also provided in this chapter, along with the information
on support resources, (i.e. office and equipment and permanent support staff).

The consultant aim to apply highest level of professional standard on this project by mobilizing
best possible human and other resources as well as management skills to achieve the optimum
work quality and standards of deliverables up to the complete satisfaction of the client.

2.2 The Consultant


2.2.1 Smart Consult Pvt. Ltd.
 Name of consulting firm/company : Smart Consult Pvt Ltd
 Type of firm (Partnership/Pvt. Ltd./Public Ltd., etc.) : Private Limited
 Date of incorporation/registration : 2070/05/26 (September 11,2013)
 Place of incorporation/registration : Kathmandu, Nepal
 Type of services provided : Consulting Services
 Registered office (Place, Country): Old Baneshwor, Kathmandu
 VAT Registration (if applicable): Department of Taxation, IRO-1, New Baneshwor,
Kathmandu, PAN/VAT No.: 601649172 , (Registration Date: 2070/10/02)
 Tax Clearance certificate (up to last fiscal year): Tax Clearance of FY 2071/072
 Name of Contact Person and Designation, Telephone No., Fax No., Email address:
 Name of Contact Person : Mr. Sanjeev Pokhrel / Chief Executive Officer
 Telephone/Fax/ Mobile : 01-4488294/ 01-4488294 / 9841411541
 Email address : er.sanjeevpokhrel@gmail.com
: sanjeev@smartconsult.com.np
 Web Site : www.smartconsult.com.np
 Main Area of Expertise: Consultancy services in Renewable Energy Sector (
Hydropower, Solar and Bio-Energy) and Grid Connection.

(Smart Consult Pvt. Ltd ) 3


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

2.2.3 Relevant Experience of the firm

Table: Relevant Experience of Company


Relevant Services carried out in the Last three Years.

PDS-1:
Assignment Name :
Transmission Survey, Mapping, Design and
Cost Estimation of Seven Micro Hydropower Country: Nepal
for Mini-Grid Interconnection in Taplejung
District.
Location within Country: Taplejung Professional Staff Provided by Your
Consultant/Entity(profiles):
Team Leader - 1
Engineers -2
GIS Expert-1
Name of Client: AEPC/RERL No. of Staff: 4
Address: Khumaltar, Lalitpur No. of Staff-Months:8;
Duration of Assignment: 2 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs. 4,94,036.00
17 August 2015 16 November 2015
No. of Months of Professional Staff Provided by
Name of Associated Consultants, If Any:
Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Sanjeev Pokhrel
Narrative Description of Project: ( Actual assignment, nature of activities performed and location)
11KV Transmission Survey, Mapping, Design and Cost Estimation, technical specification and
tender document preparation of Seven Micro Hydropower for Mini-Grid Interconnection in
Taplejung District was carried out.
Description of Actual Services Provided by Consultant Staff:
The Services provided by the Firms are:
 Literature review and primary data collections
 Field visit and survey of the shortest route
 Load profile study and generation pattern analysis
 Design of 11kV mini grid line
 Drawing and estimation of the conductors and poles.
 Report preparation and recommend with suggestion
 Environmental management plan
 Findings and recommendations
 Social and Environmental Impact
 Financial and Economic analysis of the project..

Firm’s Name: Smart Consult Pvt. Ltd

Signature of the Firm’s Authorized Representative:___________________

(Smart Consult Pvt. Ltd ) 4


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

Firm’s Seal:____________________

(Smart Consult Pvt. Ltd ) 5


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-2:
Assignment Name :
Preparation of Technical and Legal documents
Country: Nepal
for four Mini Hydro SPV.

Location within Country: Rukum, Professional Staff Provided by Your


Solukhumbu, Baglung. Consultant/Entity(profiles):
Team Leader - 1
Engineers -2

Name of Client: AEPC?RERL No. of Staff: 3


Address: Khumaltar, Lalitpur No. of Staff-Months:6;
Duration of Assignment: 2 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs193,286.50
November, 2015 December, 2015
No. of Months of Professional Staff Provided by
Name of Associated Consultants, If Any:
Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Sanjeev Pokharel
Narrative Description of Project: ( Actual assignment, nature of activities performed and location)
Preparation of Technical and Legal documents for four Mini Hydro SPV was completed.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study
 Description of the project area
 Basic description of hydrological parameters using MIP and Hydest method.
 Preparation of desk study report of four mini hydro power projects for Survey License from
Department of Electricity Development.
 ToR Preparation for the consultant.
 Co-ordinate fixing for the proposed project sites.
 Findings and recommendations

Firm’s Name: Smart Consult Pvt. LTd

Signature of the Firm’s Authorized Representative:___________________

Firm’s Seal:____________________

(Smart Consult Pvt. Ltd ) 6


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 7


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-3:
Assignment Name :
Detail Engineering Survey, Structural Drawing
Country: Nepal
and Estimation of Phawa Khola Mini
Hydropower Project (360KW).
Professional Staff Provided by Your
Location within Country: Taplejung Consultant/Entity(profiles):
Team Leader - 1
Geotechnical Engineers -1
Water Resource Engineer-1
Mechanical Engineer-1
Electrical Engineer-1
Quantity Surveyor-1
Draft Person-1
Name of Client: DDC Taplejung and
RERL/AEPC. No. of Staff: 7

Address: DDC Taplejung. No. of Staff-Months:42;


Duration of Assignment: 6 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs. 10,00,000.00
April,2014 October, 2014
No. of Months of Professional Staff Provided by
Name of Associated Consultants, If Any:
Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Saroj Acharya
Narrative Description of Project: ( Actual assignment, nature of activities performed and location)
Detail Engineering Survey, Structural Drawing and Estimation of Phawa Khola Mini Hydropower
Project (360KW) was carried out.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study
 Description of the project area
 Description of the environment
 Potential environmental impact and its mitigation measures
 Public Consultation and information collections
 Design of different civil, electrical and mechanical components.
 Energy calculations and revenue analysis.
 Design, estimate and boq preparation of different project components.
 Findings and recommendations
 Social and Environmental Impact
 Financial and Economic analysis of the project.
 Formulate the detailed project report as per the feasibility study guidelines of mini hydro projects
of Alternative Energy Promotion Center (AEPC).

Firm’s Name: Smart Consult Pvt. LTd

Signature of the Firm’s Authorized Representative:___________________

Firm’s Seal:____________________

(Smart Consult Pvt. Ltd ) 8


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 9


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-4:
Assignment Name :
Initial Environmental Examination (IEE) Study
Country: Nepal
of Chotte Khola Small Hydropower (993 kW).

Location within Country: Manbu VDC, Professional Staff Provided by Your


Gorkha Consultant/Entity(profiles):
Team Leader - 1
Engineers -2

Name of Client: Pashupati Environmental


Engineering Power Company Pvt. Ltd No. of Staff: 3

Address: Kaldhara, Kathmandu, Nepal No. of Staff-Months:6;


Duration of Assignment: 2 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs. 8 Lakhs
15 Falgun 2072 15 Baishak 2073
No. of Months of Professional Staff Provided by
Name of Associated Consultants, If Any:
Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Avhishek Shrestha
Narrative Description of Project: ( Actual assignment, nature of activities performed and location)
Initial Environmental Examination (IEE) of Chotte Khola SHP (936 kW), Manbu VDC, Gorkha.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study
 Description of the project area
 Description of the environment
 Analysis of alternatives
 Potential environmental impact and its mitigation measures
 Public Consultation and information disclosure
 Grievance redress mechanism
 Environmental management plan
 Findings and recommendations
 Social and Environmental Impact

Firm’s Name: Smart Consult Pvt. LTd

Signature of the Firm’s Authorized Representative:___________________

Firm’s Seal:____________________

(Smart Consult Pvt. Ltd ) 10


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 11


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-5:

Assignment Name:
Verification of testing and commissioning work
Country: Nepal
of "Tri-Hybrid Energy System of Emergency
Blood Bank"
Professional Staff Provided by Your
Consultant/Entity(profiles):
Location within Country: Lalitpur, Nepal
Team Leader – 1
Electrical Engineers -1
Supervisors-1
Name of Client: Nepal Red Cross Society,
Lalitpur Chapter. No. of Staff: 3

No. of Staff-Months: 6;
Address: Lalitpur, Kathmandu
Duration of Assignment: 2 months
Start Date Completion Date Approx. Value of Services
(Month/Year): (Month/Year): June NRs. 5,00,000.00
15 Jan 2015 15 March 2015
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Sanjeev Pokhrel (Team Leader)

Narrative Description of Project: ( Actual assignment, nature of activities performed and


location)
The overall objective of the assignment is the Verification of testing and commissioning work of
"Tri-Hybrid Energy System of Emergency Blood Bank", Lalitpur. The work includes engineering
design, drawing, estimation and field verification of testing and commissioning of 18kWp solar PV,
20kW Diesel Power Supply and National Grid Connection.
Description of Actual Services Provided by Consultant Staff:
The Services provided by the Firms are:
 Literature review and information collections.
 Site visit and study.
 Asses the load demand analysis of the blood bank
 Conduct the sizing of solar PV and battery sizes
 Design the different components of solar PV, diesel generator and inverter
 Prepare the bill of quantity, estimate, drawing
 Report Preparation work.
 Monitoring of the system of the testing and commissioning works.

Firm’s Name: Smart Consult Pvt. Ltd

Signature of the Firm’s Authorized Representative:__________________

Firm’s Seal:___________________

(Smart Consult Pvt. Ltd ) 12


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 13


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-6:
Assignment Name:
Interconnection of four micro hydropower
Country: Nepal.
projects in Taplejung District forming mini grid
network.
Professional Staff Provided by Your
Location within Country: Taplejung District, Consultant/Entity(profiles):
Nepal. Team Leader/Planner – 1
Electrical Engineers -1
Support Staff -1
Name of Client: Office of District No. of Staff : 3
Development Committee, Taplejung
No. of Staff-Months : 6
Address: Phungling, Taplejung District, Nepal.
Duration of Assignment : 2 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs. 350,000.00
April 2014 June 2014
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Sanjeev Pokhrel- Team Leader

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
Interconnection of Four micro hydro power in Taplejung District forming mini grid network. The
four projects are Sobuwa Khola SHP(125kW), Chimal MHP(90kW), Lauwa Khola MHP(100kW)
and Yafre Khola MHP(95 kW), Taplejung District.
Description of Actual Services Provided by Consultant Staff:
 Literature review and primary data collections
 Field visit and survey of the shortest route
 Load profile study and generation pattern analysis
 Design of 11kV mini grid line
 Drawing and estimation of the conductors and poles.
 Report preparation and recommend with suggestion.

Firm’s Name: Smart Consult Pvt. Ltd

Signature of the Firm’s Authorized Representative:___________________

Firm’s
Seal:____________________

(Smart Consult Pvt. Ltd ) 14


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 15


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-7:
Assignment Name:
Review of detailed feasibility study report of
Middle Phawa Khola Mini Hydro Project Country: Nepal
(360kW)

Professional Staff Provided by Your


Consultant/Entity(profiles):
Location within Country: Sikaicha VDC,
Team Leader - 1
Taplejung District
Civil Engineer-1
Electrical Engineer-1

Name of Client: RERL/AEPC


No. of Staff: 3
No. of Staff-Months:9;
Address: Sikaicha VDC, Taplejung.
Duration of Assignment: 3 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs 3,49,170.00
Jan 2015 March , 2015
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Saroj Acharya- Team Leader

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
Review of detailed feasibility study report of Middle Phawa Khola Mini Hydropower Project
(360kW), Sikaicha VDC, Taplejung District.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study data review.
 Description of the project area
 Description of the environment
 Analysis of alternatives
 Potential environmental impact and its mitigation measures
 Public Consultation and information disclosure
 Review of design of different civil, electrical and mechanical components.
 Environmental management plan
 Findings and recommendations
 Social and Environmental Impact
 Financial and Economic analysis of the project.
 Formulate the detailed project report as per the feasibility study guidelines of mini hydro
projects of Alternative Energy Promotion Center (AEPC).

Firm’s Name: Smart Consult Pvt Ltd

Signature of the Firm’s Authorized Representative: ___________________

Firm’s Seal: ____________________

(Smart Consult Pvt. Ltd ) 16


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 17


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-8:
Assignment Name:
Capacity Up gradation, Detail Design,
Construction/Structural Drawing, Cost
Country: Nepal
Estimation and Tender Document Preparation
Works of Middle Phawa Khola Mini
Hydropower Project.
Professional Staff Provided by Your
Consultant/Entity(profiles):
Location within Country: Sikaicha and
Team Leader - 1
Phawa Khola VDC, Taplejung District
Civil Engineer-1
Electrical Engineer-1

Name of Client: MFALD/DDC, Taplejung


No. of Staff: 3
Address: Sikaicha and Phawa Khola VDC, No. of Staff-Months:9;
Taplejung. Duration of Assignment: 4 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs 9,58,1206.10
10th June, 2016 10th October, 2016
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Sanjeev Pokharel- Team Leader

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
Capacity Up gradation, Detail Design, Construction/Structural Drawing, Cost Estimation and
Tender Document Preparation Works of Middle Phawa Khola Mini Hydropower Project was
carried out at Sikaicha and Phawa Khola VDC, Taplejung.
Description of Actual Services Provided by Consultant Staff:
The Services provided by the Firms are:
 Field Study data review.
 Description of the project area
 Description of the environment
 Analysis of alternatives
 Potential environmental impact and its mitigation measures
 Public Consultation and information disclosure
 Review of design of different civil, electrical and mechanical components.
 Environmental management plan
 Findings and recommendations
 Social and Environmental Impact
 Financial and Economic analysis of the project.
 Formulate the detailed project report as per the feasibility study guidelines of mini hydro
projects of Alternative Energy Promotion Center (AEPC).

Firm’s Name: Smart Consult Pvt Ltd

Signature of the Firm’s Authorized Representative: ___________________

Firm’s Seal: ____________________

(Smart Consult Pvt. Ltd ) 18


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 19


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-9:
Assignment Name:
Detail Feasibilty Study, Design, Drawing and
Country: Nepal
Report Preparation Work of Phawa Khola Mini
Hydropower Project, 400 kW.
Professional Staff Provided by Your
Consultant/Entity(profiles):
Location within Country: Sikaicha and
Team Leader - 1
Phawa Khola VDC, Taplejung District
Civil Engineer-1
Electrical Engineer-1

Name of Client: MFALD/DDC, Taplejung


No. of Staff: 3
Address: Sikaicha and Phawa Khola VDC, No. of Staff-Months:9;
Taplejung. Duration of Assignment:9 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs 10,00,000.00
2071/01/11 2071/09/20
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Saroj Acharya- Team Leader

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
Detail Feasibilty Study, Design, and Drawing and Report Preparation Work of Phawa Khola Mini
Hydropower Project, 400 kW was carried out at Sikaicha and Phawa Khola VDC, Taplejung.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study data review.
 Description of the project area
 Description of the environment
 Analysis of alternatives
 Potential environmental impact and its mitigation measures
 Public Consultation and information disclosure
 Review of design of different civil, electrical and mechanical components.
 Environmental management plan
 Findings and recommendations
 Social and Environmental Impact
 Financial and Economic analysis of the project.
 Formulate the detailed project report as per the feasibility study guidelines of mini hydro
projects of Alternative Energy Promotion Center (AEPC).

Firm’s Name: Smart Consult Pvt Ltd

Signature of the Firm’s Authorized Representative: ___________________

Firm’s Seal: ____________________

(Smart Consult Pvt. Ltd ) 20


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 21


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-10:
Assignment Name:
Transmission and Distribution Master Plan
Preparation of Taplejung District Headquarter Country: Nepal
and DFS Update of Middle Phawa Mini Hydro
Project,360 kW.
Professional Staff Provided by Your
Location within Country: Phungling Consultant/Entity(profiles):
Bazar,Phawa Khola and Sikaicha VDC, Team Leader - 1
Taplejung District Civil Engineer-1
Electrical Engineer-1

Name of Client: MFALD/DDC, Taplejung


No. of Staff: 3
Address: Sikaicha and Phawa Khola VDC, No. of Staff-Months:9;
Taplejung. Duration of Assignment: 2 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs 4,75,000.00
13th September, 2015 13th November 2015
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:
Mr. Sanjeev Pokharel - Team Leader

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
R Transmission and Distribution Master Plan Preparation of Taplejung District Headquarter and
DFS Update of Middle Phawa Mini Hydro Project,360 kW.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study data review.
 Description of the project area
 Description of the environment
 Analysis of alternatives
 Load profile study and generation pattern analysis
 Drawing and estimation of the conductors and poles.
 Report preparation and recommend with suggestion.

Firm’s Name: Smart Consult Pvt Ltd

Signature of the Firm’s Authorized Representative: ___________________

Firm’s Seal: ____________________

(Smart Consult Pvt. Ltd ) 22


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 23


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-11:
Assignment Name:
Earthquake damage detailed assessment of
Country: Nepal
Chotte Khola SHP (993 kW) for insurance
claim
Professional Staff Provided by Your
Location within Country: Manbu VDC, Consultant/Entity(profiles):
Gorkha Team Leader/Planner - 1
Civil Engineer-1
Draft man-1

Name of Client: Pashupati Environmental


No. of Staff: 3
Engineering Power Company Pvt. Ltd
Address: Manbu VDC, Gorkha No. of Staff-Months:9;
Duration of Assignment: 3 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs. 3,50,000.00
May 2015 July 2015
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.)
Involved and Functions Performed:
Mr. Saroj Acharya- Team Leader
Narrative Description of Project:
Earthquake damage detailed assessment of Chhotte Khola SHP (993kW) for insurance claim in
Manbu VDC, Gorkha. The work was basically dealt with the assessment of the damaged
structure due to the recent earthquake. The components monitored were civil, hydro mechanical
and electro mechanical components.
Description of Actual Services Provided by Consultant Staff:
The Services provided by the Firms are:
 Literature review and review of the DPR report
 Field Study
 Walkover survey of all the components damaged by earthquake.
 Measure the components with the damaged part and take its photographs.
 Analyze the damaged parts of hydro and electromechanical components.
 Estimate the loss occurred by the earthquake.
 Estimate the loss in energy due to failure of the plant due to disaster.
 Prepare the report and summarize all the losses.
 Report submission.

Firm’s Name: Smart Consult Pvt Ltd.

Signature of the Firm’s Authorized Representative:___________________

Firm’s Seal:____________________

(Smart Consult Pvt. Ltd ) 24


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 25


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-12:
Assignment Name:
Assessment of Sick Micro Hydropower
Country: Nepal
Projects initiated in ESAP-I and II for Project
Closure.
Professional Staff Provided by Your
Location within Country: Gorkha, Lamjung, Consultant/Entity(profiles):
Dhading and Argakhanchi. Team Leader/Planner - 1
Civil Engineer-1
Draft man-1

Name of Client: AEPC/NRREP No. of Staff: 3


Address: Manbu VDC, Gorkha No. of Staff-Months:1.5;
Duration of Assignment: 15 days
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
NRs. 2,97,416.00
10 June 2016 30 June 2016
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.)
Involved and Functions Performed:
Mr. Sanjeev Pokhrel- Team Leader
Narrative Description of Project:
Analyze the status of the sick micro hydropower project, review each component as per the BoQ
contracted with the supplier and the status of the equipment reached to the site. Provide the exact
financial and technical status of such projects.

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Literature review and review of the DPR report
 Field Study
 Walkover survey of all the components damaged by earthquake.
 Measure the components with the damaged part and take its photographs.
 Analyze the damaged parts of hydro and electromechanical components.
 Estimate the loss occurred by the earthquake.
 Estimate the loss in energy due to failure of the plant due to disaster.
 Prepare the report and summarize all the losses.
 Report submission.

Firm’s Name: Smart Consult Pvt Ltd.

Signature of the Firm’s Authorized Representative:___________________

Firm’s Seal:____________________

(Smart Consult Pvt. Ltd ) 26


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 27


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS: 13
Assignment Name:
Detail Feasibility Study of Large Bio Gas
Country:Nepal
Power Generation Plant in Shree Krishna
GauSewaSadan, Birat Nagar, Nepal.
Professional Staff Provided by Your
Consultant/Entity(profiles):
Location within Country
Team Leader-1 Environmentalist -1
Jatuwa, Birat Nagar, Morang, Nepal
Engineer -2
Surveyor -1

Name of Client:Shree Krishna GauSewaSadan


Trust No. of Staff: 5

No. of Staff-Months:3
Address: Morang, Birat Nagar, Nepal
Duration of Assignment: 1.5 month
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Day/Month/Year):
NRs. 6,74,500.00
Nov 2016 Dec 2016
Name of Associated Consultants, If Any: No. of Months of Professional Staff Provided
Local NGO by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.)
Involved and Functions Performed:
Mr. Balaji Arumugam- Team Leader , Chandramohan – Project coordinator, Anil Sharma-
Environmentalist, Suraj Prakash – Engineer, Nabin Shrestha- Bio energy Expert, Sanjeev Pokrel-
Electrical Engineer

Narrative Description of Project: (Actual assignment, nature of activities performed and


location): SKGSS cattle farm is visited and technical datas were collected. Raw material
availability, Environment Impact assessment, energy Demand analysis, Potential of Bio Gas
production and Power generation assessment. Advise on better collection routing & transfer
points also given. Cow dung Waste processing of bio degradable waste for electricity generation
Purpose. Hands on training and advisory have been given to the skilled workers of vermi
composting plant. Slurry generated can be utilized as fertilizer for local community to get better
yield of crops.
Description of Actual Services Provided by Consultant Staff:

 Existing dump site & current SWM practices


 Waste Composition Analysis
 Waste generation, Quantification &Projection
 Pre & Post training on value chain of waste collection

(Smart Consult Pvt. Ltd ) 28


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

 Enhanced economic status of cattle farm managing family


 Current Waste Management scenario, Legal Frame work
 Characterization of waste& their Management
 Process technology (alternatives & selection)
 Collection routing also made for Cow dung collection
 Estimation of project costs, operational & maintenance costs
 Assessment of revenues, financial and economic analysis.
 Social and Environmental Impact Assessment
 Detail Design engineering
 Awareness on SWM practice
 Scientific approach on Existing vermi compost plant
 DFS report preparation

Smart Consult Pvt. Ltd /Sundaram Fab Pvt LtdJV


Signature:
Office Seal

(Smart Consult Pvt. Ltd ) 29


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 30


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-:14
Assignment Name:
Detail Feasibility Study Detail Design,
Construction Drawing, Cost Estimation and Country: India
Tender Document Preparation Works of 1MWp
Grid Tied Solar Project
Professional Staff Provided by Your
Consultant/Entity(profiles):
Location within Country: Pappapatti,
Team Leader -
Madurai District, Tamil Nadu
Civil Engineer-
Electrical Engineer-

Name of Client:
Latitude Solar AB Sweden No. of Staff:

No. of Staff-Months:
Address: Madurai District, Tamil Nadu
Duration of Assignment: 5 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
INR :12,78,200.00
11thFeb 2016 10th July 2016
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
Review of Detail Feasibility Study Detail Design, Construction Drawing, Cost Estimation and
Tender Document Preparation Works of 1MWp Grid Tied Solar Project., Pappapatti, Madurai
District, Tamil Nadu
Description of Actual Services Provided by Consultant Staff:
The Services provided by the Firms are:
 Field Study data review.
 Description of the project area
 Study of Sastha Green Power
 Detailed design of civil, module mounting structures, Topographical Survey, Design of DC, AC
components, Switch yard and transmission line, and other balance of systems, with their
installation drawings
 Cost Estimations and Tender Documents preparation of SPV power plant components and
switch yard Equipments.
 Review of design of different civil, electrical and mechanical components.
 Findings and recommendations

Firm’s Name: N11 Solar Energy Pvt. Ltd (India)/Smart


Consult Pvt. Ltd JV
Signature of the Firm’s Authorized Representative:
__________________
Firm’s Seal

(Smart Consult Pvt. Ltd ) 31


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

(Smart Consult Pvt. Ltd ) 32


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

PDS-:15
Assignment Name:
Techno economic Study of prime life space
Country: India
consultancy Pvt Ltd, Mumbai (1MWp) Grid
Tied Solar PV Project
Professional Staff Provided by Your
Location within Country: Podichedu Village, Consultant/Entity(profiles):
Nalgonda District, Telangana, India Team Leader -
Civil Engineer-
Electrical Engineer-

Name of Client:
Latitude Solar AB Sweden No. of Staff:

No. of Staff-Months:
Address: Nalgonda District, Telangana, India
Duration of Assignment: 3 months
Start Date Completion Date
Approx. Value of Services
(Month/Year): (Month/Year):
INR :9,78,200.00
11th April 2016 10th July 2016
No. of Months of Professional Staff Provided
Name of Associated Consultants, If Any:
by Associated Consultants:
Name of Senior Staff, Designation (Project Director/Coordinator, Team Leader etc.) Involved
and Functions Performed:

Narrative Description of Project: (Actual assignment, nature of activities performed and location)
Techno economic Study of prime life space consultancy Pvt Ltd, Mumbai (1MWp) Grid Tied Solar
PV Project, Podichedu Village, Nalgonda District, Telangana, India

Description of Actual Services Provided by Consultant Staff:


The Services provided by the Firms are:
 Field Study data review.
 Description of the project area
 Project Cost Estimations and Financial Analysis Bankable DPR, technical and financial due
diligence.
 Potential environmental impact and its mitigation measures
 Review of design of different civil, electrical and mechanical components.
 Environmental management plan
 Findings and recommendations
 Social and Environmental Impact

Firm’s Name: N11 Solar Energy Pvt. Ltd (India)/Smart


Consult Pvt. Ltd JV
Signature of the Firm’s Authorized Representative:
__________________
Firm’s Seal

(Smart Consult Pvt. Ltd ) 33


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

Work Experience Certificates are attached.

Note: Detail of company background and other (Company Profile) are attached in Annex

(Smart Consult Pvt. Ltd ) 34


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

CHAPTER - 3
COMMENTS AND SUGGESTION, PROJECT APPRECIATION AND
UNDERSTANDING OF TOR

3.1 Objective of the Study


The main objective of this study is to carry out an upgrading study of Ritha khola micro hydro
plant to a mini hydro plant located in Baglung district.
3.2 Scope of Services
a) Assess the availability of water in the river for increasing installed capacity.
b) Assess the possibility to increase the size of water conveyance structures (canal, settling
basin, forebay, tailrace and spillways) and prepare additional quantity and cost estimate of
the materials required for upgrading. Identify places along the canal that need to be
strengthened for stability. A suitable design and cost estimate of stabilizing structure should
be prepared. A detailed section wise location of stabilizing structures need to be plotted and
drawing prepared
c) Asses the possibility of increasing the head of the project and the possibility of
increasing the size of power house to accommodate increased equipment resulting from
upgrading. Prepare cost estimates of hydro electromechanical equipment required.

d) Prepare Bill of Quantities of all Civil, Electrical and Hydro mechanical components.
e) Prepare Quantity estimate and cost estimate of transmission and distribution line for
connecting the plant to Burtibang Bazzar.
f) Interact with User committee, operator to identify the current load and identify
the amount of energy that can be sold.
g) Identify/ assess if the upgraded plant can attract private investments for
construction. h) Prepare construction drawings as well as structural drawings of
civil structures.
i) Prepare a financial analysis of the project as a business case for presenting to
possible investors.

3.3 Duration of the Study and Reporting


The duration for the assigned task is 3 months. Following reports will be submitted:

3.3.1 Draft report: The consultant will submit two (2) copies of the draft report after 2
month from signing the contract. The report will include completion of
the IEE report of two mini hydropower projects.

The draft feasibility study report which includes:


1. INTRODUCTION
1.1 Executive Summary
1.2 Scope of the Project
1.3 Aims
1.3.1 Aim of the study and specific objectives
1.3.2 Aim and Objective of different stakeholders
2. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK
2.1 Nepal and ADB requirements and guidelines

(Smart Consult Pvt. Ltd ) 35


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

2.2 International agreements

3. DESCRIPTION OF THE PROJECT


3.1 Project ownership and maintenance
3.2 Summary of subproject structures and operating regime
3.3 Power supply arrangements
4. RISK ASSESMENT
4.1 Hydrology and Meteorology
4.2 Geology and Land Stability
4.3 Land use on subprojects sites
4.4 River use in the dewatered section and further upstream
4.5 Terrestrial ecology
4.6 Conservation/Protected Areas
5. ANTICIPATED ENVIRONMENTAL IMPACTS AND
MITIGATION MEASURES
5.1 Potential adverse impacts-river diversion/dewatering,
affected ecology, soil disposal.
5.2 Likely project benefits-direct and indirect.

6. INFORMATION DISCLOSURE, CONSULTATION AND


PARTICIPATION
6.1 Hydrology and Meteorology
6.2 Geology and Land Stability
6.3 Land use on subprojects sites
6.4 River use in the dewatered section and further upstream
7. ENVIRONMENTAL MANAGEMENT PROGRAM
7.1 Environmental and social measure to be implemented
7.2 Monitoring
8. CONCLUSIONS AND RECOMMENDATIONS

3.3.2 Final report: The consultant will submit two (2) copies of final reports after 1 month
of submission of the draft report, incorporating comments and
suggestions on the draft reports and also from the stakeholders
workshops. The final report and maps will be in hard as well as in soft
copies.

3.4 Comments on the Terms of Reference (ToR)


The consultants have reviewed thoroughly the Terms of Reference (ToR).The RFP and
information to the consultants are quite explicit, provide a clear and concise statement of
objectives for service and the assignment objectives and provide adequate definition of the scope
of the works required to deliver services to the project

Comments on Data/Facilities/ Services

 It is suggested to develop information management system/ communication system for the


sharing of information/ standards/ policies of such micro/mini hydropower projects to
make easy access for the consultant. Again, regular discussions, supervision,
coordination will make work easier and project completion on time.
 Background information of the mini hydropower project and brief review of previous
any study is missing
 No linkage of accessibility analysis in reporting.

(Smart Consult Pvt. Ltd ) 36


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

 Preparation of the Initial Environmental Assessment (IEE) of all services and facilities
will be time consuming and lengthy. TOR is silent about the process of using tools for
this.
 It would be better to provide the basic information about the geography, line agencies
NGO/INGOs working in area.
 A single chart depicting time, methodology, experts, scopes and budget limitation under
each objective head will help to understand and analyze the project in detail, which is
missing.
 Generalization and hypothetical assumption documentation may be a big problem than a
concrete and concise competitiveness during selection without clear information.

(Smart Consult Pvt. Ltd ) 37


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

CHAPTER - 4
DESCRIPTION ON APPROACH AND METHODOLOGY AND
WORK PLAN
4.1 GENERAL APPROACH
The Consultant approach to the detail design and allied works of the project is based on its
understanding of the terms of reference presented in previous chapter. The approach, which
the consultant has formulated for understanding the study, is geared to achieve the objectives
of TOR in the most efficient manner, both technically as well as financially.
The Main Features Of the Consultant Approach Are:
The methodology will be carried out for the study based on the following factors:
 Stipulation of the TOR
 The Consultants and the professional’s past experience in similar assignments
 Additional information collected by the Consultants from various sources
Time Management through Proper Planning
 Through study of job or project requirement
 Project schedule and resource planning
 Assignment and delegation of responsibility to proper staff within well defined staffing
structure.
Team leader: The consultant have assigned a team leader, who has devoted many years of
his professional carrier in the field of climate change, IEE and EIA of small and mini
hydropower projects and other renewable energy projects works as an team leader or manager,
who will be responsible to coordinate with client, Team Member and other management
works.

The Consultant will do the detailed approach and methodology for carrying out this
assignment task, the following steps will be followed:
 Literature review or desk work.
 Preparation of the data collection forms.
 Field study and investigation applying the appropriate technique
 Collection of relevant primary and secondary data from concern authority and
stakeholders.
 Consultative/ Interaction meeting with AEPC in the centre and field with related
stakeholder
 Data analysis and identify the best data of environmental impact and there
mitigations measures, their analysis and other available facilities in the proposed
project site.
 Recommend best available and suitable technology as per the demand of the farm
and the climatic as wells as geological conditions.
 Preparation and submission of study report to AEPC
 Incorporate comments in report.

(Smart Consult Pvt. Ltd ) 38


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

.
4.2 METHODOLOGY
.
The consultant efforts will be comprehensively streamlined to meet the objectives of the
assignment by covering scope of services outlined in the prescribed Terms of Reference. It will
follow the following specific process to accomplish the assignment as specified in the objectives
and scopes of work in the TOR.

The Consultant will study the entire procedure of project implementation as recommended by the
guidelines provided in terms of reference and periodic plan methodology developed. The
Consultant will strictly follow the methodology prescribed by the guideline while preparing the
periodic plan of the municipality under the study area. The general methodology of the study is
outlined as below.
Table: General Methodology of the study
Action No: Description
1 Literature Review.
2 Fieid visit ,Investigation and Discussion with stake holders.
3 Project Design
4 Alternative Analysis
5 Estimation and BOQ Preparation.
6 Financial/ Economic Analysis
7 Draft report preparation and submission with in corporating feedbacks from
RERL/AEPC officials
8
9 Final report submission

The Consultant will follow the following specific process to accomplish the assignment as
specified in the objectives and scopes of work in the ToR.

(Smart Consult Pvt. Ltd ) 39


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

 Discussion with AEPC officials and gather the


relevant information.
Literature Review  Review of related literature and other documents
related to previous feasibility study before field
visit.

 Field visit
 Topographic survey, hydrological survey,
geological survey, geo-technical survey,
Field Visit, Investigation and
construction material survey, transmission and
Discussion with stake holders. distribution survey.
 Discussion with the concerned stakeholders of the
project area and find the cause of conflicts if any.

 Project Planning and Layout.


 Detail Design and drawings of civil structures,
Project Design hydro mechanical components, electro mechanical
components.
 Energy calculations.

 Different Alternate solutions to the project


Alternative Analysis implementation with different options.

 Estimation and BoQ preparion of civil components (


Weir, Intake, Gravel Trap, Headrace canal,
desander, Forbay, anchor blocks, power house),
Estimation and BoQ Preparation. Hydro Mechanical components (Hydraulic Turbines,
Gates, Penstocks, roofing truss), Electro Mechanical
components and Switchyard Equipments.

 Financial and Economic analysi.


 Calculating NPV, IRR, B/C Ratio, Payback
Financial/Economic Analysis Period,EIRR, DSCR ratio.
 Subsidy calculations based on house hold,
installed capacity etc.

Draft report preparation and  Draft report compilation and submission to AEPC/
NRREP including design, drawing, estimation,
Submission with incorporating technical specifications.
feedbacks from RERL/AEPC officials.  Incorporate feedbacks from AEPC officials if any.

Final Report Submission.

Figure Methodology Flow Chart

4.3 EXPECTED OUTPUT


The consultant shall submit one hard copy and an electronic copy of the final feasibility study
report of individual farm. The reports will be prepared as per the guidelines of ADB's Safeguard
Policy Statement (SPS, 2009). The reports shall be submitted for AEPC/RERL review and
finalized taken into account the received comments.

(Smart Consult Pvt. Ltd ) 40


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

4.4 APPLICATION OF APPROPRIATE TECHNOLOGY AND INNOVATIVE IDEAS


WHERE APPLICABLE
The consultant will be always aware to seek the possibility of applying appropriate technologies
and innovative methods and their implementation during different phases and aspects of project
considering their potential impacts on cost, reliability and performance criteria.

 Application of indigenous knowledge, materials and techniques


 Applying modified and latest approaches of modeling and design tools.
 Implementation of better and new technologies and materials having high performance which
have been used in other parts of the words.
 Maintaining and improving aesthetics of the solar mini-grid in accordance with local settings.

4.5 INNOVATIVENESS
It is always the philosophy of the consultant. to be innovative in their approach to the project,
which brings value to the project as well as to the Clients. The innovativeness could be in terms of

 Effectively make use of the lessons learned from the previous similar projects in the
overall engineering and construction supervision techniques, and contract management
practices
 Use participatory design approach considering all stakeholders and make sustainability
analysis considering all vulnerability.
 Develop and implement effective co-ordination system, which is more vital in the case
of the organizational set up introduced in the present Project
 Transfer of knowledge and skill to local people
 Formation of the community and select representative for reporting.
 Transfer of sustainable quality assurance systems etc.
 Provide guidelines and motivate people with its advantages to them and their
community
 Aware community about its forward and backward linkages and suggest them with
better economic up liftment activities.

(Smart Consult Pvt. Ltd ) 41


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

CHAPTER - 5
TEAM COMPOSITION AND TASK ASSIGNMENTS OF KEY
PERSONS.
Team Composition and Task Assigned

Organization of The Study Team


The proposed project team is selected for the smooth and effective completion of the project with
due consideration to the requirement of ToR. The task envisaged in the proposed job as stated in
this chapter call for inputs for multidisciplinary team of experts with each and every member
contributing to his area of expertise systematically and meticulously. The organization structure of
the consulting team for the service is shown in figure 6-2 respectively. The team for this job has,
accordingly been composed to carry out the tasks in a coherent, comprehensive and integrated
manner to obtain the best output.
The Proposed Team Members have been selected because:

 All of them have excellent qualification in the work required and are full abreast with
the technical advances in their particular field of interest.
 All of them have matching experience and have successfully completed their
assignments.
 All of them are able to relate and communicate quickly and easily to their client’s need
and with each other.
 Most of them have similar experience in mini hydropower project and IEE/EIA.
 All of them have high level of inter-personal qualities to listen to the views of others
impartially and work effectively to achieve the best outcome of the project.

Strong Project Team


Knowledgeable Professionals
High Professionalism

Project Management Linkage and Coordination with


Responsive Successful Clients
Project
Time & Quality Conscious Beneficiaries and Stakeholders

Logistic and Administrative Support


Time, Quality, Cost Conscious

(Smart Consult Pvt. Ltd ) 42


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

Affiliation
with Company
Name Proposed Position Task /Responsibilities
(Full /Part
Time)
Abhishek Team Main responsibilities Full Time
Shrestha Leader/Environmental Main task will include but not (Smart Consult)
Expert limited to:
 Overall responsible for
coordination, planning and
design of IEE study of mini
hydropower project
 Make hold meetings,
discussions and presentation
with the stakeholders.
 Monitor and supervise the
progress of the work
 Prepare and compile the report.
 Prepare working plan, orient
other team members about
project, allocation of
responsibilities to other team
members.
 Designing in mitigation
measures to minimize the
adverse impacts.
 Propose environmental impacts
mitigation measures
 Support in the reporting of the
environmental issues with
possible recommendations.

Sanjeev Pokhrel Electrical Engineer  Identify and describe the Full Time
subproject's potential (Smart Consult
environmental and social Pvt Ltd)
impacts which also includes the
inventory management
provision.
 Propose the environmental
friendly technology solution and
recommendations.
 Assist the team leader in
preparing the report.

(Smart Consult Pvt. Ltd ) 43


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

CHAPTER – 6
ORGANIZATION AND WORK PROGRAM

6.1 GENERAL

The Organization chart, work program and manning schedule is made to concur the requirements
of the proposed approach and methodology described Chapter 4 of this proposal.

In order to full fill the tasks described in the methodology of work in a timely and efficient
manner, proposed services of the consultant demand a careful planning and management of
activities; adherence to strict organization principles (well defined function, careful selection of
staff, clear line of command and control, well defined reporting, feedback and evaluation
arrangements etc.) deployment of adequate resources on time and quality of work, and
maintaining proper cooperation and liaison with project and other stakeholders involved periodic
plan. These have been well considered while developing our organization and work program.

6.2 ORGANIZATION FOR THE PROJECT

Government of Nepal, Ministry of Population and Environment, Alternative Energy Promotion


Center, Renewable Energy for Rural Livelihood Program (RERL) is overall responsible to
facilitate planning, coordination, review of progress and reporting on overall project
implementation.

6.3 WORK PROGRAM

The work program has been prepared in line with the ToR and to meet the required milestones of
activities in the implementation of the project as per our understanding of the ToR,

Project will be completed within 60 days as per our time estimation.

In the opinion of the consultant, all the major items of consultancy services have been identified
and included in the work program presented here. Similarly, the proposed work program uses
realistic estimation of duration of various activities and timings of major events.

(Smart Consult Pvt. Ltd ) 44


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district”

CHAPTER- 7
MANNING SCHEDULE

7.1 GENERAL
The consultant have put a lot of efforts in understanding the nature, scope and significance of the
proposed services, which has been reflected in this proposal. Similarly, a careful consideration has
been made while selecting the professional team members for the project. It fully understand that
despite rich experience and sound establishment of the firm, the success of the project will depend
largely on the composition of the project team. The team must represent a combination of
interdisciplinary skills, including high degree of technical expertise in a number of disciplines,
and successful records of professional experience in similar type of projects.

7.2 STAFFING AND MANNING SCHEDULE


Our proposed staffing consists of the following types.

 Project Staffs, and

 Supporting Staffs.

For this type of project it is essential that support and coordination for the project is provided by
the consultant’s head office to ensure:

 Quality of consultant’s services

 Technical support backup

 Management support back up

 Provision of any specialist inputs that may be required

 Client liaison

7.2.1 Team Composition


Our project key team comprises professionals in various disciplines. The name, proposed position
and years of relevant experience of the proposed professional staffs are presented below:
Relevant
S.No. Name Proposed Position Qualification
experience
1. Abhishek Shrestha Team Leader M.Sc in Climate 8 years
/Environmental Expert Change and Policy.
BSc in Environmental
Science.
2. Sanjeev Pokhrel Electrical Engineer- M.Tech in Alternate 9 yrs
Solar Expert Hydro Energy System.

(Smart Consult Pvt. Ltd ) 45


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district "

7.3 ACTIVITY WORK SCHEDULE

Work Schedule for IEE of Solar Mini Grid Sub-Project


Days(4 days each slot)
S.N Activities Remarks
i ii iii iv v vi vii viii
Literature Review: Review IEE report of various
Team Leader & Electrical
1 mini hydro supported by RERL and ADB's
Engineer
Safegurad Policy

Site visit, Information Collection, Public


Consultation, Survey/Data Collection and Team Leader & Electrical
2
Investigation of Environmental, Bio-Diversity Engineer
and Socio-Economic Conditions.
Alternative analysis, assessment of potential
Team Leader & Electrical
3 environmental impact & their mitigation
Engineer
measure, environment management plan

Report preparation and complete


Team Leader & Electrical
4 documentations, Submission of draft report to
Engineer
RERL/AEPC

Presentation and Feedback Collection from


Team Leader & Electrical
5 RERL Experts and incorporating their comments
Engineer
and feedback. Submission of the final report

(Smart Consult Pvt. Ltd ) 46


Technical Proposal for Preparation of " Upgrading study of Ritha khola micro hydro project located in Baglung district"

7.4 TIME SCHEDULE FOR PROFESSIONAL STAFF


TIME SCHEDULE FOR PROFESSIONAL PERSONNEL
Week
Name Position Reports Due/Activities Number of days
I II III IV V VI VII VIII
Leading, planning, strategy
formulation and overall report
Team
preparation as well as
Abhishek Shrestha Leader/Environmental 30
Environmental impact analysis
Expert
and suggest its mitigation
measures.
Study of risk and impact
Sanjeev Pokhrel Electrical Engineer related to project, data analysis 15
and report formulation.

Full -time 2 month


Report Due 0.5 month
Activity Duration 1.5 month
Signature: