You are on page 1of 30

CERT'D

A.A.E

A.A.E
APPR'D

M.TH

M.TH
CHK'D

SH.A

SH.A

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REVISED AS PER NG COMMENTS
ISSUED FOR APPROVAL
DESCRIPTION

LV AC CABLE SIZING CALCULATIONS


B.A

A.K
BY

26.11.2017

12.03.2018
DATE
NO

00

00

REVISIONS
DESIGNED
BY B.Asy
DATE 26.11.2017
CHECKED
BY SH.ALI
DATE 26.11.2017
OPRG. DEPT
BY
DATE
ENG'G. DEPT.
BY
DATE
CERTIFIED.
BY
DATE AS BUILT BY DATE
DOCUMENT TITLE INDEX PLANT DOCUMENT NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR
LV AC CABLE SIZING CALCULATIONS
CONSTRUCTION OF
FOR ORDERING ADDITION OF NEW 3-80/100MVA POWER TRANSFORMERS AT A MD426 WE-485220 01 OF 30 01
MATERIALS UNTIL
CERTIFIED AND MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION
DATED
MADINAH SAUDI ARABIA JOB ORDER NO. 1532120.03 DWG. CONT. SHT. WE-485208

SEC-ERB CAD-E (2002/03)


DMS EXCEL
INDEX
SHEET NO. CONTENT

1 COVER

2 INDEX & LEGEND

3 DESIGN BASIS OF CABLES

4-8 AC CABLE SIZING

9 BOQ OF L.V AC CABLES

10-17 ANNEXURES

LEGEND
ILC : LOAD CURRENT
IOLC : OVER LOAD CURRENT
ACB : AIR CIRCUIT BREAKER
MCCB : MOULDED CASE CIRCUIT BREAKER
MCB : MINITURE CIRCUIT BREAKER
SDB : SUB DISTRIBUTION BOARD
ACDB : AC DISTRIBUTION BOARD
ILP : INDOOR LIGHTING PANEL
OLP : OUTDOOR LIGHTING PANEL
OLTC : ON LOAD TAPE CHANGER
HVAC : HEATING VENTILATION AIR CONDITIONER
LCC : LOCAL CONTROL CABINET
HTR : HEATER
LTNG : LIGHTING
SCKT : SOCKET
TEMP. : TEMPERATURE DERATING FACTOR
GRP. : GROUPING DERATING FACTOR
PERMI. : %VD PERMISSIBLE VOLTAGE DROP
MK. : MARSHALLING KIOSK

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 2 of 30


Design Basis for cables
1- Cables are sized based on SEC Standard TES-P-119.29 ( LV Cable Sizing & Selection )

2- Formula used within this sheet are that provided by SEC Standard TES-P-119.29

3- As per 01-TMSS-01, ambient temperature of 40˚C is considered for cable sizing

4- For main incomer cables, the short circuit withstand current for Cu. conductors, XLPE Insulated is

given by the formula:-

0 . 143 S
I SC 
t
Where:-
Isc : Short Time Rating Current in kA

S : Conductor Cross-Section Area in mm²

t : Current Duration in Seconds.

For 1C X 630 mm² Cable, for 3 Second S/C :-

0.143 X 630
Isc = = 52.015 KA

The secondary side neutral cable size will be the same size of phase cable (1Cx630 mm2) with 1 run and it will withstand the S.C
rating of 50 KA.

Thus, the given cable can withstand the system fault level (50 kA ).

5- Cable sizes given are subject to change as per load updates.

6- Indicated lengthes are approximate, the actual route length may increase/decrease as per actual site conditions.

7- As per SEC standard No ( TES-P-119.29 ),Clause(7.1.9),Page 11, voltage drops (Regulation in %) shall be limited as:-

a)Total voltage drop from Station Transformer to loads not exceed 5%

b) Station Transformer to main distribution board (MDB) 0.8%


c) MDB to various loads OF BUS-A
4.20%
(Motor starting voltage drop limited to 12.5%)

Reference Documents

AC Auxiliary One Line Diagram WA-485268

Overall General Equipment Layout WA-485267

Auxiliary Transformer Sizing Calculations WE-485215

LV AC CB Sizing Calculation WE-464083

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 3 of 30


LV AC Cable sizing :-
System Voltage = 400 / 230 VAC

IFL 3ᵩ =  Kw x 1000/(√3 x V x PF) %VD = (Voltage Drop / Supply Voltage) x 100
IFL 1ᵩ =  Kw x 1000 / ( V x PF ) VOLTAGE DROP = (Unit Voltage Drop/1000 * Length * Ampere of Load)/No. Of Run
IOLC = 1.20 x ILC " Theoretical "
UNIT TOTAL TOTAL DERATING FACTORS Permi.

DIVERSITY FACTOR
CB DATA Selected Cable

DEMAND FACTOR
LOAD LOAD LOAD

PHASE
ILC IOLC Derated VD
C.B NO. From Equipment VOLT COSQ Over %VD
AMP AMP CB No. of Length unit VD Temp. Grp.
ALL
AMP (volt) % VD
KW KW KVA TYPE Core mm² Type Laid in AMP
Run (m) (V/Amp/KM)
Rating

ACDB (AT AC/DC ROOM)-Ground floor

4600AT/ CU / XLPE
Q101 AUX.T1 FROM 33kV /380V AUX.T1 TO ACDB (BUS - A) (AH17) 2125 1 1 2125 2500 3 380 3798 4558.16 ACB 4P 0.85 1C 630 AIR 900 7 37 0.15 0.95 0.87 0.83 5206.95 3.01 0.793 0.8
4600AF / PVC

4600AT/ CU / XLPE
Q102 AUX.T2 FROM 33kV /380V AUX.T2 TO ACDB (BUS - B)(AH40) 2125 1 1 2125 2500 3 380 3798.4685 4558.162 ACB 4P 0.85 1C 630 AIR 900 7 32 0.15 0.95 0.87 0.83 5206.95 2.60 0.685 0.8
4600AF / PVC

4600AT/
Q103 ACDB BUS TIE 2125 1 1 2125 2500 3 380 3798.4685 4558.162 ACB 4P 0.85
4600AF

STANDBY 2300AT/
Q104 FUTURE STANDBY DIESEL GENERATOR 1062.5 1 1 1062.5 1250 3 380 1899.2342 2279.081 ACB 4P 0.85
GENERATOR 2300AF

380/220V, 4600A, 50kA (3s), 60Hz, 3PH 4 WIRE MAIN ACDB - BUS A

MAIN ACDB SUPPLY -2 FOR EXISTING MAIN ACDB FOR EXISTING 380KV BSP
Q.A1 SPARE FOR EXISTING SYSTEM 4000 MCCB TPN FUTURE CABLE SUPPLY OUT OF CONTRACTOR SCOPE
BUS A SUBSTATION

MAIN ACDB CU / XLPE


Q.A2 SUPPLY FOR POWER PANEL-1 (SDB-1). 21.53 1.00 1.00 21.53 25.33 3 380 38.49 46.19 80 MCCB TPN 0.85 4C 25 Air 118 1 15 1.50 0.95 0.7 0.67 78.47 0.87 0.23 0.80
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A3 SUPPLY FOR PACKAGE COMPRESSOR UNIT PACU-1 (DUTY). 60.40 0.50 1.00 60.40 71.06 3 380 107.97 129.56 160 MCCB TPN 0.85 4C 70 Air 220 1 55 0.58 0.95 0.7 0.67 146.30 3.44 0.91 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A4 SUPPLY FOR PACKAGE COMPRESSOR UNIT PACU-3 (STANDBY). 64.40 0.50 1.00 64.40 75.76 3 380 115.12 138.14 160 MCCB TPN 0.85 4C 70 Air 220 1 44 0.58 0.95 0.7 0.67 146.30 2.94 0.77 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A5 SUPPLY FOR INDOOR LIGHTING PANEL OF GROUND FLOOR (AC ILPG). 19.00 1.00 1.00 19.00 22.35 3 380 33.96 40.75 63 MCCB TPN 0.85 4C 25 Air 118 1 20 1.50 0.95 0.7 0.67 78.47 1.02 0.27 0.8
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A6 SUPPLY FOR 125V DC BATTERY CHARGER-1 75.00 0.50 1.00 75.00 88.24 3 380 134.06 160.88 250 MCCB TPN 0.85 4C 95 Air 272 1 21 0.44 0.95 0.7 0.67 180.88 1.24 0.33 4.2
BUS A / PVC

MAIN ACDB 200AMP,380V RECEPTACLES FOR OIL FILTRATION UNIT FOR (110/33 KV) CU / XLPE
Q.A7 111.90 0.00 1.00 111.90 131.65 3 380 160.02 192.02 200 MCCB TPN 0.85 4C 120 Duct 251 1 50 0.37 0.95 0.88 0.84 209.84 2.96 0.78 4.2
BUS A TRANSFORMER-1 AREA / PVC

MAIN ACDB 200AMP,380V RECEPTACLES FOR OIL FILTRATION UNIT FOR (110/33 KV) CU / XLPE
Q.A8 111.90 0.00 1.00 111.90 131.65 3 380 160.02 192.02 200 MCCB TPN 0.85 4C 120 Duct 251 1 46 0.37 0.95 0.88 0.84 209.84 2.72 0.72 4.2
BUS A TRANSFORMER-2 AREA / PVC

MAIN ACDB CU / XLPE


Q.A9 63AMP,380V WELDING RECEPTACLE FOR CAPACITOR BANK-1 AREA 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 48 1.50 0.95 0.76 0.72 75.09 3.76 0.99 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A10 63AMP,380V WELDING RECEPTACLE FOR CAPACITOR BANK-2 AREA 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 46 1.50 0.95 0.76 0.72 75.09 3.61 0.95 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A11 63AMP,380V WELDING RECEPTACLE FOR CAPACITOR BANK-3 AREA 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 44 1.50 0.95 0.76 0.72 75.09 3.45 0.91 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A12 63AMP,380V WELDING RECEPTACLE FOR AUXILARY TRANSFORMERS 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 40 1.50 0.95 0.76 0.72 75.09 3.14 0.83 4.2
BUS A / PVC

MAIN ACDB 63AMP,380V WELDING RECEPTACLE FOR PACU UNITS (1 & 3) ON THE CU / XLPE
Q.A13 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 45 1.50 0.95 0.76 0.72 75.09 3.53 0.93 4.2
BUS A ROOF. / PVC

MAIN ACDB CU / XLPE


Q.A14 SUPPLY FOR ELECTRICAL DUCT HEATER EDH-1 40.00 0.05 1.00 40.00 47.06 3 380 71.50 85.80 100 MCCB TPN 0.85 4C 35 Air 142 1 45 1.10 0.95 0.7 0.67 94.43 3.54 0.93 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A15 SUPPLY FOR HVAC CONTROL PANEL-1 18.00 0.05 1.00 18.00 21.18 3 380 32.18 38.61 40 MCCB TPN 0.85 4C 10 Air 67 1 15 3.50 0.95 0.7 0.67 44.56 1.69 0.44 4.2
BUS A / PVC

MAIN ACDB CU / XLPE


Q.A16 SUPPLY FOR PORTABLE BATTERY CHARGER 25.93 0.05 1.00 25.93 30.50 3 380 46.34 55.61 63 MCCB TPN 0.85 4C 25 Air 118 1 25 1.50 0.95 0.7 0.67 78.47 1.74 0.46 4.2
BUS A / PVC

MAIN ACDB
Q.A17 SPARE 250 MCCB TPN
BUS A

MAIN ACDB
Q.A18 SPARE 200 MCCB TPN
BUS A

MAIN ACDB
Q.A19 SPARE 80 MCCB TPN
BUS A

MAIN ACDB
Q.A20 SPARE 63 MCCB TPN
BUS A

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 4 of 30


UNIT TOTAL TOTAL DERATING FACTORS Permi.

DIVERSITY FACTOR
CB DATA Selected Cable

DEMAND FACTOR
LOAD LOAD LOAD

PHASE
ILC IOLC Derated VD
C.B NO. From Equipment VOLT COSQ Over %VD
AMP AMP CB No. of Length unit VD Temp. Grp.
ALL
AMP (volt) % VD
KW KW KVA TYPE Core mm² Type Laid in AMP
Run (m) (V/Amp/KM)
Rating

380/220V, 4600A, 50kA (3s), 60Hz, 3PH 4 WIRE MAIN ACDB - BUS B

MAIN ACDB SUPPLY -1 FOR EXISTING MAIN ACDB FOR EXISTING 380KV BSP
Q.B1 SPARE FOR EXISTING SYSTEM 4000 MCCB TPN FUTURE CABLE SUPPLY OUT OF CONTRACTOR SCOPE
BUS B SUBSTATION

MAIN ACDB CU / XLPE


Q.B2 SUPPLY FOR POWER PANEL-2 (SDB-2). 26.41 1.00 1.00 26.41 31.07 3 380 47.21 56.66 80 MCCB TPN 0.85 4C 25 Air 118 1 12 1.50 0.95 0.7 0.67 78.47 0.85 0.22 0.80
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B3 SUPPLY FOR PACKAGE COMPRESSOR UNIT PACU-2 (STANDBY) 60.40 0.50 1.00 60.40 71.06 3 380 107.97 129.56 160 MCCB TPN 0.85 4C 70 Air 220 1 46 0.58 0.95 0.7 0.67 146.30 2.88 0.76 4.2
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B4 SUPPLY FOR PACKAGE COMPRESSOR UNIT PACU-4 (DUTY) 64.40 0.50 1.00 64.40 75.76 3 380 115.12 138.14 160 MCCB TPN 0.85 4C 70 Air 220 1 34 0.58 0.95 0.7 0.67 146.30 2.27 0.60 4.2
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B5 SUPPLY FOR OUTDOOR LIGHTING PANEL (OLP). 9.90 1.00 1.00 9.90 11.64 3 380 17.69 21.23 63 MCCB TPN 0.85 4C 25 Air 118 1 14 1.50 0.95 0.7 0.67 78.47 0.37 0.10 0.8
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B6 SUPPLY FOR 125V DC BATTERY CHARGER-2. 75.00 0.50 1.00 75.00 88.24 3 380 134.06 160.88 250 MCCB TPN 0.85 4C 95 Air 272 1 23 0.44 0.95 0.7 0.67 180.88 1.36 0.36 4.2
BUS B / PVC

MAIN ACDB 200AMP,380V RECEPTACLES FOR OIL FILTRATION UNIT FOR (110/33 KV) CU / XLPE
Q.B7 111.90 0.00 1.00 111.90 131.65 3 380 160.02 192.02 200 MCCB TPN 0.85 4C 120 Duct 251 1 38 0.37 0.95 0.88 0.84 209.84 2.25 0.59 4.2
BUS B TRANSFORMER-3 AREA / PVC

MAIN ACDB 63AMP,380V WELDING & MAINTENANCE RECEPTACL FOR (110/33 KV) CU / XLPE
Q.B8 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 50 1.50 0.95 0.76 0.72 75.09 3.92 1.03 4.2
BUS B TRANSFORMER-1 AREA / PVC

MAIN ACDB 63AMP,380V WELDING & MAINTENANCE RECEPTACL FOR (110/33 KV) CU / XLPE
Q.B9 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 46 1.50 0.95 0.76 0.72 75.09 3.61 0.95 4.2
BUS B TRANSFORMER-2 AREA / PVC

MAIN ACDB 63AMP,380V WELDING & MAINTENANCE RECEPTACL FOR (110/33 KV) CU / XLPE
Q.B10 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 38 1.50 0.95 0.76 0.72 75.09 2.98 0.78 4.2
BUS B TRANSFORMER-3 AREA / PVC

MAIN ACDB CU / XLPE


Q.B11 63AMP,380V WELDING RECEPTACLE FOR CAPACITOR BANK-4 AREA 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 37 1.50 0.95 0.76 0.72 75.09 2.90 0.76 4.2
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B12 63AMP,380V WELDING RECEPTACLE FOR CAPACITOR BANK-5 AREA 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 35 1.50 0.95 0.76 0.72 75.09 2.74 0.72 4.2
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B13 63AMP,380V WELDING RECEPTACLE FOR CAPACITOR BANK-6 AREA 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Duct 104 1 33 1.50 0.95 0.76 0.72 75.09 2.59 0.68 4.2
BUS B / PVC

MAIN ACDB 63AMP,380V WELDING RECEPTACLE FOR PACU UNITS (2 & 4) ON THE CU / XLPE
Q.B14 29.23 0.00 1.00 29.23 34.39 3 380 52.25 62.70 63 MCCB TPN 0.85 4C 25 Air 118 1 40 1.50 0.95 0.7 0.67 78.47 3.14 0.83 4.2
BUS B ROOF. / PVC

MAIN ACDB CU / XLPE


Q.B15 SUPPLY FOR ELECTRICAL DUCT HEATER EDH-2 21.00 0.05 1.00 21.00 24.71 3 380 37.54 45.05 50 MCCB TPN 0.85 4C 16 Air 88 1 42 2.20 0.95 0.7 0.67 58.52 3.47 0.91 4.2
BUS B / PVC

MAIN ACDB CU / XLPE


Q.B16 SUPPLY FOR HVAC CONTROL PANEL-2 18.00 0.05 1.00 18.00 21.18 3 380 32.18 38.61 40 MCCB TPN 0.85 4C 10 Air 67 1 15 3.50 0.95 0.7 0.67 44.56 1.69 0.44 4.2
BUS B / PVC

MAIN ACDB
Q.B17 SPARE 250 MCCB TPN
BUS B

MAIN ACDB
Q.B18 SPARE 200 MCCB TPN
BUS B

MAIN ACDB
Q.B19 SPARE 80 MCCB TPN
BUS B

MAIN ACDB
Q.B20 SPARE 63 MCCB TPN
BUS B

380/230V, 80A, 25kA (3s), 60Hz, 3PH 4 WIRE SDB-1 (Control Room) - Ground Floor

QC SDB-1 SUPPLY FOR SDB-1 21.53 1.00 1.00 21.53 25.33 3 380 38.49 46.19 80 MCCB TPN

CU / XLPE
QC.1 SDB-1 380V 3PH SUPPLY FOR 110/33 KV TR-1 COOLING FAN GROUPS 4.42 1.00 1.00 4.42 5.20 3 380 7.90 9.48 32 MCB TPN 0.85 4C 6 Duct 46 1 58 5.90 0.95 0.76 0.72 33.21 2.70 0.71 3.40
/ PVC

CU / XLPE
QC.2 SDB-1 380V 3PH SUPPLY FOR 110/33 KV TR-2 COOLING FAN GROUPS 4.42 1.00 1.00 4.42 5.20 3 380 7.90 9.48 32 MCB TPN 0.85 4C 6 Duct 46 1 59 5.90 0.95 0.76 0.72 33.21 2.75 0.72 3.40
/ PVC

CU / XLPE
QC.3 SDB-1 380V 3PH SUPPLY FOR 110/33 KV TR-3 COOLING FAN GROUPS 4.42 1.00 1.00 4.42 5.20 3 380 7.90 9.48 32 MCB TPN 0.85 4C 6 Duct 46 1 52 5.90 0.95 0.76 0.72 33.21 2.42 0.64 3.40
/ PVC

CU / XLPE
QC.4 SDB-1 380V AC SUPPLY FOR 110/33KV T01 TRANSFORMER PIT PUMP-1. 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Duct 37 1 53 8.70 0.95 0.76 0.72 26.71 1.65 0.43 3.40
/ PVC

CU / XLPE
QC.5 SDB-1 380V AC SUPPLY FOR 110/33KV T02 TRANSFORMER PIT PUMP-2 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Duct 37 1 62 8.70 0.95 0.76 0.72 26.71 1.93 0.51 3.40
/ PVC

CU / XLPE
QC.6 SDB-1 380V AC SUPPLY FOR 110/33KV T03 TRANSFORMER PIT PUMP-3. 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Duct 37 1 53 8.70 0.95 0.76 0.72 26.71 1.65 0.43 3.40
/ PVC

CU / XLPE
QC.7 SDB-1 380V AC SUPPLY FOR AUXILIARY TRANSFORMER-1 PIT PUMP-1 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Duct 37 1 39 8.70 0.95 0.76 0.72 26.71 1.21 0.32 3.40
/ PVC

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 5 of 30


UNIT TOTAL TOTAL DERATING FACTORS Permi.

DIVERSITY FACTOR
CB DATA Selected Cable

DEMAND FACTOR
LOAD LOAD LOAD

PHASE
ILC IOLC Derated VD
C.B NO. From Equipment VOLT COSQ Over %VD
AMP AMP CB No. of Length unit VD Temp. Grp.
ALL
AMP (volt) % VD
KW KW KVA TYPE Core mm² Type Laid in AMP
Run (m) (V/Amp/KM)
Rating

CU / XLPE
QC.8 SDB-1 380V AC SUPPLY FOR AUXILIARY TRANSFORMER-2 PIT PUMP-2 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Duct 37 1 32 8.70 0.95 0.76 0.72 26.71 1.00 0.26 3.40
/ PVC

CU / XLPE
QC.9 SDB-1 380V AC SUPPLY FOR MAIN DCDB 2.14 0.50 1.00 2.14 2.38 3 380 3.62 4.34 20 MCB TPN 0.90 4C 4 Air 38 1 22 8.70 0.95 0.7 0.67 25.27 0.69 0.18 3.40
/ PVC

CU / XLPE
QC.10 SDB-1 380VAC SUPPLY FOR FAX/TELEPHONE EXCHANGE. 5.00 0.50 1.00 5.00 5.88 3 380 8.94 10.73 20 MCB TPN 0.85 4C 4 Air 38 1 25 8.70 0.95 0.7 0.67 25.27 1.94 0.51 3.40
/ PVC

CU / XLPE
QC.11 SDB-1 220V 1PH SUPPLY FOR 110/33 KV TR-1 ONLINE GAS/MOISTURE ANALYSER 0.32 1.00 1.00 0.32 0.38 1 220 1.71 2.05 20 MCB SPN 0.85 2C 4 Duct 37 1 58 8.70 0.95 0.76 0.72 26.71 0.86 0.39 3.40
/ PVC

CU / XLPE
QC.12 SDB-1 220V 1PH SUPPLY FOR 110/33 KV TR-2 ONLINE GAS/MOISTURE ANALYSER 0.32 1.00 1.00 0.32 0.38 1 220 1.71 2.05 20 MCB SPN 0.85 2C 4 Duct 37 1 59 8.70 0.95 0.76 0.72 26.71 0.88 0.40 3.40
/ PVC

CU / XLPE
QC.13 SDB-1 220V 1PH SUPPLY FOR 110/33 KV TR-3 ONLINE GAS/MOISTURE ANALYSER 0.32 1.00 1.00 0.32 0.38 1 220 1.71 2.05 20 MCB SPN 0.85 2C 4 Duct 37 1 52 8.70 0.95 0.76 0.72 26.71 0.77 0.35 3.40
/ PVC

220V AC SUPPLY FOR CONTROL ROOM (PC'S, MONITORS, CU / XLPE


QC.14 SDB-1 2.00 1.00 1.00 2.00 2.35 1 220 10.70 12.83 20 MCB SPN 0.85 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 1.86 0.85 3.40
PRINTERS…..ETC). / PVC

220VAC SUPPLY 33KV SWGR. PANELS OF SECTION-1 (AH01 TO AH19) CU / XLPE


QC.15 SDB-1 4.55 0.05 1.00 4.55 5.36 1 220 24.35 29.22 32 MCB SPN 0.85 2C 6 Air 48 1 44 5.90 0.95 0.7 0.67 31.92 6.32 2.87 3.40
(HTR,LTNG,SCKT) / PVC

220VAC SUPPLY 33KV SWGR. PANELS OF SECTION-2 (AH20 TO AH38) CU / XLPE


QC.16 SDB-1 4.55 0.05 1.00 4.55 5.36 1 220 24.35 29.22 32 MCB SPN 0.85 2C 6 Air 48 1 40 5.90 0.95 0.7 0.67 31.92 5.75 2.61 3.40
(HTR,LTNG,SCKT) / PVC

220VAC SUPPLY 33KV SWGR. PANELS OF SECTION-C (AH39 TO AH56) CU / XLPE


QC.17 SDB-1 4.46 0.05 1.00 4.46 5.25 1 220 23.84 28.61 32 MCB SPN 0.85 2C 6 Air 48 1 40 5.90 0.95 0.7 0.67 31.92 5.63 2.56 3.40
(HTR,LTNG,SCKT) / PVC

CU / XLPE
QC.18 SDB-1 220 V AC SUPPLY FOR WATER HEATER FOR TOLIET 2.00 0.00 1.00 2.00 2.35 1 220 10.70 12.83 20 MCB SPN 0.85 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 1.86 0.85 3.40
/ PVC

CU / XLPE
QC.19 SDB-1 220V AC SUPPLY FOR TOILET ROOM EXHAUST FAN 0.04 0.00 1.00 0.04 0.05 1 220 0.23 0.28 20 MCB SPN 0.85 2C 4 Air 38 1 23 8.70 0.95 0.7 0.67 25.27 0.05 0.02 3.40
/ PVC

CU / XLPE
QC.20 SDB-1 220V AC SUPPLY FOR BATTERY ROOM EXHAUST FAN. 0.12 0.00 1.00 0.12 0.14 1 220 0.65 0.78 20 MCB SPN 0.85 2C 4 Air 38 1 35 8.70 0.95 0.7 0.67 25.27 0.20 0.09 3.40
/ PVC

CU / XLPE
QC.21 SDB-1 220V AC SUPPLY FOR MFACP PANELS 0.75 0.00 1.00 0.75 0.88 1 220 4.00 4.80 20 MCB SPN 0.85 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 0.70 0.32 3.40
/ PVC

220V,1PH SUPPLY FM-200 RELEASING PANEL - CONTROL ROOM - CU / XLPE


QC.22 SDB-1 0.37 0.00 1.00 0.37 0.44 1 220 2.00 2.40 20 MCB SPN 0.85 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 0.35 0.16 3.40
GROUND FLOOR / PVC

220V,1PH SUPPLY FM-200 RELEASING PANEL - AC/DC ROOM - GROUND CU / XLPE


QC.23 SDB-1 0.37 0.00 1.00 0.37 0.44 1 220 2.00 2.40 20 MCB SPN 0.85 2C 4 Air 38 1 15 8.70 0.95 0.7 0.67 25.27 0.26 0.12 3.40
FLOOR / PVC

220V,1PH SUPPLY FM-200 RELEASING PANEL - BATTERY ROOM - CU / XLPE


QC.24 SDB-1 0.37 0.00 1.00 0.37 0.44 1 220 2.00 2.40 20 MCB SPN 0.85 2C 4 Air 38 1 30 8.70 0.95 0.7 0.67 25.27 0.52 0.24 3.40
GROUND FLOOR / PVC

CU / XLPE
QC.25 SDB-1 380 AC SUPPLY FOR MISCELLANEOUS PORTABLE SUPPLY 1.00 0.50 1.00 1.00 1.18 3 380 1.79 2.15 20 MCB TPN 0.85 4C 4 Air 38 1 35 8.70 0.95 0.7 0.67 25.27 0.54 0.14 3.40
/ PVC

CU / XLPE
QC.26 SDB-1 220 AC SUPPLY-1 FOR +AMI.1 PANEL 0.33 0.27 1.00 0.33 0.39 1 220 1.78 2.14 20 MCB SPN 0.85 2C 4 Air 38 1 10 8.70 0.95 0.7 0.67 25.27 0.16 0.07 3.40
/ PVC

CU / XLPE
QC.27 SDB-1 220 AC SUPPLY-1 FOR +AMI.2 PANEL 0.33 0.27 1.00 0.33 0.39 1 220 1.78 2.14 20 MCB SPN 0.85 2C 4 Air 38 1 10 8.70 0.95 0.7 0.67 25.27 0.16 0.07 3.40
/ PVC

CU / XLPE
QC.28 SDB-1 380V AC SUPPLY-1 FOR TR-1 OLTC MOTOR DRIVE UNIT 1.11 0.00 1.00 1.11 1.30 3 380 1.98 2.37 20 MCB TPN 0.85 4C 4 Duct 37 1 56 8.70 0.95 0.76 0.72 26.71 0.96 0.25 3.40
/ PVC

CU / XLPE
QC.29 SDB-1 380V AC SUPPLY-1 FOR TR-2 OLTC MOTOR DRIVE UNIT 1.11 0.00 1.00 1.11 1.30 3 380 1.98 2.37 20 MCB TPN 0.85 4C 4 Duct 37 1 57 8.70 0.95 0.76 0.72 26.71 0.98 0.26 3.40
/ PVC

CU / XLPE
QC.30 SDB-1 380V AC SUPPLY-1 FOR TR-13 OLTC MOTOR DRIVE UNIT 1.11 0.00 1.00 1.11 1.30 3 380 1.98 2.37 20 MCB TPN 0.85 4C 4 Duct 37 1 50 8.70 0.95 0.76 0.72 26.71 0.86 0.23 3.40
/ PVC

CU / XLPE
QC.31 SDB-1 220V AC SUPPLY FOR TR-1 OLTC LIGHTING & HEATER 0.26 0.50 1.00 0.26 0.30 1 220 1.36 1.64 20 MCB SPN 0.85 2C 4 Duct 37 1 56 8.70 0.95 0.76 0.72 26.71 0.66 0.30 3.40
/ PVC

CU / XLPE
QC.32 SDB-1 220V AC SUPPLY FOR TR-2 OLTC LIGHTING & HEATER 0.26 0.50 1.00 0.26 0.30 1 220 1.36 1.64 20 MCB SPN 0.85 2C 4 Duct 37 1 57 8.70 0.95 0.76 0.72 26.71 0.68 0.31 3.40
/ PVC

CU / XLPE
QC.33 SDB-1 220V AC SUPPLY FOR TR-3 OLTC LIGHTING & HEATER 0.26 0.50 1.00 0.26 0.30 1 220 1.36 1.64 20 MCB SPN 0.85 2C 4 Duct 37 1 50 8.70 0.95 0.76 0.72 26.71 0.59 0.27 3.40
/ PVC

QC.34 SDB-1 SPARE 3 380 32 MCB TPN

QC.35 SDB-1 SPARE 3 380 20 MCB TPN

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 6 of 30


UNIT TOTAL TOTAL DERATING FACTORS Permi.

DIVERSITY FACTOR
CB DATA Selected Cable

DEMAND FACTOR
LOAD LOAD LOAD

PHASE
ILC IOLC Derated VD
C.B NO. From Equipment VOLT COSQ Over %VD
AMP AMP CB No. of Length unit VD Temp. Grp.
ALL
AMP (volt) % VD
KW KW KVA TYPE Core mm² Type Laid in AMP
Run (m) (V/Amp/KM)
Rating

QC.36 SDB-1 SPARE 3 380 20 MCB TPN

QC.37 SDB-1 SPARE 1 220 32 MCB SPN

QC.38 SDB-1 SPARE 1 220 20 MCB SPN

QC.39 SDB-1 SPARE 1 220 20 MCB SPN

QC.40 SDB-1 SPARE 1 220 20 MCB SPN

380/230V, 80A, 25kA (3s), 60Hz, 3PH 4 WIRE SDB-2 (Control Room) - Ground Floor

QD SDB-2 SUPPLY FOR SDB-2 26.41 1.00 1.00 26.41 31.07 3 380 47.21 56.66 80 MCCB TPN

CU / XLPE
QD.1 SDB-2 380V 3PH SUPPLY FOR 110/33 KV TR-1 COOLING FAN GROUPS 4.42 1.00 1.00 4.42 5.20 3 380 7.90 9.48 32 MCB TPN 0.85 4C 6 Duct 46 1 56 5.90 0.95 0.76 0.72 33.21 2.61 0.69 3.40
/ PVC

CU / XLPE
QD.2 SDB-2 380V 3PH SUPPLY FOR 110/33 KV TR-2 COOLING FAN GROUPS 4.42 1.00 1.00 4.42 5.20 3 380 7.90 9.48 32 MCB TPN 0.85 4C 6 Duct 46 1 57 5.90 0.95 0.76 0.72 33.21 2.66 0.70 3.40
/ PVC

CU / XLPE
QD.3 SDB-2 380V 3PH SUPPLY FOR 110/33 KV TR-3 COOLING FAN GROUPS 4.42 1.00 1.00 4.42 5.20 3 380 7.90 9.48 32 MCB TPN 0.85 4C 6 Duct 46 1 50 5.90 0.95 0.76 0.72 33.21 2.33 0.61 3.40
/ PVC

CU / XLPE
QD.4 SDB-2 380V AC SUPPLY FOR DCP-1 2.14 0.50 1.00 2.14 2.38 3 380 3.62 4.34 20 MCB TPN 0.90 4C 4 Air 38 1 22 8.70 0.95 0.7 0.67 25.27 0.69 0.18 3.40
/ PVC

CU / XLPE
QD.5 SDB-2 380V AC SUPPLY FOR DCP-2 2.14 0.50 1.00 2.14 2.38 3 380 3.62 4.34 20 MCB TPN 0.90 4C 4 Air 38 1 24 8.70 0.95 0.7 0.67 25.27 0.76 0.20 3.40
/ PVC

CU / XLPE
QD.6 SDB-2 380V AC SUPPLY FOR MISCELLANEOUS PORTABLE SUPPLY 1.00 0.50 1.00 1.00 1.18 3 380 1.79 2.15 20 MCB TPN 0.85 4C 4 Air 38 1 30 8.70 0.95 0.7 0.67 25.27 0.47 0.12 3.40
/ PVC

CU / XLPE
QD.7 SDB-2 380V AC SUPPLY FOR WATER BOOSTER PUMP. 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Air 38 1 39 8.70 0.95 0.7 0.67 25.27 1.21 0.32 3.40
/ PVC

CU / XLPE
QD.8 SDB-2 380V AC SUPPLY FOR WATER TRANSFER PUMP. 2.00 0.00 1.00 2.00 2.35 3 380 3.58 4.29 20 MCB TPN 0.85 4C 4 Air 38 1 38 8.70 0.95 0.7 0.67 25.27 1.18 0.31 3.40
/ PVC

220V,1PH SUPPLY-1 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.9 SDB-2 2.67 0.27 1.00 2.67 2.96 1 220 13.47 16.17 20 MCB SPN 0.90 2C 4 Air 38 1 26 8.70 0.95 0.7 0.67 25.27 3.05 1.39 3.40
(+FPP.1,+FPP.2,+FPP.3,+FPP.4,+FPP.5,+FPP.6,+FPP.7&+FPP.8) / PVC

220V,1PH SUPPLY-2 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.10 SDB-2 2.67 0.27 1.00 2.67 2.96 1 220 13.47 16.17 20 MCB SPN 0.90 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 2.34 1.07 3.40
(+FPP.9,+FPP.10,+FPP.11, +FPP.12, D32+R1 , D32+R2, D05+R2,FUT) / PVC

220V,1PH SUPPLY-3 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.11 SDB-2 2.67 0.27 1.00 2.67 2.96 1 220 13.47 16.17 20 MCB SPN 0.90 2C 4 Air 38 1 25 8.70 0.95 0.7 0.67 25.27 2.93 1.33 3.40
(D05+R1,D04+R2,D04+R1,+FPP13,+FPP.14,+FPP.15,+FPP.16,+FPP.17) / PVC

220V,1PH SUPPLY-4 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.12 SDB-2 2.59 0.27 1.00 2.59 2.88 1 220 13.10 15.71 20 MCB SPN 0.90 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 2.28 1.04 3.40
(+CBP.1,+CBP.2,+CBP.3,+CBP.5,+CBP.6,+ACCS,+ACSE) / PVC

220V,1PH SUPPLY-5 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.13 SDB-2 2.67 0.27 1.00 2.67 2.97 1 220 13.48 16.18 20 MCB SPN 0.90 2C 4 Air 38 1 18 8.70 0.95 0.7 0.67 25.27 2.11 0.96 3.40
(RTU-1,RTU-2,RTU-3,RTU-4,SMP-1,SMP-2) / PVC

220V,1PH SUPPLY-6 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.14 SDB-2 2.59 0.27 1.00 2.59 2.88 1 220 13.10 15.71 20 MCB SPN 0.90 2C 4 Air 38 1 25 8.70 0.95 0.7 0.67 25.27 2.85 1.29 3.40
(+AVC.1,+AVC.2,+AVC.3,=UVLS+R1,=UVLS+R2, =UFLS+R1,=UFLS+R2) / PVC

220V,1PH SUPPLY-7 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.15 SDB-2 2.59 0.27 1.00 2.59 2.88 1 220 13.10 15.71 20 MCB SPN 0.90 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 2.28 1.04 3.40
(+CP-1,+CP-2,+CP-3,+CP-4,+CP-5,+BZ-1,+BZ-2) / PVC

220V,1PH SUPPLY-8 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.16 SDB-2 2.67 0.27 1.00 2.67 2.96 1 220 13.47 16.17 20 MCB SPN 0.90 2C 4 Air 38 1 25 8.70 0.95 0.7 0.67 25.27 2.93 1.33 3.40
(+RMT-6,+RMT-5,+RMT-4,+RMT-3,+RMT-2,+RMT-1,+ANN.2,+ANN.1) / PVC

220V,1PH SUPPLY-9 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.17 SDB-2 2.52 0.27 1.00 2.52 2.80 1 220 12.72 15.26 20 MCB SPN 0.90 2C 4 Air 38 1 30 8.70 0.95 0.7 0.67 25.27 3.32 1.51 3.40
(DDR,G11,G12,DCDB,DCP-1,DCP-2) / PVC

220V,1PH SUPPLY-10 FOR CONTROL ROOM PANELS CU / XLPE


QD.18 SDB-2 2.44 0.27 1.00 2.44 2.72 1 220 12.34 14.81 20 MCB SPN 0.90 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 2.15 0.98 3.40
(HTR,LTNG,SCKT)(ELP,ILP,ILPB,OLP,33KV SYNCHRONIZING PANEL) / PVC

CU / XLPE
QD.19 SDB-2 220V AC SUPPLY FOR HAND DRYER 1.28 0.00 1.00 1.28 1.50 1 220 6.82 8.18 20 MCB SPN 0.85 2C 4 Air 38 1 20 8.70 0.95 0.7 0.67 25.27 1.19 0.54 3.40
/ PVC

CU / XLPE
QD.20 SDB-2 220V AC SUPPLY FOR BASEMENT SUMP PUMP-1 2.00 0.00 1.00 2.00 2.35 1 220 10.70 12.83 20 MCB SPN 0.85 2C 4 Air 38 1 51 8.70 0.95 0.7 0.67 25.27 4.75 2.16 3.40
/ PVC

CU / XLPE
QD.21 SDB-2 220V AC SUPPLY FOR BASEMENT SUMP PUMP-2 2.00 0.00 1.00 2.00 2.35 1 220 10.70 12.83 20 MCB SPN 0.85 2C 4 Air 38 1 38 8.70 0.95 0.7 0.67 25.27 3.54 1.61 3.40
/ PVC

CU / XLPE
QD.22 SDB-2 220V AC SUPPLY FOR BASEMENT SUMP PUMP-3 2.00 0.00 1.00 2.00 2.35 1 220 10.70 12.83 20 MCB SPN 0.85 2C 4 Air 38 1 42 8.70 0.95 0.7 0.67 25.27 3.91 1.78 3.40
/ PVC

220V,1PH SUPPLY FM-200 RELEASING PANEL - 13.8 KV SWITCHGEAR CU / XLPE


QD.23 SDB-2 0.37 0.00 1.00 0.37 0.44 1 220 2.00 2.40 20 MCB SPN 0.85 2C 4 Air 38 1 35 8.70 0.95 0.7 0.67 25.27 0.61 0.28 3.40
ROOM - GROUND FLOOR / PVC

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 7 of 30


UNIT TOTAL TOTAL DERATING FACTORS Permi.

DIVERSITY FACTOR
CB DATA Selected Cable

DEMAND FACTOR
LOAD LOAD LOAD

PHASE
ILC IOLC Derated VD
C.B NO. From Equipment VOLT COSQ Over %VD
AMP AMP CB No. of Length unit VD Temp. Grp.
ALL
AMP (volt) % VD
KW KW KVA TYPE Core mm² Type Laid in AMP
Run (m) (V/Amp/KM)
Rating

CU / XLPE
QD.24 SDB-2 220 AC SUPPLY FOR FM-200 ROOM FAN 0.39 0.00 1.00 0.39 0.46 1 220 2.09 2.51 20 MCB SPN 0.85 2C 4 Air 38 1 30 8.70 0.95 0.7 0.67 25.27 0.55 0.25 3.40
/ PVC

CU / XLPE
QD.25 SDB-2 220 AC SUPPLY-2 FOR +AMI.1 PANEL 0.33 0.27 1.00 0.33 0.39 1 220 1.78 2.14 20 MCB SPN 0.85 2C 4 Air 38 1 14 8.70 0.95 0.7 0.67 25.27 0.22 0.10 3.40
/ PVC

CU / XLPE
QD.26 SDB-2 220 AC SUPPLY-2 FOR +AMI.2 PANEL 0.33 0.27 1.00 0.33 0.39 1 220 1.78 2.14 20 MCB SPN 0.85 2C 4 Air 38 1 15 8.70 0.95 0.7 0.67 25.27 0.23 0.11 3.40
/ PVC

220V,1PH SUPPLY-11 FOR CONTROL ROOM PANELS (HTR,LTNG,SCKT) CU / XLPE


QD.27 SDB-2 2.52 0.27 1.00 2.52 2.80 1 220 12.72 15.26 20 MCB SPN 0.90 2C 4 Air 38 1 18 8.70 0.95 0.7 0.67 25.27 1.99 0.91 3.40
SMP-3,SOE-1,SOE-2,SOE-3,SOE-4,FUT) / PVC

CU / XLPE
QD.28 SDB-2 380V AC SUPPLY-2 FOR TR-1 OLTC MOTOR DRIVE UNIT 1.11 0.00 1.00 1.11 1.30 3 380 1.98 2.37 20 MCB TPN 0.85 4C 4 Duct 37 1 56 8.70 0.95 0.76 0.72 26.71 0.96 0.25 3.40
/ PVC

CU / XLPE
QD.29 SDB-2 380V AC SUPPLY-2 FOR TR-2 OLTC MOTOR DRIVE UNIT 1.11 0.00 1.00 1.11 1.30 3 380 1.98 2.37 20 MCB TPN 0.85 4C 4 Duct 37 1 57 8.70 0.95 0.76 0.72 26.71 0.98 0.26 3.40
/ PVC

CU / XLPE
QD.30 SDB-2 380V AC SUPPLY-2 FOR TR-13 OLTC MOTOR DRIVE UNIT 1.11 0.00 1.00 1.11 1.30 3 380 1.98 2.37 20 MCB TPN 0.85 4C 4 Duct 37 1 50 8.70 0.95 0.76 0.72 26.71 0.86 0.23 3.40
/ PVC

220V AC SUPPLY FOR TR-1 MK LIGHTING, HEATER , SOCKET & AUXILIARY CU / XLPE
QD.31 SDB-2 1.74 0.50 1.00 1.74 2.04 1 220 9.29 11.15 20 MCB SPN 0.85 2C 4 Duct 37 1 56 8.70 0.95 0.76 0.72 26.71 4.53 2.06 3.40
SUPPLY / PVC

220V AC SUPPLY FOR TR-2 MK LIGHTING, HEATER , SOCKET & AUXILIARY CU / XLPE
QD.32 SDB-2 1.74 0.50 1.00 1.74 2.04 1 220 9.29 11.15 20 MCB SPN 0.85 2C 4 Duct 37 1 57 8.70 0.95 0.76 0.72 26.71 4.61 2.09 3.40
SUPPLY / PVC

220V AC SUPPLY FOR TR-3 MK LIGHTING, HEATER , SOCKET & AUXILIARY CU / XLPE
QD.33 SDB-2 1.74 0.50 1.00 1.74 2.04 1 220 9.29 11.15 20 MCB SPN 0.85 2C 4 Duct 37 1 50 8.70 0.95 0.76 0.72 26.71 4.04 1.84 3.40
SUPPLY / PVC

QD.34 SDB-2 SPARE 3 380 32 MCB TPN

QD.35 SDB-2 SPARE 3 380 20 MCB TPN

QD.36 SDB-2 SPARE 3 380 20 MCB TPN

QD.37 SDB-2 SPARE 1 220 20 MCB SPN

QD.38 SDB-2 SPARE 1 220 20 MCB SPN

QD.39 SDB-2 SPARE 1 220 20 MCB SPN

* SDB-2 Diversity factor is used only to calculate main C.B rating. 0 0 0 0.00 0.00

* Diveristy Factor Used Only For Sizing The Sub Distribuion Panels Incomer C.B.

Notes:

1) All the cable lengths shown here are tentative and may be varied according to the type of installations.

2) All the technical parameters of the cables mentioned here is for XLPE cables@90ºC

3) The ambient temperature is considerd as 40ºC as per 01-TMSS-01

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 8 of 30


Sample Calculation For Cable Sizing
- Take ( ELECTRICAL DUCT HEATER EDH-1 - Q.A14 ) As Sample

Total power of the load (X) = 40 KW


Power = sqrt (3) x V x I x cosΦ
Supply Voltage (V) = 380 V
power factor (p.f) = Cos Φ = 0.85
i.e Full load current (IFL) = power(X)/sqrt(3)x supply voltage(v)x(p.f)
IFL=40000 / sqrt(3) x 380x 0.85 =71.5 A
Overload load current (IOL) = IFL X 120% A
IOL=71.5X 1.2= 85.8A
Then we select the C.B rating value above the overload current value
i.e the selected C.B rating is 100A ,of MCCB Type
Required current (IReq) = Full load current (IFL)
i.e IReq=85.8 A
Due to the load we choose cable and check if it is acceptable for this load or not after appling the derated factor
Selected cable properties (As per maunfacture):
Four core cable with copper conductor -XLPE insulated laid in air
Cross Section Area =25mm²
Number of core= 4
Ampacity = 118 A
Unit Voltage Drop =1.5V/A/KM
Cable length (L)=45 m
Derating Factors :
For ambient temperature = 0.95 (Air) Grouping factor =0.7
Overall derating factor =0.95*0.7=0.67
Derated Ampere = ampacity * no.of run * derating factors
i.e Derated AMP = 118 *0.67 = 78.47 A
voltage drop = (Unit Voltage Drop*Length/1000*Ampere of load)/No.of run =
= (1.5*45/1000*71.5)/1) = 4.83 Volt
Voltage Drop percentage = (Voltage drop actual *100 /System Voltage )=4.83/380=1.27%
Voltage Drop permissible =(Max Permissible V.D -Max Permissible V.D on Aux tr-1 )=4.2%

- Conclosion
As The derated ampere is higher than the over load current and Voltage drop is lower
than the Max permissable value (4.2 %)
i.e The cable with conductor size 4Cx25 mm² is suitable for the mentioned load .

WE-485220,Rev01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 9 of 30


SUMMARY OF LV AC CABLES

Cable Description With


Cable length (m)
( 600/1000 V, CU Conductor, XLPE Insulated PVC Sheathed Cables) 20% Margin (m)

1C630 1518 1822

4C120 134 161

4C95 44 53

4C70 179 215

4C25 588 706

4C10 30 36

4C6 332 399

4C4 800 960

2C6 124 149

2C4 1190 1428

SUMMARY OF LV AC CABLE LUGS

Cable Lugs With


Cable Lugs suitable For :-
( PCs ) 20 % Margin

630 Sq.mm 88 106

120 Sq.mm 24 29

70 Sq.mm 32 39

25 Sq.mm 136 164

10 Sq.mm 16 20

6 Sq.mm 60 72

4 Sq.mm 304 365

Note :

1 - This BOQ is tentative with 20 % margin but it shall be confirmed after approval for AC cable sizing calculation.

2 - All the materials shall be complied with the data schedule & NG Standard.

3 - CABLES FOR ILP&OLP ARE EXCLUDED FROM THIS BOQ AS IT IS ALREADY SHOWN IN BRANCH CABLE SIZING.

WE-485220,Rev01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 10 of 30


Annexure-01
Current Rating

TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
CURRENT RATING

Table 20 : Single core cables with copper conductor, XLPE insulated and PVC
sheathed, 0.6/1 kv

Conductor Conductor Resistance Current Carrying Capacity


In Ground In Air
Cross DC at AC at AC at Direct Direct In Duct Free Free In
Sectional 20°C 90°C 90°C Laid Laid (Flat) (Trefoil) Pipes
Area Maximum in Flat in Trefoil (Flat) (Trefoil) Approx
Formation Formation Approx Approx Amps Approx Approx Approx
mm 2 Approx Approx Amps Amps Amps Amps Amps
ohm/km ohm/km ohm/km
1.5 12.1 15.2 15.2 31 30 22 27 22 19
2.5 7.41 9.45 9.45 40 39 29 36 29 24
4 4.61 5.88 5.88 52 50 38 47 38 32
6 3.08 3.93 3.93 65 63 47 60 49 40
10 1.83 2.33 2.33 87 83 63 82 66 54
16 1.15 1.47 1.47 112 107 82 109 88 70
25 0.727 0.927 0.927 144 137 105 145 116 92
35 0.524 0.668 0.669 172 165 127 178 143 112
50 0.387 0.494 0.494 204 195 151 218 175 134
70 0.268 0.342 0.343 251 238 187 277 222 168
95 0.193 0.247 0.248 301 286 225 344 274 205
120 0.153 0.196 0.197 345 327 258 409 326 237
150 0.124 0.159 0.16 385 363 290 461 367 269
185 0.0991 0.128 0.129 436 410 330 534 425 308
240 0.0754 0.098 0.100 507 474 382 638 505 361
300 0.0601 0.079 0.0815 573 532 431 740 583 411
400 0.0470 0.0629 0.0661 645 600 489 865 676 469
500 0.0366 0.0504 0.0543 744 673 550 1009 779 533
630 0.0283 0.0407 0.0453 847 752 615 1184 900 603

24

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 11 of 22


TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
CURRENT RATING

Table 21 : Three and four core cable with copper conductor, XLPE insulated and PVC
sheathed, 0.6/1 kv

Conductor Conductor Resistance In Ground In Air

Cross DC at AC at Unarmoured Armoured Unarmoured Armoured


Sectional 20°C 90°C
Direct Laid in Direct Free In pipes Free
Area Laid Duct Laid

Maximum Approx Approx Approx Approx Approx Approx Approx


mm 2 Amps Amps Amps Amps Amps Amps
ohm/km ohm/km
1.5 12.1 15.4 27 22 - 22 18 -
2.5 7.41 9.45 35 29 - 29 24 -
4 4.61 5.88 45 37 46 38 31 39
6 3.08 3.93 56 46 57 48 39 50
10 1.83 2.33 76 62 76 67 52 67
16 1.15 1.47 98 80 98 88 68 89
25 0.727 0.927 128 104 128 118 90 120
35 0.524 0.669 157 125 158 142 107 149
50 0.387 0.494 187 149 188 175 129 182
70 0.268 0.343 229 183 229 220 161 229
95 0.193 0.248 276 220 274 272 196 280
120 0.153 0.197 313 251 310 316 226 322
150 0.124 0.160 350 283 346 363 258 368
185 0.0991 0.129 395 321 387 418 295 420
240 0.0754 0.0998 458 372 444 496 346 491
300 0.0601 0.0812 516 420 494 571 394 557
400 0.0470 0.0656 584 478 549 665 454 635
500 0.0366 0.0536 655 538 597 760 515 705

25

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 12 of 22


Annexure-02
Grouping Factor

TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
CURRENT RATING

Table 6 : Group rating factors for circuits of three single core cables in trefoil or laid flat
touching, in horizontal formation

Number of
Circuits A A
Spacing Spacing
Nil (cables Touching) Cable to Cable Clearance A

Trefoil Flat Laying 0.15m 0.30m 0.45m 0.60m

2 0.78 0.81 0.83 0.88 0.91 0.93


3 0.66 0.7 0.73 0.79 0.84 0.87
4 0.61 0.64 0.68 0.73 0.79 0.85
5 0.56 0.6 0.64 0.73 0.79 0.85
6 0.53 0.57 0.61 0.71 0.78 0.82

Table 7 : Group rating factors for multicore cables in horizontal formation

Number of
Cables in A
Group Spacing

Cable to Cable Clearance A

Touching 0.15m 0.30m 0.45m 0.60

2 0.81 0.87 0.91 0.93 0.95


3 0.70 0.78 0.84 0.88 0.90
4 0.63 0.74 0.81 0.86 0.89
5 0.59 0.70 0.78 0.84 0.87
6 0.55 0.68 0.77 0.83 0.87

14

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 13 of 22


TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
CURRENT RATING

Table 12 : Group rating factors for single core cables in trefoil Single way ducts, horizontal
(average values)

Number of
Circuits A
Spacing
Cable to Cable Clearance A

Touching 0.45m 0.60m

2 0.87 0.91 0.93


3 0.78 0.84 0.87
4 0.74 0.81 0.85
5 0.70 0.79 0.83
6 0.69 0.78 0.82

Table 13 : Group rating factors for multicore cables in single way ducts Horizontal formation
(average values)

Number of
Cables in
A
Group Spacing
Cable to Cable Clearance A

Nil Cables 0.30m 0.45m 0.60


Touching
2 0.90 0.93 0.95 0.96
3 0.83 0.88 0.91 0.93
4 0.79 0.85 0.89 0.92
5 0.75 0.83 0.88 0.91
6 0.73 0.82 0.87 0.90
2 0.88 0.91 0.93 0.94
3 0.80 0.85 0.88 0.90
4 0.76 0.81 0.85 0.88
5 0.72 0.78 0.83 0.86
6 0.69 0.76 0.81 0.85

17

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 14 of 22


Annexure-03
Voltage Drop

TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
VOLTAGE DROP

Table 26 : Approximate voltage drop at 60 HZ for single core stranded plain


copper/aluminum conductors, XLPE insulated, PVC sheathed

Nominal Copper Conductor mV/Amp/m Aluminum Conductor mV/Amp/m


Area of
Conductor XLPE Rated XLPE Rated XLPE Rated XLPE Rated
90°C 90°C 90°C 90°C

mm 2 Flat Trefoil Flat Trefoil


1.5 22.9 22.8 - -
2.5 14.1 14.1 - -
4 8.8 8.7 - -
6 5.90 5.90 - -
10 3.60 3.60 - -
16 2.30 2.30 3.70 3.70
25 1.50 1.50 2.40 2.40
35 1.10 1.10 1.80 1.70
50 0.84 0.83 1.30 1.30
70 0.61 0.60 0.95 0.93
95 0.47 0.46 0.71 0.70
120 0.39 0.38 0.58 0.57
150 0.34 0.33 0.50 0.48
185 0.29 0.28 0.42 0.40
240 0.25 0.24 0.34 0.33
300 0.22 0.21 0.29 0.28
400 0.19 0.18 0.25 0.24
500 0.17 0.16 0.22 0.21
630 0.16 0.15 0.19 0.18

30

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 15 of 22


TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
VOLTAGE DROP

Table 27 : Approximate voltage drop at 60 HZ for three and four core stranded plain
copper/aluminum conductors, XLPE insulated, PVC sheathed

Nominal Area of Copper Conductor Aluminum Conductor


Conductor mV/Amp/m mV/Amp/m

mm 2 XLPE Rated 90°C XLPE Rated 90°C


1.5 22.8 -
2.5 14 -
4 8.7 -
6 5.90 -
10 3.50 -
16 2.20 3.70
25 1.50 2.40
35 1.10 1.70
50 0.81 1.30
70 0.58 0.92
95 0.44 0.68
120 0.37 0.56
150 0.31 0.47
185 0.27 0.39
240 0.23 0.32
300 0.20 0.27
400 0.18 0.23
500 0.15 0.20

31

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 16 of 22


Annexure-04
GROUND TEMPRETURE

TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
CURRENT RATING

2 INSTALLATION CONDITIONS FOR DIRECT BURIAL CABLES


For a cable installed direct buried, the following tables will be used to
calculate the current rates based on the actual soil thermal resistivity,
Ground ambient temperature and the Depth of Laying.
Table 3 : Rating factors for ground temperature variation

Ground
15°C 20°C 25°C 30°C 35°C 40°C 45°C 50°C 55°C
Temparature
Cable Type

PVC Insulated 1.18 1.15 1.1 1.04 1 0.95 0.88 0.83 0.77
XLPE Insulated 1.16 1.13 1.09 1.03 1 0.95 0.89 0.84 0.79

Table 4 : Rating factors for depth of laying (to center of cable or trefoil group of cables)

Depth of Laying (m) upto 70mm 2 95mm 2 to 240mm 2 Above 300mm 2

0.50 1.00 1.00 1.00


0.60 0.99 0.98 0.97
0.80 0.97 0.96 0.94
1.00 0.95 0.93 0.92
1.25 0.94 0.92 0.89
1.50 0.93 0.90 0.87
1.75 0.92 0.89 0.86
2.00 0.91 0.88 0.85
2.50 0.90 0.87 0.84

Table 5 : Rating factors for variation in thermal resistivity of soil (average values)

Soil Thermal Resistivity ( °C.m/W)


Size of Cables mm 2

0.8 0.9 1.0 1.5 2.0 2.5 3.0

Single Core Cables


Upto 150 1.16 1.12 1.07 0.91 0.81 0.73 0.66
From 185 to 300 1.17 1.12 1.07 0.91 0.80 0.73 0.66
From 400 to 1000 1.17 1.12 1.07 0.91 0.80 0.73 0.66
Multi Core Cables
Upto16 1.12 1.08 1.05 0.93 0.84 0.77 0.72
From 25 to 150 1.14 1.10 1.06 0.92 0.82 0.75 0.69
From 185 to 500 1.15 1.10 1.07 0.92 0.81 0.74 0.67

13

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 17 of 22


TECHNICAL INFORMATION
ELECTRICAL CHARACTERISTICS
CURRENT RATING

3 INSTALLATION CONDITIONS FOR CABLES IN DUCTS

A duct is an enclosure of metal or insulating material other than conduits or cable trunking,
intended for the protection of cables which are drawn in after errection of the ducting.
The recommended relation between the cable size and duct size is as in table 8

Table 8 : Recommended duct dimensions and cable sizes

Duct
Number of Cables in Group
Inside Diameter (mm) Outside Diameter (mm)

Upto and including 65 100 130


Above 65 upto and including 90 125 160

As the same principal of cables installed in direct burial methods above, the current carrying
capacities of cables depends on the installed condition, the rating is calculated based on the
values in section 1.5 page10.

The de-rating factors of other conditions should be considered to calculate the actual possible
maximum current carrying capacity of the cables.

Tables 9-13 are for the factors to be multiplied by the tabulated current.

Table 9 : Rating factors for ground temperature variation

Ground
15°C 20°C 25°C 30°C 35°C 40°C 45°C 50°C 55°C
Temparature
Cable Type

PVC Insulated 1.18 1.15 1.1 1.04 1 0.95 0.88 0.83 0.77
XLPE Insulated 1.16 1.13 1.09 1.03 1 0.95 0.89 0.84 0.79

15

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 18 of 22


Annexure-05
PACU-1 A&B

TRANSMISSION MATERIALS STANDARD SPECIFICATION 73-TMSS-01, Rev. 01

6.0 DATA SCHEDULE (Cont’d)

AIR CONDITIONING UNITS, PACKAGED

REFERENCE
SECTION
DESCRIPTION 'A' 'B' 'C'
NO.

4.3 (Continued)
21378
Evaporator Air Flow (CMH) *
500
Evaporator Fan ESP (Pa) *

Unit Power Input, kW * 60.4

136.7
Min. Circuit Current (Amps.) *

Power Supply

Nominal System Voltage


(V) 400
Frequency (Hz) 60 60
No. of Phases 3

Control Voltage (V) 230


Frequency (Hz) 60 60
No. of Phases 1

Energy Eff. Ratio (EER), W/W 9.7

Coef. of Performance (COP) -

Unit Sound Rating, dB

Compressor
Manufacturer/Model No * Copeland

Comp. Motor Code No./Qty * /2

A' - NATIONAL GRID SAUDI ARABIA SPECIFIED DATA/PARAMETER


'B' - BIDDER/SUPPLIER/VENDOR/CONTRACTOR PROPOSED DATA/PARAMETERS
'C' - REMARKS SUPPORTING THE PROPOSED DEVIATION IN COLUMN 'B'
(*) -DATA/PARAMETER TO BE PROVIDED/PROPOSED BY THE BIDDER/SUPPLIER/
VENDOR/CONTRACTOR IN COLUMN 'B' WITH SUPPORTING CALCULATIONS AT
DESIGN STAGE

73TMSS01R01/MHS Date of Approval: January 21, 2013 PAGE 26 OF 31


WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 19 of 22
Annexure-06
PACU-2 A&B

TRANSMISSION MATERIALS STANDARD SPECIFICATION 73-TMSS-01, Rev. 01

6.0 DATA SCHEDULE (Cont’d)

AIR CONDITIONING UNITS, PACKAGED

REFERENCE
SECTION
DESCRIPTION 'A' 'B' 'C'
NO.

4.3 (Continued)
27396
Evaporator Air Flow (CMH) *
500
Evaporator Fan ESP (Pa) *

Unit Power Input, kW * 64.4

144.7
Min. Circuit Current (Amps.) *

Power Supply

Nominal System Voltage


(V) 400
Frequency (Hz) 60 60
No. of Phases 3

Control Voltage (V) 230


Frequency (Hz) 60 60
No. of Phases 1

Energy Eff. Ratio (EER), W/W 9.2

Coef. of Performance (COP) -

Unit Sound Rating, dB

Compressor
Manufacturer/Model No * Copeland

Comp. Motor Code No./Qty * /2

A' - NATIONAL GRID SAUDI ARABIA SPECIFIED DATA/PARAMETER


'B' - BIDDER/SUPPLIER/VENDOR/CONTRACTOR PROPOSED DATA/PARAMETERS
'C' - REMARKS SUPPORTING THE PROPOSED DEVIATION IN COLUMN 'B'
(*) -DATA/PARAMETER TO BE PROVIDED/PROPOSED BY THE BIDDER/SUPPLIER/
VENDOR/CONTRACTOR IN COLUMN 'B' WITH SUPPORTING CALCULATIONS AT
DESIGN STAGE

73TMSS01R01/MHS Date of Approval: January 21, 2013 PAGE 26 OF 31


WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 20 of 22
Annexure-07
DUCT HEATER -1&2

SUBMITTAL
CLIENT AL MASHARIQ DATE 16-Nov-2017 Quotation Ref# BP-K-E-01-121017-01
PROJECT MADINAH EAST SUBSTATION LOCATION KHOBAR Page No

Control
No: of KW/ Duct Size W SCR C
Unit Tag Qty Total KW V/Ph/Hz Circuit Htr. Type M A E
stages circuit xH qty B
Volts
EDH1 1 40 400/3/60 24 VAC 2 20.0 FLANGE 1500 X 600 0 610 200 650 150
EDH2 1 21 400/3/60 24 VAC 2 10.5 FLANGE 1400 X 800 0 610 200 850 150

Unit Tag NOMENCLATURE (Model Number)


EDH-1 HF 3 F 1500 600 40 400 3 24 2 R 0
EDH-2 HF 3 F 1400 800 21 400 3 24 2 R 0

Page# 2
WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 21 of 22
Annexure-08
FIRE ALARAM

Title : System Description & Power Loads


Revision # 01
TRADING & DEVELOPMENT CO.
FOR MACHINERY & EQUIPMENT LTD
System Description: FIRE DETECTION & ALARM SYSTEM

Project : Al-Madinah East 33KV Substation Our Ref # 5137


Prepared by: Engineering Department Date : 14-Jan-18
Panel Dimensions ELECTRICAL SPECIFICATION

ITEM NO. PART NO. DESCRIPTION QTY. PROTECTED AREA LOCATION MOUNTING HEIGHT WIDTH DEPTH OPERATION Remarks
FREQUENCY (Hz) CURRENT (A)
(mm) (mm) (mm) VOLTAGE

General Fire Alarm Control Panel


4100ES Master Controller Assembly with LCD and
operator interface, 9 A system power
1 4100-9211 supply/battery charger (SPS), 250 point IDNet 1 Wall Mounted 1422 610 296 220/240 VAC 50/60 2
interface, 3 NACs, auxiliary relay, and external RUI
communications interface

Expansion Power Supply (XPS); 9 A output, 3 built- General Alarm For


2 4100-5102 in Class A/B NACs; NAC operation is same as 2 Complete Corridor Inside FACP - 220/240 VAC 50/60 4
SPS Substation

24-Pin Dot Matrix Fire Alarm System


3 4190-9013 1 Floor Mounted 900 602 450 120 VAC 60 1.1
Remote Printer.

4 - MIMIC Panel For The Entire Substation 1 Wall Mounted 1050 1250 150 -

NOVEC-1230 Conventional Fire Extinguishing Control Panel


1 84-732001-901 Fire Extinguishing Control Panel (RP-1) 1 Control Room (GF) Corridor Wall Mounted 483 362 152 220/240 VAC 50/60 2

2 84-732001-901 Fire Extinguishing Control Panel (RP-2) 1 AC/DC Room Corridor Wall Mounted 483 362 152 220/240 VAC 50/60 2

33 kv Swithcgear
3 84-732001-901 Fire Extinguishing Control Panel (RP-3) 1 Corridor Wall Mounted 483 362 152 220/240 VAC 50/60 2
Romm (GF)

4 84-732001-901 Fire Extinguishing Control Panel (RP-4) 1 Battery Room (GF) Corridor Wall Mounted 483 362 152 220/240 VAC 50/60 2

NOTES:
Consider certain margin in Circuit breaker rating for any future development.

WE-485220,Rev.01 MADINAH EAST (MEDEA) 380/110-33KV BSP SUBSTATION 22 of 22


Annexure-09
SWGR
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load
Incomer feeder
Sr. Equipment Qty. Watt / Eqpt. Incomer feeder
No. Cont. Mome Cont. Mome
1 Breaker Closing coil 1 5 250 5.00 250

2 Breaker trip coil 2 125 250

3 Blocking magnet for closing ckt. 1 5 250 5.00 250

4 Breaker carriage blocking magnet 1 5 250 5.00 250

5 Spring charging motor 1 1500 1500


(starting time 100m secs.) 400 400

6 Earth switch blocking magnet 1 10 10.00

7 Indication lamp (CB ON/OFF) 2 1.2 2.40

8 Indication (CB TEST / SERVICE Pos.) 2 1.2 2.40

9 Indication lamp for Earth sw. ON 1 1.2 1.20

10 O/C+E/F relay, REF 615 2 18 21 36.00 42

11 REC 670 0 120 120

12 MVAJ101/MVAJ105 0 150

13 LOR7805F 0 575

14 Bistable relay, RXMD2 2 3.2 3.2 6.40 6.4

15 RXMB1 6 2 2 12.00 12

16 No-Volt Flag relay, RXSF1 4 1.3 5.20

17 Aux. Flag relay, RXSF1 1 1.3 1.3

18 Digital Multi function meter 1 6 6.00

19 Trip circuit supervision, SPER1C 4 2 8.00


TOTAL LOAD (WATTS) 104.60 2961.7

Prepared by: Ismail Al-Troudy


Page 1 of 7
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load
OG/AUX
Sr. Equipment Qty. Watt / Eqpt. OG/AUX
No. Cont. Mome Cont. Mome
1 Breaker Closing coil 1 5 250 5.00 250

2 Breaker trip coil 2 125 250

3 Blocking magnet for closing ckt. 1 5 250 5.00 250

4 Breaker carriage blocking magnet 1 5 250 5.00 250

5 Spring charging motor 1 1500 1500


(starting time 100m secs.) 400 400

6 Earth switch blocking magnet 1 10 10.00

7 Indication lamp (CB ON/OFF) 2 1.2 2.40

8 Indication (CB TEST / SERVICE Pos.) 2 1.2 2.40

9 Indication lamp for Earth sw. ON 1 1.2 1.20

10 O/C+E/F relay, REF 615 1 18 21 18.00 21

11 REC 670 0 120 120

12 MVAJ101/MVAJ105 0 150

13 LOR7805F 0 575

14 Bistable relay, RXMD2 2 3.2 3.2 3.20 6.4

15 RXMB1 3 2 2 6.00 6

16 No-Volt Flag relay, RXSF1 4 1.3 5.20

17 Aux. Flag relay, RXSF1 1 1.3 1.3

18 Digital Multi function meter 1 6 6.00

19 Trip circuit supervision, SPER1C 4 2 8.00


TOTAL LOAD (WATTS) 77.4 2934.7

Prepared by: Ismail Al-Troudy


Page 2 of 7
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load
CAP.
Sr. Equipment Qty. Watt / Eqpt. CAP.
No. Cont. Mome Cont. Mome
1 Breaker Closing coil 1 5 250 5.00 250

2 Breaker trip coil 2 125 250

3 Blocking magnet for closing ckt. 1 5 250 5.00 250

4 Breaker carriage blocking magnet 1 5 250 5.00 250

5 Spring charging motor 1 1500 1500


(starting time 100m secs.) 400 400

6 Earth switch blocking magnet 1 10 10.00

7 Indication lamp (CB ON/OFF) 2 1.2 2.40

8 Indication (CB TEST / SERVICE Pos.) 2 1.2 2.40

9 Indication lamp for Earth sw. ON 1 1.2 1.20

10 O/C+E/F relay, REF 615 1 18 21 18.00 21

11 REC 670 0 120 120

12 MVAJ101/MVAJ105 0 150

13 LOR7805F 0 575

14 Bistable relay, RXMD2 2 3.2 3.2 3.20 3.2

15 RXMB1 3 2 2 6.00 6

16 No-Volt Flag relay, RXSF1 4 1.3 5.20

17 Aux. Flag relay, RXSF1 1 1.3 1.3

18 Digital Multi function meter 1 6 6.00

19 Trip circuit supervision, SPER1C 4 2 8.00


TOTAL LOAD (WATTS) 77.4 2931.5

Prepared by: Ismail Al-Troudy


Page 3 of 7
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load
Bus Tie
Sr. Equipment Qty. Watt / Eqpt. Bus Tie
No. Cont. Mome Cont. Mome
1 Breaker Closing coil 1 5 250 5.00 250

2 Breaker trip coil 2 125 250

3 Blocking magnet for closing ckt. 1 5 250 5.00 250

4 Breaker carriage blocking magnet 1 5 250 5.00 250

5 Spring charging motor 1 1500 1500


(starting time 100m secs.) 400 400

6 Earth switch blocking magnet 0 10

7 Indication lamp (CB ON/OFF) 2 1.2 2.40

8 Indication (CB TEST / SERVICE Pos.) 2 1.2 2.40

9 Indication lamp for Earth sw. ON 0 1.2

10 O/C+E/F relay, REF 615 2 18 21 36.00 42

11 REC 670 0 120 120

12 MVAJ101/MVAJ105 1 150 150

13 LOR7805F 1 575 575

14 Bistable relay, RXMD2 2 3.2 3.2 6.40 6.4

15 RXMB1 5 2 2 10.00 10

16 No-Volt Flag relay, RXSF1 4 1.3 5.20

17 Aux. Flag relay, RXSF1 1 1.3 1.3

18 Digital Multi function meter 1 6 6.00

19 Trip circuit supervision, SPER1C 4 2 8.00


TOTAL LOAD (WATTS) 91.40 3684.7

Prepared by: Ismail Al-Troudy


Page 4 of 7
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load
BME
Sr. Equipment Qty. Watt / Eqpt. BME
No. Cont. Mome Cont. Mome
1 Breaker Closing coil 0 5 250

2 Breaker trip coil 0 125

3 Blocking magnet for closing ckt. 0 5 250

4 Breaker carriage blocking magnet 0 5 250

5 Spring charging motor 0 1500


(starting time 100m secs.) 400

6 Earth switch blocking magnet 1 10 10.00

7 Indication lamp (CB ON/OFF) 0 1.2

8 Indication (CB TEST / SERVICE Pos.) 0 1.2

9 Indication lamp for Earth sw. ON 1 1.2 1.20

10 O/C+E/F relay, REF 615 0 18 21

11 REC 670 1 120 120 120.00 120

12 MVAJ101/MVAJ105 0 150

13 Bistable relay, RXMD2 0 3.2 3.2

14 RXMB1 1 2 2 2.00 2

15 No-Volt Flag relay, RXSF1 1 1.3 1.30

16 Aux. Flag relay, RXSF1 1 1.3 1.3

17 Digital Multi function meter 1 6 6.00

TOTAL LOAD (WATTS) 140.5 123.3

Prepared by: Ismail Al-Troudy


Page 5 of 7
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load
BRM
Sr. Equipment Qty. Watt / Eqpt. BRM
No. Cont. Mome Cont. Mome
1 Breaker Closing coil 0 5 250

2 Breaker trip coil 0 125

3 Blocking magnet for closing ckt. 0 5 250

4 Breaker carriage blocking magnet 0 5 250

5 Spring charging motor 0 1500


(starting time 100m secs.) 400

6 Earth switch blocking magnet 1 10 10.00

7 Indication lamp (CB ON/OFF) 0 1.2

8 Indication (CB TEST / SERVICE Pos.) 0 1.2

9 Indication lamp for Earth sw. ON 1 1.2 1.20

10 O/C+E/F relay, REF 615 0 18 21

11 REC 670 1 120 120 120.00 120

12 MVAJ101/MVAJ105 0 150

13 Bistable relay, RXMD2 0 3.2 3.2

14 RXMB1 1 2 2 2.00 2

15 No-Volt Flag relay, RXSF1 1 1.3 1.30

16 Aux. Flag relay, RXSF1 1 1.3 1.3

17 Digital Multi function meter 1 6 6.00

TOTAL LOAD (WATTS) 140.5 123.3

Prepared by: Ismail Al-Troudy


Page 6 of 7
ABB
ABB Electrical Industries Co. Ltd.

PROJECT NAME: N108479.001- MADINAH EAST 110/33KV SS


ABB Reference: N108479.001-AC & DC LOAD Rev. 1

Switchgear Type: 33kV UG ZS3.2 Date: 13-Apr-17

Document No.: WD-485888

AC / DC Load

Sr. Equipment Qty. With Watt / Eqpt. Incomer feeder OG/AUX CAP. Bus Tie BME BRM Total Load Remarks
No. Future feeder Cont. Mome Cont. Mome Cont. Mome Cont. Mome Cont. Mome Cont. Mome Cont. Mome Cont. Mome
1 Breaker Closing coil 51 5 250 5.00 250 5.00 250 5.00 250 5.00 250 255 6375 50% breaker at a time

2 Breaker trip coil 102 125 250 250 250 250 6375 50% breaker at a time

momentary load for 150ms


3 Blocking magnet for closing ckt. 51 5 250 5.00 250 5.00 250 5.00 250 5.00 250 255 6375 50% breaker at a time

momentary load for 150ms


4 Breaker carriage blocking magnet 51 5 250 5.00 250 5.00 250 5.00 250 5.00 250 255 6375 50% breaker at a time

5 Spring charging motor 51 1500 1500 1500 1500 1500 38250 Considering 50% motors
(starting time 100m secs.) 400 400 400 400 400 10200

6 Earth switch blocking magnet 52 10 10.00 10.00 10.00 10.00 10.00 520

7 Indication lamp (CB ON/OFF) 102 1.2 2.40 2.40 2.40 2.40 61.2 Considering 50%

8 Indication (CB TEST / SERVICE Pos.) 102 1.2 2.40 2.40 2.40 2.40 61.2 Considering 50%

9 Indication lamp for Earth sw. ON 52 1.2 1.20 1.20 1.20 1.20 1.20 62.4

10 O/C+E/F relay, REF 615 56 18 21 36.00 42 18.00 21 18.00 21 36.00 42 1008 1176

11 REC 670 3 120 120 120.00 120 120.00 120 360 360

12 MVAJ101/MVAJ105 2 150 150 300

13 LOR7805F 2 575 575 1150

14 Bistable relay, RXMD2 102 3.2 3.2 6.40 6.4 3.20 6.4 3.20 3.2 6.40 6.4 163.2 163.2 Considering 50%

15 RXMB1 169 2 2 12.00 12 6.00 6 6.00 6 10.00 10 2.00 2 2.00 2 169 169 Considering 50%

16 No-Volt Flag relay, RXSF1 208 1.3 5.20 5.20 5.20 5.20 1.30 1.30 270.4

17 Aux. Flag relay, RXSF1 3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 3.9

18 Digital Multi function meter 54 6 6.00 6.00 6.00 6.00 6.00 6.00 324

19 Trip circuit supervision, SPER1C 208 2 8.00 8.00 8.00 8.00 416
TOTAL LOAD (WATTS) 104.6 2961.7 77.4 2934.7 77.4 2931.5 91.4 3684.7 140.5 123.3 140.5 123.3 4180.4 77272.1

1- Cont : Continuous load


3- Quantities of equipment considered may change during detailed engineering.
4- DC Wattage of various equipment are based on the information furnished by manufacturers.
5- AC LOAD : Each cubicle has the following equipment: Total W
Space heater of 150Watts, 220V ………… 1no. x 56 8400
Low voltage box light. of 10Watts, 127V ………… 1no. x 56 560
Cooling Fans for 280Watts, 220V ………… 10nos. 2800
Cooling Fans for 215Watts, 220V ………… 2nos. 1075

Prepared by: Ismail Al-Troudy


Page 7 of 7
Annexure-10
(Page : 1 of 1)

POWER TRANSFORMER
Date MAY.12.2017
LOAD DATA FOR TRANSFORMER
Revision 1

A. Project Name : SEC-WOA / Madinah East expansion


B. Project No. : 20170553-TGC008 (Q'ty : 3set)
C. HEES Design No. : TL3041
D. Specification : 3PH 60Hz, 84/105MVA, 110/34.5kV, ONAN/ONAF

1. POWER SOURCE : 3PH 400/230VAC 60Hz


3PH 400VAC, 60Hz
Power
Voltage Consumtion Stand-by
Description Q'ty Total(kVA)
(kV) (kVA)
(AC:kVA)
FAN MOTOR (FM1 - FM26) 0.4 0.200 26 5.200
UNDER VOLTAGE RELAY (27N) 0.4 0.004 1 0.004
MOTOR DRIVE UNIT (MDU) - MOTOR 0.4 1.300 1 1.300
SUB TOTAL(1) 6.504
1PH 230VAC, 60Hz(CTR[AC230V/AC110] FOR MDU CONTROL,RTCC)
Power
Voltage Consumtion Stand-by
Description Q'ty Total(kVA)
(kV) (kVA)
(AC:kVA)
RECEPTACLE (RT) 0.23 1 1.380 1.380
FLUORESCENT LAMP (FL) 0.23 0.020 1 0.020
HEATER (HTR1, HTR2) 0.23 0.120 2 0.240
MOTOR DRIVE UNIT (MDU) - HEATER&LIGHTING 0.23 0.300 1 0.300
RTCC CONTROL POWER 0.11 0.400 1 0.400
SUB TOTAL(2) 2.340

TOTAL (1)+(2) : AC 8.844

2. POWER SOURCE : DC125V


1) DC125V (PS[DC125/24V] FOR TRANSDUCER,WTS,GAS MONITOR CONVERTER)
Power
Voltage Stand-by
Description Consumtion Q'ty Total(W)
(V) (W)
(AC:W)
AUX. RELAY (3X,27D) 125 5.4 2 10.8
TIMER - ONDELAY (T1) 125 1.6 1 1.6
TIMER - OFF DELAY (62-1) 125 0.5 1 0.5
MAGNETIC CONTACT (4-F1, 4-F2) 125 5.4 2 10.8
POWER SUPPLY (PS1,PS2) 125 9.5 2 19.0
MOTOR DRIVE UNIT(MDU)-CONTROL 125 100.000 1 100.000
TRANSDUCER (TD1, TD2, TD3) 24 5.0 3 15.0
DIRECT TEMP MONITOR(WTS) 24 2.5 1 2.5
SUB TOTAL(1) 160.2

TOTAL:DC 160.2

3. POWER SOURCE : AC / DC (FOR GAS MONITOR)

Power
Voltage Stand-by
Description Consumtion Q'ty Total(W)
(kV) (W)
(AC:W)
GAS MONITOR(45M) 320.0 1 320.0
SUB TOTAL(2) 320.0

TOTAL (1)+(2) : AC 320.0

Hyundai Electric Energy Systems Co., LTD. A4(210 x 297mm)