You are on page 1of 7

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SURAU SATU

TINGKAT, SEBUAH SEKOLAH RENDAH AGAMA (24 KELAS), TIGA


TINGKAT DAN SEBUAH KANTIN DI ATAS LOT 514, PRESINT 18,
PUTRAJAYA.

WATER RETICULATION PROPOSAL

FOR

SYARIKAT BEKALAN AIR SELANGOR

FEBRUARI 2015

Prepared by:

RMS & ASSOCIATES CONSULT.


NO 88A, JALAN BADMINTON 13/29,
SEKSYEN 13, 40100,
SHAH ALAM, SELANGOR D.E.
TEL: 03-55117494 FAX: 03-55117496
CIVIL

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SURAU SATU


TINGKAT, SEBUAH SEKOLAH RENDAH AGAMA (24 KELAS), TIGA
TINGKAT DAN SEBUAH KANTIN DI ATAS LOT 514, PRESINT 18,
PUTRAJAYA.

1.0 BRIEF DESCRIPTION ON THE SCOPE OF WORKS

Jabatan Agama Islam Wilayah Persekutuan had planned to


develop upgrading works at Presint 18 Putrajaya.

The area of the land is granually flat. We proposed the Platform


Level based on the land surveyor data and site investigation
data. All final decision based on the data required before get
the actual platform and piling size. Minor site clearing is required
for the development area.

1.1 EXTERNAL WATER SUPPLY

Water supply for the Wilayah Persekutuan Putrajaya is under the


jurisdiction of SYABAS Holding Sdn Bhd or (SYABAS). Based on the
design and conforming to the Authority’s requirements and
design procedures, the following conceptual design is
established. The development shall obtain its water supply from
the existing pipeline with the size to be confirmed with SYABAS.

Based on the Water pressure test result only will be able to further
analysis the water supply system for the development. The water
pressure to be requested from SYABAS during application for
water. However based on the preliminary analysis for water
demand, 150mm dia. of Concrete Lined Mild Steel (CLMS) and
150mm dia. of HDPE Pipe to be proposed from the tapping point.

A length of 150mm dia. of Ductile Iron (DI) will be constructed


and 3 nos of Hydrant to be installed.
The water supply demand for the development is in the region of
23,100 Gallons per 1 day storage.

1
CIVIL

The estimated water demand derivations are as shown in Table


1 below: -

Table 1.0 Estimated Water Demand

Item Type of Area Factor Unit Total


Building m2 Demand
(g/d)
1. Surau - 13/person 500 person 6500

2. Gerai - 396.25/stall 1 unit 396.25

3. School - 13.2/student 1200 student 15840

4. Rumah Bilal - 330/unit 1 unit 330

~23,100
TOTAL (Gal/day).

Total Water Demand = 23,100 gallon/day

The potable water shall be supplied via water reticulation


pipeline from the elevated water tank. Then from the elevated
water tank, the water supply by gravity to each roof top water
tank of the highest level of the respecting unit.

One third of the total water demand will be stored at suction


tank to make sure there is sufficient pressure to transport water
on the rooftop. The size of suction tank used is 4.43 mm diameter
with 3.07 m height.

Internal water storage will be provided for Domestic Water,


which shall be stored inside the internal water tank proposed to
be located in the rooftop of all building.
As such, the internal storage is categorized under internal
plumbing and shall be submitted under M& E services.

2
CIVIL

2.0 Water Supply

The following Guidelines will be adopted throughout.


a. MWA Design Guidelines
b. SPAN Design Guidelines
c. Water Supply Enactment
d. British Standard 534
e. JKR Standards
The water supply system characteristics shall be designed to
meet the following criteria: -

o Maximum flow velocity “V” shall be not exceeding 0.6 m/sec.

o Peak flow factor for water reticulation shall be 2.5, while its fire
analysis shall be average flow plus fire flow of hydrant with
one (1) draw-off point operating at 1140 lpm.

o Hazen-Williams equation using Hardy Cross analysis is used for


hydraulic calculation and simplified as follows: -

o HL = 10.7Q1.852
 C1.852D4.87
Where,

HL = head loss due to pipe friction, meter/km


Q = Design flow, m3/sec
C = pipe coefficient, 100
D = internal diameter of pipe, meter

o minimum pipe gradient shall not be less than 1:500

3
CIVIL

o Minimum cover to crown of pipe shall be 1.0m and maximum


cover shall be 2.0m. Where these conditions cannot be met,
the pipes shall be surrounded with minimum thickness of
150mm mass concrete.

o All pipes lay adjacent to or under the roadway shall have a


minimum cover of 1.2m to the crown of pipe.

o Pipe materials shall be mild steel PN16 to BS534 or Ductile Iron.

o Fire hydrants of double pillar type shall be located


approximately 90m intervals within the reticulation system. Its
location and type shall be as approved by BOMBA

o All valve chambers shall be brick chambers, except for Fire


Hydrant valve chambers.

o Isolating valve shall be located within the system at suitable


locations for maintenance purpose.

o Minimum residual pressure above highest supply level shall not


be less than 7.5m of head of water.

o Thrust blocks for bends and tees shall be designed to sustain


1.5 x working pressure with excess of 1.5 safety factors.

o Air valves shall be installed at highest points, points that


constitute changes of direction and slope. For position of
long descending/ascending pipeline, the spacing shall be <
100m.

4
CIVIL

o Scour valve shall be installed at lowest point in pipeline. Its size


shall be one third of pipeline diameter.

o Minimum riser for culvert crossing shall be 300mm.

o Minimum hydraulic gradient in pipeline shall not fall below


than 5.0 m to the crown of the pipeline to avoid air pocket
and column separation.

5
CIVIL

Table 2 : Estimation of water consumption

Residential Daily Water Usage (g/d)


Low cost house and low cost flat 220 / unit
Medium low cost flat and medium cost 330 / unit
house 330/ unit
Single and double storey terrace house 330 / unit
Single and double storey bungalow 440/ unit
Apartment/condominium 440/ unit
(Additional 450 litres per room if more
than 4 bedrooms).
Commercial
Single storey shops 440/ unit
Multiple storey shop house 330/ unit
Office 1,000 /100m2
Petrol station – a) with car washing bay 10,000/ unit
b) without car washing 10,000/ unit
bay 450 /stall
market – a) dry stall 1,500 /stall
b) wet stall 1,500 /stall
hawker centre 1,500 /room
hotel 220/ unit
shopping complex According to daily water
industrial lots usage
light industrial workshop 1,500 /unit
terrace factory 5,000 /unit
Public and Social
Hospital 1,500 /bed
Mosque/ surau 10 /person
Community hall 25,000 /unit
Club house 50,000 /unit
Balai raya 440 /unit
Day school 10/student
Boarding school 55/student
Institution 25,000 /ha
Kindergarten 30 /child