City Development Plan for Sathuvachari Town Draft Final Report

Vellore District, Tamilnadu -1-

1
BACKGROUND
1.1 PROJECT BACKGROUND
Government of India (GoI) has modified the formerly known Integrated Development of
Small and Medium Towns (IDSMT) Scheme as the Urban Infrastructure Development
Scheme for Small and Medium Towns (UIDSSMT) for urban centres in India. The GoI has
envisaged UIDSSMT with an aim to improve urban infrastructure in towns and cities in a
planned manner. The scheme seeks to enhance public and private investments in
infrastructure development of urban areas with an elaborative reform agenda. The duration
of the scheme is five years, beginning from 2005-06. The financing pattern for the scheme is
80:10:10 as share of the central, state and local institutions respectively. The City
Development Plan (CDP) is proposed to be made with an objective to identify the
infrastructure projects to be implemented during next 20 years across various urban sectors
along with the proposed implementation mechanism including the Private Sector
Participation (PSP) Strategy. The CDP focuses on the urban reforms measures needs to be
implemented, to improve the health of ailing municipalities.

Under this direction, Commissionerate of Municipal Administration (CMA), Government of


Tamil Nadu (GoTN), intends to assist in strengthening and improving the financial position of
Grade III Municipalities for effective capital investment management and urban services
delivery under Tamil Nadu Urban Development Project (TNUDP III). CMA has begun the
process of capacity building in these ULBs to enhance the vision of the stakeholders in the
growth and development of the towns.

In this regard, the assignment of Preparation of City Development Plan for Sathuvachari
Town has been entrusted to M/s. Community Consulting India Private Limited (CCI) by
CMA.

1.1.1 CITY DEVELOPMENT PLAN

A City Development Plan (CDP) is the ULB’s corporate strategy that presents both vision of
a desired future perspective for the city and the ULB’s organization, and mission statements
on how the ULB, together with other stakeholders, intends to work towards achieving their
long-term vision within the investment period (5 to 7 years). A CDP translates mission into
actions and actions into outcomes. When a CDP is developed in close consultation with, and
endorsed by all relevant local stakeholders, a ULB and others who commit themselves to
action can be held accountable for their mission statements, actions and expected
outcomes. The CDP will helps to enhance economic development and improved quality of
life. The long-term objective for all of the actions is defined in the plan. The full set of
proposed regulations, tax policies, infrastructure and other local government program
expenditures will be framed considering long-term economic development and improved
quality of life, especially for the poor, firmly in mind.

CITY DEVELOPMENT PLAN

A City Development Plan (CDP) helps a city take stock of its opportunities and endowments, gauge its
place in relation to its hopes for the future, and to link these objectives to choices for improving its
competitive position, for instance in producing tradable, identifying critical investments, mobilizing

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -2-

private sector partnerships, and to reduce poverty. A CDP is visualized as a document that would
provide a perspective and a vision for the future development of a city. It should present the current
status of city’s development; set out the directions of change; identify the thrust areas; and suggest
alternative routes, strategies and interventions for bringing about the change. It should establish a
logical and consistent framework for evaluation of investment decisions. A CDP will specifically
comprise of the following:
ƒ Situation analysis, with regard to the context i.e., demographic and economic trends, city
governance, service provision & delivery including systems & structures, financial status of the city
government and agencies concerned with service provision including an analysis of their
creditworthiness; and effectiveness and efficiency of the institutional frameworks;
ƒ Perspective and a vision for the city;
ƒ Strategy identifying key strategic issues, risks and opportunities facing the city, with focus on
reform and reform priorities; and
ƒ City Investment Plan, referring to order of investment needed to implement the perspective and
alternative financing strategies.

A CDP clearly defines how a ULB will a) serve its customers (businesses and citizens), e.g.
how it intends to guarantee basic level of urban services to all citizens, make urban planning
responsive to emerging needs, become responsive to the needs of, and improve its
services, to local businesses; b) run its business, e.g. how it intends to manage public
finance in a modern and transparent way, execute urban planning and governance in line
with an established framework, become more responsive, cost and time efficient through
integrating technology in their governance and service delivery processes; and c) manage
its resources, e.g. how it intends to increase revenues and expand its tax base to allow for
self-sustaining urban service delivery, improve its creditworthiness, but also how it intends to
recruit and retain a skilled workforce.

CONTEXT OF A CITY DEVELOPMENT PLAN

Past efforts to produce this kind of broad, integrated approach have been fraught with coordination
problems and multiple implementation agencies, which have lead to confusion and wasted resources.
Moreover, past planning, like city master plans, have been excessively technical and unresponsive to
citizen input and demand. The CDP is different from master planning as cities are now more open to
outside influences in a globalized economy, and more able to act on opportunities for growth. At the
same time, decentralization is giving cities more scope for action, and democratization is opening the
planning and political process to much greater participation and accountability. A CDP is geared to
respond to these new circumstances.

1.1.2 OBJECTIVE OF THE ASSIGNMENT

The aim of the assignment is to prepare comprehensive City Development Plan for a period
of 25-30 years (2007-2027 with 5 yearly updates) indicating policies, programmes,
strategies and funding mechanisms to meet the development requirements. The
development plan would be formed as shared vision for the town involving various
stakeholders with a long-term development perspective.

This development plan formulated would aid ULB to join the main stream of urban
development which has a good potential for future growth and immediate implementation of
financial reforms in these towns. The development plan would be formed as envisaged by
Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT)
Scheme Agenda for the city involving various stakeholders with a long-term development
perspective.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -3-

The objective of this assignment is to visualize the town in the next 25-30 years and the
tasks involved are listed below:

ƒ Define the growth directions and service up-gradation in reflection to the activity mix/
growth;
ƒ Assess the demand for the projects specified by the ULBs, and come out with gap in
services with respect to the vision;
ƒ Broadly outline the infrastructural needs;
ƒ Improve infrastructure facilities and to create durable public assets and quality oriented
services in the ULBs;
ƒ Define specific rehabilitation of infrastructure and capital improvement needs with
regards to provision of infrastructure in both slums and other areas;
ƒ Indicate the priority of projects;
ƒ Define revenue enhancement and revenue management improvements required to
sustain the rehabilitation proposed;
ƒ Reforms required in local administration and service delivery including public private
partnership in infrastructure development;
ƒ Suggest measures to address common growth and infrastructure issues and to promote
integrated development;
ƒ Management changes required at the local level to improve O&M of assets;
ƒ Possibilities of strengthening e-governance in these towns.

1.2 TASK INVOLVED


The aim of the assignment is to prepare consensus-based city development plan indicating
policies, programmes, strategies and funding mechanisms to meet the development
requirements. The development plan would be formed as shared vision for the city involving
various stakeholders with a long-term development perspective. The assignment is split into
a number of following defined tasks:

STAGE I: CITY ASSESSMENT AND OPTIONAL STRATEGY FORMULATION


Task 1: Project Commissioning, Startup and Mobilization
Task 2: Inception Report
Task 3: Secondary and Primary Data Collection and Analysis
Task 4: City Assessment and Optional Strategies
Task 5: Intermediate Status Report
STAGE II: CITY STAKEHOLDERS CONSULTATIONS
Stakeholders Workshops
City opinion Survey
STAGE III: FINALIZATION OF CITY DEVELOPMENT PLAN
Task 6: Finalization of Development Strategies
Task 7: Project Costing and Determination of Funding Sources
Task 8: Scheduling of Priority Actions and Developing a City Investment Plan
Task 9: Draft City Development Plan
Task 10: Final City Development Plan

1.2.1 TASKS COMPLETED

A reconnaissance survey of the town was made for data collection and existing situation
assessment. Data on demography, population below poverty line (BPL), industries,
economic, physical & social infrastructure in slums & other areas, municipal finance &
governance aspects were obtained and analyzed. Consultations were held with pertinent
stakeholders including the ULB Council, government departments & NGOs. Detailed

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -4-

discussions were also held on projects previously identified by the ULB. Therefore, based on
the aforementioned activities, a logical framework was evolved.

A review of town’s economic development, physical planning and growth management


issues, physical infrastructure status, social infrastructure status, and municipal fiscal status
along with the O&M requirements, capacity assessments to operate and maintain systems
has been conducted.

An Inception report analyzing the town’s economic base and development potentials,
physical planning and growth management issues, fiscal and physical & social infrastructure
status and other requirements per study ToR has been prepared and submitted.

The aforementioned deliverable have been approved by the Technical Review Committee
comprising of officials from Commissionerate of Municipal Administration (CMA), Regional
Directorate of Municipal Administration (RDMA) - Vellore, Tamil Nadu Urban Infrastructure
Financial Services Limited (TNUIFSL), Directorate of Town and Country Planning (DTCP)
and Executive officer and elected representatives of the ULB.

Subsequent to the first consultation workshop, an analytical frame work was arrived at for
preparing CDP for Sathuvachari. The tasks covered during the preparation of Intermediate
Report are as follows:

1. Vision Statement for the ULB showing their future perspective of growth directions and
potentials has been prepared based on consultations with stakeholders.
2. A Situational Analysis of demographic and economic trends in the town and their
implications for ULB governance and urban public service delivery systems and
structures referring to their infrastructure and assessment of existing financial status and
financial improvement needs in consultation with stakeholders to achieve the vision.
3. Strategic Plan identifying developmental strategies to accomplish the vision envisaged
with special attention to local economic development and poverty reduction measures.
4. Capital Investment Plan (CIP) scheduling identified and prioritized investments
formulated to effect the strategies formulated.
5. Asset Management Plan (AMP) to ensure that assets are operated and maintained in a
sustainable and cost effective manner.

The aforementioned deliverable was also reviewed by the Technical Review Committee and
approved for preparation of Draft Final Report the next stage of the assignment.

This Draft Final Report incorporating the priority list of identified projects in short term &
long term period in consultation with Stakeholders, their capital investment plan and financial
operating plan of the municipality under optimum and sustainable scenarios forms part of
this Draft Final Report.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -5-

2
PROFILE OF THE TOWN
2.1 LOCATION AND LINKAGES
Sathuvachari is located at a distance of 136 km west of Chennai. The town is located on the
NH from Bangalore to Chennai. Katpadi Railway Junction, the most important junction in the
northern part of the state is situated at a distance of 8 kms from the municipal boundary. The
highways which runs through the town connects the town with all the important urban
centres of the region.

Katpadi

SATHUVACHARI
Gudiyattam Ranipettai

Vellore Arcot Wallajah

Road ways: The well established road network of highways and other district roads in the
town provide enhanced connectivity for the town. Sathuvachari Town is connected to the
towns of Chittoor, Palamaner and Thirupathi in Andhra Pradesh on the north; Vellore, Ambur
and Krishnagiri on the West, Vaniyambadi and Thirupattur to the South West.

Rail ways: Katpadi Railway Junction is the nearest railway junction in the town. The number
of commuters has increased tremendously mainly due to Christian Medical College &
Hospital and Vellore Institute of Technology.
CHARI
Airways: The nearest airport to the town is Chennai. It is a located at a distance of 136 km
from the town.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -6-

2.2 REGIONAL SETTING


Sathuvachari Municipality is under the revenue Table 2.1 Salient Features of Sathuvachari Town
administration of Vellore district. Sathuvachari Town SATHUVACHARI
Municipality is situated at a distance of 2 kms
on the western side of Vellore. Recent District Vellore
development in Vellore has made Sathuvachari, Area 16.06 sq. km.
a suburb of Vellore. The town is located on the
National Highway connecting Bangalore – 12°54'N 79°19'E
Geographic
Chennai. Elevation : 175.86 m
Location
above MSL

Location of the town on National Highway Census population 44,942 (year 2001)
support and supplement the regional identity of Road: Frequent bus
the town. The prestigious institution of Vellore services connect the
town with Vellore and
Institute of Science and Technology is at a
other urban centres in
distance of the 2-km form the town. Connectivity the northern part of
state.
2.3 PHYSICAL CHARACTERISTICS Rail: Katpadi, Important
railway junction of
2.3.1 GEOGRAPHY Southern Railway.
Geographically, the town is situated at 12o54’ Tropical - Max. 37.1°C
Min. 26.4°C;
Northern latitude and 79o19’ eastern longitude. Winter- Max. 31.3°C
The topography is almost flat and situated at an Climate
Min. 20.6°C;
altitude of 175.86 meters above mean sea level. Annual Precipitation:
The wind direction is predominant towards 835 mm.
south west. However, during summer it is from
south west to north east.

Source: www.msn.com.

2.3.2 CLIMATE
The seasons in the town are classified as follows:
• Winter - Mid December to end of February.
• Summer - March, April and May.
• South West Monsoon - June to Mid October.
• North East Monsoon - Mid October to Mid December

The average maximum and minimum temperature are 42°C and 13°C respectively. Light to
moderate rainfall of 10 cm occurs during the months of June, July and August.
2.3.3 SOIL CONDITIONS
The soil of the area is of red and black clay mixed with a large proportion of sand gravel.
Other than limestone, there are hardly any minerals.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -7-

2.4 HISTORY AND GROWTH


Sathuvachari Municipality is a suburb town of Vellore, the district headquarters. History of
the town Sathuvachari dates before the invasion of the British. The town was then a small
hamlet on the southern banks of River Palar. The name “Sathuvachari” derived from the
word “Sathuvan – chari”. Sathuvan is the name of the craftsman (achari) who was the key
person in constructing the Vellore Fort. Hence the name derived for the town. Post
independence, Sathuvachari was a Village Panchayat and subsequently was upgraded to a
Town Panchayat in 1967 and Municipality in 2004.

2.5 POPULATION
As per 2001 census, population is 44,942 persons and the town is divided into 21 wards and
spread over an area of 16.06 sq. km. The ward wise details of the town are given in the
following table. A total of 9919 households were enumerated per 2001 census.

Table 2.2: Wardwise Population in the Municipality


Ward Total Households Total Population Male Population Female Population Gender Ratio
1 631 2786 1329 1457 1096
2 472 2040 1045 995 952
3 393 1809 890 919 1033
4 253 1174 576 598 1038
5 388 1720 855 865 1012
6 457 2137 1067 1070 1003
7 183 815 386 429 1111
8 216 1040 505 535 1059
9 437 2005 975 1030 1056
10 573 2519 1233 1286 1043
11 348 1482 728 744 1008
12 371 1654 845 809 957
13 298 1645 820 825 1006
14 274 1365 709 656 925
15 689 3214 1641 1573 959
16 1026 4537 2241 2296 1025
17 583 2524 1257 1267 1008
18 705 3230 1627 1603 985
19 486 2040 1032 1008 977
20 328 1512 767 745 971
21 808 3694 1903 1791 941
Source: Census of India 2001
Table 2.3: Population and growth Trend in the Municipality
Year Population Growth Rate in %
Total Population Variation Decadal Annual (Avg.)
1961 6,317 1,404 28.58 2.86
1971 10,736 4,419 69.95 7.00
1981 16,752 6,016 56.04 5.60
1991 25,165 8,413 50.22 5.02
2001 44,942 19,777 78.56 7.85
Source: Census of India 1951,61,71,81 and 91

2.5.1 GENDER RATIO


The municipality has an average gender ratio of 1007 in the town as per 2001 census. The
highest ratio of 1111 is found in the 7th ward of the town. The ratio of females per 1000
males in the town for the past 5 decades is given in the following table.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -8-

Table 2.4: Gender Ratio- Sathuvachari Municipality


Year Males Females Females/1000 Males
1961 3,260 3,111 954
1971 4,276 4,079 954
1981 7,481 7,271 972
1991 12,737 12,428 976
2001 22,441 22,501 1003
Source: Census of India 1951,61,71,81, 91and 2001

2.5.2 LITERACY RATE


As per 2001 census, the total literates in the town are 34,929. The Male Literates are 18,457
and the Female literates are 16,472. Average literacy rate in the town is 77.72%, which is
higher than the national average literacy rate.

Table 2.5: Literacy Rate- Sathuvachari Municipality


Year Male Female Total
1991 Population 12737 12428 25165
Literate 10060 7975 18035
% of Literate 78.98 64.17 71.67
2001 Population 22,441 22,501 44,942
Literate 18,457 16,472 34,929
% of Literate 52.84 47.15 77.72
Source: Census of India 1951, 61, 71, 81, 91 and 2001

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu -9-

3
SITUATION ANALYSIS
3.1 INTRODUCTION
Descriptions of the existing situation in each of the sectors of development and systems
prevailing in the town have been given in inception Report. These descriptions have enabled
the stakeholders essentially to gain a clear understanding of the town and its present
scenario with reference to the development perspective envisioned.

The existing situation in this town was observed to be far from desirable and the town is in
need of improvement. This need was not only revealed during the analysis, but was also
evinced by stakeholders and beneficiaries during field visits, discussions and consultations
conducted by the study team. Therefore, it is imperative to assess the potentials of the town
in each sector for future development and evolve strategies to set the ULB on the road to
well planned development. Areas considered for assessment are given below:

ƒ Planning & Land Use Assessment


ƒ Infrastructure Assessment
ƒ Social Assessment
ƒ Basic Services to Urban Poor
ƒ Economic Assessment
ƒ Urban Governance
ƒ Finance Assessment

This assessment of situation forms critical input for evolving a logical framework for the
Strategic Plan. The assessment made is illustrated with an overview, system analysis and
identification of key issues and potentials for improvement.

3.2 PLANNING & LAND USE ASSESSMENT


Sathuvachari municipality falls under purview of Vellore LPA. The land use structure clearly
reveals the character and the identity of the town. During the late 80’s the town was
envisioned to be developed as a satellite town of Vellore town due to the availability of virgin
land for developments then. Pursuant to these developments, TNHB developed site and
services scheme in the town. The areas on the southern side of the bypass road were
developed into housing board layout. The developments were carried on in a phased
manner. Thus, the composition of the town is such that, nearly 80% of the total land area in
the town is of residential developments and the remaining 20% of the town is occupied by
the older settlements, in the town.

Residential use occupies the major share of the land use structure in the town. The areas
developed with layout were characterized with wider roads and adequate facility for
recreational activities in the town. These parts of the town show individual residential units.
The current demand for land in the town and the spillover developments of Vellore town has
resulted in the conversion of land use along the major corridors of the town and also the
development of high rise building structures in the town.

Sathuvachari has evolved in unison with Vellore Corporation, which guides and determines
the character of growth in the town and also the policy of GOTN to form Vellore Municipality
by integrating the neighboring local bodies in the town has resulted in much more enhanced
growth in the town. On integration of the town with the Corporation area, the town

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 10 -

Sathuvachari will be developed as the residential hub of the corporation supported with high
standard of infrastructural facilities.

3.2.1 GROWTH AREAS


Growth and Developments in Sathuvachari are visualized along the growth of the Vellore
town. Sathuvachari is also called as the residential hub of the region, as the major land use
of the town is Residential and area available for further development in the town is much
restricted due to the location of hills on the Southern side and River on the northern side of
the town.

All the areas of the town other than the settlement of Old Sathuvachari have been
developed by the Tamil Nadu Housing Board as neighborhoods and with the requisite
facilities. They have developed 5 residential layouts in the town, which are named as Phase
I, Phase II, Phase III, Phase IV and Phase V. Of them, Phase I and Phase II are already
developed and has become stagnant in growth. Subsequently growth of the town is more
pronounced in the Phase III, Phase IV, Phase V areas of the town.

3.2.2 GROWTH DIRECTIONS AND POTENTIALS


Growth Potentials: Planned layouts in proximity to the town were the prime reason for fast
growth of Sathuvachari in the last decade. Location of the Collectorate, District Court and
other governmental offices within the town limits also supports the growth in the town. In
addition to that the close proximity of the town with Vellore, the district headquarters and
also the nearness of the urban character encourage growth of the town to a greater extent.
The regional connectivity of the town has to be properly made use of on considering the
future land use of the town.

Growth Constraints: The physical boundaries of the town on the Northern and the southern
side of the town are the major constraints of growth in the town. The other major constraint
for growth in the town is the unavailability of land for future expansion. This has led to the
rapid conversion of residential activities to mixed land use and open spaces in the town are
not used properly as planned, which also adversely affects the sustainable development of
the town, and this situation is aggravated due to traffic congestion and limited availability of
space within the town.

3.3 INFRASTRUCTURE ASSESSMENT


Sectors covered under infrastructure assessment are listed below:
ƒ Water Supply ƒ Roads, Traffic and Transportation
ƒ Sewerage and Sanitation ƒ Street Lighting
ƒ Storm Water Drainage ƒ Other Amenities and
ƒ Solid Waste Management ƒ Services for Urban Poor

3.3.1 WATER SUPPLY


The town is currently supplied with protected water
supply by two schemes executed by Tamil Nadu Water
Supply and Drainage Board. The first water supply
scheme was commenced during the year 1977 and the
new scheme was installed in the year 2004-05. River
Palar is the main source of water in the town under all
these schemes. There are 2 head works constructed
under Palar Scheme and Vellore Combined Water
Supply Scheme (VCWSS) on the banks of River Palar.
Under these schemes the town receives 40 LL of water
daily.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 11 -

PALAR SCHEME: Water from the two infiltration


galleries with a yield of 28.00 LL is constructed in
the banks of River Palar. The water pumped is
conveyed to the collection well of 3.25 LL
capacity. Two 75 hp motors and two 30 Hp
turbine motors are used to pump the water to the
OHT of capacity 4 LL at Sathuvachari and the
OHT of 1LL capacity at Rangapuram. The
coverage of the OHT’s is given in the Table
no:3.1. The total length of the pumping mains
under this scheme is about 5.5 km.

VCWSS: Water from 8 open wells on the banks of Palar River with a yield of 25.50 LL is
pumped to the Booster station at a distance of 15 Table No 3.1: Existing Storage Capacity
kms from the town through a pumping main of Storage Reservoirs Capacity Ward
600mm PSC pipes. Water from the booster (LL) Coverage
station (2.5Lakh Liters capacity) is pumped to the Sathuvachari 4 1,2,3,4,5,6,7,8
OHT at Hari Om (Phase III) area. Other than the Vallalar High school 3 9,10
above mentioned source, water from the Bore Back side (Phase – III)
wells, Open wells and Hand pumps of a total Hari Om OHT 3.25 11,12
capacity of 11.00 LL is also used by the ULB. Rangapuram 2
Rangapuram(Old) 1 13,14,12
SERVICE RESERVOIRS: At present there are 9 Rajiv Gandhi Nagar 4 15,16,17
storage reservoirs with a total capacity of 21.75 Nehru Nagar 3.25 18,19,20,21
Phase – I (S- type ) 1 16,17
LL and 3 GLR’s of a total capacity of 9.75 LL is
Phase – I (L- type ) 1 15
installed. The location and capacity of the OHT’s
are given in the Table.no:3.1. Phase – V 2 15
Ground Level Reservoirs
Phase 3 11,12 3.25
DISTRIBUTION SYSTEM: The ULB is provided
Phase 2 3.25
18,19,20,21
with 6674 house service connections. Of which 6 Phase 4 -- 2
are commercial and 1 is industrial. Distribution Source: ULB, 2007.
mains are laid for a distance of 56 kms in the
town. Other than the service reservoirs, the town also has 320 public fountains in the town to
provide water supply. The town is provided with 77 lpcd of water daily.
Table No 3.2: Water Tariff & Connection Details
WATER TARIFF: For the unmetered connections in Type of Deposit Flat Rate
the town, a flat rate of Rs. 30 is collected for the Connections (Rs) (Rs.month)
residential connections and Rs.60 is collected for the Residential 2,500 40
Commercial connections. The deposit amount Commercial 5,000 60
collected for connection and connection charges on Industrial 10,000 75
flat rate basis are provided in the Table. No: 3.2 Source: ULB, 2007.

ADEQUACY OF SERVICES
Table No. 3.3: Performance Indicators - Existing Water Supply System
SL. CURRENT NORMATIVE
SERVICE INDICATOR UNIT
NO. STATUS STANDARD
1. Daily per capita supply (2008/2009) Litres 77 135
2. Roads covered with distribution network Percent 71.95 > 100
3. Storage capacity with respect to supply Percent 79 33
4. Treatment capacity available with respect to supply Percent NA 100
5. Property tax assessments covered by service connections Percent 20 85
6. Proportion of non-domestic service connections percent 0.52 > 5.00
7. Slum population per public stand post persons 3 150
Source: ULB; 2008 and Analysis

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 12 -

KEY ISSUES

Assessment of the present water supply system and its scope for improvement and issues
pertaining to the supply and distribution were discussed in detail in the various meetings
held with officials and stakeholders of Sathuvachari town and issues identified were
assessed field visits and service analysis, the identified issues are outlined below:

ƒ Source Availability: The present supply of water is not adequate to meet the existing and
future demand, and augmentation at source is required to meet future requirements.
However due to the frequent power cuts booster stations could not pump the designed
capacity. Hence Booster stations are required to be provided with generator facility;
ƒ Low Supply Levels: Even though the ULB supplies 77 lpcd, certain areas of the town
(like wards 16,14,15,13) experiences low supply levels due to the terrain of the town;
ƒ Inequitable Distribution: While the average rate of water supply in the town appears
satisfactory, the distribution is not equitable.
ƒ Lack of a sustainable cost recovery approach to ensure sustainability of the system.
ƒ Non-Revenue Water: The distribution network of the municipality is aged and
characterized by leaks through pipelines, faulty service connections and uncontrolled
drawl from public stand posts.
ƒ Treatment Capacity: Sathuvachari town does not have any treatment facility except
chlorination. In respect of increasing demand in the future and alternate sources such as
surface water, treatment facilities will have to be implemented;
ƒ Inadequate Service Coverage: Only about 20% of the PTAs are provided with water
supply service connections. Existing demand for water supply has not taken into account
the requirement of water supply to the expansion areas;
ƒ Inadequate Summer Storage: Even though town receives moderate rainfall, there is no
scope for storing rainwater for recharging, as most of the water bodies are encroached,
silted and used as sewage outfalls;
ƒ Rehabilitation of D-System; The D-system of the town was laid in the year 1985 and
also during the implementation of the new scheme, the older D-system was not
improved and it requires to be re-laid to ensure proper distribution system in the town.
Although intermittent rehabilitation works have been carried out based on complaints
received, the system needs a comprehensive rehabilitation measure based on detailed
assessment.
ƒ Heavy O&M Cost: As the water supply scheme established in the town runs through
pumping from the source to service reservoir, the ULB has to bear high electricity
charges every year.
ƒ Need for Asset Management Action Plan: The ULB is required to maintain an effective
O&M Schedule, for water supply assets, for regular maintenance and energy
optimization.

POTENTIALS FOR IMPROVEMENT

In order to appreciate and articulate the current situation and present future possibilities, the
water supply system was analyzed from all perspectives. The objective of this analysis is to
essentially demarcate potentials and drawbacks of the existing system, weigh the
possibilities and prepare the roadmap for an improved, effectively planned, designed,
operated and maintained system:

ƒ Assured source – Palar River ensures assured supply of water to Sathuvachari for a
period of at least 8 months in a year.
ƒ The town has a storage capacity 21.75 LL against the estimated supply of 53.50 LL,
estimates 79% of storage capacity which is more than the prescribed norm.
ƒ Town has the capacity to expand its service connections to another 50% since public
are willing to avail service connections.
ƒ The service has the potential to involve the private sector in the current format to bring in
efficiency.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 13 -

3.3.2 SEWERAGE AND SANITATION

The town does not have Under Ground Sewerage Scheme. The waste water from the
households are let into the open drains and then conveyed into the natural channels, which
drains into Palar River. There are no drains constructed in the extended areas of the town,
and in these areas, the waste water is let into the streets causing unhygienic conditions in
the town.

SANITATION FACILITIES: Septic tank is the method of disposal system found in the town.
There are no public conveniences facilities available in the town. There is an imminent
requirement for providing public convenience facility near government office complexes in
the town. A scheme for providing UGSS scheme to 3 Zones of the town is proposed at an
estimated cost of 16.55 Crores by the ULB. However, as part of the CDP, a preliminary
techno-economic analysis shall be performed to evaluate the feasibility and need for phased
implementation of the proposal.

ADEQUACY OF SERVICES

An index of performance of the existing facility parameters benchmarked against the


normative/standard requirements as prescribed by reference guidelines/standards such as
CPHEEO guidelines, pertinent manuals/publication and nominally prevalent level of services
in similar cities with functional (good) urban infrastructure is furnished in the table below. It is
imperative to mention that the nominal standard/benchmark is the requisite level of
provision/delivery that is to be achieved by the ULB under this assignment.
Table No: 3.4 Key Performance Indicators
SL. NO. SERVICE INDICATOR UNIT CURRENT NORMATIVE
STATUS STANDARD
1. Assessment covered with septic tanks percent 44 --
2. Assessment covered with LCS percent 8 --
3. Assessment covered with safe disposal facility - Total percent 44 --
4. Slum population per seat of public convenience persons NA --
5. Seats under pay & use category percent NA --
Source: ULB; 2008 and Analysis

KEY ISSUES

Discussions were held with principal stakeholders of Sathuvachari to assess the key issues
that surround the present sewerage system. The issues identified through discussions, field
visits and service analysis are outlined below:

ƒ The town is not provided with an underground sewerage scheme;


ƒ Discharge of untreated sewage to Palar River via storm water drains and to other low-
lying areas and the resultant degradation of the environment and health risk was
highlighted as a major hazard;
ƒ Discharge of sewage to surface water sources and low-lying areas poses a significant
threat to groundwater and surface water quality and is a public health hazard;
ƒ Households in the town were equipped only with septic tanks, soak pits. These were
cleaned on an infrequent basis and the collected sewage was disposed in low-lying
areas in an indiscriminate manner;
ƒ Inadequate and Ill-Maintained Public Sanitation: There is a high dependency by slum
population on public conveniences, the seat per person is limited and most slum
dwellers resort to open defecation;
ƒ Public awareness regarding safe sanitation is very poor in the Slum areas of the town.

POTENTIAL FOR IMPROVEMENTS

In order to appreciate and articulate the current situation and present future possibilities, the

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 14 -

Sewerage and Sanitation sector was analyzed from all perspectives. The objective of this
analysis is to essentially demarcate potentials and drawbacks of the existing system, weigh
the possibilities and prepare the roadmap for an improved, effectively planned, designed,
operated and maintained system:

ƒ It has the potential to set up Under Ground Sewerage System since town is rapidly
growing in recent times and lots of residential activities are taking place.
ƒ More than 40% of households are having septic tank facility to dispose sewage
ƒ Willingness of the Public for Underground Sewage Scheme in the town.

3.3.3 STORM WATER DRAINS

DRAINAGE SYSTEM: The topography of the town is in Table No. 3.5. Existing Storm Water drains
such of that the rain water collected form the hills on the Type of Drains Length
southern side of the town are conveyed to the inlet (Kms.)
channel on the north western side of the town into the Pucca / Surfaced Drains 46.53
Kutcha Drains --
river through the network of channels and streams.
Natural Drainage Channels 6.24
Presently these drains are encroached and clogged by Total 52.77
the garbage and other waste dumped into them, Source: ULB; 2007
subsequently resulting in low carrying capacity of these
drains.

DRAINS: The existing drainage conditions of Sathuvachari consists of both the Natural
channels which flows into River Palar and the drainage system constructed on the sides of
the roads. The natural channel named “Kannaru“ runs for about 6.24 km in the town. This
channel acts as main flood moderator for the town. Storm water drains for a total length of
46.53 kms has been constructed by the ULB. The type and length of drains in the town are
given in the Table no: 3.5.

ADEQUACY OF SERVICES

An index of performance of the existing storm water drainage system parameters


benchmarked against the normative/standard requirements or service levels as prescribed
by reference guidelines/standards such as PWD/CPHEEO guidelines, pertinent
manuals/publication and nominally prevalent level of services in similar cities with functional
(good) urban infrastructure is furnished in the table below. It is imperative to mention that the
nominal standard/benchmark is the requisite level of provision/delivery that is to be achieved
by the ULB under this assignment.
Table No.3.6: Key Performance Indicators - Storm Water Drains
SL. SERVICE INDICATOR UNIT CURRENT NORMATIVE
NO. STATUS STANDARD
1. Road length covered with storm water drainage percent 30.19 130
2. Pucca Drains (Open & Closed) percent 82.98 100
3. Road length covered with Pucca drains percent 25.05 130
Source: ULB; 2008 and Analysis

KEY ISSUES

Discussions were held with principal stakeholders of Sathuvachari to assess the key issues
that surround the present storm water drainage system and its scope for improvement. The
issues identified through discussions, field visits and service analysis are outlined below:

ƒ Inadequate Coverage: Drains cover only 30% of the road length. Besides, kutcha drains
are not well defined and are damaged during heavy rains, thus reducing the meaningful
coverage of built up drains;

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 15 -

ƒ Problem Areas: Brick work, Random Rubble Masonry, Plain cement concrete drains are
damaged at many places within the town and drains are not properly networked causes
missing links in many places, lack of proper disposal system;
ƒ Due to faster growth of population and rapid increase in the number of households,
habitations has extended to the low lying areas which do not have proper drainage
outlets.
ƒ Roads in the town have been badly affected and damaged at several locations during
monsoons due to the inadequacy of storm water drainage networks. The monsoons
have been witnessing, year after year, overflow of several secondary and primary drains
as most stretches of these drains are silted.
ƒ Future population addition is expected to increase the pressure on the drainage system
of the town thereby requiring the ULB to concentrate on the development of road
networks along with that of storm water drains.
ƒ Silting and Solid Waste Accumulation: Silting and uncontrolled garbage dumping cause
blockage and stagnate water channels/wastewater runoff. Consequently, drains choke
and overflow into neighboring areas. The outfall point of the channel into river is also
silted with waste and garbage.
ƒ Underutilized Water Bodies: Area under water bodies within the town limit is not being
put to productive use as summer storage tanks. Presently, the tanks are in dilapidated
condition and are only being used for recharge purpose. Misuse of water bodies is also
noticed in terms of uncontrolled solid waste dumping.

POTENTIAL FOR IMPROVEMENTS

In order to appreciate and articulate the current situation and present future possibilities, the
Storm Water facility was analyzed from all perspectives. The objective of this analysis is to
essentially demarcate potentials and drawbacks of the existing system, weigh the
possibilities and prepare the roadmap for an improved, effectively planned, designed,
operated and maintained system:

ƒ Major drains are available for conveyance of storm water away from residential
dwellings and low-lying areas.
ƒ Sathuvachari has the potential to recycle and reuse the storm waters since most of the
storm water leads to Palar River.
ƒ Adequate natural gradients are available for achieving self cleansing velocities for open
drainage system.
ƒ Existence of good basic infrastructure of drainage system.

3.3.4 SOLID WASTE MANAGEMENT

The collection, transportation, treatment 0%


5%
and disposal of municipal solid waste are 5%
10%
the obligatory functions of the ULB. The
2%
municipal solid waste mainly comprises
3%
waste from households, markets,
commercial establishments, hotels,
hospitals and to some extent, small-scale 5%
industries.
70%

WASTE GENERATED: As per discussions Bio degradable Glass


with officials of the ULB, the town Rags Paper

generates about 17 MT of waste every day Plastic Leather & rubber

at the rate of 378 grams per capita. The Metals & other domestic hazardous Inert

waste generated includes the wastes form


Households, Markets, Commercial establishments, Offices and Industries. The physical
characteristic of the waste generated in the town is such that, 70% of the waste generated in
the town is Bio-degradable.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 16 -

COLLECTION SYSTEM: The waste generated in the town is collected by the ULB by engaging
the services of Self Help Groups. Door to door collection is done. The list of vehicles used
for waste collection is given in the Table.3.7. Other than door to door collection system there
are also 40 bins in the town for waste collection ULB has 44 sanitary workers against the
sanctioned strength of 138 workers and 60 SHG workers, supervised by 2 sanitary
supervisors and a Sanitary Inspectors. The SWM
department is headed by a Sanitary Inspector, who Table No. 3.7. Vehicles used for Waste
Collection
monitors the collection and disposal of solid wastes within Type of Vehicles Number
the town limit. Tractors 1
Tippers 2
DISPOSAL METHOD: ULB does not have any land for waste Mini lorries 1
dumping; currently, the waste collected is dumped along the Tipper 2
canals. They have identified 8 acre extent of land in the Tricycle 21
periphery for Solid Waste Management. Proper scientific Total 27
method of treatment of the waste has to be done in the Source: ULB; 2007
town.

ADEQUACY OF SERVICES
An index of performance of solid waste management sector parameters benchmarked
against the normative/standard requirements or service levels as prescribed by reference
guidelines/standards such as CPHEEO guidelines, Municipal Solid Waste (Management &
Handling) Rules, 2000, pertinent manuals/publication and nominally prevalent level of
services in similar cities with functional (good) urban infrastructure is furnished in the table
below. It is imperative to mention that the nominal standard/benchmark is the requisite level
of provision/delivery that is to be achieved by the ULB under this assignment.

Table No. 3.8: Key Performance Indicators - Solid Waste Management


SL. SERVICE INDICATOR UNIT CURRENT NORMATIVE
NO. STATUS STANDARD
1. Estimated waste generation per capita per day grams 329 300
2. Waste collected as estimated by ULB (w.r.t. waste generation) percent 82 100
3. Waste collected as per the available capacity percent 0 --
(w.r.t. waste generation)
4. Road length per conservancy staff metres 1769 500
Source: ULB; 2008 and Analysis

KEY ISSUES

Discussions were held with principal stakeholders of the solid waste management and
officials of the ULB to assess the key issues that surround the present solid waste
management system and its scope for improvement. The issues identified through
discussions, field visits and service analysis are outlined below:

ƒ Absence of Effective Primary Collection Mechanism: The absence of the full fledged
door-to-door solid waste collection system in the town is basically leading to unhealthy
conditions in the town. The practice of throwing of the waste onto the streets is
exaggerating the problem. Segregation of waste at source is not being practiced in the
town. Source segregation and primary collection of waste through private participation,
is under active consideration by the ULB;
ƒ Inadequate Collection Vehicles & Dumper Bins: Inadequate fleet size of the collection
vehicles, mainly pushcarts and tricycles, is hampering the collection efficiency. Also,
additional dumper bins needs to be located at various locations in the town;
ƒ Lack of Scientific Waste Disposal: As the scientific disposal of waste is not followed, the
waste is being disposed through open dumping. The waste is disposed improperly
forming heaps of waste at the site, posing problem to environment and health of the
local people. Though the data pertaining to the ground water quality around the site is

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 17 -

not available, there is a probability of ground water contamination due to open dumping;
and;
ƒ Occupation Health Hazards: The waste collection, loading and unloading operations
have been done manually. The sanitary workers have not been provided with any
protective equipment posing heath hazards.

POTENTIAL FOR DEVELOPMENT

In order to appreciate and articulate the current situation and present future possibilities, the
Solid Waste Management was analyzed from all perspectives. The objective of this analysis
is to essentially demarcate potentials and drawbacks of the existing system, weigh the
possibilities and prepare the roadmap for an improved, effectively planned, designed,
operated and maintained system:

ƒ Integrated landfill facility for the Local bodies in Vellore Region can be initiated by for
effective waste management system.
ƒ Land is available and has been procured for a techno-economically feasible alternative
of solid waste treatment and disposal.
ƒ Involvement of the NGO’s in the collection and compost generation activity in town has
to be supported.
ƒ Support available from GoTN for scientific treatment and disposal of solid wastes.
ƒ It has the potential to involve the private sector to increase efficiency in service delivery
in rest of the wards.
ƒ Desire of citizens for a clean town.

3.3.5 ROADS, TRAFFIC AND TRANSPORTATION

OVERVIEW: The role of ULB regarding roads comprises construction of major roads and
maintenance of all roads in its jurisdiction, except roads belonging to the Highways
Department. The ULB is also responsible for implementing proposals from Master Plan with
regard to new major roads and road widening activities.

Location of the town with respect to the National Highway connecting Bangalore and
Chennai has enhanced the connectivity with all the important towns such as Chennai,
Vellore, Wallajah, Gudiyattam, Arcot, Ambur and all other important urban centres of the
region.

MUNICIPAL ROADS: Municipality maintains a


total road length of 75.836 km in the town. The Table No. 3.9. Type and Length of the Roads
length and type of roads in the town are given in Roads Type of the Roads Length in
the Table.no:3.9. These roads are mainly meant kms
Municipal Roads B. T. Roads 54.752
to support the residential activities within the
Cement Concrete 17.919.
town. Roads in the older Sathuvachari are much
Earthen Roads 3.165
narrow and require improvements. The south
Total 75.836
avenue road runs parallel to the highway carries High Way Roads National Highways 2.00
maximum traffic in the town. In this road, traffic Total 2.00
is to be streamlined and the encroachments are
Source: ULB, 2007
to be removed to ease the traffic congestion in
the town

NATIONAL HIGHWAYS: NH 46 connecting Bangalore and Chennai runs for a total length
of 2 kms in the middle of the town.

BUS SHELTERS: The town does not have a bus stand facility.

Provision of foot over bridges in the junctions, namely RTO road junction, Vallalar road
junction and Rangapuram junction is immediate requirement of the town. A bridge

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 18 -

connecting Sathuvachari – Kankanallur has to be provided for enhanced railway connectivity


of the town. Some of the major limitations noticed in the existing system of roads are
inadequacy of pedestrian sidewalks, absence of two-wheeler tracks/service lanes, and
absence of parking spaces and bus lay-by. However, the aforementioned provisions are
only indicative of stakeholder requirements and are subject to further analysis as part of
CDP and detailed investigation as part of the DPR preparation stage (not scope of CDP
study).

ADEQUACY OF SERVICES
An index of performance of roads sector parameters benchmarked against the
normative/standard requirements or service levels as prescribed by reference
guidelines/standards such as MoRTH guidelines, pertinent manuals/publication and
nominally prevalent level of services in similar cities with functional (good) urban
infrastructure is furnished in the table below. It is imperative to mention that the nominal
standard/benchmark is the requisite level of provision/delivery that is to be achieved by the
ULB under this assignment.

Table No. 3.10: Performance of Key Road related Service Indicators in Sathuvachari
SL. SERVICE INDICATOR UNIT CURRENT
NO. STATUS
1. Road density km/sq. km 4.85
2. Per capita road length metres 0.038
3. Proportion of surfaced municipal roads percent 96
4. Proportion of blacktop/asphalted roads (w.r.t. total municipal roads) percent -
Source: ULB; 2008 and Analysis

The town has a road network density of 4.85 km/sq. km which is less than the normative
standard of 10 – 15 km/sq.km. The per-capita road length maintained by the ULB is 0.038m,
which is less than the standard of 1.50 to 2.00 m. The conditions of major roads are
observed to be satisfactory. However, minor roads and roads within individual residential
colonies are extremely narrow. The clear driveway is Footpaths and parking facilities were
found lacking along the streets within town limits.

KEY ISSUES

Discussions were held with principal stakeholders of the roads, traffic and transportation
sector and officials of the ULB to assess the key issues that surround the present road,
traffic and transportation system and its scope for improvement. The issues identified
through discussions, field visits and service analysis are outlined below:

ƒ The extended areas of the town namely the Phase III & IV areas are to be provided with
adequate road facility.
ƒ The major intersections of the town namely, RTO Junction, Rangapuram Junction and
Vallar nagar has to be provided by the Subway/ Underpass facility to avoid the fatal
accidents which are more common in these areas.
ƒ Except for a few major intersections in the town, the rest lack cohesion with road
geometry, necessitating an integrated traffic and transport system. Lack of lane
separators and unabated parking on the main roads and intersections aggregate the
problem.
ƒ Improper access to the railway station due to absence of bridge connecting
Sathuvachari and Kankanallur town.
ƒ Major roads lack footpaths and pedestrian facilities; those available are encroached
upon by informal activities and street hawkers.
ƒ Absence of Street Furniture/Signage: The roads/junctions lack signals, signage, and
footpaths. Improper road sweeping results in most roads being covered with top-soil,
mud and granular particles which further reduces the driving safety.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 19 -

POTENTIAL FOR DEVELOPMENT

In order to appreciate and articulate the current situation and present future possibilities, the
Roads, Traffic and Transportation sector was analyzed from all perspectives. The objective
of this analysis is to essentially demarcate potentials and drawbacks of the existing system,
weigh the possibilities and prepare the roadmap for an improved, effectively planned,
designed, operated and maintained system:

ƒ Sathuvachari, abutting the National Highway connecting Bangalore - Chennai has good
road connectivity with major urban centres in the region like Chennai, Bangalore.
ƒ Major region of the town is connected with the NH and By-pass enhancing the
connectivity of the town.
ƒ An extensive network of roads providing for internal connectivity is available which can
be streamlined and enhanced for improved traffic management.
ƒ Adequate signaling is available along major roads at all the blind curves to facilitate
regulated traffic flow.
ƒ GoTN is committed to improve the roads and transportation.

The master plan proposals (scheme roads) of Vellore LPA towards improving regional
connectivity with other urban nodes reveals the potential for sustenance of the present and
potential industrial/ commercial and residential activities in the town.

3.3.6 STREET LIGHTING


There are about 2,223 street lights installed and maintained by the Town Panchayat. In this,
1700 are tube lights, 456 Sodium Vapour Lamps, 55 mercury alloyed lights 11 Mini High
mast lights and 1 High Mast lights in the town. In an average lighting fixtures are placed at
a distance of 45 m interval approximately. Almost all the lights are in working condition. The
compositions of street lights are given in the Table.No:5.6.

ADEQUACY OF SERVICES
An index of performance of the street light sector parameters benchmarked against the
normative/standard requirements or service levels is furnished in the table below:

Table No. 3.11: Performance of Key Street Lighting Service Indicators in Sathuvachari
SL. SERVICE INDICATOR UNIT CURRENT NORMATIVE
NO. STATUS STANDARDS
1. Spacing between lamp posts metres 35 30
2. Proportion of fluorescent lamps (tube lights) w.r.t. total percent 76 60
fixtures
3. Proportion of high power fixtures w.r.t. total fixtures percent 24 40
Source: ULB; 2008 and Analysis

KEY ISSUES

Key issues in street lighting are shifting of poles along the kerb-side of the road and
inadequate street lighting since spacing of street lights in this town is maintained as 70 m
which is far more than the standard spacing of 36 m. One of major issues in this sector is
absence of high power fixtures (High Mast Light) in major road junction. Hence, the need for
new street lights in the newly formed extension areas and major junctions are required. The
other issues include the absence of electric poles and extension lines in many wards in the
western part of the town.

POTENTIAL FOR DEVELOPMENT

In order to appreciate and articulate the current situation and present future possibilities, the
Street Lighting facility was analyzed from all perspectives. The objective of this analysis is to
essentially demarcate potentials and drawbacks of the existing system, weigh the

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 20 -

possibilities and prepare the roadmap for an improved, effectively planned, designed,
operated and maintained system:

ƒ It has the potential to involve the private sector for operation and maintenance of street
lighting.
ƒ Town has the potentials to utilize renewable energy sources to reduce energy cost.
ƒ Proportions of fluorescent lamps are more than the normative standard of 60% of total
street lights exists in the town.

3.4 SOCIAL ASSESSMENT


3.4.1 SOCIAL INFRASTRUCTURE

EDUCATION: Sathuvachari Municipality has 6 Primary schools, Middle Schools – 1 and 1


higher secondary school in the town. Sathuvachari is dependent on Vellore, which is located
at a distance of 2 kms form the town for the higher order educational facilities such as
Vellore Medical College and other famous arts and science colleges. The famous deemed
university of Vellore Institute of Science and technology is much adjacent to the Municipal
boundary.

HEALTH: Vellore Medical College Hospital, located at a distance of 2 kms form the town is
the major health facility for the town. Other than that the town has large number of private
hospitals functioning within the town limits catering service to the people.

PARKS AND PLAYFIELDS: Sathuvachari Municipality has 4 Parks located around the
town. Out of the four parks, two are well developed, one situated at Ward -1 in CMC colony
and the other at Ward-16 next to Varasakthi Vinayagar Temple. There is a park exclusively
for children with all playfields situated in ward-19 next to the Sathuvachari Branch Library.
The fourth park called the Science Park is under renovation and is situated at Ward-16 near
Vallar main road.

LIBRARY: There is a branch library in the ward -19 functioning in the town which is
maintained by the District Library.

Proximity of the town to Vellore makes Sathuvachari dependent on Vellore for all the social
and higher order facilities such as colleges, Hospitals, Community halls etc., As seen above,
the existing situation of infrastructure provision, service and delivery has been discussed.

Key issues and the problems that confront the efficient provision of services and Strategies
to mitigate and/or eliminate the identified problems/issues and proposals for improvement of
the existing system shall be recommended in the Intermediate Status Report pursuant to
detailed demand-gap analysis, region specific issues and consultations with the pertinent
stakeholders comprising government and non-government entities.

KEY ISSUES

The key issues identified through discussions, field visits and service analysis are outlined
below:

Education:
• The infrastructure facilities in the schools are very poor and in a dilapidated
condition. Lack of sanitation and water supply facilities were highlighted by the
stakeholders.
• Existing schools are operated in tiled/thatched roof which requires up-gradation to
RCC roof. The roads leading to the schools are to be laid with proper drainage
facilities in their sides to prevent stagnation of water.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 21 -

Health:
• The existing health facilities in the town are not adequate to meet the demand of the
public. During the stake holder consultation establishment of regional level hospital
facility was highlighted as the important requirement for the town. As the town is
mainly dependent on Vellore Municipality for higher order facilities, local facilities are
to be strengthened in the town.
Market and Commercial Facilities;
• The town does not have a dedicated market area or facility in the town.
• The local shops and convenient shopping facilities in the town are also inadequate in
the town.
Parks and Open spaces: Existing parks and play fields within their limits are not properly
maintained. They also lacked open spaces and recreational spaces within their limits.
Development of a science park near the court complex was highlighted as an important
need of the public.
Bus Stand/Shelters: During the stakeholders’ discussions, it was highlighted that a bus
stand facility is required along the by-pass road, as the town does not have any other mode
of connectivity other than roads.

The existing situation of infrastructure provision, service and delivery has been discussed in
the preceding sections. Key issues and the problems that confront the efficient provision of
services and Strategies to mitigate and/or eliminate the identified problems/issues and
proposals for improvement of the existing system shall be recommended in the Intermediate
Status Report pursuant to detailed demand-gap analysis, region specific issues and
consultations with the pertinent stakeholders comprising government and non-government
entities.

3.4.2 BASIC SERVICES TO URBAN POOR

An Overview: Owing to rapid urbanization in and around the town, a large influx of the
migrants from economically weaker sections has been observed, which has resulted in
formation of slums. The town presents a wide range of activities in various institutional,
commercial and tourism sectors. Growth in such activities, possibilities of absorption in
various service sectors, scope of employment in trade and business activities, hawking,
retailing etc. could have attracted rural poor to the town. The ULB is the agency responsible
for provision of services to urban poor settlements within town limits.

As per the Census 2001 and data available from the ULB, the town has 7 notified slums in
which there are approximately 1260 houses with a population of 6,300 (approx.). Most of
these slums are located in the rural habitation encroaching both private and municipal land.
Discussions with officials indicated that most of the notified slums are not provided with
basic services and amenities. Discussions have also indicated that the major problem area
in slums is inadequate provision of water supply, roads, drains and sanitation facilities. List
of slums in the town is given below:

Service Provision in Slums


Housing: Housing condition in slums is observed to be significantly deficient. Large
proportions of households were found staying in rudimentary households and remaining in
pucca houses, where percentage of households staying in RCC is very less. Majority of
households reside in houses with built area less than 100 sq. ft. It was noticed that
residential status of most of the slum households was temporary, where settlement have
developed within the last 10 years due to growing migration in the town as increasing
demand for workers.
Infrastructure Services: As per the discussion with the officials of the ULB, the overall view
about the existing infrastructure in the slums is understood and presented below. To
improve the condition of slums and to make slum dwellers self-dependent, government is
initiating various programs, which has been described in the following section:

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 22 -

ƒ Water Supply: The main source of water supply in slums is met through hand pumps
and public stand posts (PSPs). The ULB has provided 372 units of PSPs covering all the
slums. As the dependency on the PSPs is high, there are a lot of illegal tapping of water
from the existing pipe line.
ƒ Sanitation: Most of the slums do have access to sanitation facility. Safe sanitation
facilities comprise of low cost sanitation, public conveniences and ISPs. Due to
inadequacy in the existing level of facilities in the slums, people resort to open
defecation on vacant lands, which is a cause of serious health concern and the
stagnation of the rain water in the vacant lands also affects the environmental conditions
of the town.
ƒ Solid Waste Management: Per discussions held with ULB officials, it was indicated that
there are no designated solid waste collection points or waste bins provided in slums.
Also wastes from this place are collected once in a week. As a result, in most of the
slums, waste is disposed in nearby vacant areas and in open drains creating unhygienic
conditions.
ƒ Roads: Most of the roads in the slums are very narrow and are earthen. In the slum area
along the river, roads are to be laid to provide better conditions in the town.
ƒ Storm Water Drains: Slum settlements in the town are not provided with a proper storm
water drain network. Earthen drains were mostly damaged or clogged due to solid waste
dumping and silting. New formation of drains along existing roads and new roads is
essential.
ƒ Streetlights: Overall streetlight spacing in the town is about 35 m, and in slums, it is
noticed to be far higher. It is noticed that several road junctions and street stretches are
poorly lit, and some of the slums are devoid of any facilities of street lighting.

ADEQUACY ANALYSIS

Following are a set of indicators, for which the current situation and the desired values are
presented. The desired values can be used as benchmarks by the ULB to check its
performance annually/ periodically and set targets for itself to be achieved in the next
financial year. The details of performance indicators are furnished in the table below.

Table No. 3.12: Performance Indicators for Slums in Sathuvachari


Sl. Current Benchmark/
Service Indicators Unit
No. Situation Standards
1. Proportion of slum population to total city population (2008/2009) percent 1.81 < 10
2. Household size in slums (per HH) persons 4.98 --
3. Distribution network reach (against road length in slums) in slums percent NA > 100
4. Slum population per public stand post persons 3 75
5. Slum population per seat of public convenience/ ISP Complex persons NA 60
6. Road length (per capita road length) metres NA 0.25 - 0.51
Source: ULB; 2008 and Analysis

KEY ISSUES

Following are some of the key issues pertaining to provision and delivery of services to
urban poor in Sathuvachari Town:
ƒ Slums are densely populated and not provided with adequate infrastructure;
ƒ Poor water supply and sanitation is a major concern. The slums are not provided with
adequate number of public convenience seats and existing facilities are in dilapidated
conditions. Hence, the slum population resorts to open defecation at a number of
locations; and
ƒ Slums are provided with inadequate waste collection bins, thus resulting in dumping of
garbage on road-side and in the drains;

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 23 -

POTENTIAL FOR DEVELOPMENT

In order to appreciate and articulate the current situation and present future possibilities,
infrastructure facilities in the slums was analyzed from all perspectives. The objective of this
analysis is to essentially demarcate potentials and drawbacks of the existing system, weigh
the possibilities and prepare the roadmap for an improved, effectively planned, designed,
operated and maintained system:
ƒ Basic services like water supply, sanitation, drainage, waste management are available
in many slums. However, there are some shortfalls.
ƒ There has been an active participation and involvement of slum dwellers and
NGOs/CBOs in slum upgrading and urban poverty alleviation initiatives. This would
provide a platform for coordinated efforts for undertaking such initiatives in future.
ƒ Desire to form community organizations.
ƒ Poverty pockets are relatively less in number.
ƒ Good awareness level in slum areas.

3.5 ECONOMIC ASSESSMENT


3.5.1 ECONOMIC BASE

Sathuvachari town is the satellite town of Vellore Municipality. During the late 80’s, TNHB
has developed sites and services scheme in the town and thus the town has slowly evolved
as the residential satellite town of Vellore. The closeness of the town with the urban area
has resulted in the faster growth of households within the town. Most of the people who
reside in the town work in Vellore Municipality and also the recent establishment of Collector
office complex and other government departments within the town limits have brought a
large influx of the people into the town. Currently, the town acts as the residential urban
node of the region supported with the basic commercial and infrastructural facilities. The
town does not have any large scale of commercial or industrial activity.

3.5.2 OCCUPATIONAL PATTERN

The total workers in the town as per 2001 census are 15,020. The workers constitute about
33.42 % of the total population, of them Male workers are about 11,523 and Female workers
are 3,497, and the work participation rate of the town is only 33.42 %.

Table 3.13: Occupation Pattern - Sathuvachari Municipality


Total Total Workers Primary Sector Secondary Sector Tertiary Sector
Year No. of % of No. of % of No of % of No. of % of
Population
Workers Workers Workers Workers Workers Workers Workers Workers
1991 25165 8056 32.01 811 10.07 1161 14.41 6084 75.52
2001 44,942 15,020 33.42 441 2.94 2,202 14.66 12,377 82.40
Source: Census of India 1991 and 2001
Of the total workforce 82.40 %, the maximum share of the workforce is from the tertiary
sector and minimum share of the work force is from the primary sector, which accounts to
about 2.94%. Secondary Sector accounts to about 14.66%. The beedi workers constitute
the secondary sector of the town. Proximity of the town with Vellore has increased the rate
of tertiary workers in the town.
3.5.3 TOURISM RELATED ACTIVITIES

The town does not have important places of tourism prominence with their limits, but the
important tourist place of the region such as the Vellore fort, Golden Temple. Yelagiri Hills,
Jalagandeeshwar temple, Vallimalai hills, and Sholingar hills are in close vicinity to the town.
The town also has better facilities to reside, thus the number of tourists visiting the town are
more.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 24 -

3.6 URBAN GOVERNANCE


Sathuvachari Municipality was constituted as Town
Panchayat in the year 01.04.1967 and as second
grade on 25th March 1973 and was upgraded as first
grade from 28.03.1973 as per G.O.Ms.No.143 dated
23.01.1973, RD & LA Department of the local
planning Area is 16.06 sq.km. Sathuvachari
Municipality was upgraded from Selection Grade
Town Panchayat to III Grade Municipality as per
Tamil Nadu Government Gazette Extra-ordinary part
IV – section 2, dated 14.6.2004.

The Municipal Council comprising of 21 ward councilors is headed by Chairperson, who is


elected by councilors of the town. The councilors elect a Vice-Chairperson among them. The
executive wing is headed by the Executive Officer and he is assisted by a team of officials
like Sanitary Inspector, Head Clark, and other officers.

• POLITICAL WING: In Municipal council, the Political arm of the Town consists of 21
elected councilors each representing a ward. The Chairman heads Municipal council
which performs its duties as per the provisions of the District Municipalities Act 1920.
The Political wing provides direction to the Municipality and performs its functions
through a set of committees constituted for different purposes.
• EXECUTIVE WING: The Executive wing is responsible for day to day operations of the
Municipality and is headed by the Executive Officer. The Executive Officer is the
Administrative head of the Municipality and is supported by different departments in
the operations. The Organizational structure comprises of four functional
departments.
• FUNCTIONAL DEPARTMENTS: Sathuvachari consists of four functional departments.
Each department consists of Head who reports to the Executive Officer and
functions as per the responsibilities prescribed in the Act and as delegated by the
Executive Officer.

Department Functions
General Administration Establishment, Accounts, Records, Correspondence, Treasury
Engineering Works, Water supply, Operations and maintenance
Public Health Preventive Health care, Conservancy, Vital Statistics
Revenue Billing and collection of taxes, charges and fees

The Commissioner/ Executive officer forms the prime responsible person of the municipality
and is the fulcrum of all the activities under taken by the municipality. Some of the major
functions and duties of the commissioner are listed below:

• Responsible for preparation and certification of all periodical records, returns and
furnishes all information as may from time to time be required by the Municipal
Council or the Standing Committees.
• Solely responsible for preparation of accounts.
• Discusses various developmental potentials and issues with the elected
representatives and along with some other key officials.
• Coordinates and directs the developmental activities in the town.

Departmental profile and responsibilities of the various functional departments are explained
in brief in the following table.

Department Headed by Assisted by Functions/ Duties/ Responsibilities


General Commissioner/ Manager – General Establishment, Accounts, Records,
Administration/ Executive officer Administration, Head Clerk, Correspondence, Treasury

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 25 -

Personnel Public Relation Officer,


Superintendent and other
officers
Revenue and Revenue Inspectors (1 Junior Assistant, Bill Revenue: Billing and collection of taxes,
Accounts nos.) & Accountant. Collectors. charges and fees
Department Accounts: Control of financial matters,
preparation of budgets and maintenance
and management of accrual based
accounting system of ULB
Engineering Municipal Engineer Assistant Engineer, Junior Planning, Implementation, Operation and
Engineer and Technical Maintenance of Urban Infrastructure.
Assistant Sectors - Street lights, Roads, Buildings,
Drainage, Parks, Water Supply and
Municipal vehicles.
Major Works:
• Construction and maintenance of roads,
buildings and other infrastructure
systems.
• Ensuring the quality and quantity of
water supply to the town
Public Health Municipal Sanitary Sanitary inceptor Prevention of Food Adulteration,
Officer Sanitary Supervisors Conservancy Work, Sweeping Streets,
Sanitary workers Maintenance of drainage, Control of
Drivers and other staff epidemic diseases, License to D&O
trades, Birth & Death Registration, Birth
and Death Registration and Solid Waste
Management

The organization structure of the Municipality is represented in the following chart.

SATHUVACHARI Chairperson
Third Grade Municipality

Executive officer Vice Chairman

Ward
Councilor
Head Clerk (1) Sanitary Municipal
Inspector Engineer (1)
(1)

OHT Tap
Operator Inspector (1)
Junior Bill Sanitary Technical (5)
Assistant Collector Supervisor Assistant (1)
(1)

WS Fitter
Helper (2) (1)
Record
Clerk Wire Man
Sanitary (2)
(1) workers
(35)
Office
Assistant (1)

Drivers
(3)

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 26 -

3.7 FINANCIAL ASSESSMENT


The ULBs normally have their own sources of revenue, collected in the form of taxes and/or
user charges though most of their revenue/ income is in the form of assigned revenue
and/or budgetary revenue grant. Barring the ULBs, all other departments and agencies
provide the services through budgetary support.

Accounts of the ULBs are maintained on cash basis (single entry accounting system) till the
FY 2002-2003. The financial status of each ULB has been reviewed for the past six years,
commencing from FY 2002-03. Currently, ULB in Tamil Nadu maintain three separate funds,
namely General Fund, Water & Drainage Fund and Education Fund. All these funds are
managed under two heads namely, Revenue Account and Capital Account. For the purpose
of this analysis, revenue & capital account of the ULB is considered and Education Fund is
clubbed with General Fund, because it is predominantly reimbursement inclined. Key
financial indicators have been computed and compared with the desired benchmark to
ascertain strength or weakness inherent to the system and appropriate remedial measures
that can be envisioned.

For the purposes of analysis, all the account items are broadly categorized under the
following major heads:

ƒ Revenue Account: All recurring items of income and expenditure are included under this
head. These include taxes, charges, salaries, maintenance expenses, debt servicing,
etc.
ƒ Capital Account: Income and expenditure items under this account are primarily non-
recurring in nature. Income items include loans, contributions by GoTN, other agencies
and capital grants under various State and Central Government programmes and
income from sale of assets. Expenditure items include expenses booked under
developmental works and purchase of capital assets.
ƒ Advances, Investments and Deposits: Under the municipal accounting system, certain
items are compiled under advances, investments and deposits. These items are
temporary in nature and are essentially adjustments for the purpose of recoveries and
payments. Items under this head include income tax deductions, investments/realization,
pension payments, provident fund, payment and recoveries of advances to employees
and contractors, etc.
3.7.1 FINANCIAL STATUS
Table 3.14: Summary of Finances of Sathuvachari
Sl. No. Account Head 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Actual
REVENUE ACCOUNT
1 Income 226.48 193.63 230.81 273.20 266.56 333.73
2 Expenditure 113.04 152.88 149.28 255.55 266.16 470.89
3 Status (Surplus/Deficit) 113.44 40.75 81.53 17.65 0.40 (137.15)
CAPITAL ACCOUNT
1 Income 58.79 29.72 16.28 82.44 92.52 119.76
2 Expenditure 65.65 66.12 81.15 127.56 208.05 152.06
3 Status (Surplus/Deficit) (6.86) (36.40) (64.87) (45.12) (115.53) (32.30)
OVERALL STATUS
1 Income 285.27 223.35 247.09 355.64 359.08 453.49
2 Expenditure 178.69 219.00 230.43 383.11 474.21 622.95
3 Status (Surplus/Deficit) 106.58 4.35 16.66 (27.47) (115.13) (169.45)

Financial assessment of Sathuvachari Municipality has been carried out based on the
financial information collected for six financial years, i.e. FY 2002-03 to FY 2007-08.
Revenue income of the ULB has shown a fluctuating trend over the past few years. It has
fluctuated between the levels of Rs. 193.63 lakhs in FY 2003-04 to Rs. 333.73 lakhs in FY
2007-08. Yet, it shows an overall increase in the past years at a compounded annual growth

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 27 -

rate (CAGR) of 9.17 percent,

Trend in Revenue Income and Revenue Expenditure Trend in Capital Income and Capital Expenditure

500 3
400 2

Rs. in Lakhs
Rs. in Lakhs

300 2

200 1
1
100
0
0
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Income Ex penditure
Income Ex penditure

Capital income comprises loans, grants and contributions in the form of sale proceeds of
assets, and contributions and deposits received. A major share on capital income is in the
form of deposits received on account of capital work assignment. The capital account has
witnessed a deficit-implying utilization of revenue surpluses to fund capital works. The
following sections present a detailed review of revenue accounts, primarily aimed at
assessing the municipal fiscal status and provide a base for determining the ability of the
ULB to sustain the planned investments.

3.7.2 REVENUE ACCOUNT

The revenue account comprises two components, revenue income and revenue
expenditure. Revenue income comprises internal resources in the form of tax and non-tax
items. External resources are in the form of assigned revenues and revenue grants from the
GoTN. Revenue expenditure comprises expenditure incurred on salaries, operation &
maintenance, administrative expenses and debt servicing.

Share of Revenue Receipts

100%

80%

60%

40%

20%

0%
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Property T ax a. Professional T ax
b. Other Taxes (excluding Professional T ax) Assigned Revenue
Devolution Fund a. Water Charges
b. Service Charges and Fees (excluding Water Charges) Grants and Contributions
Sale and Hire Charges Other Income
Loan

REVENUE INCOME
The revenue sources can be broadly categorized as own sources (includes both tax and
non-tax revenues), assigned revenues and grants. The source-wise income generated
during the review period is presented in the table below. The base and basis of each income
source has been further elaborated in the following section.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 28 -

Table 3.15: Source-wise Revenue Income


Sl. No. Account Head 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Actual
REVENUE ACCOUNT
1 Property Tax 56.93 58.41 62.68 67.52 68.13 67.74
2 Other Taxes
a. Profession Tax 10.67 13.14 15.69 15.95 19.17 20.94
b. Others 0.00 0.00 0.00 0.00 0.00 0.00
3 Assigned Revenue 71.52 39.52 50.41 11.22 33.60 27.43
4 Devolution Fund 44.10 50.42 51.94 118.93 81.52 149.76
5 Service Charges and Fees
a. Water Charges 7.33 7.30 7.87 24.25 23.15 23.73
b. Service Charges and Fees 14.39 8.63 11.26 10.20 12.60 16.53
(excluding Water Charges)
6 Sale and Hire Charges 0.00 0.00 0.00 0.04 0.01 0.00
7 Other Income 21.53 16.21 30.95 25.09 28.37 27.61
SECTORAL CONTRIBUTION TO TOTAL REVENUE
1 Property Tax 19.96 26.15 25.37 18.98 18.97 14.94
2 Other Taxes
a. Profession Tax 3.74 5.88 6.35 4.49 5.34 4.62
b. Others 0.00 0.00 0.00 0.00 0.00 0.00
3 Assigned Revenue 25.07 17.70 20.40 3.15 9.36 6.05
4 Devolution Fund 15.46 22.57 21.02 33.44 22.70 33.02
5 Service Charges and Fees
a. Water Charges 2.57 3.27 3.18 6.82 6.45 5.23
b. Service Charges and Fees 5.04 3.86 4.56 2.87 3.51 3.64
(excluding Water Charges)
6 Sale and Hire Charges 0.00 0.00 0.00 0.01 0.00 0.00
7 Other Income 7.55 7.26 12.53 7.06 7.90 6.09
GROWTH TRENDS IN %
1 Property Tax 2.60 7.31 7.71 0.90 (0.57)
2 Other Taxes 0.00 0.00 0.00 0.00 0.00
a. Profession Tax 23.09 19.43 1.69 20.15 9.21
b. Others -- -- -- -- --
3 Assigned Revenue (44.74) 27.56 (77.75) 199.50 (18.34)
4 Devolution Fund 14.32 3.03 128.96 (31.45) 83.70
5 Service Charges and Fees 0.00 0.00 0.00 0.00 0.00
a. Water Charges (0.44) 7.78 208.24 (4.50) 2.49
b. Service Charges and Fees (excluding Water (28.92) (40.03) 30.52 (9.46) 23.56
Charges)
6 Sale and Hire Charges (100.00) -- -- (73.58) (100.00)
7 Other Income (24.72) 90.94 (18.92) 13.07 (2.71)

Property tax is the major source of tax revenue


Details Composition (%)
while other taxes include tax on carriages & carts, Own Tax 25.80
advertisement tax and tax on animals. Non-tax Own Non-Tax 16.57
sources included all non-tax revenues such as Assigned Revenue 13.62
fees and charges levied as per the Act. Such Devolution Fund 24.70
revenue sources include rent from municipal
properties, fees & user charges, sale & hire charges and others.

Major source of revenue income is in the form of Own tax sources (i.e. property tax,
profession tax and other taxes) which contributes about 26 percent during the assessment
period. It is followed by devolutions, which contributes to about 25% of the revenue income
on average.

On an average, 43 percent of the total revenue income is generated through own sources.
As a whole, revenue income has registered an annual growth of about 9.17 percent on
average during the assessment period. Incomes through own-source heads that contribute
substantially towards revenue income include the following:

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 29 -

Property Tax: The most important category Share of Property Tax / Total Incom e

in the own sources of income is the property 30


tax1. This tax is imposed on land and 25

% to Total Income
buildings depending on their nature of use. 20

Property tax component comprises holding 15

tax, latrine / drainage tax and lighting tax. 10


5
Property tax is based on the Annual Rental
0
Value (ARV) of property and is the single 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
largest and most elastic source of revenue.

The ARV of the property varies with the nature of use, viz. a) residential use - owner
occupied, b) residential use - rental and c) commercial use.

The ARV is calculated based on the plinth area, building and land cost. The present tax rate
is 10 percent of the ARV, which comprises 5 percent in general purpose tax, 3 percent in
water tax, 1percent in lighting tax and 1 percent in scavenging tax. ULB is empowered to
revise the property tax at least once in six years (quinquennial revision).

The property tax Table 3.16: Demand-Collection-Balance (DCB) Statement for Property Tax
component has (Rs. Lakhs)
registered an average Particulars 2002- 2003- 2004- 2005- 2006- 2007-
annual growth rate of 03 04 05 06 07 08
3.59 percent during the Total Number of Assessments 9535 9831 10803 11056 11987 12007
Growth in Assessments -- 3.10 9.89 2.34 8.42 0.17
assessment period. Demand
Property tax demand- 1. Arrears 14.74 25.24 30.65 28.29 35.84 30.23
collection-balance 2. Current 62.55 58.41 62.28 65.51 66.43 66.96
(DCB) statement 3. Total 77.29 83.65 92.92 93.80 102.26 97.19
analysis indicates a Collection
1. Arrears 14.20 22.14 21.99 13.48 15.44 12.45
uniform increase in 2. Current 34.64 30.87 45.03 44.49 49.84 48.42
number of property tax 3. Total 48.84 53.01 67.02 57.97 65.28 60.87
assessments during Balance
the last six financial 1. Arrears 0.54 3.10 8.66 14.81 20.40 17.78
2. Current 27.91 27.54 17.24 21.02 16.59 18.54
years. Average
3. Total 28.45 30.65 25.90 35.84 36.99 36.32
property tax per Collection Analysis
property works out to 1. Arrears 96.34 87.71 71.75 47.64 43.08 41.17
Rs. 577 while average 2. Current 55.38 52.85 72.31 67.91 75.03 72.31
ARV of the property 3. Total 63.19 63.36 72.13 61.80 63.83 62.63
works out to Rs. 5541 Source: ULB; 2008
during the assessment period.
Growth in PT assessments Grow th trends in Property tax
14000
70
12000
10000 65
Rs. in lacs

8000
6000 60
4000
2000 55

0
50
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

On average, about 30 percent of the total demand constitutes the arrears during the
assessment period. The overall collection performance was about 64.49 percent during the
assessment period.

1Property tax belongs to the class of general benefit taxes, primarily indirect user charges for municipal services whose benefits are collective
and not confined to any particular individual / community.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 30 -

Property Tax Collection Performance Comparison of PT and WS assessments


74% 14000
72% 12000
70% 10000

% of collection
68%
8000
66%
6000
64%
4000
62%
2000
60%
0
58%
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
56%
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 No. of PT assessments No. of WS assessments

Other Taxes: Other tax revenues are in the form of taxes levied on carriage & carts,
animals, advertisement, professional tax and others. The most important category in own
sources of income is the property tax. Professional tax is the other most important tax and it
contributes about 5.07 percent of the total tax revenue.

Assigned Revenues: Assigned revenues Trend


TrendininAssigned
AssignedRevenues
Revenues
include revenues transferred to the ULB by 100
100

lacs
GoTN under specific acts. This source of

Rs.ininlacs
50
50
revenue income comprises duty on transfer of

Rs.
00
properties, entertainment tax / public resort and 2002-03 2003-04 2004-05 2005-06 2006-07
2002-03 2003-04 2004-05 2005-06 2006-07
other assigned revenues. The growth of which
Years
however has been inconsistent. It has a share Years
Assigned
AssignedRevenues
of 13.62 on average, of the total revenue Revenues

income. As a whole, the assigned revenue has


shown inconsistent growth rate during the assessment period. During these six financial
years there is more fluctuation in the Assigned revenues.

Devolution Funds: Based on the Second State Trend in Devolution funds


Finance Commission recommendations, GoTN 160
transfers 8% of its state revenue to the local 140
120
governments. Devolution fund shows a
Rs. in lacs

100
fluctuating trend over the assessment period. 80
60
On average, it contributes about 24.70% of the 40

total revenue. It has consistently increased from 20


0
Rs. 44.10 lakhs in FY 2002-03 to Rs. 149.78 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

lakhs in FY 2007-08, except during the FY


2006-07. During the FY 2006-07, it has fallen to a level of Rs. 81.52 lakhs.

Non-Tax Revenue / Remunerative Enterprise: Income from remunerative enterprises is


categorized as non-tax income received in the form of rentals from assets like shopping
complexes, market fees, parking fees and income from other real assets owned by the ULB.
Rent from the municipal properties is only a minor contributor among non-tax revenue items.
Among the Non-Tax revenue, other income contributes 8.06% and Water Charges
contribute about 4.59% to the total revenue income. During the assessment period Non–Tax
contributes about 16.57 percent on average.

REVENUE EXPENDITURE
Revenue expenditure of the ULB has been analyzed based on expenditure heads broadly
classified under the following heads:
ƒ Personal cost;
ƒ Administrative expenses;
ƒ Operating expenses;
ƒ Interest & finance charges;
ƒ Revenue grants, contributions and subsidies; and
ƒ Miscellaneous / other expenses.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 31 -

Table 3.17: Head-wise Revenue Expenditure


Sl. No. Account Head 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Actual Budget
EXPENDITURE ACCOUNT
1 Personnel Cost 28.12 28.78 30.61 34.13 47.45 58.27
2 Terminal and Retirement Benefits 0.20 0.17 0.17 0.17 0.17 1.75
3 Operating Expenses 51.28 52.79 62.00 69.61 71.49 198.90
4 Administrative Expenses 15.43 42.36 13.29 84.40 92.91 127.02
5 Finance Expenses
a. Interest on Loans 4.43 14.17 13.96 16.71 2.64 16.26
SECTORAL CONTRIBUTION TO TOTAL EXPENDITURE
1 Personnel Cost 15.73 13.14 13.28 8.91 10.01 9.35
2 Terminal and Retirement Benefits 0.11 0.08 0.07 0.04 0.04 0.28
3 Operating Expenses 28.70 24.10 26.91 18.17 15.08 31.93
4 Administrative Expenses 8.63 19.34 5.77 22.03 19.59 20.39
5 Finance Expenses
a. Interest on Loans 2.48 6.47 6.06 4.36 0.56 2.61
GROWTH TRENDS IN %
1 Personnel Cost -- 2.35 6.36 11.52 39.02 22.79
2 Terminal and Retirement Benefits -- (13.33) 0.00 0.00 0.00 920.61
3 Operating Expenses -- 2.93 17.46 12.28 2.70 178.22
4 Administrative Expenses -- 174.55 (68.62) 534.85 10.09 36.72
5 Finance Expenses
a. Interest on Loans -- 220.18 (1.49) 19.74 (84.22) 516.65
Source: ULB; 2008

Share of Revenue Expenditure


100% Capital Expenditure
90%
80% a. Interest on Loans

70%
Administrative Expenses
60%
50%
Operating Expenses
40%
30%
T erminal and
20% Retirement Benefits
10% Personnel Cost
0%
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

Application of funds by each sector and head-wise utilization of the revenue expenditure is
presented in the table and charts. It may be observed that the operating expenses accounts
more than the other expenditures with an average of Rs.84.34 lakhs during the assessment
period, which contributes about 24.15 percent of the total expenditure on average. Next
major expenditure is an administrative expense which is contributing about 15.96%. It is
followed by Personnel Cost contributing 11.74% in the total expenditure. During the
assessment period, revenue expenditure has indicated an average growth of about 37.03
percent per annum while the corresponding
growth in revenue income was 9.17 percent. Trend increase in Personnel cost
70

Personnel cost & terminal benefits to 60

employees: This include salaries and other 50


Rs. in lacs

related payments to employees. The 40

expense has been more or less steadily 30

increasing; it reaches the maximum in the 20

year 2007-08. The growth trend of 10

personnel expenses is as follows- 0


2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 32 -

The personnel cost has been gradually increasing but not in a great pace. The ULB shall try
to outsource certain activities like solid waste management, and street light maintenance.
Many of such activities would help in reducing the personnel cost.

Operating Expenses: This head of expenditure include power charges, maintenance


expenses of gardens, parks, hospitals, removal of debris, purchase of scavenging materials,
etc. The major item under this head is the power charges for Head Water works which
constitutes roughly 8.31% of the total expenditure. Apart from power charges for Head
Water works, streetlight maintenance constitutes about 5.18% of the total expenditure. The
composition of power charges as part of the total operating expenses is given in the below
graph.

Trend increase in power charges Power charges as a ratio of total operating expenses

80.00
40 70.00
Rs. in lacs

60.00
20

R s . in la c s
50.00
0 40.00
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 30.00
20.00
10.00
Pow er charges for headw orks 0.00
Pow er charges for street lights 2002-03 2003-04 2004-05 2005-06 2006-07
Pow er charges for headw orks Pow er charges
Yearsfor street lights Total operating expenses

From the numbers and the graph, it is seen that power charges consumes the majority
portion. The ULB shall focus its attention on reducing the costs incurred under this head by
privatizing the entire street lighting, to the Energy Service Companies. This is the model
which is being tried by many local bodies. This applies to both street lighting and water
supply. It is to be noted that the above analysis does not include sewerage systems. If
sewerage systems are proposed, the ULB cannot sustain the expenditure in their balance
sheet. Energy efficiency measures can be attempted by the ULB in a small scale.

Repairs & Maintenance: This is the major Re pairs & M ainte nance
head of expenditure and includes repairs 80
and maintenance of assets like drainage, 70

bridges, roads, etc. The bigger item of 60

expenditure under this head is School & 50


Rs. in lacs

Water Supply Maintenance which 40


30
constitutes 6.22% of the total income. The
20
other maintenance expenditure constitutes a 10
minor ratio of less than 1%. Moreover, the 0
ULB shall also do a leak detection study, 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

upon implementation of which the


maintenance costs of water supply could be less. Reportedly, the other major expenditures
are the heavy vehicle maintenance and drainage and culvert maintenance. In absolute
terms, it does not appear to be huge.

DEBT SERVICING
As on March 31, 2008 ULB has a loan obligations/debt liability of Rs. 156.90 lakhs.
Considering the current property tax demand (FY 2007-08) of Rs. 66.96 lakhs, the ULB can
leverage debt to finance its projects to an extent of Rs. 134 - 201 lakhs as this would be
within the threshold range of minimum 2 and maximum 3 times the current property tax
demand generally considered by financial institutions for the purposes of lending. However,
based on the revenue receipts and revenue expenditure during the assessment period, the
ULB would be in a position to draw loans2 to an extent of about Rs. 63.52 lakhs on average.

2 Based on the acceptable thumb-rule, about 25 percent of the total revenue receipts and/or about 30 percent of the total revenue expenditure,

whichever is lower, can be considered as leverageable surplus.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 33 -

3.7.3 CAPITAL ACCOUNT


The capital account comprises two components, viz. capital income and capital expenditure.
The base and the basis of transactions in this account are elaborated below.

Table 3.18: Break-up of Capital Receipts/Income


2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Capital Account (Receipt)
A Grants in aid from State Government
1 Basic Amenities 0.00 3.00 0.00 0.00 10.62 0.00
2 M.P L.A.D 25.99 6.88 0.00 0.00 5.80 5.10
3 M.L.A, L.A.D 12.65 11.50 7.25 5.95 0.35 28.08
4 D.D.P 2.20 3.65 1.64 4.00 0.00 4.00
5 Drought Relief 0.00 0.00 0.00 0.00 0.00 15.00
6 C.M.D.A 13.53 3.20 6.34 0.00 0.00 23.30
7 Specific Grants- Part II Scheme 0.90 0.00 0.75 0.00 0.00 10.00
8 Hill Area Development Grant 0.00 0.00 0.00 0.00 0.00 2.12
9 Temple Town/ Tourism Development 0.00 0.00 0.00 15.05 15.05 16.81
10 Bus Stand/ C.C Roads 0.00 0.00 0.00 50.00 50.00 0.00
11 Hospitals & Dispensaries 0.00 0.00 0.00 0.00 0.00 0.00
12 Preventive medicine 0.00 0.00 0.00 7.44 0.00 11.75
13 Water supply and Drainage 0.00 1.49 0.00 0.00 0.00 0.00
14 Town Planning 0.00 0.00 0.30 0.00 5.03 0.00
15 Others 0.32 0.00 0.00 0.00 0.00 0.00
Total Grants in Aid- A (1 to 17) 55.59 29.72 16.28 82.44 86.85 116.16
B Grants from Central Government
1 Eleventh/TwFC Central Fin.Commn. 0.00 0.00 0.00 0.00 0.00 0.00
2 National Slum Development Programme 1.30 0.00 0.00 0.00 0.00 0.00
3 SJSRY Wages 0.00 0.00 0.00 0.00 0.00 0.00
4 SJSRY Self Employment 0.00 0.00 0.00 0.00 1.67 1.60
5 VAMBAY Scheme 1.90 0.00 0.00 0.00 4.00 2.00
Total Grants from Central Govt. B 3.20 0.00 0.00 0.00 5.67 3.60
Total Grants from State & Central Govt. 58.79 29.72 16.28 82.44 92.52 119.76
Source: ULB; 2008

Capital Income: Capital Table 3.19: Break-up of Capital Expenditure


income mainly comprises 2002- 2003- 2004- 2005- 2006- 2007-
income/receipts for capital Particulars
03 04 05 06 07 08
works like loans/ Roads 33.09 16.99 51.36 53.88 156.90 40.11
borrowings, capital grants Storm Water Drains 14.70 17.49 16.36 19.97 21.23 65.04
Water Supply 14.69 18.63 3.87 0.00 14.63 22.19
from the Central/State Sewerage & Sanitation 0.00 0.00 1.02 13.33 0.00 6.45
Government, and sale Street Lighting 0.00 0.00 0.00 3.63 4.35 5.84
proceeds from assets apart Others 3.17 13.01 8.54 36.75 10.94 12.43
from transfers from the Total 65.65 66.12 81.15 127.56 208.05 152.06
revenue account to the Source: ULB; 2008
three capital funds
maintained by the ULB, viz. Municipal General Funds, Earmarked Funds and Reserve
Funds. This account also has contributions received in the form of security deposits/ EMD
from suppliers, contractors, etc. It is noteworthy that the ULB has received capital income of
Rs.119.76 lakhs during the FY 2007-08 of which 96% was received from the state
Government grant.

Capital Expenditure: Capital expenditure may be broadly categorized under three broad
heads, viz. a) acquisition/ purchase of fixed assets; b) capital projects; and c) other capital
expenses like refund of deposits, spending from the municipal funds, etc. The ULB has
spent about Rs.208.05 lakhs during the FY 2006-07, whereas the capital income is only
Rs.95.52 lakhs in FY 2006-07. It is noted that the amount for this work is drawn from the
general fund of the municipality.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 34 -

3.7.4 REVIEW OF FINANCE

Highlights of the finance of Sathuvachari Municipality under different heads are listed below.

Minimum Maximum Average Unit


A. Resource Mobilization Indicators - General

1 Share of Property Tax Component 14.94 26.15 20.73 percent


2 Share of Other Taxes (including Professional Tax) 3.74 6.35 5.07 percent
3 Share of Assigned Revenue 3.15 25.07 13.62 percent
4 Share of Devolution Funds 15.46 33.44 24.70 percent
5 Share of Service Charges and Fees 7.13 9.96 8.50 percent
6 Share of Grants and Contributions 6.59 26.41 19.31 percent
7 Share of Sale and Hire Charges 0.00 0.01 0.00 percent
8 Share of Other Income 6.09 12.53 8.06 percent
9 Per Capita Income -Year 2006-07 877.15 Rupees
10 Growth in Property Tax Component (0.57) 7.71 3.59 percent
11 Growth in Other Taxes (including Professional Tax) 1.69 23.09 14.71 percent
12 Growth in Other Taxes (excluding Professional Tax) 0.00 0.00 0.00 percent
13 Growth in Assigned Revenue (77.75) 199.50 17.25 percent
14 Growth in Devolution Funds (31.45) 128.96 39.71 percent
15 Growth in Service Charges and Fees (including Water (26.67) 80.05 17.98 percent
Charges)
16 Growth in Service Charges and Fees (excluding Water (40.03) 31.16 7.15 percent
Charges)
17 Growth in Grants and Contributions (49.45) 406.39 70.68 percent
18 Growth in Sale and Hire Charges (100.00) (73.58) (91.19) percent
19 Growth in Other Income (24.72) 90.94 11.53 percent
20 Growth in Total Receipts (21.71) 43.93 12.02 percent

B. Resource Mobilization Indicators - Property Tax

1 No. of Assessments as on 2006/2007 11987 Nos.


2 Growth in Assessments 2.34 9.89 7.92 percent
3 Current Tax Rate 10 percent
4 ARV per Property - 2006/2007 5541 Rupees
5 Tax Per Property (Average) 577 Rupees
6 Collection Performance
a. Arrear Demand 43.08 96.34 69.30 percent
b. Current Demand 52.85 75.03 64.70 percent
c. Total Demand 61.80 72.13 64.86 percent

C. Resource Mobilization Indicators - Profession Tax

1 No. of Assessments as on 2006/2007 2448 Nos.


2 Growth in Assessments 1.02 1.77 1.86 percent
3 Current Tax Rate 0 percent
4 Tax Per Assessment (Average) 626 Rupees
5 Collection Performance
a. Arrear Demand 0.00 0.00 0.00 percent
b. Current Demand 100.00 100.00 100.00 percent

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 35 -

c. Total Demand 100.00 100.00 100.00 percent

D. Resource Mobilization Indicators - Water Charges

1 No. of Connections as on 2006/2007 6695 Nos.


2 Growth in Connections 1.06 11.93 7.58 percent
3 Share of Water Tax in Property Tax Component 0.00 percent
4 Collection Performance
a. Arrear Demand 9.38 22.08 18.24 percent
b. Current Demand 35.86 52.70 44.87 percent
c. Total Demand 22.95 33.38 30.55 percent

E. Expenditure Management

1 Share of Personnel Cost (Establishment) 8.91 15.73 11.74 percent


2 Share of Terminal and Retirement Benefits 0.04 0.28 0.10 percent
3 Share of Operating Expenses 15.08 31.93 24.15 percent
6 Share of Administrative Expenses 5.77 22.03 15.96 percent
7 Share of Finance Expenses 0.56 0.56 3.76 percent
8 Share of Deposits & Advances 24.41 24.41 33.95 percent
9 Per Capita Expenditure - 2006-2007 917.22 Rupees
10 Growth in Personnel Cost (Establishment) 2.35 39.02 16.41 percent
11 Growth in Terminal and Retirement Benefits (13.33) 920.61 181.46 percent
12 Growth in Operating Expenses 2.70 178.22 42.72 percent
15 Growth in Administrative Expenses (68.62) 534.85 137.52 percent
16 Growth in Finance Expenses (84.22) 516.65 134.17 percent
17 Share of Deposits & Advances (26.91) 63.10 23.37 percent
18 Share of Debt Servicing Expenditure 0.56 6.47 3.76 percent
19 Operating Ratio 0.50 1.00 0.79 Ratio
20 Growth in Debt Servicing Expenditure (78.72) 205.43 17.40 percent
21 Growth in Total Expenditure 5.22 66.26 29.84 percent

F. Debt and Liability Management

1 Agency wise Outstanding Loan Amount


a. Government of Tamil Nadu 10.72 Rs.
Lakhs
b. MUDF/TNUDF 18.41 Rs.
Lakhs
c. Other Financial Institutions 127.77 Rs.
Lakhs
Total 156.90 Rs.
Lakhs
2 Outstanding Loan Per Capita 303.48 Rupees
3 Ratio of Outstanding Loan to Property Tax Demand 2.39 Ratio
4 DS/TR (Debt Service/Total Revenue) 0.99 7.32 4.48 percent

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 36 -

3.7.5 KEY FINANCIAL INDICATORS

To assess the financial situation and performance of the ULB, certain key financial indictors
have been generated. Following are the heads under which specific indicators of financial
status and performance of the ULB have been assessed:

ƒ Resource mobilization;
ƒ Expenditure management; and
ƒ Debt and liability management.

Following table provides performance of various key financial indicators of the ULB during
the assessment period, along with the comparison with certain desirable benchmarks for
evaluation.
Table 3.20: Performance of Key Financial Indicators in Sathuvachari Municipality
Sl. Account Head Summary Statement
No. (All figures in Rs. Lakhs)
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08
Actual
1 Revenue Account Status (Incl. OB) 515.31 519.66 536.32 508.85 393.72 224.27
2 Operating Ratio (Rev. Expend. /Rev. Inc.) 0.63 0.98 0.93 1.08 1.32 1.37
3 Debt Servicing - Percentage of Income 1.55 6.34 5.65 4.70 0.73 3.59
Source: ULB; 2008

Performance of Sathuvachari
Minimum Maximum Average Desirable Benchmark
Existing (2002-03 to 2006-07)
OR (Ratio) 0.50 1.00 0.79 Less than 1.00
DSR (%) 0.99 7.32 4.48 Less than 25 percent
Category 1

Note: 1: Financially Sound; 2: Financially Fragile; 3: Financially Insolvent

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 37 -

4
POPULATION PROJECTION
4.1 BASIS AND METHODS
A critical factor in estimating the requirement of the urban infrastructure for future planning,
project formulation and capital investment estimation and outlay is the projection of
population. Projection of the future population for Sathuvachari is based on the following
factors:

ƒ Past census population and relevant details;


ƒ Decadal growth and growth rates of the country, state (TN) and the ULB;
ƒ Population density pattern and availability of land for the future development;
ƒ Socio-economic characteristics and economic base along with employment generating
potential;
ƒ Development (Master) Plan for the region considering the contextual issues stated and
growth pattern in terms of land use and land availability for growth including proposed
plans and potential for significant change in land use (within project period/ design life);
ƒ Positioning of the hinterland, linkages with core of region and connectivity, importance
and contribution as an economic base for the region;
ƒ Availability of resources to facilitate provision and delivery of services and facilities;
ƒ Implications of the ongoing and proposed projects towards improving the provision and
delivery of services;
ƒ Other external and internal growth dynamics responsible for migration; and
ƒ Other factors - tourism, natural disasters and related.

The impact of the above factors was considered while


Population Projection Methods
performing the projection. Population projection has been Numerical Methods
performed based on CPHEEO guidelines that are generally ƒ Arithmetic Increase
acceptable for urban planning and infrastructure ƒ Incremental Increase
development related projects. The base criteria adopted for ƒ Geometric Increase
the projection of future population are listed below: Graphical Methods
ƒ Exponential Series
ƒ Polynomial 2nd Order Series
ƒ Year of Study - 2008 ƒ Power Series
ƒ Census Years – 2011 to 2061 ƒ Logarithmic Series
ƒ Design Stages - 2010 (Commissioning/Present Stage), ƒ Linear Series
2025 (Intermediate Stage) and 2040 (Ultimate Stage)

Per CPHEEO guidelines and general construction practices, civil works/structures in the
case of urban infrastructure projects such as water supply and sewerage are designed for a
service life of 30 years and mechanical/electrical equipment for 15 years. Therefore, design
stages essentially reflect the period/duration for which projection is required to design the
replacements, renewals and reconstruction activities. Projection of future population has
been performed for the vision period exceeding 50 years (2008 - 2061).

4.2 METHODOLOGY AND EVALUATION OF PROJECTION METHODS


The methodology used to project growth of population for Sathuvachari is outlined below:

ƒ A pilot projection was performed to evaluate the past trend of decadal growth, i.e. the
population of 2001 was projected by utilizing available census data from 1961 to 1991.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 38 -

The projected value (by numerical and graphical methods) was then compared with the
actual census population to identify the method that resulted in the minimum variation
(nominal - +/- 10%);
ƒ Projection of future population (2008 - 2061) was then performed by utilizing the
method(s) that resulted in the minimum variation (< 10 percent). In cases where the
variation was found to be significant (> 10 percent), the applicable methods were utilized
for comparison;
ƒ Results from the aforementioned methods were compared, average decadal growth
rates estimated and submitted for review and approval by the Review Committee.

Details of the past and present census population as provided by the ULB and verified with
the Department of Census are furnished in Table 4.1.

Table 4.1: Census Population (1951 - 2001) of Sathuvachari


Year Area Census population Decadal growth rate Density
sq.km. pers. % pers./sq.km.
1961 16.06 6,317 -- 393
1971 16.06 10,736 69.95% 668
1981 16.06 16,752 56.04% 1,043
1991 16.06 25,165 50.22% 1,567
2001 16.06 44,942 78.59% 2,798
Source: Analysis based on the Data provided by ULB; 2008

4.3 PROJECTION OF FUTURE POPULATION


Based on the aforementioned methodology and evaluation performed, population has been
projected for Sathuvachari for the specified stages based on numerical and graphical
methods. Details of the comparison of population projection by the aforementioned methods
for Sathuvachari and the evaluation of projection methods (pilot projection) are enclosed as
Annexure – 1. A comparison of results of population projection for Sathuvachari is shown
below in Table 4.2.

Table 4.2: Population Projection for Sathuvachari – Comparison


Year Census Arithmetic Geometric Incremental Poly 2nd order
information increase increase increase
1961 6,317
1971 10,736
1981 16,752
1991 25,165
2001 44,942
2008 51,701 63,191 54,747 58,047
2010 53,633 69,653 58,010 62,530
2011 54,598 73,128 59,718 64,842
2021 64,255 118,991 79,613 90,566
2025 68,117 144,573 89,004 102,180
2031 73,911 193,619 104,627 121,021
2040 82,601 300,079 131,517 152,474
2041 83,567 315,049 134,760 156,206
2051 93,223 512,637 170,013 196,121
2057 99,017 686,545 193,622 222,341
2061 102,880 834,145 210,386 240,767

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 39 -

4.4 PROJECTED POPULATION


Table 4.3: Projected Population
The projection of future population has been Year / Census Recommended
performed for Sathuvachari is based on the Stage Population Projected Population
pertinent factors, potential impacts, related
aspects and their applicable methods. 1961 6,317
1971 10,736
It can be observed that the projection of future 1981 16,752
population by ‘Arithmetic Increase Method and 1991 25,165
‘Poly 2nd order increases method is optimal 2001 44,942
projections for the purposes of planning for 2008 51,701
urban infrastructure projects. 2010 53,633
2011 54,598
The lesser projected value of the 2021 64,255
2025 68,117
aforementioned methods, i.e. ‘Arithmetic
2031 73,911
Increase Method’ was recommended as the 2040 82,601
design population for the respective project 2041 83,567
design stages and vision period. The 2051 93,223
recommended projected population, given in the 2057 99,017
adjacent table is approved for further analysis. 2061 102,880

Projected Population

120,000

100,000

80,000

60,000

40,000
Ultimate stage
Interim Stage
Base Year

20,000

-
1961 1971 1981 1991 2001 2011 2021 2031 2041 2051 2061

Base population Projected Population

4.5 PROJECTION FOR PROJECTED FORMULATION / DETAILED DESIGN


The aforementioned projection has been performed only for the purpose of assessment of
the demand versus the supply gap in urban infrastructure provision and delivery. It is
recommended to conduct a detailed projection during the Detailed Project Report
preparation stage by considering the below listed factors:

ƒ Project-specific requirements and characteristics;


ƒ Present and past population, area and density of each ward in the Corporation;
ƒ Classification of wards as high, medium and low-density zones (relative grading) to
assess the localized development and growth pattern of population;
ƒ Potential for future development in each ward based on proximity to city/town center, its
position/location in the District, established road network and access to related
infrastructure and transport facilities; and
ƒ Present land use pattern and possible significant change in land use over the project
period (generally 30 years); and
ƒ Growth rates published by the Department of Census, GoI, and are
characteristic/specific to similar cities.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 40 -

5
CITY OPINION SURVEY
5.1 SURVEY FINDINGS
Broad Objectives
A City Opinion survey was carried on for ƒ Assess existing standards of service delivery
Sathuvachari town to understand the perceptions of ƒ Determine need for higher standards
the citizens regarding the overall reflection of the ƒ Priorities and preferences
living conditions in the town and the services ƒ Bring out inequities across space and across
category of respondents
rendered by the ULB. The findings and inferences
drawn from the above survey formed an important
output for formulation of CDP as these were directly Aspects/Sectors Covered in Demand
related to ideas and concepts of the citizens. Assessment Surveys
ƒ Water supply
ƒ Sewerage and drainage
This survey also highlighted the key concern areas ƒ Solid waste management
among the citizens and thereby helped the ULB to ƒ Road network and transportation
focus its attention on such issues. Finally, the survey ƒ Parking facilities
also provided key reference points for determining the ƒ Street lighting
strategies to achieve the vision. It may be noted that ƒ Social infrastructure / community facilities
ƒ Complaint redressal system
all the information captured and the inferences drawn
ƒ Property tax
from this section were based on perceptions of the ƒ Public awareness
respondents. ƒ Public opinion
ƒ Personal information
5.1.1 SURVEY METHODOLOGY

The survey was conducted in all the wards located within the administrative jurisdiction of
the ULB. The survey covered various aspects on the Future Developmental Vision of the
Town, Provision and delivery of urban/civic services, aspects related to citizen
representation such as presence of citizen associations, involvement of citizens in managing
urban services, etc. The survey also gathered socio-economic data relating to the
respondents in order to draw suitable conclusions regarding different categories of
respondents. The broader aspects covered under the surveys are given in the box above.

The sample size for the survey was selected based on the Administrative Jurisdiction and
various income groups. Broadly, the samples are categorized as follows:

ƒ Households;
ƒ Urban Poor (Slum Dwellers);
ƒ Commercial Establishments;
ƒ Educational Institutions and
ƒ Industrial Establishments.

Questionnaire was designed to perform the City Opinion Survey. A copy of the above
questionnaire is given as Annexure - 5. The methodology adopted for selection of samples
for each of the categories is given in the table below:

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 41 -

Table 5.1: Sample Selection Methodology


SL.NO CATEGORY RATIONALE
1. Households ƒ Sampling based on electoral rolls, using systematic random sampling method;
ƒ Selection of about 25 pockets with about 2 interviews per pocket;
ƒ Pockets distributed across the wards. More pockets in high density wards;
ƒ Pockets preferably covered areas with known inequities in service provision;
ƒ Monitoring socio-economic categories in pocket interviews during fieldwork &
conducting booster interviews (purposive) to achieve shortfall (if any) in a particular
category to arrive at a quota of about 50 in each of the four categories;
ƒ Booster interviews (purposive), covered at least one-third of women respondents;
ƒ Conduct 1 household interview per every 25 buildings (skip 25 buildings for the next
interview).
2. Urban Poor (Slum ƒ Slums categorized into 4 categories by population and samples were selected for
Dwellers) ensuring geographical spread as well as coverage across slum settlements of different
sizes;
ƒ Number of interviews conducted per slum is proportional to the population of the slum
- depending upon the size, 2-4 interviews conducted per slum; and
ƒ Cluster sampling followed to conduct interviews in each slum - each slum is divided
into 3-4 clusters (that ensures geographical coverage within the slum settlement) and
2-3 interviews conducted in each cluster.
3. Commercial ƒ Purposive sampling followed;
ƒ Geographical coverage is ensured while selecting establishments - interviews
conducted in different areas across the town;
ƒ Covered areas/establishments located outside municipal limits (but within urban
agglomeration), which are functionally connected to the city (if required); and
ƒ Owner / Manager of the establishment interviewed.
4. Educational ƒ Purposive sampling followed;
Institutions ƒ Geographical coverage is ensured while selecting institution - interviews conducted in
different areas across the town;
ƒ Covered areas/establishments located outside municipal limits, which are functionally
connected to the town (if required); and
ƒ Interview the head of the institution/ technical staff members.
5. Industries ƒ Purposive sampling followed;
Establishments ƒ Geographical coverage is ensured while selecting the industries - interviews
conducted in different areas across the town;
ƒ Household industries(purposive), conducted to incorporate the small scale industries
and other industries;
ƒ Number of interviews conducted in a ward is proportionate to the number of industries;
and
ƒ Workers or Owners interviewed.
Note: In all categories, about two-third of total sample size were selected on random basis as per above suggested methodology, while remaining
one-third of the sample size were covered through purposive booster interviews to achieve balance of different types of respondents within each
category.

The surveyors were provided with on-field training for conducting the survey and the
supervisors were made responsible for maintaining the desired level of quality of the survey.
Pilot test was carried out before the commencement of the survey to ascertain: a) whether
the identified/specified respondent is able to answer the questions, b) whether the questions
were properly understood by the respondents and all appropriate responses were listed, and
c) whether any key aspects had been left out of the questionnaire. The pilot tests were
successful.

5.1.2 ANALYTICAL FRAMEWORK


The City Opinion Survey analysis was carried out separately for each category viz.,
households, and urban poor, commercial establishments, educational and industrial
establishments. Apart from the category-wise analysis, certain results have been analyzed
across all categories of consumers to highlight the key findings for Sathuvachari as a whole.
The ward wise sample size selected in each category is listed below:

Table 5.2: Ward Wise Sample Selection in each Category


Category 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Commercial - - - - - - 2 - 2 2 - 3 2 2 1 - - - - 1 - 15

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 42 -

Category 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Education - - - - - - - - - - - - - - 3 - - - 1 - 1 5
Industries - 2 - - - - - - - - - - - - - - 1 - - - - 3
Household 1 1 4 4 4 5 - 5 4 3 4 2 3 1 2 3 - 2 4 4 4 60
Slums 3 1 - - - - 1 - - - - - - 2 - 1 5 3 - - - 16
Total 4 4 4 4 4 5 3 5 6 5 4 5 5 5 6 4 6 5 5 5 5 99

The broad framework adopted for the analysis is given below:

ƒ Coverage: Analysis of the coverage has been done separately for each customer
category to ascertain category-specific issues. Finally, a cumulative analysis was carried
out across all categories to have an overall picture.

ƒ Public Opinion/Public Awareness: Two aspects relating to public opinion/awareness


were analyzed as part of the survey:
o Awareness of various aspects relating to ULB service delivery, citizens perception of
a good city, vision of citizens.
o Overall rating of municipal services on a categorical scale reflecting the satisfaction
level of the citizens. Citizens were also questioned about the most important service
that needs to be improved. This input was required to prioritize the action plans of
the ULB.

ƒ Cross-Tabulations: Each question typically captures responses to one variable or a


particular category. Cross-tabulation is a method that helps highlight findings in one
variable and further analyze of the responses. In one category, cross-tabulation primarily
involves tabulating responses to a dependent variable vis-à-vis an independent variable.

ƒ Conclusions: The conclusions and implications of the survey findings have been drawn
at both levels, viz. for operational decisions and for strategic/policy decisions. Both have
been taken into account as inputs for CDP preparation.

5.2 SURVEY RESULTS, ANALYSIS AND INFERENCES


The respondents expressed their interest in the provision of an improved level of civic
services. The survey, evaluated the perception of citizens on services presently provided by
the ULB.

VISION FOR THE TOWN

The vision for the town is derived from inferences given by the citizens on their requirements
and phase of development of the town. The opinions/ suggestion of the citizens given during
the survey are given below:

ƒ The potential factor for the development of the town is described to be the market
facilities and better linkage with the surrounding villages and other urban centers.
ƒ Majority of the people stresses the importance of improvement of infrastructure
facilities and sustainable economic development.
ƒ The need for other recreational facilities in the town was put forward as the town
does not have major tourist attractions.
ƒ According to the people’s opinion, it would better connectivity the railway station in
the town.
ƒ In the future vision of the town, the inhabitants perceives the town as an urban node
having higher order education and health facilities.

Analysis of the data collected through the City Opinion Survey on several aspects of the
identified Focus Areas is presented in the following sections.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 43 -

ƒ Basic Infrastructure
ƒ Public Facilities
ƒ Environment

5.2.1 BASIC INFRASTRUCTURE

The analysis of the survey shows that the


respondents’ key interest lies in the provision of water 80
70
supply and roads. The parking facilities in the opinion 70

of the respondents need lesser importance. According 60

to the survey, about 90% of the importance is to be 50

40
given to the provision of water supply. In case of the 30
30

town, next higher importance is given to the roads as 20


more 80% by the respondents. 10

WATER SUPPLY Additonal Water Supply No Response

The issues as described by the public and the 70 67

stakeholders are mainly inadequate and inconsistent 60


supply, limited supply, poor water quality and poor 50
maintenance. The survey result shows that the water 40
33
supply system is to improve a lot and not up to the 30
satisfactory level of the people. More over 70% of the 20
people responded that water supply system requires 10
improvement. Majority of the public states, that there 0
is an inadequacy in supply of water. The supply in the Need Maintenance No Response

town is not consistent in terms of period and quantity


of supply. 52 52

51

50
SEWAGE AND SANITATION 49

48
47
The respondents of the town have expressed the 47

need for the underground sewerage system. More 46

than 67% of the public have stated the need for 45

underground sewerage system as there is no proper 44


Need to Develop No Response
mechanism of disposal in the town. Almost all the
household use the septic tanks with soak pits for 70 66
disposal. The inhabitants of the town have pointed out 60
the issue of poor drainage and improper sanitation 50
facilities in the town.
40
34
30
STORM WATER DRAINAGE 20

10
The need for the development of the storm water
0
drainage is emphasized by the people, more over 52 Improve Collection Efficiency No Response

% of the respondents responded. All the 52% are


noted that the existing drainage system required
improvements. The inadequacy of the drains in the 120

98
town and floods are occurring in the in the monsoon 100

times are highlighted by the respondents. 80

60

SOLID WASTE MANAGEMENT 40

20
The need for solid waste management system is 2
emphasized by the respondents. More than 34% of 0
Need Maintenance No Response

the public have stated the need for solid waste

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 44 -

management system as there is no proper mechanism of collection and disposal in the


town. The inhabitants of the town have also pointed out the issue of less collection and less
coverage of the town.

ROADS, TRAFFIC AND TRANSPORTATION

The roads and connectivity to other towns are major factor in the development of this town.
The importance of the need for prioritization of the road in the development activity is
explained earlier. The major issues noted during the survey are the absence of proper
maintenance of many roads of the areas in the town. The roads in the town are unplanned
and are kutcha roads. Moreover, about 98% of the public states that the existing roads
requires improvements.
100
90 86

STREET LIGHTING 80
70
60
There is an inadequacy of street lighting the town as 50

per the survey results. More than 86% of the 40

respondents have expressed the poor services in 30


20 14
terms of maintenance and operation. 10
0
Need to Improve No Response

5.2.2 RATING OF MUNICIPAL SERVICES

The ratings of the municipal services were analyzed in three different sectors, basic
infrastructure, environment and public facilities.

BASIC INFRASTRUCTURE

As the survey conducted, it is shown clearly that


the priority is given to the Drinking Water. Then it 100
90 80
90

is followed by the road in the second place. Solid 80


70 60
50
Waste Management is placed in the third followed
60
50 40
40 30
by the Under Ground Drainage in fourth rank and 30
20
20
10
storm water drain in the fifth. Even though there is 10
0

not much priority given to the Street light, parking Ro


ad t er ins sa l L ig
ht es
wa er a
ge
Dr a po ili ti r tat
i on
ee t fa c
facilities, and Rail/Road transportations that is D ri
nk in g
u nd
S ew
m W a t er
W a st e Di s S tr
a rk
in g
T ran
spo
G ro S to
r rm
P
oa d
also an issue raised by some of the people Un
d er S to
Ra
il /R

PUBLIC FACILITIES 100


90
90
80
80
70 70
The schools/college has placed in the first rank 70
60
60
50
followed by the Public transport in the second 50
40
place. Then parks and playgrounds and health 30

related activities have given equal priority by the 20


10

people placed in the 3rd level. Then community 0


Park and Public School / Helath Community Recreation

hall and recreation facilities are prioritized in the playfield Transport College related
facilities
Hall

last.
120
100
ENVIRONMENT 100 90
80
80 70
60
60 50
In terms of environmental issue, open drains and 40 30
40

natural channels in the town is considered 20


20
10 8
important. Apart from storm water drainage, the 0

other major issues in the environmental sector are


e
n
ke

ne

ht
n

ds

ak
ac
tio
tio

tio
tio

ai

ug
La

oo

lo
dr

qu
Sp
llu

llu
llu

llu

yc

ro
Fl

land, water and air pollution. Here also people are


/

n
po

po

po

C
po

th

D
pe
er

pe

ar
iv

se
ir

O
nd
er

E
A
R

at

oi
La

prioritized water pollution first and air pollution in


W

the second place.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 45 -

6
STAKEHOLDERS CONSULTATION
6.1 CONSULTATION PROCESS
Preparation of a City Development Plan (CDP) is essentially a consultative process and
therefore identification of stakeholders to be involved in the process is of crucial importance.
A list of such identified stakeholders is given in this section. The identified stakeholders may
be broadly categorized as under:

ƒ Elected Representatives;
ƒ Service Providers/GoTN Departments;
ƒ Business Houses and Associations; and
ƒ NGOs/CBOs and Resource Persons

The identified stakeholders shall be involved in a proactive manner through all stages of the
consultative process.
6.1.1 GENERAL

CDP preparation involves extensive consultations with the


Illustrative List of Stakeholders
Stakeholders at the ULB and Departmental levels. (Government)
Pursuant to the Inception report submission, a workshop Elected Representatives
was conducted including a wider list of stakeholders ƒ Chairperson
ƒ Elected Representatives
comprising non government and other representatives.
Detailed consultations were also held in with the elected Service Providers/GoTN Departments/Boards
representatives and other non-governmental entities at
ƒ District Collector & Magistrate
the ULB level to obtain necessary feedback and ƒ Regional Director of Municipal
development requirements. Subsequently, pursuant to the Administration
identified development strategies for the town, proposals, ƒ Local Planning Authority
ƒ Highways Department (DTCP)
projects and estimated capital investment plan were ƒ TWAD Board
formulated in the Intermediate Status report and the ƒ Public Works Department/ Water
scheduling of projects and investments are to be finalized Resources Org.
ƒ Tamil Nadu Pollution Control Board
in the subsequent workshop to be organized with ‘Action ƒ Tourism Department
Stakeholders’ to finalize the proposed projects and ƒ Traffic Police
strategies. ƒ Transport Department
ƒ Tamil Nadu Electricity Board
6.1.2 INDIVIDUAL / SECTOR-SPECIFIC DISCUSSIONS ƒ Southern Railways
ƒ BSNL
ƒ District Rural Development Agency
The Consulting Team performed a series of individual and District Industries Centre
sector-specific discussions with various stakeholders, ƒ Fire Department
ƒ Regional Transport Officer (RTO)
representing both government and non-government ƒ HR&CE Administration Department
sector. Broadly, the individual consultations has been ƒ Tamil Nadu Housing Board
held for discussing the town and regional level’s existing ƒ Tamil Nadu Slum Clearance Board
ƒ Health & Family Welfare Dept.
constraints/weaknesses, felt needs, opportunities and ƒ Dept. of Women & Child Dev.
focus areas for the proposed CDP. The sector-specific ƒ Department of Forest
discussions were performed with service providing
agencies to understand the current situation, system details, technical and administrative
issues, prospects, and their preparedness to meet the emerging challenges. These
discussions helped to identify the city’s strengths and weaknesses in facilitating economic
growth and improving quality of life for all citizens.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 46 -

6.1.3 CONSULTATION WORKSHOPS

Each phase of the study culminates with a workshop, which shall endorse the findings with
specific remarks and suggestions. All these workshops are organized with a plenary session
in which the Consulting Team shall present the findings of the consultations, relevant data
analysis and findings for discussions, clearly specifying the objective, agenda and expected
outcome of the workshop.

The First Workshop (Workshop 1) was organized on December 18, 2007 pursuant to
necessary individual consultations, field visits, to discuss the initial aspects of the proposed
study and key issues. This workshop was convened by the Chairperson, Tmt..Jeyalakshmi
Regional Director of Municipal Administration and attended by the Commissioner, Council
Members and other ULB officials.

Subsequent to the submission of Inception Report a review meeting was held on January
31, 2008 in the meeting convened by the Chairperson, Tmt..Jeyalakshmi , Regional Director
of Municipal Administration in the Council Hall of Sathuvachari Municipality. Aforementioned
report was reviewed by the Technical Review Committee comprising the RDMA, CMA,
DTCP and executive and elected representatives from the ULB and the same had been
approved.

On the approval of the inception report, a Second Workshop was organized on May 5, 2008
to discuss the findings of the Inception Report. The study team presented the Inception
Report and the vision for the town and development strategies to achieve the vision was
formulated during this workshop. Subsequently, development strategies, proposals, projects,
estimated capital investment plan and scheduling have been formulated and included in the
Intermediate Status Report.

Subsequent to the submission of Intermediate Status Report a review meeting was held on
21st August, 2008 at the Municipal Office - Sathuvachari, Vellore. The session was chaired
by Mr. Rajamanickam, D.D. (Town Planning), Commissionerate of Municipal Administration,
The Officials from the RDMA, Vellore region, Chairpersons, Executive officers, Officials of
the above mentioned municipalities. The aforementioned report was reviewed by the
Technical Review Committee and the same had been approved.

On the approval of the Intermediate Status Report, a Third Workshop was organized on
January 23rd, 2008 to discuss the prioritization of identified projects. The study team
presented Intermediate Status Report and the estimated sectoral investments for all the
sectors during this workshop.

This report is the Draft Final Report for the town being submitted under Stage III of the
assignment. Subsequently, project prioritization, funding agencies, Financial Operating Plan,
technical assistance and the implementation framework have been formulated and included
in the Draft Final Report. The stakeholders’ consultation is conveyed to prioritize the
identified projects and finalize Financial Operation Plan and Capital Investment Plan. The
same would be presented to the ULB Council and comments if any, would be addressed.
Final Report, with the council’s resolution will be submitted to as City Development Plan for
Sathuvachari town.

Minutes of the consultations workshops and review meetings held are enclosed as
Annexure – 2, 3, 4, 5, 6 and 7

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 47 -

7
VISION AND FOCUS AREA
7.1 INTRODUCTION
In order to achieve a consistent urban development approach towards effective urban
reconstruction and development, it is essential that we share a common vision of the future
development of our urban areas. This section discusses the vision for Sathuvachari Town
with sector specific targets.

Developing a Vision for the town is central to the City Development Plan. A Vision is a
statement of where the town wishes to go, within a given time frame, and is often expressed
in terms of clear expectations. It defines the potential of the town and reflects on its unique
attributes in terms of comparative and competitive advantages, values and preferences of
the residents of the town, the relationship of the town to the state, the national and global
economies and is described within the scope of the historic and physical attributes of the
town. A vision is a tool that helps align stakeholders’ energies to work together to achieve a
common goal for the betterment of the town and therefore design strategies accordingly. All
programmes and projects must therefore be aligned with the identified vision.

7.2 PROCESS OF DEVELOPING VISION


The vision was developed in a participatory process under various stages with various
stakeholders of the town. The Vision formulated was drawn form the inferences of the
Survey and the stake holders consultations conducted in the town, during these participatory
process, participants were asked their views on what they liked about their town, what they
wished to change and the priority for bringing about the change. There was unity of opinion
that the town has better linkages, better employment opportunities and potential for growth.
Stakeholders felt that this ‘special ness’ should be preserved and utilized to the town’s
benefit.

At the time of stakeholders’ consultation and workshops, the stakeholders discussed and
articulated several factors that are taken into consideration while formulating the vision.
These are listed below.

ƒ Augment the town’s identity and encourage developments as satellite town for Vellore
by identifying the areas of core competencies of the town.
ƒ To ensure safe, healthy, attractive and sustainable destination for the people to reside
in.
ƒ Inspire and strive for excellence, innovation and achievement of better living conditions
for the people.
ƒ To enhance the participation of people in decision making and administration activities
by making administration participative and responsive to people’s need.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 48 -

7.3 THE VISION AND DEVELOPMENT OBJECTIVES


The Vision for Sathuvachari Town was formulated by the stakeholders through the
consensus approach and consultation with the community on strengths, current issues,
concerns, problems and desirable future focus areas.

“Sathuvachari is envisioned as the residential satellite town, providing


improved, safe and healthy living conditions for the residents in the town
and the centre for administrative activities in the region.”

The vision for the development of the town, have been perceived around the following
objectivies,

ƒ Provision of basic infrastructure and urban services for all, towards achieving improved
quality of life by 2012;
ƒ Strong and sustainable economic growth with better employment opportunities;
ƒ Increasing prosperity through higher quality jobs and better distribution of wealth
(incomes and assets);
ƒ Reducing levels of poverty and increasing personal and household incomes;
ƒ Improving levels of environmental quality and sustainability;
ƒ Improved safety and security;
ƒ Improving life expectancy and health of the population;
ƒ A literate, educated and skilled population with a strong entrepreneurial base;
ƒ Responsive, people-centered governance through higher rate of civic participation; and
ƒ Efficient and effective administration for universal access to services.

The inputs received on the draft vision from the stakeholders have been analyzed sector
wise to come up with specific objectives for the sectors and have developed the strategies
during this stage of the assignment.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 49 -

8
DEVELOPMENT STRATEGIES
8.1 PROCESS
The objective of preparation of CDP for the town is to develop a long term vision and short
term developmental strategies covering the priority sectors over the next five years. These
developmental Strategies formulated for the town has been developed in partnership with
various stakeholders and interest groups dedicated to the town’s well being.

The developemental strategies are set of actions, policies and programs / projects designed
to achieve a formulated aim. Strategies provide a direction that takes advantage of the
unique conditions that exist in a location. Thinking strategically creates not only a shared
vision for the future, but also a framework for decision-making and the allocation of limited
resources.

The essence of the process of framing strategies is the involvement and participation of the
target population or the beneficiary. Framing of the Strategies, starts from the
conceptualisation of the idea of business mechanism in planning and goes on to
implementation and maintenance of the plan in a sustainable mode. For this, there should
be a target or vision at town level to pursue and accordingly channelise the efforts in their
thinking, saying and doing.

To arrive at the future vision of the town, a few relevant queries relating to resource
generation management, project feasibility with sustainability and other support
prerequisites were put across to the councillors and other stakeholders. Based on the vision
arrived at the Stakeholders workshop for Sathuvachari, a ten year phasing of the proposals
of the plan is suggested. It intends to address the ‘essential’ need in terms of services, in
order of micro level priority, so that a sound base would be built at the end of ten years as a
take-off point, when the citizens and citizen groups will be prepared to spare their attention
without pre-occupation or reservation from the priority needs at individual locality level (i.e
ward level) to the town level and consciously involve themselves in the town building
process. Selection and formulation of strategies are made on the basis of judgment of
“outcomes” and not on the bases of “inputs”.

8.2 THE FRAME WORK


The framework of the developmental strategies organizes actions and policies suggested by
the stakeholders to achieve the community vision. The Strategy Framework provides a way
to organize goals and specific actions as part of the town’s future growth and vision.

VISION OF Actions
THE TOWN

Primary Strategies

FOCUS AREAS Development


Strategies
Secondary Strategies

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 50 -

The framework proposed for Sathuvachari comprises of seven major focus areas.
Developemental strategies formulated for each focus area are the means of achiveing the
vision of the town by means of formulating primary and supporting strategies. The following
Implementation Matrix summarizes these strategies in a series of proposed actions.

Primary Strategies – Primary strategies for the town include major new development
initiatives based on town and region-wide trends, and the unique position. Primary
Strategies are those initiatives that are expected to have the greatest influence to redirect
the role of the town in the region.

Secondary Strategies – Secondary strategies are activities and programs that would
enhance the overall environment and support the primary strategies. Although these
strategies are shown on a second tier, it should be understood that in many cases, they are
the projects that are necessary in order to implement the primary strategies.

The Developement strategies are primarily formed on the basis of the following three
dimensions namely,
• Improvement of the efficiency of the service delivery;
• Creating infrastructure assets to improve service delivery; and
• Improving the governance aspects of the Municipality.

In order to tackle the issues of basic, economic and social infrastructure and to achieve the
vision derived for the town, the study team in consultation with the stakeholders has
identified the following broad strategies under the following sectors:
ƒ Land Use -- Compatible land use, Development Control rules to promote and support
economic activities, development of transport links.
ƒ Core Municipal Infrastructure -- Adequacy, reliability and accessibility to core municipal
services for all citizens with Municipality as the prime service provider.
ƒ Urban Environment -- Conservation of rivers, water bodies, and natural environment of
the town; making environment an integral part of every decision-making process.
ƒ Urban Poor -- Affordable housing, tenure security, integrated service provision, access
to basic infrastructure needs and social amenities
ƒ Economic Development -- Improving infrastructure, service delivery and governance by
attracting public private partnerships (PPP), creating coordination for implementing
economic policies in the urban region, developing collaborations between industries and
institutions to further establish Sathuvachari as a dynamic town of the Region.
ƒ Urban Governance -- Redefining the roles of administration, making it accountable and
transparent and empowering and involving citizens.

8.3 PRIMARY AND SECONDARY STRATEGIES


The following table illustrates the Strategic Framework evolved for Sathuvachari Municipality

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 51 -

Table 8.1: Strategic Framework for Identification of Actions – Sathuvachari


No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions
PHYSICAL DEVELOPMENT
Land use Management
1 Development of the town as 1. On integration of the town with Vellore 1. Formulation of new development Control rules and building
Satellite town to Vellore corporation, the development guidelines has to regulations in the town to support the growth as the satellite
be regularized town to Vellore.
2. Development of neighborhood concept within 2. Identify and regulate commercial activities within the
the town. residential neighborhood areas of the town.
3. Regulate development activities to enhance the 3. Development of all the supporting facilities and necessary
connectivity of the town with Vellore. additional facilities for the residential layouts in the town.
2 To achieve Optimum Utilization 1. Channelizing the developments considering the 4. Integrate the road and rail network in the town as it is an
of land policies and programmes of the government. important transit point.
5. Restrict the encroachments of water bodies in the town.
3 To promote a spatial structure 1. Addition of commercial infrastructure in the 6. Widening of the major roads and eviction of encroachments
of the town that caters to the potential wards. in the major corridors of the town.
emerging Economic activities 2. Promotion of neighborhood schemes to meet 7. Promotion of activities in the peripheral/outskirts in a phased
and Population growth. the future housing demand under private manner.
partnership.
8. Identification of suitable locations for providing Bus lay-by.
3. Improvements to public domain areas - road 9. Identification of potential road corridors for future growth.
space and institutions. 10. Establishment of new linkages within and outside the region.
4 To Integrate land use and 1. Improve more road open space on major arterial 11. Promotion of activities in the peripheral/outskirts in a phased
transport development. roads to improve the traffic flow. manner.
2. Regulate mixed land use based road widths. 12. Identification of suitable locations for providing parking lots.
5 To Preserve natural assets and 1. Specific guidelines for building permission to 13. Provision of more public spaces while promoting real
heritage elements in the town. match with road width. estates.
2. Generate more urban land through market 14. Prevent / regulate the mushrooming of new houses along
friendly mechanisms. the hills to preserve the hilly eco system.
3. Formulate water bodies’ networking programme 15. Revitalizing the major drains and natural channels leading to
to supply integrated open spaces to support the river in the town.
physical and economic infrastructure.
Water Supply
1 To provide water supply at the 1. Comprehensive Water Sector Development / 1. Water supply system to meet the 30-year demand (2010-
prescribed rate of supply Augmentation Plan. 2040).
2. Water Supply Operation & Maintenance Plan. 2. Identification of individual water supply scheme to fulfill the
2 To ensure daily supply of water 1. Planning and capacity augmentation for future demand.
to the users adequate and equitable water supply. 3. Impose regulation for the use of ground water by means of

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 52 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


erecting deep bore wells.
4. Implementing the continuous system of water supply.
3 To provide 100% Coverage 1. Water supply system for uncovered and 5. Developing efficient operation and management of water
extension areas to ensure 100% coverage. supply systems.
4 To Minimize NRW component 1. Performance monitoring - energy audit, leak 6. Rehabilitation of existing sources to increase the present
detection, NRW studies, water quality, etc. supply rate.
2. Creation of public awareness. 7. Redistribution/re-zoning of distribution system in existing
5 To achieve cost recovery 1. Comprehensive Asset management plan. areas.
2. Institutional strengthening and capacity building. 8. Rehabilitation of existing service reservoirs if applicable.
3. Revenue enhancement through collection 9. Construction of additional service reservoirs / sumps if
drives, metering and tariff rationalization to raise applicable.
annual collection. 10. Proposed distribution system in uncovered / extension
4. Establishment of GIS based assessment areas.
mechanism. 11. Provision of 24 hr water supply in bus stand using cooler
Plant under private partnerships.
12. Rehabilitation and upgrading of pump / booster stations and
transmission systems.
13. Provision of generator facility in booster stations.
14. Maximizing of cost recovery from system beneficiaries/users
of the services.
15. Drive against illegal connection.
16. Promote individual House Service Connections (HSCs) in
slum locations and discourage Public Stand Posts (PSPs)
as a policy measure and to increase accountability.
17. Developing technically feasible and financially viable
projects for implementation.
18. Prepare an asset inventory and map the water supply
systems for effective monitoring.
19. Capacity Building of the ULB staff to undertake efficient
management and administrative decisions.
20. Creating Public Awareness with regards water conservation
activities.
21. Assessment of gaps and investment needs in the urban
poor/ slum locations.
Sewerage and Sanitation
1 To provide sewerage system 1. Comprehensive Sewer Master Plan. 1. Prepare a comprehensive UGS master plan to explore the

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 53 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


2. Prevent discharge of sewage and sullage to possibility of the decentralization of the system of operations
storm water drains. for effective service delivery.
2 To provide proper sewage 1. Treatment of sewage - decentralized advanced 2. Sewage collection and conveyance system for unsewered
disposal facility systems. areas considering ultimate stage sewage generation.
2. Development of treated waste water re-uses 3. Ensure 100% coverage.
systems. 4. Plan the UGS system and ensure the location of STPs in
3 To provide sanitation facilities 1. Identification of beneficiaries under various unobjectionable location.
to low income groups Central and State funded schemes to establish 5. Improve and ensure access to sanitary facilities for the
sanitation facility. urban poor and slum dwellers.
2. Expanding sanitation program to low income 6. Encourage pay & use category of public conveniences with
communities. community involvement in the maintenance of the same.
3. Providing subsidies to poorer communities for 7. Performance monitoring - energy audit, quality, etc.
setting LCS facility in slum areas. 8. Assessment of possibilities of recycle and reuse of sewage
4. Integration of existing and proposed LCS & water.
community toilets to proposed UGSS. 9. De-silting of existing water bodies and development of the
4 To protect water bodies 1. Identification of water bodies within town limits bed lining.
for conservation. 10. Re-development of tank/lake bunds through slab lining.
2. Manage and control developmental activities 11. Re-development of perimeter area - paved walkway, area
along water front areas. lighting, compound wall/fencing, access control and
3. Rehabilitation of existing water bodies. landscaping;
4. Re-development of area adjoining water bodies 12. Water treatment and recirculation including passive aeration
for community use, if available. systems;
5. Improvements to supply channel / catchments 13. Reconstruction and restoration of drains leading into and out
facilities, water quality maintenance and of the water bodies including by-pass and flood control;
groundwater recharge in water bodies. 14. Installation of water quality monitoring stations.
6. Inventory measures to control the pollution of 15. Mosquito and fly control measures to have better living
water bodies. environment for the citizens.
7. Frequent testing of water samples. 16. Settling tank facility for slaughter house.
17. Assessment of gaps and investment needs in the urban
poor/ slum locations.
Storm Water Drainage
1 To ensure network coverage 1. Storm Water Drainage Master Plan / Pilot 1. Identification of hierarchy of drains in the town.
Project 2. Improve drainage network on a priority basis in flood-prone
2. Eviction of encroachments along major and areas.
minor drains. 3. De-silting of existing storm water drains.
3. Rehabilitation of existing drains. 4. Perimeter protection of major drains.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 54 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


4. Expansion of drain network to uncovered areas. 5. Re-grading/re-surfacing of drains as required.
2 To achieve efficient 1. Identify, delineate, sanitize and protect the 6. New drain network for uncovered areas.
Management of natural system natural drainage system of the town. 7. Construction of new roads integrated with construction of
2. Awareness programs to prevent solid/liquid drains.
waste dumping into drains. 8. Exploring Rain water harvesting measures to recharge
3 To Recharge / Reuse storm 1. Assessment of possibilities for recharge/ reuse ground water.
water of waste water in the town. 9. Assessment of gaps and investment needs in the urban
2. Expansion of Rain water harvesting poor/ slum locations.
system/structures town wide.
Solid Waste Management
1 To comply with MSW handing 1. Scientific approach for Sweeping. 1. Phased implementation of ‘Door to Door collection System’
rules, 2000 2. Minimization of generation of Solid Waste. through community organizations by mobilizing, facilitating,
3. Source segregation of municipal solid waste. organizing and supporting community activities with the help
4. Augmentation and expansion of primary of local NGOs.
collection of waste. 2. Create a separate multi-disciplinary SWM cell with expertise
5. Modernization and expansion of existing waste in engineering, human resources/personnel management,
transportation system. awareness generation/ health.
6. Municipal solid waste treatment and disposal. 3. Installation of ‘Community Storage Bins’ in areas where
7. Regulation of recyclable wastes handling and re- door-to-door collection cannot be implemented.
use. 4. Implementation of TWO BIN System of solid waste
8. Proper handling and disposal of slaughter house collection.
and other categories of wastes. 5. Placement of dumper bins sufficient in number at market
2 To ensure effective processing 1. Increase the ambit of Solid Waste Management and commercial areas.
of waste through composting. to include “recycling” and to facilitate and 6. Ensure optimum utilization of existing fleet.
regulate the sector accordingly. 7. Initiate Information-Education-Communication (I-E-C)
2. Encouraging local level aerobic vermin campaigns to raise awareness among the urban poor and
composting. slum dwellers of better SWM practices.
3. Compost the organic fraction of the waste. 8. Initiate steps towards sharing the responsibility of primary
4. Sanitary land filling of inorganic fraction of waste collection of segregated garbage with citizens.
and the compost rejects. 9. Develop integrated waste processing facility in a scientific,
5. Ensuring cost recovery/return from compost eco-friendly manner – for different types of material by
processing. combining two or three towns.
6. Implementation through PPP mode. 10. Expanding the ‘Voluntary Garbage Disposal Scheme’ for
more number of restaurants/hotels and commercial
3 To achieve Human resource 1. Work shops and training program to educate establishments and collecting user charges.
development goals staff 11. Increase present staff strength based on CPHEEO norms.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 55 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


2. Entrusting responsibilities to the authorities to 12. Persuading the hospitals to be part of the existing bio-
hold them accountable for any non medical waste management facility.
conformation.
3. Encourage performance based incentives to
enhance efficiency and output.
Roads, Traffic and Transportation
1 To ensure adequate road 1. Comprehensive Traffic Study for entire town. 1. Improvements of the existing roads.
network facility / coverage 2. Augmentation and rehabilitation of roads. 2. ULB maintained roads - up gradation of existing earthen /
3. Widening and strengthening of road structure gravel road to BT / CC roads based on the incidental traffic
and eviction of encroachments. volume count.
2 To ease traffic congestion in 1. Study of city-wide parking requirements and 3. Departmental roads - widening of major roads to 2/4/6 lanes
the town development of parking infrastructure. with provision of service road (pedestrians, two- and three-
2. Improvement of Pedestrian Facilities. wheelers) within town limit.
3. Traffic streamlining. 4. Provision of Sub ways/Under passes at three major
4. Segregation of slow and fast moving vehicular junctions of the town.
traffic. 5. Provision of bus shelters at the appropriate locations.
5. Construction of underpass/ over bridges at 6. Provision of signals, pedestrian crossings, median, traffic
crossings. island, roundabout and signage’s.
6. Proper re-alignment of road furniture and utilities 7. Pedestrian Footpaths to be provided in all the major roads
3 To offer regional linkages 1. Establishment of regional linkages considering for better movement.
the future growth potentials. 8. Provision of link road to Railway station i.e., strengthening of
the Kanakayanallur Bridge.
9. Improvements of the existing road network and hierarchy in
the town.
Street Lighting
1 To ensure adequate street 1. Comprehensive Street light management plan. 1. Up gradation of existing street lights.
lighting facility 2. Development/updating of Asset Register. 2. Installation of high-mast cluster lighting at important
2 To Reduce/minimize energy 1. Energy audit studies. junctions.
cost 2. Innovation of new technologies. 3. New street lights for uncovered and extension areas.
3. Utilization of alternate renewable energy 4. Power consumption management and implementation of
sources. energy efficiency measures.
3 To Establish PPP 1. Exploration of possibilities of public private 5. Use of energy saving equipment.
partnerships. 6. Identification of possibilities of underground cabling.
7. Encouraging private operators for O&M.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 56 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


SOCIAL DEVELOPMENT
1 To enhance quality of life. 1. Ensure a safe, healthy environment for the 1. Expansion of existing educational facility.
residents. 2. Expansion of existing health care facility.
2. Inter- Sectoral convergence for Urban Health 3. Establishment of new educational institutions based on
Care. future need.
3. Establish a successful and sustainable living 4. Establishment of new health care institutions based on
environment. future need.
5. Establishment of community hall / Marriage hall under PPP
2 To achieve universal access to 1. Increasing private sector and NGO participation. mode.
social facilities 6. Improvement of infrastructure facilities in Burial grounds.
7. Provision of parks, play fields and community facilities
based on the demand.
SLUM IMPROVEMENT
1 To ensure all poor will have 1. Development of Comprehensive data base. 1. Comprehensive listing of slums.
access to qualitative and 2. Community empowerment. 2. Preparation of a database on socio-economic
affordable basic services 3. Institutional Strengthening and Capacity characteristics of all slum dwellers in the listed slums.
Building. 3. Mapping and assessment of physical characteristics of
4. Relocation of slums located in vulnerable Areas. slums (housing and services) for all tenable slums.
5. Channelize all programs and activities of various 4. Preparation of DPRs for each of the slums as an integrated
government agencies for the urban poor through scheme covering both housing and services.
the special purpose vehicle. 5. Provision of basic infrastructure - both physical (water,
2 To confirm 100 % literacy 1. Evolving a comprehensive education system. roads, sanitation and sewerage) and social infrastructure
2. Improving Educational facilities. (clinics, schools, training facilities, etc). Construction of EWS
3 To achieve Universal access to 1. Evolving a comprehensive health care policy. housing schemes & fixing priorities to BPL.
primary health care and no one 2. Improving health facilities. 6. Identify Target Beneficiaries.
should die of preventable 3. Improving Access to Social Services. 7. Integrate Community Development -Provide economic
diseases generation activities.
4 Livelihood to all urban poor 1. Evolving a comprehensive Livelihood Policy. 8. Improving living condition of slum dwellers.
2. Linking livelihoods to city’s economy. 9. Conduct livelihood Training Program.
3. Community Based Approach. 10. Identification of land parcels for resettlement of slum
4. Target women and children. dwellers of all non-tenable slums and involvement of
5. Economic Support/Enterprise Development. NGOs/CBOs in the process.
11. Awareness on health and hygiene shall be created among
5 Security of tenure and 1. Development of housing through partnerships – slum dwellers in line with the long-term goal of moving
Affordable Housing PPP. towards individual toilets and doing away with public
2. Provision of land tenure security. convenience systems.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 57 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


3. Formulation of Notification and De-notification
Policy.
ECONOMIC DEVELOPMENT
1 To provide employment 1. Formation of Integrated tourism development 1. Developing civic infrastructure like water supply, drainage,
opportunities to all plan. sewerage, waste management etc.
2. Creation of organized commercial centres for 2. Making available serviced land for industries, and real
retail and wholesale trade. estate development.
3. Encouraging service sector by implementation of 3. Establishment of hotel and lodging facility under PPP.
training programmes. 4. Creating amusement parks and other entertainment facilities
2 To encourage setting up of IT 1. Allocation of land for setting up of IT Parks. especially for local citizens and tourists.
and ITES 2. Provision of road linkages and basic 5. Encourage private sector to develop shopping complexes
infrastructure facilities considering the future and multiplexes to meet the growing demands of the
demand. expanding middle class in the region.
3 To encourage economic 1. Expansion of daily and weekly markets in the 6. Promote non-polluting small scale and cottage industries.
activity town. 7. Encourage development and growth of housing complexes
2. Exploring possibilities of promoting commercial in the private sector or joint venture.
activities. 8. Creating infrastructure including making availability of land
3. Active promotion of public- private partnership to attract educational and research institutes.
(PPP) for development and operation of 9. Construction of additional shopping space.
infrastructure and utilities. 10. Construction of community hall in appropriate location.
4. Initiate collaborative arrangements with other 11. Encourage small scale and household industries by means
departments and economic development of offering training programs.
agencies to facilitate implementation. 12. Encourage formation of SHGs by means of conducting
5. Facilitate assistance for enterprises to improve women self employment / training programs.
export supply chains thereby increasing 13. Relaxation of polices and procedures in order to attract
competitiveness through enhanced supplier and investors.
customer relationships and reduced operating
costs.
URBAN GOVERNANCE
1 Greater local participation 1. Capacity Building Program. 1. Promotion of town identity and a sense of citizenship for all
and involvement 2. Full adoption of 74th CAA Model. 2. Public meetings, participatory planning and budgeting.
3. Conduct citizen satisfaction surveys & analysis 3. Involvement of marginalized groups in the city systems.
on annual basis to assess citizen needs and 4. Efficient investment in infrastructure.
demands including satisfaction levels. 5. Delegation of decision taking to the lowest appropriate level.
4. PR strategies to enhance community 6. Collaboration and partnerships, rather than competition
participation and create awareness. 7. Appropriate training to improve capacity of ULB officials

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 58 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


5. Innovative citizen complaint redressal system 8. Using information technology to best advantage
including e-Governance. 9. Environmental planning and management carried out in co-
6. Augment and strengthen new initiatives on operation with the citizens
citizen interface and orientation. 10. Disaster preparedness and crime control for safer
7. Regular interface with citizen associations/forum environments.
to understand public needs. 11. Monitoring of government activities by coalitions of
2 Efficient urban 1. Establishment of town-wide framework for organizations.
management planning and governance 12. Rigorous accounting procedures
2. Functional Restructuring. 13. Clear guidelines on conduct for leaders and officials that are
3. Proposal to develop the GIS as a tool for enforced
development planning. 14. Open procurement and contracting systems
4. Exposure to innovative practices of service 15. Ensuring transparency in financial arrangements.
delivery followed across the country. 16. Disclosure of information.
5. Establishing a Project Monitoring Unit. 17. Fair and predictable regulatory frameworks.
6. Tax Reforms. 18. Independent and accessible complaints procedures.
7. Credit enhancement options other than state 19. Regular flow of information on key issues.
guarantees need to be adopted. 20. Regular and structured consultation with representative
3 Accountability/ 1. Formation of Standing Co-ordination Committee. bodies from all sectors of society including individuals in the
Transparency/ Accessibility 2. Private Sector Participation. decision making processes.
3. Specific code of conduct for municipal 21. Access to government by all individuals and organizations.
executives and elected representatives. 22. Instruments to improve efficiency through enhanced
4. Public education, resource mobilization, good technical, administrative and financial capacities.
leadership and transparent processes applied to 23. Setting in place an active and online public Grievances’
municipal finance and development work. Redressal System, with automated department-wise
5. Closer networking with media and their complaint loading and monitoring system.
engagement in creating public awareness and 24. Implementation of GIS technology in the fields of asset
creating demand for good governance. Cautious management, land administration, assessment of property
engagement of private sector with continuous taxes etc.,
monitoring is necessary.
6. Preparation of annual Environmental Status
Report through a multi-stakeholder consultation
process.
7. Modern and transparent budgeting, accounting,
financial management system for all urban
services and governance functions.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 59 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


FINANCIAL IMPROVEMENT
1 Computerization Initiatives. 1. Billing and collection of taxes and user charges 1. Implementation of MIS to provide relevant information on
through e-services. accounts, commercial and operating systems for better
2. Speed up development of e-Governance system decision-making and information dissemination to citizens;
and accounting system. 2. Application of e-Governance is equally important for
3. Database management of assets, records, municipal finance.
lands, properties, etc. 3. Mapping of properties and developing GIS-enabled property
2 Reforms. 1. Innovations both at policy and project levels to tax management system for enhancing property tax
speed up the urban reform process. net/coverage and better administration.
2. Accounting reforms - shifting from single entry 4. Areas of reform measures include property tax, accounting
cash based accounting system to accrual based and auditing and resource mobilization and revenue
double entry accounting system. enhancement.
3. Reforms to have in-built mechanism of 5. Bringing transparency and uniformity in taxation policies.
participation and commitment. 6. Tax policy and operational procedures should be simple and
4. Institutional strengthening and financial capacity clear.
building to be an integral part of the reform 7. Development of templates for property tax (for self-
measures. assessment) to increase tax collection (without levying fresh
5. Establishment of financially self-sustaining taxes), including implementation strategies.
agency for urban governance service delivery 8. Property tax base should be de-linked from rental value
through reforms. method and should be linked to unit area or capital value
3 Privatization Initiatives. 1. Exploring areas of privatization. method.
2. Formulation of framework for attracting private 9. Legislative changes in the accounting systems and reporting
investors. requirements.
4 Resource Mobilization 1. Collection of arrears through innovative ideas 10. Designing of accounting procedures.
Initiatives. and approaches using tools for community 11. Standardized recognition norms for municipal assets and
participation and fast track litigation methods. revenues.
2. Strengthen the fiscal powers of ULB to fix tax 12. Auditing of accounts should be carried out effectively and
rates, fee structure and user charges through regularly to promote transparency and accountability.
specific guidelines and notifications, which 13. Increasing revenue through measures for better coverage,
should find a place in the Municipal Rules. assessment, billing, collection and enforcement.
Prepare model guidelines for the city to allow 14. Controlling growth of expenditure.
greater flexibility in levying taxes, fees and user 15. Improving the organization and efficiency of the tax
charges, borrowing funds and incurring administration system.
expenditures; 16. Augmentation of resource mobilization/revenue generation
5 Capacity Building 1. Staffing pattern, organizational restructuring and from properties belonging to ULB for improving the overall
performance appraisal. financial health.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 60 -

No. Sector Specific Objective Primary Strategies Supporting Strategies / Actions


2. Development of MIS for effective and efficient 17. Energy audit to minimize expenditure and increase useful
management & decision-making. service life of equipment
3. Publication of newsletters for creating 18. Staff training, exposure visits and motivation programs to
awareness and participation. bring about awareness on recent developments and
4. Prepare and conduct capacity building technologies.
programmes for elected representatives, 19. Development of training material in the local language and
especially women representatives, with a view to impact and evaluation studies of the training programmes.
enable them to focus on gender based issues.
5. Promote the creation of interactive platforms for
sharing municipal innovations, and experiences
among municipal managers.
6. Better human resources management through
assessment of the training needs of personnel
involved in urban administration to enhance
management and organizational capabilities.
7. Assessment of fund requirement and resource
persons to tackle the training needs of all
personnel.
8. Capacity building to strategically position the
ULB to employ highly qualified personnel based
on need.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 61 -

8.4 STRATEGIES – INTEGRATING WITH VELLORE CORPORATION


Vellore, the district headquarters is the northern gateway to the state of Tamil Nadu. Vellore
constitutes one of the oldest surviving municipalities in the south India and its history dates
back to 142 years. It was recently crowned as the largest (area wise) corporation in the state.
The city is strategically located on the banks of River Palar. It is geographically placed in
between the capital cities of Bangalore and Chennai in the East West direction and the
temple towns of Thiruvannamalai and Triupati in the North South direction. One of the
famous and architecturally renowned monument of south India, the “Vellore Fort Complex” is
located in the Centre of the town, which clearly explains the strategic importance of the town
since ancient days and further explicates its historic significance.

The Vellore local administration was constituted as early as 1866 under the provisions of
town improvement act 1865. The Municipal Council was formed in the year 1920 as per the
provision of Madras District Municipalities Act 1920. The Municipality was upgraded to first
grade in 1947 and to selection grade in 1970 and further upgraded to a special grade in
1979. At the time of initial constitution of the municipality and the areas including Fort,
Adavananthal, Beripet, Velapadi, Salavanpet, Thottapalayam, Aruganthampoondi, Kosapet,
Kavaraipet, Commissary Bazaar and Sankaranpalayam were included in its limits. It has
been upgraded as Corporation from 01.08.2008.

Tamil Nadu Government has made decisions to include the influential municipalities in the
vicinity of Vellore to form as a part of Municipal Corporation. In the year 2011, the
Corporation Boundary is expected to be redefined by integrating 75 local bodies with that of
the existing corporation. The local bodies proposed to be included with the corporation are 6
Municipalities, 8 Town Panchayats and 61 Village Panchayats. Melvishram is one among the
the Six municipalities to be included in the proposed Vellore corporation limit. Thus, the
developments to be planned in Melvisharam town have to be integrated with the proposals of
Vellore Corporation. Developmental strategies for the town are formulated considering the
factors of upgradation of administrative status into corporation along with the integrated
infrastructure facilities, wherever applicable. Though long-term strategy of the City
Development plan is to achieve an comprehensive development of the town, the change in
the administrative structure indicates the need to fill in the gaps especially in basic services
at various levels in a holistic manner.

Further, instead of providing individual infrastructure facilities for each local body, a
comprehensive or an integrated facility would be more effective in terms of service delivery
and financial viability of the project. And the development of integrated facilities would further
reduce the service gap under each sector, when the town is upgraded as Corporation in the
year 2011. The City Development Plan would further explore the viability of the proposals of
Vellore town after integration of the demand requirement of this town under each sector.
These plans and the feasibility of developing integrated facilities are discussed with the
concerned officials by the study team.

8.4.1 WATER SUPPLY

Water supply requirements of Vellore Municipality are fulfilled in through sub surface
sources, namely the bore wells at Otteri lake and Palar river bed. As the town does not have
any perennial watercourse and also River Palar at the northern boundary of the town is
always dry throughout the year, providing adequate water supply to the town is an important
issue in the town. Currently, the town is supplied with water from the following four sources
namely,

ƒ Palar River Basin


ƒ Otteri Scheme

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 62 -

ƒ Karugaputtur
ƒ Ponnai Scheme (2005)
Palar and Otteri Scheme are the dedicated water supply scheme for Vellore town, whereas
the Karugaputtur scheme is a combined water supply scheme and it supplies water to the
villages and town in its enroute areas.

The town receives a total supply of 75 MLD of water from these schemes. In most of the
area, the water will be supplied by gravity. In certain areas where the distribution lines are at
a lower level than the settlement, it will be install pumping station. Two such pumping
stations will be installed in Vellore. With the present population of 177413 (Census, 2001),
the supply amounts to about 42 lpcd. The water source is identified to be insufficient taking in
to account the current and projected population against the standard supply of 90 lpcd. In
City Corporate Plan, it was described that TWAD board has identified the confluence point of
River Palar with the River Ponnai near Nandhiyalayam village which is 16 km downstream of
Vellore. It was estimated to yield about 12 MLD of water.

Currently, feasibility of providing water supply through Cauvery Combined Water Supply
Scheme is being analysed by TWAD board. This scheme is designed for a supply rate of
135 lpcd covering 390 sq.km. area in Vellore District . The source is at a distance of 200 kms
from the town. A total project cost of approximately Rs.1000 Crores is identified. A budget
allotment of Rs. 946 crores has been made for the project during the budget of February
2008. This scheme proposed would also serve Dharapadavedu, which will be part of Vellore
Corporation then.

8.4.2 SEWERAGE & SANITATION

There is no separate system of sewage and storm water drain disposal in Vellore town. The
drains on either side of most of the roads carry both sullage and storm water. Sullage which
is let into the sewage farm as well as that let into Palar River are not treated. Currently,
phase 1 of the Underground sewerage system is under progress in the town. The
Underground Sewerage system proposed for the town area of 11.55 sq.km. is being
executed in two phases. Among 48 wards in the town, the wards 9 to 36 excluding a part of
ward 25 are used in phase I. The work for phase I is under progress. The total project cost is
estimated to be as Rs. 30 Crores. Technical sanction for the phase I is provided. About
15,000 connections will be provided in the phase I. Remaining wards will be covered in the
phase II of the scheme. The deposit and tariff for UGD system during the phase 1 of the
scheme is given in the following table.

Residential Commercial
Area Deposit Tariff Area Deposit Tariff
< 500 sq.ft. 5000 80 < 500 sq.ft. 8000 150
500 – 1200 sq.ft. 6000 90 500 – 1200 sq.ft. 10000 200
1200 – 2400 sq.ft. 8000 100 1200 – 2400 sq.ft. 12000 225
> 2400 sq.ft. 10000 120 > 2400 sq.ft. 15000 300

Sewage Treatment Plant site area of 1.35 acres is identified near Palar Head works. The
treated effluent from the STP site is discharged into River Palar. The UGD project is
proposed to be completed within the next two years.

Funding pattern for UGD Project (Phase I)


TNUDP Grant Rs. 9.00 Cr
Rs. 11.47 Cr
PC & ULB Rs. 9.53 Cr
Total Rs. 30.00 Cr

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 63 -

For developing integrated facilities for Vellore city and surrounding Municipalities, which
would form part of the Corporation, the Proposed STP could developed as integrated facility
for the city and surrounding influential municipalities, which would include, Dharapadavedu
also. Since there is no land available for developing independent facility in the town, the
integrated facility can be planned as the suitable alternative and would reduce the erection,
maintenance and operational charges of the plant for both the municipalities.

8.4.3 SOLID WASTE MANAGEMENT

The existing composite yard at Sadhuperi is full. The solid waste collected in town is been
dumped in all available vacant spaces and low lying areas. In City Corporate cum Business
Plan, it had been proposed to develop a new site for dumping of solid waste as an immediate
requirement. Thus, identified land can be proposed as an Integrated Solid Waste
Management Site for dumping and compositing.

At present, Dumping of municipal solid waste is carried out in Sathuperi about 7 kms from
the town. It covers an area of about 7.91 acres. Recently, a dumping platform has been
constructed at a cost of Rs.40 lakhs. This dumping site is observed to be inadequate for the
dumping of waste generated at present. In order to develop a solid waste management
system for the town, a site of area 9 acres has been identified at Sathupalayam Village
panchayat for land filling and composting.

Apart from the above schemes, TNUDF is carrying out Integrated Solid Waste Management
study for various clusters of towns in the state. In that study, an integrated facility including
Vellore corporation and the surrounding influential local bodies were studied and the in the
process waste lands in the region were identified for establishing Regional Solid Waste
Processing and Disposal Facilities in Tamil Nadu using remote sensing and GIS tools.
The town Dharapadavedu falls under the cluster of Vellore corporation including, Vellore,
Ranipet, Walajapet, Arcot, Arani, sathuvachari, Melvisharam and Dharapadavedu and a land
of 97.8 acres is identified in Sholavaram village in Vellore taluk. The identified site is located
at a distance of 20.3 kms from the town.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 64 -

9
DEMAND ASSESSMENT AND DEVELOPMENT
PROPOSALS
9.1 PREAMBLE
This section outlines the proposed development initiatives and SECTORS COVERED
specific improvements that are recommended to upgrade the
existing system of Urban Infrastructure provision, delivery, 1. Land use
operation and maintenance to normative standards and 2. Water Supply
characteristics required for a State Capital. Rapid assessment 3. Sewerage and Sanitation
4. Strom water Drainage
performed provides for cognitive navigation through the 5. Solid Waste Management
analysis and recommendations in various phases in the 6. Roads, Traffic and
preparation of the City Development Plan for the town. The Transportation
major aspects considered during assessment of the needs and 7. Street Lighting
formulating the development proposals are. 8. Basic services to Urban Poor
9. Remunerative Proposals
10. Social Amenities
• Sector wise proposed development initiatives 11. Environmental Improvement
• Specific improvements that are required to upgrade the 12. Urban Governance
existing system of infrastructure provision
• Delivery on par with the normative standards and
• Operation and maintenance of the system

Consultations held with the Stakeholders and the assessment of urban situation of the town
made by the study team have provided for a cognitive navigation through the analysis and
recommendations in identifying the various development proposals for the town. The various
sectors covered are listed in the above table:

Objectives/goals were set in consultation with the stakeholders for the infrastructure
requirements. The gaps between the existing situation and projected demand and key
issues/ problems in the existing system were analyzed and strategies were evolved. Priority
actions and proposals for improvement were identified. Capital investments were estimated
and the strategies for implementation, along with timeframes, are arrived in the following
sections:
PARAMETERS CONSIDERED FOR SECTORAL INVESTMENT

ƒ Information available/provided by concerned departments, detailed discussions with pertinent authorities,


field/site visits, techno-economic evaluation/analysis conducted by the consulting team;
ƒ Standard Schedule of Rates issued by PWD, Highways, and other engineering boards/organizations, OP
rates, prevailing market rates, and relevant information;
ƒ Consultant’s database and experience on design of projects of similar scale/nature;
ƒ Costs indicated are only estimated costs. Detailed cost estimation shall be performed for each item of work
pursuant to detailed design engineering (during the DPR preparation);
ƒ Land procurement and/or acquisition costs have not been included;
ƒ Capital and annual O&M cost of the water and sewage treatment facilities, as applicable, has been estimated
considering the techno-economically most feasible alternative technologies; and
ƒ Necessary provision for physical contingencies, cost escalation for implementation period greater than 18
months, administration/supervision and consultancy charges have been included.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 65 -

9.2 LAND USE


The land use structure of the town has been studied and on considering the existing land use
and the potential for development, a growth management policy has been formulated.
Strategy formulated would help in regulating the future developments through a conscious
and judicious development of core town and the peripheral wards, which have the maximum
potential to grow in future. The policy is ‘to allow growth of the town for a sustainable future
through dispersal of economic and developmental activities. Accordingly, the following
strategies for each of the land use have been evolved.
RESIDENTIAL USE
On the whole, the residential land use growth in the town is the major development in the
town. Closeness of the town with Vellore City has caused a lot of spill over of residential
activities form the Vellore town to Sathuvachari. This has resulted in a tremendous increase
of residential units with Sathuvachari during the last decades, the whole town area is divided
into 5 major Phases, Phase 1 and Phase 2 are areas which have already reached saturation
in the past decades. Currently a lot of developments are seen in Phase 3, 4 and 5. The
developmental proposals formulated are to redistribute the densities from the already
congested Phase 1 and Phase 2 areas. The mushrooming of the newer residential areas
and migration of people from the near by already saturated urban centers has brought a lot
of activities in the town. Though it is impractical to limit residential developments, the policies
shall be formulated in such a way that a regulated FSI and non conversion of residential to
mixed or commercial land use would relieve the pressure on residential land uses in future.

The additional population coming into the town over the years shall be accommodated within
sustainable limits of the peripheral areas. Increasing the residential land use beyond the
existing percentage in the core areas of the town may not be sustainable and hence the
strategy would be to increase the FAR in peripheral wards. This should also be
supplemented through development control regulations and guidelines that avoid conversion
of residential use into mixed and commercial uses in such residential zones. However, major
initiatives shall be possible to regulate the developments in the periphery of the town.
However, the wards adjoining the transport corridors have reached saturation. There are
other constraints such as water bodies, slums, ecologically sensitive zones in others leaving
only a few wards offering potential for growth.
COMMERCIAL USE
Commercial developments are found in a linear manner along the Bypass Road. The
commercial establishments are mainly of day to day commercial activities. The town is
dependent on Vellore Municipality for the first order of commercial facilities. In addition,

With the town functioning as a major residential hub for the region, the scope of further
commercial development remains and shall be mitigated by development of a series of
commercial centers as indicated below:

• Core Area – Business Activities – Central Business areas


• Decentralized convenient and
Petty Shopping activities – Local Business areas

The town shall promote Local Business areas and Central Business areas as the formal
commercial centers in identified areas considering its limiting growth in future. The market
forces and the convenience of the walking distance of five minutes for the local population
will essentially decide the quantum of such spaces. But these have to planned in such a way
that they shall not pose potential bottlenecks in future and they shall act as neighborhood
nodes. Currently, the existing land use structure has not explicitly characterized
developments in this way and hence, these areas have to be carved out of the existing and
potential developable areas. In line with the above analogy, the commercial facilities are to
be envisaged in the town.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 66 -

MIXED COMMERCIAL USE


The growth of mixed use cannot be avoided. However policies have to be chalked out to limit
the growth of this use in congested areas. Though mixed land use or residential with shop-
line have a good role to play in the town in terms of convenience, it has to be complimented
with wide roads to avoid travel congestion. It is not preferable to encourage mixed land use
on lesser width of roads with higher plot sizes and high coverage. This creates higher traffic
generation and more stress on street parking.

The Central business area of the town as it exists today has mixed commercial and
residential use with a significant percent of residential use. Towards developing the Central
business area and decongesting the core town, mixed land use with more commercial and
institutional use has to be promoted. However, it is essential that the major arteries shall be
of a minimum 15m wide connecting both the regions of the town has to be provided. In the
long run it is however necessary to limit the mixed land use and declare areas enumerated
above as formal commercial areas.
TRANSPORTATION
The major issue confronting the town is integration of land use with the transport system.
The connections between the residential establishments of the town have to be
strengthened. Currently most of the roads are not linked properly; the town lacks an efficient
circulation pattern. This shall be alleviated by developing a hierarchy of widened road
network to decongest the core town and other commercial areas.

The current developments and the analysis on the potential for development indicate the
wards on the periphery of the town towards north are likely to experience a high growth in
future. Hence, it is necessary to provide a sustainable mobility plan for these areas in the
form of connecting links.

9.2.1 STRATEGIES

Decongesting Core Town Area: Decongesting the core Growth Management Strategies
area shall be taken up in the right earnest. Though, ƒ Decongestion of Core Town Area
initiatives have been taken to decongest the areas ƒ Development of Potential Wards
around the railway junction, there are major commercial ƒ Revitalising Commercial and Mixed
activities located in the core town which requires to be Land uses
shifted to the extension areas to attract developments. ƒ Improvements to Public domain
For example, RTO Junction and Collector office Junction areas and Open spaces
are strategic locations for institutional and commercial activities of the town, which needs to
be regulated to relieve congestion in the area. However, economic activities that would
support in enhancing the quality of life shall be promoted in the CBD.

Development of Potential Wards: This strategy aims to allow future developments based
on the current densities, constraints such as ecologically sensitive areas which shall not be
disturbed. Considering the above, the total areas in the town are categorized into saturated
areas, Constraint areas and Potential areas.

SATURATED AREAS

These areas such as Old Sathuvachari, Phase1 and Saturated Areas


Phase 2 areas are classified as saturated zones based ƒ Saturated due to high densities
on the densities, present and in future. As the densities ƒ Namely the areas such as Older
are reaching the saturation limit, newer developments, Sathvachari, phase I areas and Part
especially commercial developments shall be limited or of Phase 2 areas
shall not be allowed.
CONSTRAINT AREAS

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 67 -

These wards are classified based on the constraints available for development which are
environmentally sensitive resources such as the Rivers; water Channels, Hills and other
environmental assets of the town. The developments in Constraint Areas
these wards would destruct the fragile eco-system and
hence shall be avoided. Areas adjacent o the river bank ƒ Constraint for development due to
presence of the Rivers, water
in the northern side of the town, and areas closer to the
Channels, Hills and other
foothills shall be allowed after careful consideration of environmental assets of the town
the impacts.

POTENTIAL AREAS

These are wards that have exhibited the potential to Potential Areas
grow in future as the developments in these wards are ƒ Potential due to availability of
catching up. These areas also do not contain any vacant lands, new development
determinants in terms of their growth and hence can proposals etc
satisfy the future growth requirements. Phase 3, 4 ad 5
are the main areas which has the potential to hold in the future population. Potential lands
have been identified by the Municipality based on private vacant lands but also on
institutional ownership. Chunks of institutional lands are also available in these wards which
hence make them potential for developments to come up.

Revitalizing Commercial and Mixed Land uses: The assessment with respect to the
current land use indicates that there is still scope for commercial activity but shall be
dispersed and balanced.

Accordingly, land use policy shall consider development of formal commercial structures at
places indicated. This is to help an immediate decongestion from the core town areas. These
shall be connected by the bypass road. The specific strategies include:

• Addition of commercial areas in the potential wards supplemented by formal land


uses in the Saturated and Constraint wards to minimize demand for commercial
activity in these wards.
• Encourage mixed land use with less residential use in the core areas and discourage
mixed land use activity based on minimum road widths in the inner areas.

Improvements to Public Domain Areas – Road Space and Institutions:


• Improving more road open space on the identified arterial road structure to improve
the traffic flow.
• Decongest the areas and actives near the court complex and the Collector office
through shifting commercial activities to extension areas and widening of the service
roads.

Revitalization of Open Spaces / Water Bodies: The area under the open spaces category
needs to be increased through identification of such potential areas. There are a number of
unidentified open spaces in the town, all the layouts approved in the town have the identified
Parks and play fields areas, these areas require improvements. While there are already
some efforts they need supplemented efforts to enhance the community open spaces. In
addition, efforts need to be initiated to conserve water Revitalise the unidentified open space s
bodies, open spaces and other sensitive resources. The & Water bodies existing in the town
specific strategies include:

• Appropriate guidelines be followed in issuing building permissions to match with the


road width to generate adequate open spaces at the community dwelling level
• Conservation of environmental resources such as uranis and odais, in terms of
pollution abatement and monitoring to recreational activities.
• Use of market friendly mechanisms like accommodation and reservation to generate
more urban land and to further generate open space.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 68 -

• Formulating a water bodies’ networking programme to supply Integrated open


spaces to support physical and economic infrastructure.

The policies along with the strategies for growth management within the town are
enumerated in Table 9.1.
Table 9.1 – Policies and Strategies for Growth Management

Policy Strategy Guidelines


• Mixed use with more commercial and less residential use in the
CBD to facilitate shifting of residential uses to outer areas.
Decongesting Core Town • Expansion of administrative boundary by merging neighboring
Decongestive Policy
Area villages.
• Facilitate relocation of institutional areas like the markets in the
CBD to the identified potential areas.
• Roads identified in the Arterial Road Structure shall be widened
Supply of Public Domain
Road widening Strategy to 12 m. This will generate additional roads area. All the other
Areas
roads also need to be widened on either side.
• Population limitations on wards type basis i.e., Saturated,
Constraint and Potential
o Average Gross density for Saturated wards-35,000
Redistribution Limiting Densities and persons/ sq.km
Policy Population o Average Gross density for Constraint wards-15,000
persons/ sq.km
o Average Gross density for Potential wards-20,000 persons/
sq.km
• Creating Arterial Green Networks by Identifying the uranis and
Open Space Policy Water Bodies’ Networking
odais and establishing appropriate linkages.

Sathuvachari town, is at a distance of 2 kms south of the town, on being integrated with
Vellore Corporation, the developmental strategies of the town would be guided by the up
gradation of administrative jurisdiction. On par with the developmental vision identified for
the town, the town would be characterized as the Industrial zone of the corporation. The
major developmental strategies of the town would be,

• Promotion of Vertical developments to accommodate the future population in the town


• To be formulated as the zonal head of the region supported with second order of facilities
such as Govt zonal Hospital, Higher order Educational facilities, Business districts,
Recreational places etc.,
• Supported with high standards of Infrastructural facilities

9.2.2 EVICTION OF ENCROACHMENTS


INTRODUCTION

Sathuvachari, residential area forms the boundary of Vellore Corporation in the southern side
of the town. Thus the service roads and streets which directly enters into the town, has
become a safe haven for the unregistered peddlers, hawkers and street-traders because
they have no place for their businesses except streets and roadside markets which results in
an unparalleled mess in the city. This also hinders the pedestrian and vehicular movement,
resulting in reduced effective driveway.

It is a well known fact that thousands of stalls on roads and markets are making money and
they are tarnishing the beauty of the market places and roads. Pushcarts, stalls and
makeshift shops do not pay tax and law of the land does not allow such "uncontrolled"
business activity. It has created an environment of suffocation for the commuter and
inhabitants of the town.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 69 -

A commercial sidewalk encroachment is specifically defined as the using a portion of a public


sidewalk for uses such as outdoor sales, display areas of flower and plant shops, outdoor
eating areas, planters and awnings and other features that are on or overhang the sidewalk.

Hawkers and peddlers could not be prevented from doing business but at the same time they
could not be allowed to block road space as well. A tangible government policy is required to
provide proper market places for their business that are encroaching the roadsides and
markets places. This policy shall include definition of the corresponding frontage type with
respect to the land use of the area, providing fencing and gates and encroachment permit
regulation. Apart from above mentioned measures, encroachment violation fees can be
imposed on those areas where encroachments are predominant.

PRESENT SCENARIO

Sathuvachari, being close to Vellore town is highly influenced by the expansion of the town
activities. Major area of the town is under residential use with NH 46 cutting across the town.
The major administrative activity of the town such as District court complex, collectorate and
bus terminus are located in the highway. The southern boundary of the town is bound by a
hill range and on the north by Palar River..

Encroachments along the road margins

The major encroachments by settlements are seen along the road margins and banks of the
channels, which drain into the Palar river on the . northern side of the town. The
encroachments along the road margins include the street vendors and hawkers, expansion
of the commercial areas onto the roads and the on street parking activities.

• Street Vendors and Hawkers – vendors who sell fruits, flowers, vegetables, clothes
etc are the main encroachers. Most of these shops are mobile, while some are in
temporary structures or along shops laid along the platform area.
• Parking of the Vehicles along the major Roads – Though this type of
encroachments does not extend for a longer time, but causes high congestion
problems during the peak hours of traffic in the town, especially during the evenings,
wherein most of the commercial facilities along the street does not have marked,
parking spaces, road side parking has become a serious problem of encroachments
in the town.
• Extended Shop Area from the Building Façade – most of the shops in the street
extend their shop area to the plat form, to attract more customers. These structures
are usually temporary, with plastic sheet roofs and shafts. These structures worsen
the situation by adding more chaos and confusion.

Encroachments along the drains

Most of the drains and


water bodies are
encroached by slums
and other structure,
which reduces the width
of the drains and affects
the smooth flow of the
town, they further cause
flooding and stagnation
problems in the towns,
affecting the environ and
sanitary conditions of the
town

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 70 -

STRATEGIES

Tamil Nadu Land Encroachment Act:

The Tamil Nadu Land Encroachment Act, 1905, envisages levy of assessment of land
revenue besides penalty in cases of encroachment on government lands. The Act also
provides for summary eviction, forfeiture of crops or other products raised on the encroached
land, levy of assessment and imposition of penalty as a deterrent measure. The
encroachments in the lands classified as assessed/ unassessed waste and Natham (house
site) are unobjectionable and when occupied by landless poor can be assigned/ alienated by
collection of the market value of the lands subject to certain conditions.

At the time of annual Jamabandhi, the District Collector/nominated Officer is required to


check interalia, that all the taluk authorities have followed all the procedure envisaged in the
Encroachment Act, particularly for prompt eviction of encroachment of lands or for transfer of
lands under unobjectionable encroachment.

Measures for the Eviction of Encroachment

Following are certain measures that can be used to eviction or discourage the encroachment
of various activities in public lands:

Appropriate frontage type with respect to land use:

The encroachments are established in areas where there are more commercial activities.
Hence, regulation when defined should be related to the corresponding land use. Generally,
the frontage in a commercial area is shop-front where facade is placed at or close to the
right-of-way line, with the entrance at sidewalk grade. The frontage is adopted for new
development of intensity that compatible with both businesses and residences adjacent to it.

Levy of Penalty in cases of Encroachments:

Under Section 3 and 5 of the Tamil Nadu Land Encroachment Act, 1905, any person
unauthorized occupation government lands shall pay, by way of full assessment and penalty,
of a sum not exceeding Rs.5 or when ten times the assessment exceeds Rs.5, a sum not
exceeding ten times of such assessment if the land is assessed. If the land is unassessed, a
penalty of a sum not exceeding Rs.10, or when twenty times of assessment Rs.10 exceeds,
a sum not exceeding twenty times of such assessment is leviable. The assessment was
fixed sufficiently heavy at the time of enactment of Act in 1905, to compel the encroacher to
surrender the land immediately. Though the penalty fixed at the time of enactment in 1905
was a stringent one, it has become insignificant and hardly acts as an effective deterrent
thereby defeating the very purpose of the Act.

Encroachment to be Removed upon Notice

In the existing building regulations, if any building or other structure or erection or any part
thereof shall have been erected, constructed or placed upon, under, over or across any
public place at any time, (whether lawfully or not) there is provision for an authorized officer
to remove the same or such part thereof as shall have been erected, constructed or placed
in the public place.

9.2.3 BUILDING USE, REGULATIONS AND CONTROLS

Building use regulations are the supporting control mechanisms to achieve a well balanced
growth structure for the town. These rules help in controlling densities, contributing to the
structured urban form for different types of land uses and also contribute to the quality of the

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 71 -

environment. However it has its limitation in conserving sensitive lands and limiting
encroachments if the proper land uses are not planned.

They should be formulated keeping in mind the provision


Building Regulations & Controls shall
of services including transportation networks. Since
be clearly outlines in the Master Plan
these services depend on the density of population, and focus on
adequate quantum has to be proportionately allotted
based on the density of population. For example - Higher ƒ Commercial and Mixed Building
Norms
Density of Population require wider roads and taller ƒ FSI
Structures. The coverage aspect of structure in a ƒ Parking Norms
particular plot is directly related to the total plinth area ƒ Specific regulations on
and open space generated. The lesser the coverage Accommodations and
allowed the more open space it will generate. Some key Reservations
relationships in the building use regulations include;

• Width of Road, Plot Size Vs Land use Type, FSI, Building Height & Setbacks
• Parking Space Vs Land use, FSI& Coverage

Since the core town is being proposed as an active Central Business Area with more
commercial use, the building rules and regulations need to support this through more FSI
assigned to these areas. This is also needed since the core areas are already saturated and
the additional population and hence the higher densities would mandate vertical
development.

In addition, certain areas along Gandhi Road, Nehru Street have seen an increase in
development activities and hence climb in the FSI and these areas are also where certain
formal commercial areas are being proposed. Hence, limited increase in FSI for the
commercial use in these areas is necessary to see that the land use pattern doesn’t turn into
mixed uses. Considering the proposed arterial structure, it is proposed to accommodate
higher densities with a medium rise in structure in these areas. The building use policies
shall be framed in such a way to encourage the decongestion of the core and include the
following components:

• Commercial and Mixed Building Norms.


• FSI Norms & Incentives
• Parking Norms
• Specific Regulations-Accommodation and Reservation

9.3 WATER SUPPLY


9.3.1 OBJECTIVES AND GOALS
The objectives and goals listed below are identified for the improvements of the existing
water supply system.

• 100 % coverage as against the present coverage of 71.95%


• Equitable distribution at an average per capita supply as specified in CPHEEO
guidelines on Water Supply and Treatment (90 lpcd)
• Mitigation of Non-Revenue Water / Unaccounted for Water (NRW/UFW)
• Continuous Monitoring to ensure that the total losses do not exceed allowable limits
as per CPHEEO guidelines
• Continual Leak Detection and Water Audit programs for further reduction of the
losses which would prove economical in the long-term.

Based on the projected population and the recommended supply levels as specified in the
“Manual on Water Supply and Treatment” by CPHEEO, the total future water demand is
estimated as follows:

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 72 -

Table 9.2: Estimated Future Water Demand


No Description / Parameter Present Stage Intermediate Stage Ultimate Stage (2040)
(2010) (2025)
1. Projected Population 53,633 68,117 82,601
2. Per capita supply (lpcd) 135 135 135
3. Installed Capacity of source (MLD) 4 4 4
4. Estimated Future Demand (MLD ) 7.24 9.20 11.15
5. Augmentation of the Source (MLD) 3.24 5.20 7.15

The above table indicates the existing system and their augmentation needs. The system is
not capable of meeting the increasing water demand through its present available system till
the year 2010 (assumed based on projected population). Augmentation measures need to
be identified for the existing distribution network. Therefore it is felt that the existing scheme
has to be augmented for meeting the ultimate stage water demand. This projected scenario
was discussed with stake holders and the following points emerged during the discussions:

• Augmentation of installed capacity of existing facilities to meet the growing demand.


• Rehabilitation of existing facilities to avoid higher costs of deferred and inadequate
maintenance.
• The distribution network is expected to cover additional 18,168 households by
individual water tap connections in the Ultimate stage.
• Water supply may be improved to a daily basis from the present once in two days
situation subject to increase of water supply at source.
• Implementation of remedial measures for identified weaknesses of the system /
sector to ensure that imminent and potential (future) threats are eliminated and also
prevented from recurring.
• Non-Revenue Water/ Unaccounted for Water (NRW/UFW) and system losses need
to be mitigated and monitored to ensure that the total losses do not exceed the
allowable limits (15 percent) as specified in CPHEEO guidelines

STRATEGIES FOR DEVELOPMENT

The Strategies formulated for water supply focus on exploring new sources, optimum use of
existing water resources, total water supply planning, conservation of ground water,
reduction of unaccounted for water and largely on Institutional strengthening & Capacity
building. The ULB should facilitate creation of capital assets so as to meet the future
requirements for the provision of water supply.

It is envisaged that during the year 2025 water demand would be about 9.20 MLD for 68,117
people which is less than the quantum of water supplied at present considering the daily
supply rate of 135 LPCD. The distribution network is expected to cover additional 18,168
households by individual water tap connection. Distribution losses due to leakages would be
brought to 10% from the existing estimated losses of 25%. Daily water supply will be affected
from the present intermittent supply. Considering the current deficit and the future
requirements for water supply, the following strategies are suggested:

Sector Approach: Capital investments in water supply have to be planned to address issues
focusing upon; (i) Augmentation of Source to meet the Per Capita Demand of Water during
ultimate stage; (ii) Increase in the storage and distribution of existing facilities to meet the
growing demand; and (iii) Rehabilitation of existing facilities to avoid the higher costs of
deferred maintenance;

Design Criteria: The ULB should increase the supply levels in terms of coverage, and to
cater to 100 percent of the population. Assuming that distribution network is extended to
more than 95 percent of the Roads within ULB area, given very high population density
within the ULB, all the citizens will enjoy the required supply.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 73 -

Source Augmentation: Development of a sustainable and quality source of water for onward
supply with requisite treatment/ disinfection is a critical issue that confronts the Sathuvachari
Municipality. Perennial sources need to be identified and tapped effectively. Although raw
water intake systems can be installed to meet future demand, the alternate local schemes
needs to be evaluated and modified, if necessary, since the MWL during summer months in
the above mentioned schemes may not allow adequate water to flow into the intake well.

Alternate Augmentation Schemes:

ƒ In demand of the future supply, augmentation of source from the existing scheme can be
utilized to its fullest potential.
ƒ During the stake holder’s consultation, the Hokkangal scheme can be used as an
alternate source to meet the future demand.
ƒ Construction of check dams at the Hills, as the “Jamadhi Aravi” has water for more than
6 months in a year and thus construction of a check dam would help in storing water and
the water can be used as an alternate local source for the town. During the stakeholders
discussions, it was stressed that the check dam could be an alternative source.

For future augmentation of water supply from Perennial River, alternative intake system, as
listed below can be evaluated for adoption

ƒ Collector Wells (only if sufficient sand depth to an extent of 5-m or higher is available);
and
ƒ Infiltration Wells/Galleries (a network or array of wells/ galleries may be required with
appropriate inter-spacing as determined from summer yield tests in accordance with the
established curve of interference).

An alternative which is practiced in drought-prone areas is also recommended and requires


further investigation at the detailed engineering stage. Summer storage tanks can be
developed in the foothills of Javed Hills. These tanks are essentially large earthen structures
which can be designed based on the probable holding capacity established through analysis
of rainfall intensity, flow during flood conditions and evaporation factors. High discharge
pumps can draw water from water bodies and other supply channels (based on location)
during high flow/ flood conditions and pump the same to the summer storage tanks for later
abstraction as a surface source for treatment and supply to the existing distribution system
during drought conditions. This measure will also serve to conserve water and enhance
groundwater storage potential.

In the face of full utilization of the surface source to meet future demand, groundwater use
can be restricted and eventually managed in an efficient manner. The existing infrastructure
for groundwater abstraction can be used to meet localized distribution requirements during
drought seasons when the yield from sources is likely to decrease. The aforementioned
discussion is indicative of the future requirement for the town in the long-term.

Rehabilitation of the existing system: The distribution lines laid in the town has to be
rehabilitated to improve the supply.

Water Supply Operation & Maintenance Plan: The plan shall be designed largely by involving
the Private Sector for O & M operations. This may be done through a management contract
with a private agency, which would be solely responsible for the O & M of the system, based
on agreed annual fee, with built-in incentives for improved performance.

Asset Management Plan: To address the condition assessment and the performance of the
water supply assets, it is recommended that a detailed asset management plan be prepared
for the assets of water supply in Sathuvachari town.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 74 -

Consumer Metering System: The ULB need to initiate metering system in the town. For the
projected population, there shall be about 10,853 nos. of metered connections in ultimate
design year of 2040. It is, therefore important that service connections be provided with
metering system under this project. The metering system is very important as it would
provide a platform for proper accounting of the water production and consumption and help
reduce the unaccounted for water and help in revenue generation.

Tariff Revision: Future capital investments on system up-gradation being imminent, the tariff
structure shall be revised from time to time to enable cost recovery and to service the
additional debt from the capital investments.

Unaccounted for Water: ULB shall implement leak detection studies to ascertain the volume
of unaccounted water. This to an extent, if corrected properly, would help ULB to realize
more water.

Re-cycle & Re-use: Strategy for Use of Recycled water for Non-potable use, based on a Pilot
Study for the ULB.

Mapping & GIS: To address the issue of system rehabilitation, mapping and establishing a
GIS system is pertinent to detail out system location, characteristics, age and condition. This
would enable identifying dilapidated sections of the network and those that require
replacement.

Institutional Strengthening & Capacity Building: The officials need to be trained for Project
Planning, Implementation, and Monitoring and Evaluation programs. It is recommended for
strong Strategic Plan database particularly to decrease the duplication of laying of pipeline
for same distribution as well as for a strong redressal system and minimizing unaccountable
losses & illegal connections

9.3.2 PRIORITY ACTIONS AND PROPOSALS


PRIORITY ACTIONS

Following table presents priority actions and their implementation plan for water supply
during the Short-term period (2008-2012):

Table 9.3: Priority Actions and Implementation Plan - Water Supply


Yr Yr Yr Yr
Component Activity Yr 1
2 3 4 5
Water Resource Water Supply Improvement Scheme to extended √ √
Management areas
Construction of additional Storage reservoirs √ √ √
Development of Distribution network for extended √ √
areas
Rainwater Harvesting Measures √ √ √
Re-cycle and Re-use treated water √ √
Augmentation of Source Augmentation / Treatment Plant √ √
Water Supply Redistribution/Re-zoning of D-system in existing √ √
System areas
Rehabilitation of Existing Service Reservoirs √ √
Expansion of House Service Coverage √ √
Installation of Meters √ √
Construction of summer storage tank √ √
Up gradation and Improvement of Distribution √ √
System
Rehabilitation of Existing Service Reservoirs √ √

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 75 -

PROPOSALS
Proposed Capital Works - Water Supply
The improvement to the water supply system is ƒ Provision of Water supply scheme to
designed to ensure that the installed water supply extension areas
infrastructure meets the community's needs (water ƒ Rehabilitation of storage and distribution
demand) for adequate and equitable supply at system in existing areas;
ƒ Source Augmentation;
reasonable charges. The projected demand for the ƒ Augmentation of Transmission Mains;
year 2025 is compared with the optimum supply ƒ Augmentation of Storage Capacity; and
available from the existing source, to verify the ƒ Extension & Augmentation of Distribution
adequacy and need to augment the capacity of Network
certain components.

Table 9.4: Demand, Supply and Required Augmentation of Water Supply System for 2025
Demand
Component Current Short-term Long-term
Supply
Unit Year 2008 Year 2010 Year 2040
Status
Demand Surplus Demand Surplus Demand Surplus
(Deficit) (Deficit) (Deficit)
Water Intake Pumping MLD 4.00 6.98 (3.98) 7.24 (3.24) 11.15 (7.15)
Water Treatment Plant MLD
(if Surface water Used) - 6.98 (6.98) 7.24 (7.24) 11.15 (11.15)
Service Storage ML 3.15 2.30 0.85 2.39 0.76 3.68 (0.53)
Distribution System Km 56.00 90.48 (34.48) 95.86 (39.86) 144.55 (88.55)
Source: Analysis

As reported by the ULB the average drawl of water from the existing sources is worked out to
be 4 MLD. The total requirement of water is calculated as 7.24 MLD for the short-term period
(2010) and 11.15 MLD for the long-term period (2040). Deducting the existing quantum of
water availabilities, the net requirement of water for short-term period is 3.24 MLD and 7.15
MLD for long-term period. The service storage is sufficient up to short term period but
additional storage 0.53 MLD is required in the long term period of 2040. From the above
table, it is confirmed that additional distribution mains of 34.48 km length needs to be
established to fulfill the present demand.
ƒ Ensure Adequate and equitable water supply scheme to the wards 15- 21, which are at a
higher elevation than the other parts of the town. The existing GLR’s in these areas of
the town are much in dilapidated condition and requires improvement to greater extent.
ƒ Rehabilitation of damaged OHT’s in the town.
ƒ Replacement of D-system was stressed at certain locations in the town; and
ƒ In order to meet the water demand during summer months local bore well source need to
be established at suitable locations.

The following proposals have been identified by the study team based on the reported
evaluations, discussions and priority actions as required and mutually agreed upon by the
Stakeholders:

ƒ Provision of Water Supply Scheme to extended areas;


ƒ Raw water supply system to meet the 30-year demand (2010-2040);
ƒ Augmentation of local sources to meet the growing demand;
ƒ Redistribution/re-zoning of distribution system in existing areas;
ƒ Rehabilitation of existing service reservoirs;
ƒ Construction of additional service reservoirs;
ƒ Rehabilitation and upgrading of Pumps/Machineries in the existing system; and
ƒ Augmentation of WTP and Clear Water Transmission Mains for ultimate stage demand.

The above proposals are envisaged to initially cover the problem areas within the town as a
first priority, and then in later stages the concept of design/implementation similar to that
adopted for ULB, can be implemented on a modular/zonal basis in the peripheral areas
consistent with future development.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 76 -

9.3.3 ESTIMATED SECTORAL INVESTMENT


Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are in the following table:

Table 9.5: Estimated Sectoral Investment - Water Supply


(Rs. in Lakhs)
Component Activity Investment
Water Supply Scheme to Extension areas 567.01
Water Resource Construction of additional Storage reservoirs 67.29
Management Development of Distribution network for extension areas 306.57
Rainwater Harvesting Measures 60.11
Source Augmentation / Treatment Plant 211.34
Redistribution/Re-zoning of D-system in existing areas 225.42
Augmentation of Expansion of House Service Coverage 160.48
Water Supply Installation of Meters 403.47
System Construction of summer storage tank 36.07
Up gradation and Improvement of Distribution System 380.03
Rehabilitation of Existing Service Reservoirs 22.84
Total 2440.64

Necessary clearances from concerned ministries or authorities need to be acquired at the


earliest. The authorities/departments/agencies that are proposed to be responsible for
project formulation/implementation/monitoring are listed below, but shall not be necessarily
limited to the following entities:

ƒ Nodal Agency: Sathuvachari Municipality;


ƒ Formulation/Implementation Agency: Sathuvachari Municipality;
ƒ Monitoring Agency: State Pollution Control Board, Tamil Nadu.

9.4 SEWERAGE AND SANITATION


An assessment of the existing gap in service levels in the town’s sewerage sector in relation
to the estimated future generation of sewage based on projected growth in population and
prescribed guidelines/normative standards has been performed for the following
components:

ƒ Sewage generation and sewage collection system;


ƒ Sewage treatment and disposal; and
ƒ Requirement of land for sewage treatment facilities.

The demand-gap assessment has been performed for the short-term period, i.e. intermediate
stage (15 years) and for the long-term, i.e. ultimate stage (30 years), and is presented in the
table below:

Table 9.6: Demand, Supply and Required Augmentation of UGS System for 2040
Demand
Project
Existing Base Intermediate Ultimate
Sub-Component
Unit Status Year 2010 Year 2025 Year 2040
Year 2008 Surplus/ Surplus/ Surplus/
Demand Demand Demand
(Deficit) (Deficit) (Deficit)
Population In nos. 51701 53633 - 68117 - 82601 -
Sewage Generation MLD 5.75 - 7.30 - 8.85 -
New Infrastructure
Sewage Pumping MLD - 5.75 (5.75) 7.30 (7.30) 8.85 (8.85)
Sewage Treatment MLD
- 5.75 (5.75) 7.30 (7.30) 8.85 (8.85)
Plant
Sewer Network Km - 93.86 (93.86) 119.20 (119.20) 144.55 (144.55)

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 77 -

Demand
Project
Existing Base Intermediate Ultimate
Sub-Component
Unit Status
Year 2010 Year 2025 Year 2040
Year 2008 Surplus/ Surplus/ Surplus/
Demand Demand Demand
(Deficit) (Deficit) (Deficit)
Estimate of Requirement of Land for Sewage Treatment Alternatives
Waste Stabilization Acres/
Pond @ 4 acres / MLD - 23 (23) 29.20 (29.20) 35.40 (35.40)
MLD
Activated Sludge Acres/
Process @ 0.25 MLD - 1.43 (1.43) 1.82 (1.82) 2.21 (2.21)
acres / MLD
Source: Analysis
Note: Requirement of land has been estimated based on available information on sewage treatment plants of similar scale, process of treatment,
scalability and related issues. The nominal footprint/area required for a specific plant is known to vary based on the degree of treatment required,
configuration of the land available, detailed design of treatment facilities and related factors. Decentralized sewage treatment facilities may result in a
net higher requirement of land. The land requirement indicated in this report is provided only for comparison/reference purposes. Actual land
requirement for the proposed STP(s) in related procurement/acquisition/estimation should be arrived at pursuant to relevant surveys, investigation
and detailed engineering design of the proposed facility.

9.4.1 STRATEGIES FOR DEVELOPMENT


It is envisaged that during the year 2040, 95% population will be covered and sewage
generation of 8.85 MLD from net water supply of 114 lpcd (80% of 135 lpcd water supply rate
+ 8-10% infiltration rate) and treatment facility amounting to the same with the following
strategies:

Sewerage Master Plan: Preliminary survey need to be performed considering the terrain
condition and sewage generation quantity to assess the technical and economical viability of
a sewerage project. A plan for sewerage should be prepared and the focus areas shall
include, but not necessarily be limited to the following:
ƒ Overall plan for collection, conveyance, treatment and disposal/re-use of generated
sewage in the development area.
ƒ Present coverage and condition of sewerage in slums and other urban poor areas.
ƒ Provision of sanitation through low-cost units/community facilities in slums and
integration of sanitation facilities with the main sewerage scheme.
ƒ The sewage treatment plant with a capacity of 8.85 MLD to fulfill the long-term demand
during the year 2040.
ƒ Availability of land for proposed sewage treatment facilities and related procurement and
socio-environmental issues.
ƒ Potential for re-use of treated wastewater (i.e. flushing of sewers and others).

Re-Cycle & Re-Use: Another issue that must be dealt with is the re-use of treated
wastewater, which can reduce the overall demand on freshwater. The following uses are
recommended for further evaluation:
ƒ Re-use of treated water for supplementing fire-fighting demand. Although it is impractical
to install a wet system of fire protection, treated wastewater can be stored at strategic
locations at ground level with pumping arrangement or overhead tanks for access by the
fire department. These locations will have to be clearly demarcated, accessible and
equipped with watch/ward to prevent misuse or human contact with the treated
wastewater. In the present scenario, this option may not be viable and is presented here
only for future consideration.
ƒ Re-use for wet sweeping of main roads - modern equipment is commercially available to
sweep and clean main roads through mechanical brushing/sweeping combined with a
water spray to keep suspended particulate matter to a minimum. Water for this operation
can be obtained from treated wastewater. This is normally applicable in major cities. In
the case of Sathuvachari, this option may not be practical. The option to utilize treated
and disinfected wastewater for gardening and related open spaces’ maintenance can be
evaluated.
ƒ Flushing of head manholes/sewers - This operation is probably the best use for treated
wastewater and is most beneficial to the longevity of the sewers that are proposed in all

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 78 -

the towns within the Sathuvachari region. Periodic flushing of the head manholes using
treated wastewater discharged from mobile flushing units is recommended to reduce silt
deposition in sewers. The flushing operation can be performed on a rotational basis
where each sewer line (starting/head reach within a sewerage zone) is flushed at least
once in a month.

Coverage of Low Income Settlements: There are 5 notified slum areas within the town limit.
All these slum areas are partially provided with the sanitation facility. Therefore it is proposed
to cover this locality by using Pay & Use type / Free / Low Cost Sanitation toilet facility under
GoI & GoTN schemes.

Operation & Maintenance Plan: Adoption of an O&M Plan and Schedule, including options of
using the private sector for O&M (e.g. management contract). The ULB can privatize O&M of
pumping stations and STPs through a service or management contract with the private
sector who would be solely responsible for the O & M of the system, based on an agreed
annual fee, with built-in incentives for improved performance.

Mapping & GIS: The O&M shall also include mapping & GIS of the sewer system, for proper
upkeep and maintenance and regular up gradation. This would enable constant vigilance
with regards to system malfunctions and promote effective maintenance.

Asset Management Plan: To address the condition assessment and the performance of the
Sewerage assets, it is recommended that an asset management plan be prepared for the
UGS Assets in ULB on implementation of the Plan.

Tariff Revision: Future capital investments on system up-gradation being imminent, the tariff
structure shall be revised from time to time to enable cost recovery and to service the
additional debt from the capital investments. It is proposed to introduce a Separate Sewer
Charge to service the debts and sustain O&M, of the new Capital Investments.

Institutional Strengthening and Capacity Building: Recruitment of trained engineering


personnel for management of Sewer works is an important issue confronting the ULB, the
present system is being implemented by TWAD Board and shall be transferred to the ULB
for maintenance of Assets, and as well of more importance is to keep them technically
updated. It is necessary that periodic training be imparted to the operations staff of the ULB.

The aforementioned strategies to a significant extent assist in provision of an efficient system


of sewerage, adequate coverage, treatment and disposal in accordance with applicable
discharge standards and full cost recovery. The master plan shall also focus on provision of
sewerage and sanitation facilities in the newly planned layouts and peripheral areas to
ensure coordinated development.

9.4.2 PRIORITY ACTIONS AND PROPOSALS


PRIORITY ACTIONS

Following table presents priority actions and their implementation plan for underground
sewerage during the project period (2008-2012):

Table 9.7: Priority Actions and Implementation Plan - Underground Sewerage Scheme
Component Activity Year 1 Year 2 Year 3 Year 4 Year 5
Sewerage Collection, Development of Sewerage System for Town √ √ √ √
Treatment & Provision of Sewage Treatment Plant √
Management Recycling Plant & Reuse system √
Sanitation Facility Community toilets √ √

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 79 -

PROPOSALS

The projected demand for 2040 is compared with Proposed Capital Works - UGSS
the Sewage generation to verify the adequacy and ƒ Sewage collection system to all areas;
ƒ Sewage Treatment Plants; and
the need to augment the capacity of certain ƒ Wastewater pumping and out-fall systems.
components. It is proposed to implement the UGSS
by, (i) Creation of assets for Pumping Capacity by
2025, (ii) Ultimate stage Treatment Capacity of 8.85 MLD and (iii) sewer network of
approximately 93.86 km length by 2010.

9.4.3 ESTIMATED SECTORAL INVESTMENT

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.8: Estimated Sectoral Investment - Underground Sewerage Scheme


(Rs. in Lakhs)
Component Activity Investment
Sewerage Collection, Development of Sewerage System for Town 3185.41
Treatment & Provision of Sewage Treatment Plant 378.71
Management Recycling Plant & Reuse system 42.08
Sanitation Facility Community toilets 19.24
Total 3625.43

Necessary clearances from concerned ministries or authorities need to be acquired at the


earliest. The authorities/departments/agencies that are proposed to be responsible for
project formulation/implementation/monitoring are listed, but shall not be necessarily limited
to the following entities:

ƒ Nodal Agency: Sathuvachari Municipality;


ƒ Formulation/Implementation Agency: Sathuvachari Municipality
ƒ Monitoring Agency: State Pollution Control Board, Tamil Nadu.

9.5 STORM WATER DRAINS


ƒ Development of drains appears to be performed as a joint activity with
development/reconstruction of roads and not as an individual sector. This is specific to
drains along major and minor roads. This is a critical deficiency area, since the existing
network along major and minor roads serves as the primary conduit for conveying storm
water from the point of origin to the major channels/drains.
ƒ A well designed and developed master plan for storm water drainage should be
developed focusing on areas such as projected growth of population and incidental
development of road network, updated rainfall details, low-lying areas, rainwater
harvesting requirements and other relevant parameters.
ƒ It is also imperative to conduct awareness programs at the town level to cover all classes
of residents to highlight the function of storm water drains, prevention of encroachment of
storm water drain areas, prevention of dumping of solid waste and discharge of
sewage/sullage from households and other related issues.
9.5.1 STRATEGIES FOR DEVELOPMENT

Strategies for storm water drainage are based on the fact that roadside storm water drains
are as important as the flood protection scheme for natural drains. The following are the
strategies identified in consultation with the stakeholders:

Storm water Pilot Project: Under this programme a study shall be taken up to identify the
flood spots within the town. This shall be based on the past history of floods and a survey of

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 80 -

all the drains in the town and their conditions. Mere cleaning of the drains could drain most of
the flood spots. In almost all the cases, strengthening of the drains and construction of
leading drains will have to be taken up. A de-silting exercise has to be taken up in all the
natural and open drains.

Drainage Rehabilitation Program: The flood prone areas identified are to be relieved of the
problem in future by undertaking a drainage rehabilitation program. As a part of this program,
the leading/connections between secondary and tertiary drains to primary drains have to be
improved and strengthened. In addition, control of weed growth, limiting the dumping of solid
and construction waste and controlling the growth of encroachments would be given top
priority.

Primary Drain Rehabilitation and Improvement Program: “Kannaru” the primary drain of the
town, runs for than 6.24 kms in the town. This drain acts the major flood carrier of the town.
But the existing drain is inadequate to handle the flash floods as the secondary drains, which
feed in water are not systematically designed and are not fully constructed in some sections.
Moreover, significant reduction in depth and width are noticed due to silting and
encroachment of drain bunds. To alleviate these, a rehabilitation and improvement program
is recommended.

Improvement Works and Construction of Tertiary Drains: Construction of tertiary drains


(pucca only) would be taken up on a priority basis as the town comprises of 46.53 km. of
tertiary drains covering 32% of the road length against a norm of 130%. It is proposed to
construct tertiary drains to all the major arterials and important roads to increase the
coverage and also to convert the kutcha drains to pucca drains to facilitate proper draining of
storm water into natural drains.

Rehabilitation of ecosystems: Efforts need to be made to develop an integrated catchments


management plan for Palar River, and other water bodies that exist in the town. Further
hydraulic capacity of these river and water bodies would be improved through widening and
deepening and construction of side walls thereby limiting the risk of floods. De-silting need to
be carried out to increase the water holding capacity and water bodies need to be protected
from dumping toxic and hazardous wastes.
Operation & Maintenance Schedule: Adoption of an O&M Schedule for works varying from
Drain Cleaning to De-silting, including options of using the private sector for O&M (e.g.
Management Contract).

Monitoring and Quality Control: Monitoring of water quality parameters need to be conducted
on a regular basis. ULB need to take up the responsibility of monitoring the parameters in the
water bodies within its jurisdiction and take preventive measures, if the results are above the
permissible limits. The horticulture department of town would devise pro-active strategies to
limit pollution to water bodies within its limits and would co-ordinate with other agencies for
monitoring the parameters in the water bodies.

Principles to Strive for in Storm Water Management

These four principles provide a helpful framework for looking at storm water plans:

Control: Control measures can be broken down into two categories: source control and runoff control.
Source control measures focus on pollution prevention. Their objective is to avoid or limit the generation of
pollutants. Typical source control Measures include proper containment measures; spill prevention and
cleanup, waste reduction, public education, illicit connection control, and reduced use of fertilizers and
pesticides. Runoff control measures focus on minimizing runoff from new developments, and siting
infrastructure to discourage development in environmentally sensitive areas. These controls are cost-
effective if implemented in the site-planning phase of new development projects. Examples of these controls
at the municipal planning level include zoning ordinances, subdivision regulations, buffers, and setback
requirements. Runoff control measures also include techniques for slowing down runoff.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 81 -

Collection: Capture and storage of runoff for more timely release is a vital component of most storm water
management systems Retention basins are areas designed to hold the storm water permanently until it
infiltrates into the ground. Detention basins are meant to slow and hold storm water before releasing it.

Conveyance: Conveyance systems are used to drain and direct the flow of runoff generated on a site. This
is often done with catch basins feeding into storm sewers. More natural systems, using vegetated
depressions and swales which look and function much like the natural drainage system, should be used
whenever possible.

Cleansing: Control, conveyance, and collection of runoff mean little without provisions for cleansing.
Cleansing is commonly accomplished through techniques that promote filtration and settling of pollutants
and their natural processing by vegetation and soil. Filtering devices include engineered structures like
sediment basins and porous pavement, but also include natural systems like stream buffers and vegetated
filter strips. Depending on their design, many collection systems like ponds and constructed wetlands also
serve to clean water.

Therefore, the priority actions identified through discussions with stakeholders and the
proposals evolved for improvement are specifically intended to achieve dual objectives, viz.
optimal utilization of the available strengths of the system through requisite identification and
creation of opportunities for system improvement and sustainability, and implementation of
remedial measures based on the identified weaknesses of the system/sector to ensure that
the imminent and potential (future) threats are eliminated and prevented from recurring.

9.5.2 PRIORITY ACTIONS AND PROPOSALS


PRIORITY ACTIONS

Following table presents the priority actions and their implementation plan for storm water
drainage during the project period (2008-2012):

Table 9.9: Priority Actions and Implementation Plan - Storm Water Drains
Component Activity Year Year Year Year Year
1 2 3 4 5
Drains Rehabilitation of Major drains/channels √ √ √
Rehabilitation Rehabilitation of Storm Water Drains √ √
Construction of Provision of storm water along existing roads √ √
Drains Formation of new drains along proposed road √ √ √ √
network

As specified earlier, priority actions identified by the stakeholders, discussed and finalized
pertaining to development of the existing network of storm water major and minor drains
including catchments, surface and area drains in Sathuvachari are furnished below:

ƒ Eviction of encroachments along major and minor drains.


ƒ Rehabilitation of existing drains.
ƒ Expansion of drain network to uncovered areas.
ƒ Awareness programs to prevent solid/liquid waste dumping into drains.

PROPOSALS
Proposed Capital Works - Storm Water
The ULB should increase the Service levels in terms of Drains
coverage, to achieve coverage of 130 percent of Road ƒ Improvement to existing minor drains;
Length, through Built Drains. The ULB is recommended ƒ Rehabilitation of existing major drains;
to adopt the strategy for rejuvenation of Lakes and ƒ Fencing and greenway development
Ponds, to be used as sources for re-charging and as along major drains;
ƒ Development of a storm water drain
Summer Storage, and through networking of Water master plan; and
Bodies, to increase Water Sustainability. ƒ New drain network for uncovered areas.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 82 -

Considering the requirements, capital investments in Drainage have to be planned to


address issues focusing upon; (i) Improvement Works and Construction of Tertiary Drains.
(ii) Drainage Rehabilitation works for low lying areas, through improvement of networking of
Secondary and Tertiary Drains to Primary Drains; (iii) Improvement and Rehabilitation of
Primary Drains through widening, deepening, construction of Side-Walls, Cross-Drainage
Works and Diversion works at Critical locations; (iv) Rejuvenation and Rehabilitation works
for Water Bodies, through de-silting, bonding works and Intersection and Diversion of
Sewage wherever required.

The Project demand for 2011 is compared with the existing Storm Water Drainage
Infrastructure, to verify the adequacy and need to augment the capacity of components.
Proposed augmentation of required components of the system is indicated in Table 9.10
below.
Table 9.10: Demand, Supply and Required Augmentation of Drainage System for 2011
Demand
Existing Year 2008 Year 2010
Project Sub-Component Unit
Status Surplus/
Demand Demand Surplus/ (Deficit)
(Deficit)
Road Length Kms 75.84 90.48 - 93.86 -
System Rehabilitation
Strengthening of Open Pucca Kms 46.83 - (15.87) - -
Drains
Strengthening of Closed Pucca Kms - - - - -
Drains
Up gradation of Kutcha drains to kms - - - - -
Pucca drains
Strengthening of Natural Drains Kms 6.24 - (6.24) - -
New Infrastructure
Storm Water Drains - (@130% Kms 52.77 117.62 (64.85) 122.01 (69.24)
of road length)
Open Pucca Drains Kms 46.53 94.1 (47.57) 97.61 (51.08)
Closed Pucca Drains Kms - 23.52 (23.52) 24.40 (24.40)
Kutcha drains Kms - - - - -
Source: Analysis

It is proposed to augment additional quantity, (i) Strengthening, De-silting and Eviction of


encroachments of 6.24 km of Natural Drains and improve networking, (v) Provision of 69.24
km length of storm water drains along the proposed road network during the short-term
period. The following proposals have been identified by the study team based on reported
evaluations, discussions and priority actions as required and mutually agreed upon by the
Stakeholders:
ƒ Development of a storm water drain master plan;
ƒ De-silting of existing storm water drains;
ƒ Improvement measures to existing water bodies;
ƒ Re-grading/re-surfacing of drains as required; and
ƒ New drain network for uncovered areas.

9.5.3 ESTIMATED SECTORAL INVESTMENT


Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.11: Estimated Sectoral Investment - Storm Water Drains (Rs. in Lakhs)
Component Activity Investment
Rehabilitation of Major drains/channels 918.99
Drains Rehabilitation
Rehabilitation of Storm Water Drains 339.57
Provision of storm water along existing roads 436.59
Construction of Drains
Formation of new drains along proposed road network 727.65
Total 2422.80

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 83 -

Necessary clearances from concerned ministries or authorities need to be acquired at the


earliest. The authorities/departments/agencies that are proposed to be responsible for
project formulation/implementation/monitoring are listed, but shall not be necessarily limited
to the following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality & Public Works
Department, Tamil Nadu.
ƒ Monitoring Agency: State Pollution Control Board, Tamil Nadu.

9.6 ROADS, TRAFFIC AND TRANSPORTATION


Based on the identified issues in Roads, Traffic and Transportation sector, it is imperative to
ensure that typical upgrading of the road network is limited not only to widening and re-
grading/paving which can provide succor only to a certain extent. Increasing the area under
roads and traffic movement, extending the provision of adequate parking and traffic
infrastructure that will match the town’s present and future needs for both private and public
transport are other areas that require attention.

9.6.1 STRATEGIES FOR DEVELOPMENT

Strategies under Roads, Traffic and Transportation focus at improving town wide
transportation network and linkages, and Provision of town and regional level transport
facilities. Improvement of Core Town Areas is proposed in terms of Pedestrianisation,
Signage and Strengthening.

Design Criteria:
• 100% coverage of surfaced roads including up-gradation of existing roads in the town.
• Ensure free flow of traffic through improvement of the junctions and providing sufficient
off-street parking facilities.
• Ensure free and safe movement of pedestrian providing footpaths and Side Protection
Barriers.

Approach: The ULB need to increase the network, so as to achieve a full cover that will to
cater to 100 percent of the population. Given the high density of population within the ULB
area, and also limited area for development, it is proposed to emphasize on strengthening
and widening measures for Roads, thus addressing the issues of congestion and incomplete
network.

Preparation of Traffic Management Plan: This shall focus on junction improvements, traffic
management within core areas of the town regional level proposals, parking and pedestrian
facilities. It has been observed that, in most of the major roads in the town pedestrians are
forced to use the carriageway due to the absence or poorly maintained footpaths. Footpaths
of 1.5m wide are proposed along the major roads where heavy pedestrian movements are
observed. For traffic safety and convenience, appropriate signs, markings, lighting,
guideposts are required to be provided on curves, intersections, public utility places, etc.
Proposals for road furniture are made considering the importance of the road, safety and
aesthetic.

Road Planning and Demand: The newly developing areas and habitations of rural in nature
requires establishment of new linkages. The road widening projects can provide success to a
certain extent in increasing the area under roads, but are limited to certain commercial
corridors and critical link roads only. Road planning shall also ensure that roads, parking and
traffic infrastructure provision matches the town’s present and future needs for both private
and public transport.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 84 -

Pedestrian Facilities and Safety Measures: Pedestrians are most vulnerable road users in
cities. It is therefore necessary to provide better facilities for pedestrian movement in areas
where pedestrian movement is predominant. Pedestrian facilities in terms of providing
footpaths free of encroachment in all the bus route roads.

Building Pay & Park type Complexes: The phenomenal growth of vehicles has lead to
increased demand for parking. Being an important commercial/market centre of the region
there is a sudden increase of floating population during peak hours. The problem is further
aggravated by the absence of adequate off street parking facility. Pay and Park complexes
are to be built for a better parking and traffic management. Such complexes can be
privatized.

Asset Rehabilitation: Upgrading shall be undertaken to extend, refurbish and enhance the
roads. Plans would be phased so as to optimize the cost and surface condition and shall
include upgrading earthen roads to Bituminous Topped Roads. This phased up-gradation
would considerably reduce the costs on new formations.

The most critical issue is not only planning for such infrastructure, but also ensuring active
and effective coordination across other departments such that development activities across
each front, i.e., installation of sewer mains, water mains, street lights, storm water drains.

9.6.2 PRIORITY ACTIONS AND PROPOSALS


PRIORITY ACTIONS

Following table presents priority actions and their implementation plan for roads, traffic and
transportation during the project period (2008-2012):

Table 9.12: Priority Actions and Implementation Plan - Roads, Traffic and Transportation
Component Activity Y1 Y2 Y3 Y4 Y5
Construction of ROB √ √ √
Strengthening existing roads √ √
up gradation of important roads √ √
Improved Safety, Formation of new roads √ √
Service delivery and Junction Improvements √ √
Customer Satisfaction Culverts √
by providing better Bus Shelters √
infrastructure Signals √
Signage and markings √ √
Road divider & Medians √ √
Traffic Island √ √
Bus Stand Improvement √
Improved Pedestrian Accessibility to the disadvantaged √ √
Facilities, comfort and Pedestrian Crossings √
safety Foot paths √ √

PROPOSALS

The following proposals have been identified by


the Study Team based on reported evaluations, Proposed Capital Works - Roads, Traffic and
discussions and priority actions as required and Transportation
ƒ Pavement Improvements to ULB maintained
mutually agreed upon by the Stakeholders: roads widening and Provision of Subways;
ƒ Studies on parking requirements and town-
The Project demand for Roads for 2011 is wide public transportation system and
compared with the existing Road Infrastructure, to ƒ Junction improvements
verify the adequacy and need to augment the

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 85 -

capacity of components. The future trend of road network development is envisaged based
on population growth and land use; efficient system of road network; segregation of traffic;
designalizing of junction; and Up gradation, widening and strengthening of major junctions.
Projected road demand, for town roads, for 2011 is indicated in Table 9.13.

The Road Length demand for 2011, based on the road density of approximately 14 km per
sq. km of area and Per Capita Road Length of approximately 1.75 m is approximately 50.72
km, as against 49.05 km for 2008. Service level based on Road Surface type is maintained
at 5 percent for CC Roads, 65 percent for BT Roads and 30 percent for WBM Roads.

Table 9.13: Demand, Supply and Required Augmentation of Internal Roads (Excluding NH, SH, MDR’s) for 2011
Project Sub-Component Unit Existing Status Demand
Year 2011
Year 2008
Demand Surplus/ (Deficit)
Road Length Kms 75.84 93.86 (18.02)
Concrete Road Kms 17.92 22.18 (4.26)
BT Road (Approved + Unapproved) Kms 54.75 67.76 (13.01)
WBM Road Kms 3.17 (3.17)
Earthen Road Kms 3.17 -- --
System Rehabilitation – Up gradation of Internal Town Roads
Repair of Concrete Roads Kms
BT Roads to Concrete Roads Kms (2.26)
Restoration of BT Roads Kms - (10.01)
WBM Roads to BT Roads Kms
Earthen Roads to WBM Roads Kms (3.17)
New Infrastructure – New Roads Formation
Concrete Road Kms - - (4.26)
BT Road Kms - (13.01)
WBM Road Kms - -
Source: Analysis

Road Augmentation: It is proposed to augment additional quantity of road network by the


following methods, (i) New Formation of additional length of 4.26 km of Black Top Roads; (ii)
New Formation of additional length of 13.01km of WBM Roads, and (iii) Up gradation of
Earthen to WBM roads to a length of 3.17 km,

Junction Improvement: Sathuvachari Town is located on the major railway junction and State
highways although the town's road system has as many designed road intersections, they
lack in many characteristics such as road geometric features, channeling islands, parking
lanes for turning vehicles, acceleration and deceleration lanes etc. To improve the town
image and the carrying capacity of road junctions, it is proposed to provide grade separated
pedestrian subways, Junction landscaping, and improvement at selected Intersections.
Following junctions are proposed for the improvements on the basis of observation and with
consultation.

ƒ RTO Office Junction


ƒ Vallar Nagar Junction
ƒ Rangapuram Junction

Intersections must be designed and operated for simplicity and uniformity and the design
must keep the capabilities and limitations of drivers, pedestrians and vehicles using
intersections. All the traffic information on road signs and marking should be considered in
the design stage prior to taking up construction work. Any location having merging, diverging
or crossing maneuvers of two vehicles is a potential conflict point. The main objective of the
intersection design should be minimizing the conflict points. The improvement measures
normally include:

ƒ Proper channelisation for the free left turn


ƒ Foot path on approaches of the junctions

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 86 -

ƒ Planned pedestrian zebra crossing


ƒ Shifting of electric poles and cutting of trees
ƒ Land acquisition / removing structures
ƒ No parking on the approaches of the junction for at least 50 m
ƒ Adequate and safe turning radius
ƒ Appropriate gradient of the road at the intersection

Bus Stand/Shelter Improvement: There is no Bus Stand currently in operation in the town,
the town lacks even properly designed bus shelters, which is imminent requirement for the
people in the town. A well equipped Bus shelter with 2 to 3 bus bay bays and seating
facilities for the passengers can be provided along the By pass road, to serve the people in a
better manner.

Implementation of Scheme Roads: In order to provide better circulation pattern for the future
development of Sathuvachari town, roads as identified in the master plan are to be
implemented under phased manner.

Access to the Railway Station: A Separate connecting Sathuvachari with the railway y station
road at Kangayanallur can be provided to enable easy movement of people from the town to
the Station and also this bridge would reduce the amount of traffic crossing the Palar Bridge.

Under Pass / Sub Ways: The whole length of the tow is traversed by the by pass road,
pedestrian crossings in the town have become a great difficulty and provision of a under
pass / Sub way for pedestrian crossings and also movement of Light weight vehicles can be
proposed at least at 2 junctions namely RTO and Vallalar road junctions.

It was noted that the land requirement for provision of new roads and other infrastructure in
the newly developed areas that are within the development area has been identified and
earmarked in the Comprehensive Development Plan. However, formation and development
of such roads are not envisaged under the above proposals.

9.6.3 ESTIMATED SECTORAL INVESTMENT

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.14 : Estimated Sectoral Investment - Roads, Traffic and Transportation


(Rs. in Lakhs)
Component Activity Investment
Strengthening existing roads 157.78
up gradation of important roads 212.66
Formation of new roads 431.10
Improved Safety, Bridges 1212.75
Service delivery and Junction Improvements 24.26
Customer Satisfaction Sub-ways 1091.48
by providing better FOB’s 4.85
infrastructure Culverts 6.06
Signals 24.26
Bus Shelters 14.55
Signage and markings 24.26
Parking Lots/ complexes 60.64
Improved Pedestrian Accessibility to the disadvantaged 30.32
Facilities, comfort and Pedestrian Crossings 6.06
safety Foot paths 63.06
Total 3376.21

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 87 -

Necessary clearances from the concerned ministries or authorities need to be acquired at


the earliest. The authorities/ departments/ agencies that are proposed to be responsible for
project formulation/ implementation/ monitoring are listed but shall not be necessarily limited
to the following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality and Highways
Department.

9.7 SOLID WASTE MANAGEMENT


9.7.1 STRATEGIES FOR DEVELOPMENT

While formulating strategies, the MSW (management & handling) rules 2000, serve as
guideline. The rules came into existence under section 3, 6 and 25 of the Environment
(Protection) Act, 1986 by Central Government. Strategies for solid waste management
revolve around optimum use of manpower, equipping them with required gears and making
the collection, transportation and disposal effective round the clock.

SEGREGATION AND STORAGE OF WASTE AT THE SOURCE OF GENERATION

Improvement measures should evolve effective strategies to mobilize the community and
citizens towards synchronizing the system of waste storage at source with primary waste
collection by the ULB and cooperate with the ULB to maintain clean streets and
neighborhoods, in particular, and the town in general. The local inhabitants should be
advised to keep two separate bins/bags for the purpose of segregation of waste at source
and adopt appropriate mode of disposal of such waste from the source as outlined in the
Manual on the Municipal Solid Waste Management.

ULB should direct all waste generators (households, institutions commercial establishments
and floating population) not to throw any solid waste in the street, open spaces, and vacant
plots or into drains by organizing public awareness programs and/or through public
notification in leading local newspapers. Any violations in this regard should be penalized
and the ULB staff should be empowered to do so.

PRIMARY COLLECTION OF SOLID WASTE

Following are the broad interventions suggested for improvement of primary collection of
solid waste:
ƒ Provide daily waste collection to all households and establishments for collection of
organic bio-degradable waste from the doorstep by ensuring regular and reliable service
so as to clear such waste within 24 hours of its generation;
ƒ Dry and recyclable wastes to be collected on alternative days as these do not decay and
need not be collected daily; and
ƒ Domestic hazardous wastes produced occasionally may not be collected from doorstep
but the people should be advised to deposit the same in special designated bins.

Accordingly, one of the key steps to be followed towards implementing the above initiatives
would be to direct the street sanitary workers to collect the wet waste (organic and bio-
degradable) door-to-door during the street sweeping process on a daily basis. Initially, some
of the well developed residential areas of the town that can readily afford the cost involved
may be covered through this process. This service shall gradually be extended to other
areas of the town.

ULB can evaluate the option of enhancing promotion of NGOs and SHGs for collection of dry
and recyclable wastes and domestic hazardous wastes from the doorstep on ‘no payment on
either side’ basis.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 88 -

STREET CLEANSING

The most important aspect of improving effectiveness of street cleansing operations may be
addressed by improving the working environment of the sanitary workers and fixing norms
for each sanitary worker so that the factor of accountability may be established to review the
performance of each sanitary worker.

Sanitary workers shall sweep the roads and footpaths in the area allotted to them as well as
collect the domestic, trade and institutional wastes in their handcart from all households,
shops and establishments situated along the stretch of road/street allotted. The sweeping
norms mentioned below are for cleaning streets in the first 4 hours of the working day.
Roads/streets, which have a central median or divided section, should be considered as two
roads. In such cases the length of the road allotted for sweeping should be reduced to half or
alternatively separate sanitary worker may be engaged for sweeping two sides of the road.
All above shall include the surface drains abutting the road having width less than 1 m. the
sanitary workers should be assigned fixed individual beats and ‘pinpoint’ work according to
the density of the area to be swept. Alternatively, the following guidelines may be considered
while prescribing these norms:

ƒ High-density area: 250 to 350 running meters of road length.


ƒ Medium-density area: 400 to 600 running meters of road length.
ƒ Low-density area: 650 to 750 running meters of road length.

In order to avoid inconvenience to the citizens by dust generated from street sweeping and
also to facilitate sweepers to perform their duty without interruption from constant vehicular
movement, it is recommended to implement “night-sweeping” arrangement in the town by the
ULB.

TEMPORARY STORAGE OF WASTES

ULB should ensure that containers are provided at an average distance of 250 meters from
the place of work of the sanitary workers. The average distance between 2 containers
should, therefore, not exceed 500 meters. The distance between the containers shall be
determined on the basis of the load of waste / refuse that is likely to be received at the
container from the area concerned. The containers should be placed on cement concrete or
asphalt flooring having a gradual slope towards the road to keep the site clean. The flooring
should be flush with the border of the road (i.e. drains) to maintain hygienic conditions and
facilitate the transfer of waste from the handcart/tricycle into the container. A catch pit may
be provided close by if storm water drains exist in the town. In areas where placement of
large containers (dumper placer containers) is inconvenient, small containers of 1.00 cu. m
size may be placed on the roads, lanes and by-lanes at short distances of about 300 m.
These containers should also be kept on paved flooring and cleared daily. It is of paramount
importance to ensure compatibility of the containers with the existing and proposed
transportation fleet.

Another option that could be used in such a situation is to avoid placing a container
altogether and instead press into service small waste collection vehicles for direct transfer of
waste from the handcarts/tricycles into such vehicles. Such vehicles can be parked at
suitable locations in the congested areas where sanitary workers can bring the waste easily.
It is suggested to use innocuous agents like bleaching powder and other permitted
insecticides to prevent the menace of breading of flies and mosquitoes at the community
storage points. Further, such an application of innocuous agents would facilitate maintaining
hygienic and odorless environment at the community storage points. It may be noted that the
proposed containerization of wastes would prevent littering and spreading of wastes at the
community storage points by stray animals. Further, proposed training of rag pickers by
NGOs would facilitate the rag pickers to collect recyclable wastes at the doorstep avoiding
the necessity to pick-up such wastes from the community waste storage points.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 89 -

The standards and norms prescribed in the Manual3 pertaining to temporary waste storage
points are based on the total waste generation and the spacing, viz. a) the total capacity of
the temporary waste storage points should be equivalent to at least 1.5 times the total waste
generation, and b) the spacing between two temporary waste storage points should be less
than or equivalent to 500 m.

TRANSPORTATION OF WASTES

Synchronization of collection with the transportation process is one of the key steps to be
initiated by the ULB. The collection of waste needs to be containerized and the proposed
transportation system should be envisaged to be compatible with the collection system. The
synchronization of transportation with that of the collection process should be planned in a
phased manner considering the financial capability and operation and maintenance capacity
of the ULB. The vehicles used for the transportation of waste shall synchronize with that of
the collection system and based on the market surveys and situation analysis and discussion
with the ULB, two types of vehicles are envisaged for the town:

ƒ Dumper Placer -Twin Container is proposed to cater to the needs of the fast moving
vehicles. This vehicle would have two containers, each of capacity 3 cu. m with side
loading and unloading facilities using hydraulic system. This vehicle is envisaged to
undertake 3 trips per day with total waste carrying capacity of 9 MT per day, primarily
used for the wider roads within the town; and
ƒ Three-Wheeler Auto Cargo is proposed to cater to the needs of the small and congested
lanes of the town especially in the old town areas. These vehicles would have an open
container of capacity 1.4 cu. m with manual loading and rear hydraulic unloading
facilities. This vehicle is envisaged to undertake 5 trips per day with total waste carrying
capacity of 3-4 MT per day.

The transportation of wastes is envisaged to be containerized as per the norms/standards


prescribed in the Manual. Accordingly, it is envisaged to replace the existing open transport
system in a phased manner. As per the norms/standards, it is suggested to have vehicular
capacity equivalent to 1.25 times that of the actual generation of waste. However, from the
economic point of view, vehicles less than 10 years (economic life) are proposed for regular
routes on a daily basis while those approaching their economic life would be used as
reserves and for pinpoint operations, achieving the requisite carrying capacity of the fleet.
With containerization of the transport, the number of trips may be considerably increased
due to saving in time for handling, loading and unloading the generated waste.

SOLID WASTE TREATMENT AND DISPOSAL

Presently, ULB has adopted only dumping as the method of waste disposal. It is
recommended to implement an effective mechanism for treatment and disposal of generated
solid waste. Evaluation of available technologies for solid waste treatment and disposal
should be performed on the following lines:
ƒ Available project experience information or proven technology (domestic/international);
ƒ Suitability of process for region-specific field condition;
ƒ Scale of operation;
ƒ Technical feasibility;
ƒ Feasibility of capacity upgrade;
ƒ Economy of operation - capital and annual O&M cost;
ƒ Requirement of land, water and power;
ƒ Manpower and level of skill requirement;
ƒ Capability of the ULB to manage the facility;
ƒ Environmental impact of such technology;
ƒ Process aesthetics; and
ƒ Overall life cycle cost.
3 Manual on Municipal Solid Waste Management

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 90 -

Based on the scale of waste generated in Sathuvachari and viability of the treatment
technologies, aerobic composting is recommended as the techno-economically feasible
process for further detailed investigation and subsequent implementation. A detailed study
needs to be made on this alternative prior to finalization.

Operation and Management Schedule: Adoption of an O&M Schedule, including options of


using the private sector for O&M (e.g. management contract). In view of the criticality of the
information on vehicle movement in assessing the collection and disposal efficiency of the
local body, it is recommended that a standard register at the disposal site and transfer
station be maintained. The register should contain information on each of the vehicle trips at
both the locations and the origin of waste collection. The Schedule can be used for periodic
maintenance of vehicles to defer Costs. A summary of this information shall be prepared at
the end of the day, to be verified by the health officer.

Approach for Optimal Manpower Utilization: Since all areas under ULB are proposed to be
brought under privatization, it is considered that there would not be any further requirement
to induct conservancy workers. The existing street sweeping operations in the ULB are
satisfactory and to ensure operational efficiency of the system, the following measures are
suggested, (i) Markets and other areas of the town shall be swept at least twice a day and
sweeping should be done on Sundays and holidays in core areas and denser areas. (ii)
Sweepings shall be collected separately as degradable and non-biodegradable waste and
deposit in containers kept at various locations and de-silting of larger drains may be done by
a separate crew equipped with appropriate implements.

Institutional Strengthening and Capacity Building: Recruitment of trained engineering


personnel for management is an important issue confronting the ULB, and as well of more
importance is to keep them technically updated. It is necessary that periodic training be
imparted to the operations staff of the ULB.

Training & Public Awareness: Training may be given at all levels. NGOs and private sector
be fully involved. IEC activities have their role in SWM but the best approach the general
cleanliness is through imposition of administrative charges on erring citizens. When citizens
do not throw solid waste on roads, the collection of solid waste will become efficient and
easy.

9.7.2 PRIORITY ACTIONS AND PROPOSALS


PRIORITY ACTIONS

As specified earlier, certain priority actions identified by the stakeholders are discussed and
finalized pertaining to development of the solid waste management sector in Sathuvachari
and are furnished below:
ƒ Comprehensive Solid Waste Management Scheme (per the MSW Rules, 2000).
ƒ Minimization of generation of Solid Waste.
ƒ Source segregation of municipal solid waste.
ƒ Augmentation and expansion of primary collection of waste.
ƒ Modernization and expansion of existing waste transportation system.
ƒ Municipal solid waste treatment and disposal.
ƒ Regulation of recyclable wastes handling and re-use.
ƒ Proper handling and disposal of slaughter house and related wastes.
Following table presents priority actions and their implementation plan for solid waste
management during the project period (2008-2012):

Table 9.15: Priority Actions and Implementation Plan - Solid Waste Management
Component Activity Y1 Y2 Y3 Y4 Y5
Primary Collection Providing bins for Door-Door Collection √ √ √
Containerized Tri-Cycles √ √

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 91 -

Table 9.15: Priority Actions and Implementation Plan - Solid Waste Management
Component Activity Y1 Y2 Y3 Y4 Y5
Equipment for Garbage Recovery Personnel √ √
Equipment for Street Sweeping Personnel √ √
Tipper Lorries - Used for Construction/Other

Debris Collection
Container Bins for Residential Areas √ √ √
(1.25 MT Capacity)
Secondary Collection Container Bins for Market, Bus Stand, √ √ √
Commercial, Railway Station etc.,
(1.25 MT Capacity)
Transportation Dual Load Dumper Placer Vehicles √ √ √
Waste Processing & Integrated Waste Treatment √ √
Disposal Sanitary Landfill Facility √ √
Administration and Utilities Complex including HT
Administration Complex √
Electrical Sub-station

PROPOSALS
Proposed Capital Works - Solid Waste
The total Solid Waste Generation in 2008 for a Per Management
Capita Generation of approximately 329 grams/day ƒ Source segregation system;
is estimated at 8 MT, indicating a priority need for ƒ Augmentation of primary collection system;
ƒ Augmentation of transportation system;
Scientific Disposal of Waste. Since, the Population ƒ Transfer stations with required equipment;
of the ULB is high, the Waste generation has been ƒ Municipal solid waste treatment plant; and
considered at 329 grams/day (based on present ƒ Construction of landfill.
generation), with a growth of 2 percent per year,
against the generation and the demand for future is assessed.

The total Solid Waste Generation for 2025 is estimated at 22.40 MT. The Present Disposal
system is Open Waste Dumping, creating potential health and environment hazard
considering the quantity of waste generation, location of disposal site and its environs, hence
further option for Scientific Waste Disposal can be explored on priority basis. The details of
Service Levels for future are presented in Table 9.16.

Table 9.16: Design Criteria and Target Service Level


Description Unit Based On CPHEEO Norms
2025
Population In nos. 68117
Per capita Waste Generation Grams/day 329
Collection Type - Door-to-Door Collection and Segregation
of Waste at Source
Collection Demand Percent of Generation 100
Vehicle Capacity Adequacy Percent of Rated Capacity 100
Treatment Type - Composting of Waste & Sanitary Landfill
Treatment Demand Percent of Generation 100
Total Solid Waste Generation MT 22.40
Source: Norms

Highest priority has to be accorded for segregation & storage at source irrespective of the
area of generation so as to facilitate an organized and environmentally acceptable waste
collection, processing and disposal. Source segregation of Recyclables and bio-degradable
(organic) waste will not only provide an efficient way for resource recovery, but will also
substantially reduce the pressure and pollution in Landfill sites.

Approach for Primary Waste Collection and Street Sweeping: The following measures have
been recommended for improving the primary collection practices of the ULB;

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 92 -

Implementation of ‘Door-to-door collection’ through 100 percent privatization - In order to


achieve the above objective, a ‘Tow Bin system of Solid Waste Storage’ at source is being
recommended. As per this system, each of the households shall be directed to keep
separate bins/ containers for biodegradable and non-biodegradable waste generated within
their premises. The segregated waste so stored in these bins will have to be transferred to
the dumper placer provided for each area. Details of Collection system and Specifications of
segregated waste are summarized in Table 9.17 and Table 9.18 respectively.

Table 9.17: Details of Proposed Primary Collection System


Mode of Area of collection Primary collection vehicle Secondary storage
Collection
Door to Door 1. Residential colonies of High Multi-bin cart/ tricycle-with 2 bins 1.Bio-degradable in Skips/ wheel
and Middle income group for Biodegradable waste and 1 containers
for recyclable 2. Non-biodegradable-Sell or hand
over to waste collector
2. Hotels/ Restaurants Closed vehicle to collect Direct transport to Disposal site
Biodegradable
Large Fruit and Vegetable Markets/ Carrying bins to Transfer Point Skip / Dumper Placer
Community Bin Transfer Stations
System
Small Community Slums/urban poor Colonies Carrying bins to Transfer Point Transfer contents of biodegradable
Bin System to community bins

Table 9.18: Details of Specification of Segregated Waste


S. Source Storage of Segregated Waste
No. Bio-Degradable Non-Bio-Degradable
1 Households 10-15 liters capacity plastic/ reinforced A bin or Bag of suitable Size
plastic/ LDPE/ metal bin with lid
2 Hotels, Restaurants 60 liters capacity-LDPE /HDPE A bin or Bag of suitable Size
3 Shops, Offices, Institutions Suitable container not exceeding 60 liters A bin or Bag of suitable Size
4 Market Stalls 40-60 liters bin-LDPE/HDPE A bin or Bag of suitable size
5 Function Halls Bin/ Skip matching to Municipal Collection A bin or Bag of suitable size
system
6 Hospitals, Nursing 60 liters capacity bin for non-infectious Store waste as per Bio-medical Waste Mgmt
homes bio-degradable waste Handling Rules 1998
7 Construction/ - Store with in premises
Demolition waste and deposit in the
notified Site by the local
body or to the municipal Vehicle
8 Garden Waste Store with in premises Deposit in large
community bin or to the
municipal vehicle

Tricycles shall be used for door-to-door collection. The collected wastes are then conveyed
to the dumper bins of capacity 1.25 MT. The available push carts shall be exclusively
earmarked for areas having narrow streets/lanes where dumper placer cannot enter and
where dumper bins cannot be placed. It is recommended to phase out waste collection
through pushcarts.

The collected garbage is transported to the waste processing site by dumper placers of
2.5 MT - 3 MT capacities. Dumper placers have to collect the dumper bins and unload the
wastes at inspection yard. Inspection yard at dumping site are constructed with tipping
platform arrangement to unload the garbage from the dumper bins to perform screening of
wastes. Demolition wastes / debris can be collected through existing Tippers or by Lorries.
Based on the recommendations above the following Table 9.19 gives the details of the
vehicles and other infrastructure to be purchased to implement this new approach.

Table 9.19: Vehicle Requirement for Primary and Secondary collection


Sl. No. Equipment Primary Collection Secondary Collection
Tricycle Dual Load Dumper Placers
1 Pay load or waste per trip (MT) 0.175 2.0 (1MT* 2 Nos)

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 93 -

2 Collectable quantity (MT) 22.40 22.40


3 No of trips per vehicle -- 3
4 No of vehicles required 160 4
5 Total Requirement with 25 % allowance 200 5
6 Available 21 --
7 To be purchased 179 5

• Assumptions: 80% of the capacity is taken for the purpose of calculation of number of tricycles and
number of dumper bins.

Table 9.20: Bin Requirement for Primary and Secondary collection


Particulars Primary Collection Secondary Collection
Household Bins Dumper Bins
Total Requirement 13624 17
Number of bins available -- --
To be purchased 13624 17

Source Segregation and Collection of Commercial Waste, through privatization; and Source
Segregation and Collection of Hotels and Market Waste - Construction waste has to be
stored at the premises of the construction either in skips or suitable containers and has to be
directly emptied to the notified disposal site by the generator. Meat and fish markets should
store waste in non-corrosive bins of maximum 100-liter capacity each and transfer contents
to large container to be kept at the market just before lifting of such large containers.
Slaughterhouses should keep separate containers for animal waste and other wastes. It is
also being recommended that this system of source segregation and storage is encouraged
through community education and awareness campaigns and hence no capital investments
are envisaged in this regard. Introduction of bio-medical waste management facility with
support from Indian Medical Association is also recommended.

Street Sweeping on Daily Basis - Since further areas and eventually the entire town is
proposed to be brought under privatization; it is considered that there would not be any
further requirement to induct conservancy workers. The existing street sweeping operations
in Sathuvachari are satisfactory and to ensure operational efficiency of the system, the
following measures are suggested. (a) Markets and other areas of the town shall be swept at
least twice a day and sweeping should be done on Sundays and holidays in core areas and
denser areas; (b) Sweepings shall be collected separately as degradable and non-
biodegradable waste and deposit in containers kept at various locations and a separate crew
equipped with appropriate implements may do de-silting of larger drains.

The factors that are considered in preparing plan for street sweeping in ULB are population
and building density, road surface, pedestrian traffic, sand accumulation, and topography. In
preparing a sweeping plan for ULB, the streets and public spaces are classified as
residential streets, market areas, and open spaces, streets having no residential areas or
having less density of habitation. The details of sanitary workers requirement as per
CPHEEO Manual are presented in Table 9.21 after taking the above factors into
consideration.
Table 9.21: Details of Sanitary Workers Requirement
S.No. Classification of Roads Length of Roads (km) Number of Sweepers per Total No. of
km Sanitary Workers
1 Highways
National highway 2 4 8
State highway -- 4
2 ULB Maintained
a. B.T.Road 54.75 2.5 137
b. C.C. Road 17..92 2.5 45
c. WBM Road 1.5
d. Earthen Road 3.17 1.5 5
Total 187

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 94 -

S.No. Classification of Roads Length of Roads (km) Number of Sweepers per Total No. of
km Sanitary Workers
Add 10 % for common places 19
Grand Total 206

In conclusion it is suggested to have good sweeping plan and to cover the entire
Sathuvachari area including lanes, by-lanes and open spaces it is necessary to work out the
“Beats”, after taking in to consideration the following requirements:

• Each sanitary worker has to do the sweeping and the cleaning of the tertiary and road
side drains and transfer the sweepings in to the bins in the sweeper’s cart and deposit
biodegradable and non-biodegradable separately in the containers/ bins kept at the
intersection of sweeping routes.
• Separate crew equipped with appropriate implements may do De-silting of larger drains.
Removal of floating debris and blockages should be the responsibility of sweepers.
• Part of the street sweeping can be outsourced to women SHGs or other agencies
through a transparent process
• The ULB should publish notification inviting general public to complain and bring it to the
notice of municipality in case their area is not cleared.
• Sanitary services should not suffer due to absence of any sanitation worker. In order to
assure this, alternate arrangements must be made to ensure that all sanitary services
are provided even when any sanitary worker is on leave or absent.

Community Participation and Enforcement of By-laws and Waste Collection and Handling
Rules - It is recommended that the community be involved in primary collection through
segregation at household level to minimize the number of waste handling operation. Non-
biodegradable waste shall be collected separately from premises where door to door
collections are organized. Present system of primary collection should be supplemented by
introducing multi-bin carts (Push carts / Tricycles) covering the entire area of the town.

It is envisaged that 100 percent area of the ULB be brought under door-to-door collection
and hence, no additional dust bins are proposed, except for slums and other areas. These
are estimated to be about 20 to 25 percent in 2011. The rest of the 75 to 80 percent shall be
privatized. In this scenario, the ULB shall overlook the collection and transportation activities.
The existing dust bins shall be phased out in an organized manner according to the
implementation of the system. This is proposed to be achieved by the year 2010-11. Based
on these assumptions, the equipments for primary collection are estimated, to meet the
future Waste Generation.

Approach for Waste Collection and Transportation: The following measures have been
recommended for improving the waste collection and transportation practices of the ULB;

Secondary Collection system - It is recommended to retain all Tippers, for secondary


collection purpose, in places where Dual Loaded Dumper Placers cannot be introduced.

Efficient Transportation System - It is also recommended that Dual Loaded Dumper Placers
(DLDPs) be introduced to improve the collection efficiency and to cover 80 percent area of
the town in phased manner. The introduction of Dual Loaded Dumper Placers shall eliminate
the need of the Secondary Collection Points. Instead of these collection points, in the end,
transfer stations with advanced segregation and recycling facilities may be introduced, in the
future. Presently, the Vehicle Capacity Adequacy Ratio is 30.

System Demand: Two Dual Loaded Dumper Placers with 6 numbers of containers will be
required for collection of approximately 9.84 tons of waste generated in Sathuvachari at
present.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 95 -

Table 9.22: System Demand for Solid Waste Management


Required per Design
S.No Type
and CPHEEO norms
Primary Collection
1 Tri-Cycles 179
2 Push-carts* -
4 Tipper Lorries - Used for Construction/Other Debris Collection* -
Secondary Collection & Transportation
1 Dumper Bins for Dual Dumper Placers (1.25 MT capacity) 5
2 Dual Dumper Placer Vehicles (2.5 to 3 MT cap.) 3
Waste Processing & Disposal
Sanitary Landfill Complex
1 Front End Loader with Shovel for MSW Landfill - waste spreading 1
Backhoe Loader (Gen. Purpose) for MSW Landfill - Hydraulic Excavator & Front End
2 Loader Combo - for loading, excavation, embankment construction etc., (3 nos. + 1 1
standby)
3 Landfill/ Soil Compactor with Pad Foot Shell Arrangement 1
Tipper Trucks w/ custom built body and Double Ram Hydraulic Tipping Arrangement for
4 1
Waste Handling (Eicher Model 10-90, Ashok Leyland or Equivalent)
Tractor with Water Tank, Pump, Spray Nozzle with Extender Arm Attachment for Fine
5 1
Spray Dispensing
Aerobic Composting Complex
1 Compost Turner and Aeration Attachment with Tractor 1
2 Front End Loaders with Shovel (JCB Model or equiv) 1
Tractor with Water Tank, Pump, Spray Nozzle with Extender Arm Attachment for Fine
3 1
Spray Dispensing
Tipper Trucks w/ custom built body and Double Ram Hydraulic Tipping Arrangement for
4 1
Waste Handling (Eicher Model 10-90, Ashok Leyland or Equivalent)
5 Mini-Loaders (Bobcats or equiv.) with Skid Steering or suitable arrangement 1

Approach and Design for Disposal of Waste: Based on Generation of Solid Waste it is
recommended to develop a landfill site for safe disposal of Solid Waste of the ULB. Based on
the successful implementation of the door-to-door collection and source segregation
practices in the town, the options of waste to energy and composting projects can be
developed. The disposal strategies for the ULB will do with.

Composting the organic fraction of the waste - Approximately 70% of the waste generated in
Sathuvachari is organic nature. In terms of the quantity, it is expected that approximately
6.89 tons of organic waste is to be generated which can be taken up for Composting. The
land requirement for compost facility is estimated at 4 acres, which will accommodate
Windrow Pads, Ancillaries and Circulation area.

Sanitary land filling of inorganic fraction of waste and the compost rejects - Inorganic waste
constitutes approximately 30 percent, quantifying to 2.95 ton, is proposed to be disposed
through Sanitary landfill. The land requirement for Landfill facility is estimated at 2 acres. The
Sanitary landfill is proposed for a volumetric capacity of 1.00 cu.m, with at least Three Lifts
(One Lift below ground and Two Lifts above ground). Landfill facility design is based on
CPHEEO design assumptions for Sanitary Landfills, wherein a landfill height of 5 m and a
bulk density of 0.85 Tons/ m3 are assumed. However, the actual height of landfill depends
on the geological/ geographical conditions of the site and technology of landfill development.

However, the study team also suggested ULB to use the regional landfill site identified in the
study performed by TNUDP and Institute of Remote Sensing, Anna University for disposal
and treatment of the waste generated in the town. The regional land fill facility would
include the Vellore Corporation and 8 municipalities surrounding the town, which
includes Sathuvachari also.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 96 -

The following proposals have been identified by the study team based on reported
evaluations, discussions and priority actions as required and mutually agreed upon by the
Mission Stakeholders:

ƒ Implementation of source segregation system;


ƒ Installation of additional primary collection bins and related component;
ƒ Augmentation of transportation fleet - tractors, dumper-loader trucks;
ƒ Installation of transfer stations with compactors, material handling equipment and
wastewater disposal facility (drains, pump station etc.);
ƒ Implementation of municipal solid waste treatment system; and
ƒ Construction of landfill for non-bio-degradable waste including lining, under-drains, gas
extractor/burners and perimeter protection.

9.7.3 ESTIMATED SECTORAL INVESTMENT

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.23: Estimated Sectoral Investment - Solid Waste Management


(Rs. In Lakhs)
Component Activity Investment
Providing bins for Door-Door Collection 3.93
Containerized Tri-Cycles 23.55
Tri-Cycle / Push Carts 0.61
Primary Collection
Equipment for Garbage Recovery Personnel 3.60
Equipment for Street Sweeping Personnel 5.11
Tipper Lorries - Used for Construction/Other Debris Collection 21.07
Container Bins for Residential Areas 1.78
(1.25 MT Capacity)
Secondary Collection
Container Bins for Market, Bus Stand, Commercial, Railway Station etc., 1.19
(1.25 MT Capacity)
Transportation Dual Load Dumper Placer Vehicles 34.56
Waste Processing & Integrated Waste Treatment 280.02
Disposal Sanitary Landfill Facility 23.34
Administration Administration and Utilities Complex
36.38
Complex
Total 435.14

Necessary clearances from the concerned ministries or authorities need to be acquired at


the earliest. The authorities/ departments/agencies that are proposed to be responsible for
project formulation/ implementation/monitoring are listed, but shall not be necessarily limited
to the following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality.
ƒ Monitoring Agency: State Pollution Control Board, GoTN, Sathuvachari

9.8 STREET LIGHTING


The principal issue in this sector is the present level of power consumption and measures to
reduce energy charges in the future that is incurred through provision of adequate street
lighting for the town roads.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 97 -

9.8.1 PRIORITY ACTIONS AND PROPOSALS


PRIORITY ACTIONS

As specified earlier, priorities actions identified by the stakeholders, discussed and finalized
pertaining to development of the street lighting sector in Sathuvachari are furnished below:

ƒ Upgrading street lighting in existing areas which essentially entail replacement of


fluorescent lights with sodium vapor or equivalent lamps and installation of high-mast
cluster lighting at important junctions that are not presently covered with such lighting
arrangements.
ƒ New street lights shall be provided for uncovered areas.
ƒ Power consumption management and energy efficiency measures.
ƒ Development of General Lighting Plan.

Following table presents priority actions and their implementation plan for street lighting
during the project period (2008-2012):

Table 9.24: Priority Actions and Implementation Plan - Street Lighting


Component Activity Y1 Y2 Y3 Y4 Y5
Proposed SV lamps in uncovered areas √
Proposed FL lamps in uncovered areas √
Proposed High Mast light in major junctions √
Proposed Timers for existing / new lights √ √
Service
Improvement Proposed Sensor Lighting √ √
Proposed Solar Lights √ √
Proposed Power Saver (Capacitors) √ √
Proposed dedicated sub-station/transformers √ √
Proposed Tri-vector meters √

Proposals

The following proposals have been identified by the study team based on reported
evaluations, discussions and priority actions as required and mutually agreed upon by the
pertinent Stakeholders:
ƒ Replacement of FL with SV or equivalent lamps
at major intersections; Proposed Capital Works - Street Lighting
ƒ Installation of street lighting fixtures at ƒ Upgrading street lighting in covered areas;
uncovered areas - poles, bull-head fittings, ƒ Provision of new street lighting for uncovered
areas;
control systems and solar panels (as- ƒ Augmentation of Power Supply Infrastructure;
applicable); and
ƒ Augmentation of transformers/sub-stations (as ƒ Installation of operational control and energy
applicable); and efficiency equipment.
ƒ Installation of capacitors, timers/trip sensors
and other operational control equipment at control nodes.
ƒ Implementation of underground cabling along major roads.

Proposed augmentation of required components of the system is indicated in Table 9.25


below.
Table 9.25: Demand, Supply and Required Augmentation of Street lighting for 2011
Project Sub-Component Unit Existing Demand
Status Year 2008 Year 2011
Demand Surplus/ Demand Surplus/
(Deficit) (Deficit)
Street Lights Nos. 2223 3016 (793) 3195 (972)
New Infrastructure
Tube Light Fixtures Nos. 1700 2413 (713) 2556 (856)

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 98 -

High Power Fixtures Nos. 511 600 (89) 636 (125)


High & Mini High mast Lights Nos. 12 3 (3) 4 (4)
Source: Analysis

It is proposed to augment additional quantity, (i) Installation of 972 New Light Poles, (ii)
Installation of New High Power Fixtures about 125 Nos., (iii) Installation of 856 nos. of Tube
light fixtures, and (iv) Installation of 3 high mast lights. Based on Discussions and field visits,
it is understood that the existing Street Lights are in good functional condition and do not
require any major rehabilitation measures.

Based on the discussions with the stakeholders, high mast lights are proposed at the
following junctions:
ƒ Vallalar Junction
ƒ RTO Office Junction
ƒ Collector office Junction

9.8.2 ESTIMATED SECTORAL INVESTMENT

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.26: Estimated Sectoral Investment - Street Lighting


(Rs. In Lakhs)
Component Activity Investment
Proposed SV lamps in uncovered areas 22.74
Proposed FL lamps in uncovered areas 104.72
Proposed High Mast light in major junctions 63.67
Proposed Timers for existing / new lights 118.40
Service
Improvement Proposed Sensor Lighting 113.85
Proposed Solar Lights 30.32
Proposed Power Saver (Capacitors) 0.06
Proposed dedicated sub-station/transformers 1.52
Proposed Tri-vector meters 0.97
Total 456.24

Necessary clearances from the concerned ministries or authorities need to be acquired at


the earliest. The authorities/ departments/ agencies that are proposed to be responsible for
project formulation/ implementation/ monitoring are listed, but shall not be necessarily limited
to the following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality and TNEB.

9.9 BASIC SERVICES FOR THE URBAN POOR


9.9.1 GENERAL

Slum upgrading (including rehabilitation) initiatives and improving the quality of life of the
urban poor in general and slum dwellers, in particular, shall be an integral part of the CDP.
With the growth of the town and addition of new areas, migration of people from rural areas
to the town is imminent. However, the strategies under growth management shall arrest the
extent of the migration. In the wake of the new developments being planned in the town, it is
necessary that they are regulated in an integrated manner.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 99 -

Various schemes introduced by the State and Central governments to improve the socio-
economic status of slum dwellers need to be utilized in an effective manner. The ULB needs
to supplement the current initiatives on its part with aggressive strategies to fulfill the
requirements of the urban poor. The best practices and strategies outlined in this chapter
shall be at the macro level, specific to social development, as infrastructure provision and
deficiencies are already addressed by the underlined strategies under each sector in the
prior chapter on Infrastructure.

BEST PRACTICES AND STRATEGIES

The ULB shall initiate community development activities within its administrative jurisdiction
and integrate this aspect in its overall plan for the development of Sathuvachari. Hence,
various Central & State Government programmes shall converge into the overall
development plan.

POVERTY ALLEVIATION AND COMMUNITY DEVELOPMENT PROGRAMS

Beneficiary Selection: The target beneficiaries need to be identified based on a socio-


economic survey and efforts need to be initiated to form Community Development Societies
(CDSs) covering the target population and implement guidelines on the lines of SJSRY in
beneficiary selection. The community needs to be encouraged to avail the benefits under
various slum development programs by developing linkages with lead bankers and ensuring
the free flow of communication and a proper reporting procedure. A town level training
strategy shall be formulated to focus on the targeted beneficiaries. The strategy will aim at
the people to be trained including policy makers, town officials, community members as well
as the beneficiaries.

Programme Monitoring: Monitoring of the programme is equally important as implementation.


Effective monitoring paves the way for replication and up scaling of such initiatives.

Social Inclusion of Vulnerable Groups: The vulnerable groups are socially under-privileged
women and the aged who are generally restricted by the dominant groups in any community.
Voice for these vulnerable groups in community development programs is necessary. It can
be ensured only through effective awareness campaigns. Improving the literacy levels
among the poor and the slum dwellers will also ensure the elimination of the differences
among the communities and ensure participation of vulnerable groups. This initiative aims at
a long-term goal and needs sustained longstanding efforts on the part of CDSs. The
activities of the CDSs shall be monitored through an evaluation procedure on a periodic
basis.

COMMUNITY DEVELOPMENT

Community development needs to be integrated to provide economic and employment


generation activities. The ULB has to strengthen its efforts to identify NGOs, SHGs and
CBOs and encourage them to work specifically for the empowerment of the urban poor in
general, and slum dwellers in particular.The ULB may concentrate on organizing specific
training programs on tailoring, housekeeping, mechanic work, lathe working, computer
operation, coir works, etc. to guarantee employment/self-employment for the identified
beneficiaries. Training needs assessment, designing the training programs, identification of
training institutions and resource persons to bring in community development also needs to
be focused.

Education: Support from various sections for involvement in education and to enhance
opportunities for increased access to literacy development is to be encouraged. There is a
need to develop strong linkages between education, training programs and resources. Value
added services (computer coaching classes, tuition, etc.) may be encouraged. The ULB shall
facilitate school-linked programs and support services.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 100 -

Strengthening Community Development Initiatives: Strengthen efforts to involve people in


the planning and decision-making at the community level that affect their lives and
encourage the participation of community in physical as well as economic generation
activities. Encourage government departments, schools, institutions and community-based
organizations to provide opportunities for people’s participation in discussions that shape
decisions and effect proper coordination between the various actors in community
development. The ULB has to identify NGOs/CBOs to develop appropriate linkages with
town level authorities and community.

Others Policies: Following are some of the policy initiatives which support/facilitate ‘best
practices’:
ƒ Support transformation of informal settlements which are notified. Allow for incremental
development and gradual improvement of settlements without loading excessive
infrastructure and construction costs. Provide the support required to speed up the
process through access to financial, organizational and technical inputs.
ƒ Draw up a town level plan quantifying present informal settlement population, and
prepare an action plan to target integration of the population into the town. Communities
residing in these settlements must be encouraged towards self-assessment and
identification of priorities through which they can initiate changes in their settlements.
ƒ There needs to be a better convergence of urban poverty programmes of the centre,
state and local governments. The Comprehensive Development Plan should be prepared
with special attention to land tenure, basic services, housing and employment needs,
including informal enterprises of the poor, of women and children. Provide the poor with
better access to housing finance at affordable cost through micro-credit schemes and
community-based lending.
ƒ Promote the cluster, collective or cooperative society approach in allocation of land to the
poor. Develop a range of tools through which communities of the poor and their
organizations begin a dialogue with the ULB on issues of tenure, infrastructure and
housing.
ƒ Develop innovations in delivery mechanism through which communities can begin to
work with local authorities to ensure universal provision of basic sanitation and other
amenities and services.
ƒ The poor should be empowered to take full part in town governance and thereby access
their due share of resources. Action for economic empowerment should include
facilitating self-managed thrift and credit societies in order to link the poor to institutional
credit.
ƒ Eviction without provision of full resettlement and livelihood opportunities should be
avoided. In-situ upgrading should always be the preferred option, except in completely
untenable situations. The ULB should play an enabling role in linking poor people to a
range of innovative housing and livelihood options.
ƒ The ULB should work with communities using participatory methods to map their access
to infrastructure services (water supply, toilets, drainage, garbage removal, etc.) and
prioritize their needs/demands. Opportunities should be actively explored for the poor to
participate in both infrastructure construction and ongoing service delivery. Although
individual family facilities should be the priority, constraints of space may require
innovative service delivery options such as community-managed shared facilities.

Therefore, the priority actions identified through discussions with stakeholders and the
proposals evolved for improvement are specifically intended to achieve dual objectives, viz.
optimal utilization of the available strengths of the system through requisite identification and
creation of opportunities for system improvement and sustainability, and implementation of
remedial measures based on the identified weaknesses of the system/sector to ensure that
the imminent and potential (future) threats are eliminated and prevented from recurrence.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 101 -

PRIORITY ACTIONS AND PROPOSALS


As specified earlier, priority actions identified by the stakeholders, and discussed and
finalized pertaining to development works related to slum upgrading and urban poor in
Sathuvachari are described below. The below listed policy framework and priority actions
have been identified by the study team based on reported evaluations, discussions and
priority actions as required and mutually agreed upon by the Stakeholders.

POLICY DIRECTIVES / ACTIONS

ƒ Development of comprehensive ‘slum upgrading’ policy to identify, notify and upgrade


the slums with clear assignment of responsibilities.
ƒ Finalization of parameters for listing and categorization of slums as tenable and non-
tenable category.
ƒ Establishment of a sustainable continuous and non-lapsable fund flow for slum
improvement programs.
ƒ Appropriate institutional arrangements for transfer of land from the GoTN to ULB for
undertaking slum improvement schemes and housing for urban poor.
ƒ Exploration of the possibility of land acquisition for slums located on private lands.

PREPARATORY ACTIVITIES

ƒ Comprehensive listing of slums.


ƒ Notification of tenable/non-tenable slums and mapping within ULB area.
ƒ Preparation of a database on socio-economic characteristics of all slum dwellers in the
listed slums.
ƒ Mapping and assessment of physical characteristics of slums (housing and services) for
all tenable slums.
ƒ Identification of land parcels for resettlement of slum dwellers of all non-tenable slums
and involvement of NGOs/CBOs in the process.
ƒ Preparation of DPRs for each of the slums as an integrated scheme covering both
housing and services.

IMPROVEMENT MEASURES

ƒ Provision of basic coverage/provision of


Proposed Capital Works - Slum Upgrading
water supply, sanitation, access roads, etc. ƒ Land Acquisition/purchase;
in all tenable slums. ƒ Construction and upgradation of dwelling units;
ƒ Project formulation for integrated and
development of all notified tenable slums ƒ Integrated development of slum through all basic
covering housing, provision of basic services amenities like water supply, sanitation, solid waste
and amenities. management, roads, storm water drains,
streetlights, etc.
ƒ Formulation of public-private partnership
projects for slum upgrading.
ƒ Exploration of rehabilitation option rather than resettlement.
ƒ Adoption of a ‘community-based approach’ in service provision and delivery to suit the
local context and requirements.
ƒ Ensure involvement of women and children from project formulation to implementation to
achieve sustainability.
ƒ Target service provision like water supply, sanitation and electricity on individual
household basis - to facilitate improvement in performance & collection of user charges.
ƒ Facilitation of ‘e-service’ provision and delivery, by communities with appropriate
supervision by the ULB.
ƒ It is recommended that the ULB bear the cost of provision of services with complete or
partial recovery.

Following table presents priority actions and their implementation plan during the project
period (2008-2012):

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 102 -

Table 9.27 Priority Actions and Implementation Plan - Slum Upgrading


Sl. No. Activity Y1 Y2 Y3 Y4 Y5
I. Policy Directives / Actions
1. Develop comprehensive ‘slum upgrading’ policy to
identify, notify and upgrade slums with clear
assignment of responsibilities
2. Finalize parameters for listing and categorization of
slums (tenable & non-tenable category)
3. Establish a sustainable continuous and non-lapsable
fund flow for slum upgrading programs
4. Institutional arrangements for land transfer from GoTN
to ULB for slum improvement schemes and housing
for urban poor
5. Explore the possibility of land acquisition for slums
located on private lands
II. Preparatory Activities
1. Comprehensive listing of slums
2. Notify tenable/non-tenable slums and mapping within
ULB area
3. Prepare a database on socio-economic characteristics
of all slum dwellers in listed slums
4. Mapping and assessment of physical characteristics of
slums (housing and services) for all tenable slums

5. Identify land parcels for resettlement of slum dwellers


of all non-tenable slums and involve NGOs/CBOs in
the process
6. Prepare DPRs for each of the slums as an integrated
scheme - both housing and services
7. Implement DPR covering both housing and services in
all tenable slums
8. Formulate public-private partnership projects for slum
upgrading
III. Improvement Measures in Notified Slums
1. Prepare a database on socio-economic characteristics
of all notified slums
2. Mapping and assessment of physical characteristics of
all notified slums (housing and services)

3. Adopt community based approach for preparing


projects and involve NGOs/CBOs in the process
4. Prepare DPRs as an integrated scheme covering both
housing and services
5. Implement DPR covering both housing and services in
all tenable slums

9.9.2 ESTIMATED SECTORAL INVESTMENT

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.28: Estimated Sectoral Investment - Slum Upgrading and Urban Poor Rs. in Lakhs
S. No. Particulars / Capital Investment Components Investment
1. Dwelling Units 57.42
2. Water Supply 5.74
3. Sewerage and Sanitation 11.48
4. Solid waste Management 8.61
5. Roads and Pavements 13.78
6. Street Lights 1.38

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 103 -

S. No. Particulars / Capital Investment Components Investment


7. Community Centers 24.26
8. Open Spaces/Gardens 24.26
Total Capital Cost (incl. contingencies, supervision,
administration and consulting charges)
146.93

Necessary clearances from the concerned ministries or authorities need to be acquired at


the earliest. The authorities/departments/agencies that are proposed to be responsible for
project formulation/implementation are listed, but shall not be necessarily limited to the
following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality and TNSCB.

9.10 REMUNERATIVE PROPOSALS


Apart from the core infrastructure facilities, other social amenities in the town are proposed
for development in the short-term period.

ƒ Improvements of the Shopping Complex constructed under UIDSSMT: Addtional floor of


shops can be constructed in the areas, as the site immediately abuts the Highway, the
major road of the town.
ƒ Construction of a market complex: Being an important residential node of the region, the
town reuqires to be provided with a market complex facility
ƒ Construction of a Marriage hall: Developement of the marriage hall/ kalayan manadapam
in the town was also dissuced during the stakeholders consultation.

Following table presents priority actions and their implementation plan during the project
period (2008-2012):

Table 9.29: Priority Actions and Implementation Plan – Remunerative Proposals


Component Activity Y1 Y2 Y3 Y4 Y5
Improvements of the Shopping Complex
√ √
Remunerative constructed under UIDSSMT
Proposals Construction of a market complex √ √
Construction of a Marriage hall √ √

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.30: Remunerative Proposals (Rs. in Lakhs)


Sl. No. Particulars / Capital Investment Components Investment
1. Improvements of the Shopping Complex constructed under UIDSSMT 9.63
2. Construction of a market complex 304.92
3. Construction of a Marriage hall 32.16
Total Capital Cost (incl. contingencies, supervision, administration and consulting
349.31
charges)

9.11 ENVIRONMENTAL IMPROVEMENT


This section pertains to the proposed development initiatives and specific improvements that
are recommended to upgrade the existing urban environment and supporting infrastructure
such as conservation of water bodies, improvement of greeneries.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 104 -

9.11.1 ENVIRONMENTAL MANAGEMENT - RAIN WATER HARVESTING

Most state governments have recently started to focus on Strategies / Implementation Measures
rainwater harvesting to protect environmental resources, ƒ Rain Water Harvesting;
recharge the ground water table, create awareness on ƒ Protection of Resources;
ƒ Slum Networking;
water usage, etc. Though the merits of rainwater ƒ Pollution Abatement; and
harvesting are a known fact, they have not trickled down ƒ Eco-systems’ Rehabilitation.
to required policy measures like pollution abatement,
resource’ networking, eco-system rehabilitation, etc.
Therefore, it is imperative that the strategies mentioned Issues - Water Pollution
ƒ Health risks;
below are implemented together with rainwater harvesting
ƒ Contamination of groundwater;
measures in an integrated manner. ƒ Encroachments of lakes and channels;
and
PROTECTION OF ENVIRONMENTAL RESOURCES ƒ Lack of coordination and unclear
One of the most critical interventions is the protection of responsibilities among agencies.
environmental resources. The protection of natural water
bodies, channels and open spaces from further encroachments shall be carried out in a
coordinated manner. Areas adjoining water bodies shall be developed and clearly marked
and notified to prevent further encroachment.

SLUM NETWORKING PROGRAM


Slum networking should be viewed as integrated improvement of the entire town using
slums, not as isolated islands, but as an urban net. The spatial spread of slums together with
contiguity between informal settlements gives an opportunity to strengthen town level
infrastructure networks. There is a close correlation between slum locations and the natural
drainage paths of the town, which needs to be tapped and improved upon with the
infrastructure services. This approach would help in building low cost service trunks,
particularly for gravity-based systems of sewerage and storm drainage, together with
environmental improvements such as cleaning of channels and major drains.

POLLUTION ABATEMENT
Industrial effluent shall be treated separately and shall not be mixed with domestic sewage.
Industry shall be encouraged to take up clean technology initiatives. This is particularly
applicable for small and medium enterprises. Apart from these specific measures, certain
industrial units will need to be shifted to designated areas for prevention of mixing of
effluents into storm water drains.

MONITORING AND QUALITY CONTROL Water Quality Monitoring Parameters


ƒ BOD levels;
Monitoring of water quality parameters is being ƒ Nitrate levels;
conducted by the SPCB and an Environmental ƒ Extent of heavy metals; and
Management Plan has been released as a guideline for ƒ Extent of toxic substances.
protecting the overall environment. However, it is
imperative that other departments that provide urban infrastructure should consult and
coordinate all developmental initiatives with the SPCB and the SPCB shall, in turn, ensure
that all applicable norms and standards are complied with.

AIR POLLUTION CONTROL


INVENTORY OF AIR QUALITY Principal Causes - Air Pollution
There is an imminent need to augment and update the ƒ Vehicular emissions;
database on air quality indicators and initiate research ƒ Industrial emissions; and
on the health impacts of specific contaminants. The ƒ Construction related activities.
database shall include sources, emission concentrations
and identify non-scheduled industrial and commercial
premises with air pollution potential so as to develop emission reduction strategies. This shall
be taken up in co-ordination with SPCB and the Traffic Police.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 105 -

LOCAL EDUCATION AND ENFORCEMENT PROGRAM


Identification of potential air pollution sources shall require mitigation through a structured
education program. This program shall be drafted in consultation with the SPCB and the
Traffic Police Department. It would focus primarily on vehicular pollution and would include
promotion of emission testing of vehicles.

POLLUTION FROM SOLID & HAZARDOUS WASTES


STUDY ON WASTE SOURCES AND CHARACTERISTICS
There is a clear inability on the part of the ULB to maintain
data on waste characteristics and thereby identify suitable Issues - Hazardous Waste Management
ƒ Collection & disposal of medical
mitigation methods. Data from waste characteristic studies
waste;
shall be periodically updated and validated to maintain ƒ Lack of disposal facilities; and
information on the identification of sources of generation, ƒ Lack of initiatives on reuse and
per capita generation, physical and chemical recycle.
characteristics of the waste.

LOCAL EDUCATION AND COMMUNITY PARTICIPATION


With high per capita generation trends, measures shall be adopted to reduce waste
generation at source. This shall be made possible only through awareness creation and by
eliciting active community involvement. The ULB shall take a pro-active role in sensitizing
communities on waste minimization through a robust awareness campaign and education.
The support of NGOs/CBOs and other agencies can be solicited in conducting such mass
awareness programs.

IDENTIFICATION OF COMMERCIAL OPPORTUNITIES


Identification of waste characteristics, sources and creation of public awareness is expected
to open avenues for commercial opportunities for waste management. With the ULB
successfully contracting out waste collection to the private sector, it would be appropriate if
further avenues like treatment and disposal, etc. are explored to carry out sustainable waste
disposal practices on a public-private-partnership format.

PLANNING FOR OPEN SPACES & OTHER RESOURCES


Open spaces and other connected resources have to be planned so that they become lungs
for the town. The development of open spaces would also enhance overall environmental
quality. It is suggested that proposals should be framed for carrying out studies or planning
exercises required for framing capital projects. Some of the best practices and strategies that
can be adopted are listed below.

SITE SELECTION AND MARKING


Potential green areas have to be identified, rehabilitated and maintained in order to reduce
the deficit of open spaces and parks. Resources like gardens, parks, cemeteries,
wastelands, heritage sites, industrial areas, forest, agricultural land, institutions and the road
network shall be identified for potential greening activities.

NETWORKING OF RESOURCES
As specified in the earlier sections, open spaces along or next to water bodies shall be
identified, rehabilitated and maintained in order to connect recreational and cultural areas.
Restoration shall start simultaneously at various areas by clearing the obstacles and
greening the areas. Special emphasis shall be given to planting trees. The aim is to restore
the green cover to its original glory that was lamentably lost during the earlier devastating
cyclone. The immediate action plan consists of greening areas where new developments are
proposed and areas that are rapidly developing. The integration of natural resources in the
city for recreational and cultural purposes shall be targeted to attract investments, increase
commercial exchanges, and create job opportunities.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 106 -

LAND USE INTERVENTIONS


Broadly three land uses can be identified for distributing green corridors - residential,
commercial and industrial. It is difficult to define clear-cut strategies to convert them to green
spaces, as each will have a characteristic of its own. However, residential areas seem to be
the easiest to link and make part of a green network. Industrial locations consist partly of
open spaces and land reserves that can be integrated to the green corridors.

The implementation of green corridors might be slow due to access and financial constraints.
A convincing argument for planting trees is the impact of the increase on property values.
Areas which are not available for connection may be given incentives by the government to
form green corridors.

MAINTENANCE OF PARKS & PLAYGROUNDS


The possibility of entrusting resident associations and private agencies with the responsibility
of maintaining parks, playgrounds and the proposed green corridors can be evaluated. The
tasks to be carried out like daily cleaning, watering, weeding, trimming, raising new
plantations, etc. need to be clearly spelled out in a contract document. Resident associations
can contribute minimum amounts towards maintenance, while the balance can be borne by
the ULB. During the stake holder’s consultations, it was highlighted that a science park can
be constructed near the existing court complex, which will add to the regional tourist
importance of the town.

PRIORITY ACTIONS

Following table presents priority actions and their implementation plan during the project
period (2008-2012):

Table 9.31: Priority Actions and Implementation Plan – Environmental Improvement


Component Activity Y1 Y2 Y3 Y4 Y5
Creation of new park s √ √
Service Improvement Formation of a science park √ √
Greening / Avenue Development √ √

9.11.2 ESTIMATED INVESTMENT

Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:
Table 9.32: Estimated Sectoral Investment – Parks & Greening Development Rs. in Lakhs

Sl. No. Sector / Component Description Investment


1. Creation of new parks 60.11
2. Formation of a science park 420.79
3. Greening / Avenue Development 10.64
Total Capital Cost (incl. contingencies, supervision, administration and consulting charges) 491.54

The authorities/departments/agencies that are proposed to be responsible for project


formulation/ implementation/monitoring are listed, but shall not be necessarily limited to the
following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality and Forest Department.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 107 -

9.12 URBAN MANAGEMENT AND GOVERNANCE


The ULBs have been found to be proactive in their commitment to introduce reforms at the
ULB level. All these reforms may be broadly categorized under the following:
ƒ Computerization Initiatives;
ƒ Property Tax Reforms;
ƒ Privatization Initiatives;
ƒ Accounting Reforms; and
ƒ Resource Mobilization Initiatives.

9.12.1 POLICY FRAMEWORK AND PRIORITY ACTIONS

As specified earlier, priority actions have been discussed and finalized by the stakeholders
for urban management and Sectoral reforms for ULBs. The following policy framework and
priority actions have been identified by the study team based on reported evaluations,
discussions and priority actions as required and mutually agreed upon by the stakeholders:

STRATEGY
ƒ Innovations both at policy and project levels to speed up the urban reform process.
ƒ Reforms to have in-built mechanism of participation and commitment.
ƒ Institutional strengthening and financial capacity building to be an integral part of the
reform measures.
ƒ Areas of reform measures include property tax, accounting and auditing and resource
mobilization and revenue enhancement.

PROPERTY TAX
ƒ Bringing transparency and uniformity in taxation policies.
ƒ Tax policy and operational procedures should be simple and clear.
ƒ Development of templates for property tax (for self-assessment) to increase tax
collection (without levying fresh taxes), including implementation strategies.
ƒ Mapping of properties and developing GIS-enabled property tax management system for
enhancing property tax net/coverage and better administration.
ƒ Collection of arrears through innovative ideas and approaches using tools for community
participation and fast track litigation methods.
ƒ Property tax base should be de-linked from rental value method and should be linked to
unit area or capital value method.

ACCOUNTING AND AUDITING


ƒ Accounting reforms - shifting from single entry cash based accounting system to accrual
based double entry accounting system.
ƒ Legislative changes in the accounting systems and reporting requirements.
ƒ Designing of accounting procedures.
ƒ Accounting manual - chart of accounts, budget codes, forms and formats, etc.
ƒ Standardized recognition norms for municipal assets and revenues.
ƒ Auditing of accounts should be carried out effectively and regularly to promote
transparency and accountability.

RESOURCE MOBILIZATION AND REVENUE ENHANCEMENT


ƒ Increasing revenue through measures for better coverage, assessment, billing, collection
and enforcement.
ƒ Controlling growth of expenditure.
ƒ Improving the organization and efficiency of the tax administration system.
ƒ Augmentation of resource mobilization/revenue generation from properties belonging to
ULB for improving the overall financial health.
ƒ Energy audit of fuel and energy consumption by various depts. of ULB to minimize
expenditures on fuel and energy, including energy audit and metering of street lights.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 108 -

ƒ Streamlining and strengthening of revenue base of the ULB:


o Strengthen the fiscal powers of ULB to fix tax rates, fee structure and user charges
through specific guidelines and notifications, which should find a place in the
Municipal Rules. Prepare model guidelines for the city to allow greater flexibility in
levying taxes, fees and user charges, borrowing funds and incurring expenditures;
o The annual report of the ULB shall devote a section highlighting the amounts of
subsidy given to a particular service, how the subsidy was funded, and who were
its beneficiaries;
o Implementation of MIS to provide relevant information on accounts, commercial
and operating systems for better decision-making and information dissemination to
citizens; and
o Application of e-Governance is equally important for municipal finance.

Apart from the above, following are some of other reform measures which should be
implemented to support the above identified key municipal reforms.

URBAN ENVIRONMENTAL MANAGEMENT


The costs of maintaining a healthy urban environment need to be recovered through various
municipal taxes and user charges following the “polluter pays” principle. For this, the
functional role of the ULB as envisaged in Item 8, 12th Schedule of the Constitution has to be
resolved keeping in view the role of the Tamil Nadu Pollution Control Board, and the
organizational and fiscal strength of the ULB.

ACCESS OF URBAN SERVICES TO THE POOR


Since “ability-to-pay” for the cost of environmental infrastructure service’ provision is an
important criterion, cross-subsidization of tariffs, innovative project structuring and user/
community participation is the means to ensure access of these services to the poor. Again
the functional and financial role of ULB with respect to the Items 10 and 11 of 12th Schedule
vis-à-vis those of central and state government agencies need to be resolved.

In addition to the above, the GoI has formulated a Reform Agenda under JNNURM.
Adherence to this Reform Agenda and Timeline is mandatory for accessing funds under the
proposed UIDSSMT.

Good governance in the municipal context stands on two broad principles, viz. transparency
and civic engagement and capacity building measures. Following sections highlight key
elements of the above two principles of good governance specific to the ULB.

TRANSPARENCY AND CIVIC ENGAGEMENT IN MUNICIPAL MANAGEMENT


Laws/rules/regulations specific to city/local issues should be employed to facilitate effective
implementation. These should be lucid and easily understood. Participatory mechanisms
should be so structured that they have legal standing and administrative power. Local bodies
should be responsive and innovative and involve community participation in civic
engagement as follows:
ƒ Specific code of conduct for municipal executives and elected representatives.
ƒ Public education, resource mobilization, good leadership and transparent processes
applied to municipal finance and development work.
ƒ Closer networking with media and their engagement in creating public awareness and
creating demand for good governance. Cautious engagement of private sector with
continuous monitoring is necessary.
ƒ Setting in place an active and online public Grievances’ Redressal System, with
automated department-wise complaint loading and monitoring system.
ƒ Instruments to improve efficiency through enhanced technical, administrative and
financial capacities.
ƒ Credit enhancement options other than state guarantees need to be adopted.
ƒ Preparation of annual Environmental Status Report through a multi-stakeholder
consultation process.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 109 -

CAPACITY BUILDING OF THE ULB


Following are some of the key aspects of capacity building measures for ULB:

ƒ The ULB shall maintain data to generate indicators as suggested in this document for
evaluating its performance.
ƒ Prepare and conduct capacity building programmes for elected representatives,
especially women representatives, with a view to enable them to focus on gender based
issues.
ƒ Promote the creation of interactive platforms for sharing municipal innovations, and
experiences among municipal managers.
ƒ Better human resource management through assessment of the training needs of
personnel involved in urban administration to enhance management and organizational
capabilities.
ƒ Assessment of fund requirement and resource persons to tackle the training needs of all
personnel.
ƒ Development of training material in the local language and impact and evaluation studies
of the training programmes.
ƒ Capacity building to better position the urban local body to employ highly qualified staff
and seek superior quality of out-sourced services.

As specified earlier, priority actions have been discussed and finalized by the stakeholders
for urban governance for ULB. The following policy framework and priority actions have been
identified by the study team based on reported evaluations, discussions and priority actions
as required and mutually agreed upon by the stakeholders.

TECHNOLOGY INTERVENTIONS THROUGH COMPUTERIZATION


ƒ Billing and collection of taxes and user charges through e-services.
ƒ Speed up development of e-Governance system and accounting system.
ƒ Database management of assets, records, lands, properties, etc.

HUMAN RESOURCE DEVELOPMENT


ƒ Staffing pattern, organizational restructuring and performance appraisal.
ƒ Development of MIS for effective and efficient management & decision-making.
ƒ Publication of newsletters for creating awareness and participation.
ƒ Staff training, exposure visits and motivation programs to bring about awareness on
recent developments and technologies.

CITIZEN ORIENTATION AND INTERFACE


ƒ Conduct citizen satisfaction surveys & analysis on annual basis to assess citizen needs
and demands including satisfaction levels.
ƒ PR strategies to enhance community participation and create awareness.
ƒ Innovative citizen complaint redressal system including e-Governance.
ƒ Augment and strengthen new initiatives on citizen interface and orientation.
ƒ Regular interface with citizen associations/forum to understand public needs.

The above assignment will be carried out by the concern ULBs with full support from the
GoTN. The outcome of the above assignment shall provide clear guidelines and impetus to
the towns for good urban governance.

9.12.2 CAPITAL INVESTMENT ESTIMATE


In order to provide financial assistance for continuing ongoing reforms and strengthening
these reforms in line with the priority actions and proposals highlighted above, Rs. 2.00
crores have been estimated for this purpose and incorporated in the CIP. The above
estimate has been prepared based on the information available/provided by concerned
departments, detailed discussions with pertinent authorities, and Consultants database and
experience on similar initiatives.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 110 -

9.13 SOCIAL AMENITIES


This section pertains to the proposed development initiatives and specific improvements that
are recommended to upgrade the existing social amenities and supporting infrastructure.

9.13.1 EDUCATION
Existing schools are in good condition, but requires certain improved basic infrastructure like
protected water supply, sanitation facility, lighting facilities, etc. Apart from the
aforementioned basic amenities, provision of computer facility, furniture / other accessories,
sports equipments are also included in the capital investment estimate for Sathuvachari
town.

9.13.2 HEALTH
Primary health center renders services in terms of general health, maternity and child care.
Existing Primary Health Centre requires certain improvement facilities like water supply,
sanitation facility, waiting area / seating arrangements for out patients, lighting facility,
modernized medical care facilities, facilities for in-patients etc. The town lack higher order
facility. During the Stake holders’ consultation, it was highlighted that construction of a
regional level hospital facility in the town is of prime importance for the people.

9.13.3 BURIAL AND BURNING GROUNDS


Burial ground in the town requires improvement facilities like pavement, access roads,
compound hall / fencing, water supply facility, gasifier facility, burning shed, lighting facility
including solar lights, sanitation facility including bathing, prayer hall, landscaping, tree
plantation etc.

9.13.4 ESTIMATED INVESTMENT


Based on the parameters specified in the earlier section, the capital cost has been estimated
for the proposed intervention and are listed below:

Table 9.33: Estimated Sectoral Investment – Social Amenities Rs. in Lakhs


Sl. No. Sector / Component Description Investment
1. Improvement of Education facility 212.23
2. Improvement of Health facility 242.55
3. Improvement of Burial Ground 90.96
Total Capital Cost (incl. contingencies, supervision, administration and consulting charges) 545.74

The authorities/departments/agencies that are proposed to be responsible for project


formulation/ implementation/monitoring are listed, but shall not be necessarily limited to the
following entities:

ƒ Nodal Agency: Sathuvachari Municipality.


ƒ Formulation/Implementation Agency: Sathuvachari Municipality, Education Department
and Health Department.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 111 -

10
CAPITAL INVESTMENT PLAN
10.1 INTRODUCTION
The Capital Investment Plan (CIP) is the multi-year scheduling of identified and prioritized
investments. The scheduling or phasing of the plan has been developed keeping in mind
likely fiscal resources availability (for new investments and O & M), technical capacity for
construction and O & M, and the choice of specific improvements to be carried out for a
period of six years, and in subsequent phases.

The need for the CIP is on account of:


• Assessment of town growth and infrastructure needs (to be carried out once every
five years)
• Preliminary outline feasibility and engineering studies carried out for new projects
• Scheduling of investments of ongoing and committed projects with funding from other
sources
• Assigning of priorities within the constraints of available financial resources

10.1.1 PROCESS

The Capital Investment Plan involves the identification of Capital Investment Plan - Process
public capital facilities to cater to the demands of the ƒ Project Identification
town population during different stages (design stages) ƒ Project Screening and Prioritization
as per the requirements of various urban services. The ƒ Project Phasing
following process is adopted in identifying capital
investment requirement and formulating the CIP.

PROJECT IDENTIFICATION
The general criteria used in identifying projects were the goals of the various departments
with regard to efficient service delivery, prompt customer service, environmental
sustainability, strategic implementation of projects, community benefits, infrastructure
maintenance needs, and the growing demand. The town stakeholder consultations and focus
group discussions held as part of the CDP preparation process were another important
aspect in the identification of projects. These consultations brought out deficiencies at the
macro and micro levels and have provided the first platform for the identification of projects.
Infrastructure delivery benchmarks in the form of indicators were also used to arrive at the
demand and the gaps in service delivery, which further correlated with the results of the
stakeholder consultations to arrive at specific project proposals.

PROJECT SCREENING, PRIORITIZATION AND PHASING


From the identified list of proposals and priority actions, projects are prioritized based on
need and funding options. The prioritization also considered various alternatives for FOP,
which is phased based on the sustainability of the ULB with regard to its finances. Specific
importance is given to the Stakeholders and opinions/feedback of the elected
representatives for institutionalizing the CIP process. As a final step, project phasing is
carried out considering investment sustainability for various options of the FOP.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 112 -

10.1.2 STRATEGIES

STRATEGIC CAPITAL INVESTMENT


The town shall use fiscal notes and policy analysis to
assist in making informed capital investment choices to Capital Investment Plan - Strategies
achieve the stakeholders’ long-term goals. This process ƒ Strategic Capital Improvement
provides guidance for capital budgeting and long-term ƒ Facility Siting
planning of capital facilities for all departments, for ƒ Decision Making
identifying and balancing competing needs, and for ƒ Program Funding
developing short- and long-term capital finance plans
for all capital investments.

This process includes defining desired outcomes of capital investments, evaluating potential
investments at the town level by applying standard criteria for assessing alternative
investments, and making more efficient use of all potential resources. The town shall budget
sufficient funds to perform major and preventive maintenance of existing facilities that is
considered cost effective. The town shall use maintenance plans for capital facilities and a
funding allocation plan for such maintenance, and may revise these plans from time to time.
There is a need for fiscal impact analyses of all major capital projects considered for funding.
Such analyses shall include, but not be limited to, one-time capital costs, life-cycle operating
and maintenance costs, revenues from the project, and costs of not doing the project. The
ULBs shall make major project specific capital decisions through the adoption of the Town's
operating and capital budgets, and the CIP.

FACILITY SITTING
Encourage the location of new community-based capital facilities. The town shall consider
providing capital facilities or amenities as an incentive to attract both public and private
investments.

DECISION MAKING AND PLAN FUNDING


Work together with other stakeholders towards coordinated capital investment planning,
including coordinated debt financing strategies to achieve the goals of the CDP. Explore
funding strategies for capital facilities, particularly for those that serve or benefit citizens
throughout the region.

10.1.3 INSTITUTIONALIZING THE CIP PROCESS

The City Investment Plan is an important element of, and is significant in terms of, the town’s
management process and sustainability with regard to the delivery of basic services. The
CIP also provides a framework for the annual budget cycle of ULB for the next 6-10 year
period, and thereafter for subsequent investment phases.

As a part of the process of CIP preparation for the CDP, ULB and Para statals have:

• Analysis and discussed with the stakeholders, the existing applicable norms and
standards for infrastructure services;
• Agreed and recommended a reasonable and realistic option;
• Justified and provided rationale if the chosen option is not within the existing service
level standards; and
• Identified the roles and responsibilities of various stakeholders in the implementation
of identified projects.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 113 -

10.1.4 SECTORS COVERED

In order to streamline the responsibilities for implementation and operation & maintenance
(O&M) of the assets created, and in line with the provisions of the 74th CAA, Tamil Nadu
Urban Local Bodies Act, 1998, and the commitment/assurance of the GoTN to transfer
different functions to the ULB as per the 74th CAA, all the proposed capital investments have
been broadly categorized under the following sectors:

o Water supply;
o Underground sewerage system.
o Roads, traffic and transportation;
o Storm water drains;
o Street lighting;
o Solid waste management;
o Slum upgrading;
o Remunerative Proposals
o Environment Improvement;
o Urban governance. And
o Social Facilities

10.2 CAPITAL FACILITIES, INVESTMENT PHASING AND IMPLEMENTATION


The Capital Investment Plan involved the identification of public capital facilities to cater to
the demand of the town populace in two phases - by the year 2025 and by 2040 - according
to the likely short- and long-term infrastructure needs.

The project identification has been done through a demand-gap analysis of the services and
reconciliation of the already identified projects as part of various outline, preliminary and in
some cases detailed engineering studies. The analysis has also built on recently completed
technical studies where these are available. Further project prioritization and strategizing of
the investments, and phasing of these investments are based on the strategies listed out
under each service sector through stakeholder consultations. The projects derived are aimed
at ensuring the optimal and efficient utilization of existing infrastructure systems and
enhancing the capacity of the systems and services to cater to the demands of future
population additions. Certain other projects listed as part of the CIP include developmental
projects other than those addressing the core service sectors viz. system modernization,
river conservation etc.

The Capital Investment Plan and forecast future of needs for provision of capital facilities
under each identified sector are presented below. These assets will help ULB to universalize
services for the current population as well as accommodate the expected increase in
population. In sectors where long-term planning is required (for example, source
development for water supply), a 30- year planning horizon (till the year 2040) is considered.
Assets created in such sectors consider the projected population in this horizon. ULB
expects that these infrastructure assets would not only guarantee services to its citizens, but
also signal a proactive commitment to potential investors considering the Sathuvachari Local
Planning Area.

10.3 CAPITAL INVESTMENT ESTIMATE


An estimate of the capital investment that is required to achieve the objectives of various
Mission Areas and comply with the respective Mission Statements is presented in this
section. This estimate is based on the following:

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 114 -

ƒ Discussions held with stakeholders;


ƒ Review of available information on the existing system;
ƒ Discussion with Stakeholders during the respective stages of preparation of the CDP;
ƒ Assessments through field visits and specific discussions with entities responsible for
system implementation, operation and maintenance;
ƒ Available Standard Schedule of Rates (SSOR);
ƒ Consultant’s database and experience with projects of similar scale and nature;
ƒ Requisite cost escalation on materials and labor for 2007-2008 rates of implementation;
ƒ Requisite cost escalation for contracts over 18-month implementation period; and
ƒ Requisite provision for unforeseen items of work and physical contingencies.

10.4 SUMMARY OF INVESTMENTS


The total estimated capital investment required for providing efficient services to the present
population and future population of ULB by the year 2040 is Rs. 14,490.17 lakhs. The
planning horizon for the projects identified in sectors of urban poor slum improvements, land
use development planning and other similar sub-projects for 2011 and accordingly the entire
identified investment is proposed for funding in short term. The planning horizon for core
service sectors of Water Supply, Sewerage are planned for Long-term period of 2040 and
projects under Storm Water Drainage and Solid Waste Management are designed for
immediate and short-term needs of 2011 and 2025 respectively. Hence, mindful of the need
for efficient resource planning, only part of the identified investment is proposed for funding
in short-term. In case of Roads, Traffic and Transport sectors, part of the identified
investment is proposed for funding in short-term considering the immediate need for
improving road network and transport systems in the town.

The phasing of the identified projects and investments is based on the following principles

• Priority needs, with developed areas receiving priority over future development area.
• Inter and intra-service linkages, viz. water supply investments shall be
complemented by corresponding sewerage/ sanitation improvements.
• Size and duration of the requirements, including preparation and implementation
period.
• Project-linked revenue implications, such as installing house connections where
supply and distribution capacities have been increased.
• The scheduling of adequate time to allow pre-feasibility, full feasibility and safeguard
investigations for those large sub-projects which will require such analysis.
• Scheduling additional infrastructure requirements to match with the population, and
tourist inflow growth over the plan period.

Proposed Capital Investment for Sathuvachari Municipality

30.00%

25.02%
25.00% 23.30%

20.00%
16.84% 16.72%

15.00%

10.00%

5.00% 3.39% 3.77%


3.15% 3.00%
2.41%
1.01% 1.38%

0.00%
Water Supply Underground Roads, Traffic & Storm Water Drains Street Lighting Solid Waste Environment Remunerative Social Amenities Slum Upgradition Urban Governance
Scheme Sew erage Scheme & Transportation Management Improvement Proposals
Sanitation

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 115 -

Table 10.1 Summary of Sector-wise Total Investment Proposed


Estimated Investment
S.No Sectors % to Total
Rs. In Lakhs
1 Water Supply System 2,440.64 16.84
2 Underground Sewerage Scheme 3,625.43 25.02
3 Roads, Traffic and Transportation 3,376.21 23.30
4 Storm Water Drains 2,422.80 16.72
5 Street Lighting 456.24 3.15
6 Solid Waste Management 435.14 3.00
7 Environment Improvement 491.54 3.39
8 Remunerative Proposals 349.31 2.41
9 Social Facilities 545.74 3.77
10 Slum Upgrading 146.93 1.01
11 Urban Governance 200.18 1.38
Total Capital Investment 14,490.17 100.00

The above table describes the sector wise capital investment proposed for the infrastructure
development of Sathuvachari town. Out of all the basic amenities, Underground Sewerage
Scheme and Roads, Traffic and Transportation accounts to Rs.3,625.43 lakhs and
Rs.3,376.21 lakhs which is 25.02 percent and 23.30 percent of the total capital investment
estimated. It is then followed by water supply system and storm water drains with a share of
16.84% and 16.72%.

10.4.1 SUMMARY OF INVESTMENTS – IMPLEMENTATION BY ULB

From the discussion with Technical Review Committee and stakeholders of the ULB projects
which are under the implementation of ULB only considered for further appraisal. Sector wise
projects developed for the implementation of ULB are given below for reference purposes.

Table 10.2 Summary of Sector-wise Total Investment Proposed – Implementation by ULB


Sl.No Sectors Estimated Investment (Rs. In Lakhs) % to Total
1 Water Supply Scheme 2,440.64 23.67%
2 Underground Sewerage Scheme & Sanitation 3,625.43 35.16%
3 Roads, Traffic & Transportation 991.94 9.62%
4 Storm Water Drains 1,503.81 14.58%
5 Street Lighting 456.24 4.42%
6 Solid Waste Management 435.14 4.22%
7 Environment Improvement 70.75 0.69%
8 Remunerative Proposals 349.31 3.39%
9 Social Amenities 90.96 0.88%
10 Slum Upgradition 146.93 1.42%
11 Urban Governance 200.18 1.94%
Total Capital Investment 10,311.35 100.00%

Out of all the basic amenities, provision of Underground Sewerage Schemes accounts to Rs.
3625.43 lakhs which is about 35.16 percent of total capital investment estimated. It is then
followed by Water Supply Scheme with a share of 23.67 percent. Storm Water Drains
accounts to a share of 14.58 percent of capital investment proposed.

The above identified investments are phased to meet the priorities in the next five years
considering the borrowing and investment capacity of the ULB. The phasing of expenditure
based on demand is given in the following sections of this report.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 116 -

10.5 PRIORITIZATION & PLANNING


The Capital Investment Plan (CIP) has been prepared for a period of 5 years (FY 2008-09 to
FY 2012-13). The phasing has been worked out based on the priorities assigned by the
stakeholders and preparedness of the service providing agencies to prepare the DPRs and
initiate implementation of the proposals. The phasing of the identified projects and
investments is based on the following principles:

ƒ Priority needs, with developed areas receiving priority over future development area.
ƒ Inter and intra-service linkages, viz. water supply investments shall be complemented by
corresponding sewerage/ sanitation improvements.
ƒ Size and duration of the requirements, including preparation and implementation period.
ƒ Project-linked revenue implications, such as installing house connections where supply
and distribution capacities have been is increased.
ƒ The scheduling of adequate time to allow pre-feasibility, full feasibility and safeguard
investigations for those large sub-projects which will require such analysis.
ƒ Scheduling additional infrastructure requirements to match with the population, and
tourist inflow growth over the plan period.

RANKING OF PRIORITIES BY STAKEHOLDERS

It is to be mentioned although Table 10.3: Sector wise Ranking of Priority


a town may find it suitable to Priority of ULB
Sl.
implement projects on a No
Sector Short-term Long-term
sequential basis through an Projects Projects
assessment of its priorities, in 1 Water Supply System 1
the specific case of 2 Underground Sewerage Scheme 2
Sathuvachari, development 3 Storm Water Drains 3
through a multi-pronged 4 Solid Waste Management 5
5 Roads, Traffic and Transportation 4
approach is the need of the
6 Street Lighting 4
hour. 7 Social Amenities 1
8 Remunerative Proposals 5
An indicative priority-based 9 Environment Improvement 3
capital investment plan has 10 Slum Upgrading 6
been outlined below to ensure 11 Urban Governance 2
that the much needed
improvement on a cross-sectoral basis can be achieved. Table 10.3 outlines the overall
priority ranking based on an assessment of need and as evinced by the stakeholders.

Water Supply, Underground Sewerage Scheme and Storm Water Drains are dominating the
priority requirement for Sathuvachari due to the following factors:

ƒ Improvement to the Water Supply and Distribution System is ranked as No.1 since the
town experiences low supply level in some wards, even though the system is supported
by Assured water source from Palar River for 8 months.
ƒ The old Distribution system was laid in 1985 and even during the implementation of new
scheme, the old scheme was not improved, but intermittent rehabilitation works have
been carried out. Based on the detailed assessment, it was noted that a comprehensive
rehabilitation measure is needed.
ƒ Identification of alternate source, either in the proximity or through long-distance
transmission will have to be evaluated in addition to ensuring that the identified sources
are sustainable as the cost of abstraction, treatment, transmission and storage will attract
a higher investment.
ƒ Next to Water Supply, Underground Sewerage Scheme is ranked as No. 2. In
consultation with stakeholders, it was observed that the underground sewerage system
is not provided in the town. It is also mentioned that the discharge of untreated sewage
into Palar River leads to unhygienic living conditions.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 117 -

ƒ Storm Water Drains takes the 3rd rank. Since the town is not provided with proper
drainage facility and less coverage leading to stagnation of water in certain parts of the
town. Only one-fourth of the town area is covered with drainage system.
ƒ Roads, Traffic and Transportation is given with 4th rank, because the town is not provided
with proper road facility leads to congestion in the core area of the town. Major
intersections lack road geometry, necessitating an integrated traffic and transport
system.
ƒ In consultation with stakeholders, it was observed that growing population and
development of residential establishments as a spill over settlement for Vellore Town put
immense pressure on the service delivery of ULB especially in the Solid Waste
Management sector. Hence Solid Waste Management is given with 5th rank in the
priority.
ƒ Sub-Sectoral priority identified during stakeholders’ consultation is given in the Table:
10.4.

Table 10.4: Identified Sub-Sectoral Priority


Water Supply
Component Activity Priority
Water Supply Scheme to Extension areas 1
Water Resource Construction of additional Storage reservoirs 2
Management Development of Distribution network for extension areas 4
Rainwater Harvesting Measures 3
Source Augmentation / Treatment Plant 1
Redistribution/Re-zoning of D-system in existing areas 4
Expansion of House Service Coverage 2
Augmentation of Water
Installation of Meters 3
Supply System
Construction of summer storage tank 6
Upgradation and Improvement of Distribution System 7
Rehabilitation of Existing Service Reservoirs 5
Underground Sewerage Scheme and Sanitation
Component Activity Priority
Sewerage Collection, Development of Sewerage System for Town 1
Treatment & Provision of Sewage Treatment Plant 3
Management Recycling Plant & Reuse system 2
Sanitation Facility Community toilets 4
Storm Water Drains
Component Activity Priority
Rehabilitation of Major drains/channels 1
Drains Rehabilitation
Rehabilitation of Storm Water Drains 4
Provision of storm water along existing roads 2
Construction of Drains
Formation of new drains along proposed road network 3
Solid Waste Management
Component Activity Priority
Providing bins for Door-Door Collection 1
Containerized Tri-Cycles 2
Tri-Cycle / Push Carts 4
Primary Collection
Equipment for Garbage Recovery Personnel 3
Equipment for Street Sweeping Personnel 5
Tipper Lorries - Used for Construction/Other Debris Collection 3
Container Bins for Residential Areas (1.25 MT Capacity) 1
Secondary Collection Container Bins for Market, Bus Stand, Commercial, Railway Station etc., (1.25 MT 2
Capacity)
Transportation Dual Load Dumper Placer Vehicles 1
Waste Processing & Integrated Waste Treatment 2
Disposal Sanitary Landfill Facility 1
Administration Complex Administration and Utilities Complex 3

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 118 -

Roads, Traffic and Transportation


Component Activity Priority
Strengthening existing roads 1
Upgradation of important roads 3
Formation of new roads 5
Bridges 6
Improved Safety, Junction Improvements 2
Service delivery and ROBs & RUBs/Sub-ways 4
Customer Satisfaction FOB’s 7
by providing better Culverts 8
infrastructure Bus Shelters 11
Signage and markings 6
Signals 9
Traffic Island 12
Parking Lots/ complexes 10
Improved Pedestrian Accessibility to the disadvantaged 3
Facilities, comfort and Pedestrian Crossings 2
safety Foot paths 1
Street Lighting
Component Activity Priority
Proposed SV lamps in uncovered areas 2
Proposed FL lamps in uncovered areas 1
Proposed High Mast light in major junctions 5
Proposed Timers for existing / new lights 3
Service Improvement Proposed Sensor Lighting 6
Proposed Solar Lights 4
Proposed Power Saver (Capacitors) 8
Proposed dedicated sub-station/transformers 7
Proposed Tri-vector meters 9
Social Amenities
Component Activity Priority
Improvement of Education facility 2
Service Improvement Improvement of Health facility 3
Improvement of Burial Ground 1
Remunerative Projects
Component Activity Priority
Improvements of the Shopping Complex constructed under UIDSSMT 1
Service Improvement Construction of a market complex 2
Construction of a Marriage hall 3
Environmental Improvement
Component Activity Priority
Creation of new parks 2
Service Improvement Formation of a science park 3
Greening / Avenue Development 1
Slum Upgradation
Component Activity Priority
Construction of housing 1
Water Supply 2
Sewerage & Sanitation 5
Solid Waste Management 3
Service Improvement
Roads & Pavements 4
Streetlights 6
Community Centers 7
Open Spaces/Gardens 8

BORROWING CAPACITY OF THE TOWN CONSIDERING 30% DSR

Borrowing Capacity for the ULB is prepared after taking into consideration, the revenue
inflows and outflows from the base scenario, i.e. the income from sewerage and water
charges and O&M on assets is taken. In order to arrive at the sustainability, three different

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 119 -

parameters were used which are,

ƒ TE4 /TR5 <1


ƒ DS6 /TR <=30%
ƒ 30% of the operating surplus should be retained as surplus and the balance can only be
leveraged.

The least of the above 3 factors was arrived at as the possible annuities payable by the ULB.
With this a conversion factor was worked out to determine the Borrowing Capacity and the
Investment Capacity. The maximum sustainable investments for the next 5 years are
summarized as follows:
Table 10.5: Borrowing & Investment Capacity of ULB
(Rs. In lakhs)
Details 2008-09 2009-10 2010-11 2011-12 2012-13 TOTAL
Borrowing Capacity 4.18 31.03 0.00 147.86 124.84 307.91
Investment Capacity 4.65 34.48 0.00 164.29 138.71 342.12

From the above table, borrowing capacity of the town is estimated as Rs. 307.91 lakhs and
the investment capacity of the ULB is estimated as Rs. 342.12 lakhs within the proposed
CDP project implementation period (Short-term period). Borrowing capacity of the town is
taken as the base for prioritizing the identified projects under CDP.

FINALIZATION OF FUNDING OPTIONS AND THE OPTIMAL WAY TO IMPLEMENT THE IDENTIFIED INVESTMENT
REQUIREMENTS

In order to finalize the funding options, the study team had a meeting with CMA, TNUIFSL,
ULB and other stakeholders. It was then finalized that the projects within the borrowing
capacity (i.e. Rs. 307.91 lakhs) of the ULB would be taken up for implementation. Taking into
consideration the present policies and priorities of CMA and other stakeholders, the study
team suggested the ULB to implement the CDP IDENTIFIED PROJECTS WITHIN THEIR
BORROWING CAPACITY for a short-term period.

As specified earlier, although the sectors have been ranked for prioritization, it is
recommended that the Sathuvachari Municipality initiates necessary action on a cross-
sectoral basis and phases out the identified investment pursuant to development of
necessary details and based on sustainability and availability of funds. Necessary action may
involve preparation of master plans, feasibility studies/assessments (where required),
detailed project reports and spade work of pertinent administrative/technical sanctions and
approvals towards obtaining funds for implementation of identified proposals/priority actions.
Sector wise prioritized investment needs based on the borrowing and investment capacity of
the ULB are given in the following Tables.

Table 10.6: Phasing of Proposed Capital Investment – Short-term Period


Sector Phasing (Rs. in lakhs)
2008-09 2009-10 2010-11 2011-12 2012-13 TOTAL
Water Supply 4.65 34.48 0.00 164.29 138.71 342.13
Total Capital Investment 4.65 34.48 0.00 164.29 138.71 342.13

Considering the borrowing capacity of the ULB, the sector wise break-up of projects and their
investment requirement are phased for short-term and long-term implementation in
consultation with the stakeholders of ULB and CMA.

4 TE – Total Expenditure
5 TR – Total Revenue
6 DS – Debt Service

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 120 -

Table 10.7: Priority Based Phasing of Proposed Capital Investment – Sector wise (Rs. in lakhs)
Short-Term Period Long- Cost
2008- 2009- 2010- 2011- 2012- Term (Rs. in
09 10 11 12 13 Total Period lakhs)
A. WATER SUPPLY SYSTEM
1 Water Supply Scheme to Extension 25.00 20.00 45 522.01 567.01
areas
2 Construction of additional Storage 4.65 14.48 40.00 59.13 8.16 67.29
reservoirs
3 Development of Distribution 20.00 25.00 45 261.57 306.57
network for extension areas
4 Rainwater Harvesting Measures 0 60.11 60.11
6 Source Augmentation 75.00 50.00 125 86.34 211.34
7 Redistribution/Re-zoning of D- 0 225.42 225.42
system in existing areas
8 Expansion of House Service 29.29 15.00 44.29 116.19 160.48
Coverage
9 Installation of Meters 10.00 13.71 23.71 379.76 403.47
10 Construction of summer 0 36.07 36.07
storage tank
11 Upgradation and Improvement of 0 380.03 380.03
Distribution System
12 Rehabilitation of Existing Service 0 22.84 22.84
Reservoirs
Sub Total (A) 4.65 34.48 0.00 164.29 138.71 342.12 2098.51 2440.64
GRAND TOTAL 4.65 34.48 0.00 164.29 138.71 342.12 2098.51 2440.64

In the prioritization, projects such as Improvements of the Shopping Complex constructed


under UIDSSMT, Construction of a market complex and Construction of a Marriage hall are
not considered. Since these projects requires major loan funding and hence the study team
suggested ULB to go for various funding options suggested in the following sections of this
report.

10.6 FINANCIAL RESOURCES


The analysis on financial resources is worked out for the Innovations in terms of
interventions to be carried out within the ULB area. The
ƒ Public-Private-Partnerships
sectors that are not in the domain of the ULB are not taken ƒ Private sector participation
for financial analysis and they are considered to be taken
by other line agencies. Majority of the investments have to come from the ULB for the
provision of water supply and sewerage and if these are not integrated with other
interventions, the deficiencies in services still persist. Though innovations in terms of public-
private-partnerships and private sector participation (i.e. BOT, BOOT, DBOT modes) are
possible in some sectors, still it is in nascent stage of development and hence public
spending should continue in some way in the future.

An important aspect that needs consideration in raising the ƒ Beneficiary Contribution for
financial resources should be through beneficiary Environmental Services
contribution. Of late, the beneficiary contribution is as much ƒ Concept of User charges for
as 30% of the total costs of environmental services. These Sustainability of Service provision
practices have to be promoted in the right earnest and the
concept of user charges need to be introduced to make the services sustainable. The
interventions should be in line with achievable targets and their resource generation.

The overall spatial strategy and resultant programs ƒ Financially Self-supporting


elaborated in the earlier chapters should be supported with Projects
financial allocations and a co-coordinated mechanism has ƒ Cost of services in line with Level
to be in place. Efforts should be directed to develop of Service and Affordability of
financially self-supporting projects, wherever possible and population
cost recovery should be the policy for such cases.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 121 -

The cost of services should be pegged with the level of services and the affordability of the
population. Though some assistance can be anticipated in the form of subsidies and external
grant, it would not be sufficient to attain the required standards and hence the real earnings
have to be improved and this must be the priority of the economic policies and programs
formulated for ULB.

The assessment of investment sustenance concludes that Streamlining and Strengthening of


though the current finances of ULB are healthy, they would ƒ Existing Tax base
not be in a position to match the proposed investments in ƒ Resource mobilisation efforts
infrastructure to achieve the desired vision unless the
existing tax base and the resource mobilization efforts are streamlined and strengthened. In
order to augment/ enhance its financial resources ULB should identify alternate resources
like user charges for the services for conservancy, parking fee etc.

ULB should attempt an enhanced property tax rate ƒ More Property tax for better
(surcharge) in areas which have better infrastructure. Service delivery
Another innovative option of resource mobilization, which ƒ Change of Lease rights to Free
most of the local bodies are adopting is to change the lease hold with respect to current
right to free hold or review all the current lease agreement Market rates
with respect market rents and take appropriate action.

In combination of aforementioned financial resources, ULB would implement reform


measures suggested in the Section - 13.4 for Urban Local Body to improve their revenue
base.

10.6.1 FUNDING ASSISTANCE FROM FIS

Apart from the aforementioned financial resources ULB ƒ Assistance from funding agencies
shall look for external funding assistance from Financial like TNUDF, TUFIDCO etc.
Institutions (FIs) like TNUDF, TUFIDCO etc to fund CDP
identified projects. Funding pattern of various sectors of development is given below for
reference purposes:

Means of Finance Loan Grant Own Total


Water Supply System 55% 30% 15% 100%
Underground Sewerage Scheme 45% 30% 25% 100%
Storm Water Drains 60% 30% 10% 100%
Solid Waste Management 20% 70% 10% 100%
Roads, Traffic and Transportation 60% 30% 10% 100%
Street Lighting 60% 40% 100%
Other Development Proposals 65% 20% 15% 100%
Environment Improvement 20% 70% 10% 100%
Slum Upgrading 10% 80% 10% 100%
Urban Governance 20% 70% 10% 100%

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 122 -

11
FINANCIAL OPERATING PLAN
11.1 OVERVIEW
The Financial Operating Plan (FOP) is a multi-year forecast of finances of the urban local
body. The FOP can be generated for a short term (5 to 7 yrs) and also for the long-term (20
yrs) period. In the context of this assignment, the FOP is generated for the short term (2008-
09 to 2012-13). The projection has also been extended for the long-term (20 years) to
essentially provide a snapshot of the impact of identified investments on the municipal
finances in the long run.

The objective of this section is to assess the investment sustenance capacity of the ULB vis-
à-vis the projects identified in the CIP as part of the CDP preparation. FOPs are essentially a
financial forecast, developed on the basis of the growth trends of various components of
income and expenditure, based on time-series data. Accordingly, the financial forecast has
been prepared for the ULB. Broadly, all the sectoral components envisaged for funding are
under the ULB. The FOP is in full consonance with the town's vision & approach to
development and priorities and action plans approved by the stakeholders. Several
assumptions were made while forecasting finances. The study team has adopted necessary
caution to adopt the assumptions based on current growth trends, contribution pattern of
various revenue drivers, and utilization pattern of various expenditure drivers. In addition,
various quantifiable assets and liabilities of the ULB were also taken into account and
phased over a period of time. The following section provides insight into the various
assumptions made, necessary logic and justifications for such assumptions.

11.2 BASE AND BASIS


In order to assess the investment sustaining capacity of the ULB, the fiscal situation is
simulated through a Financial Operating Plan (FOP). The FOP is a multi-year forecast of
finances for a term of 20 years. It is used to forecast revenue income and operating
expenditure for the period between FY 2008-09 and FY 2012-13 and between FY 2012-13
and FY 2027-28. However, capital expenditure is planned from FY 2009-10. Following are
the important considerations towards simulating the fiscal situation of the ULB and include
both existing and new resources.

ƒ Income considerations
ƒ Revision of property tax ARV by 10 percent in FY 2007-08 and FY 2012-13 from the
existing previous base (quinquinennial revision);
ƒ Revision of about 30 percent in the base tariff for water and sewerage (as applicable)
during FY 2008-09, matching with the commissioning of the proposed schemes has
been proposed. A concurrent increase of 5 percent per annum for other years as per
the prevailing procedure of the GoTN Notification is also taken into consideration;
ƒ Improving arrears tax collection efficiency to at least 75 percent and current
collection efficiency to at least 85 percent;
ƒ Growth in other revenue income items based on past performance and/or likely
growth; and
ƒ Any additional resources generated as part of proposed investments are taken into
consideration.
ƒ Expenditure considerations
ƒ Establishment expenditure assumed to increase at the rate of 8 percent per annum

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 123 -

(8 percent is considered as there has been a consistent low growth rate over the past
years and also there is a restriction by the GoTN for fresh recruitment);
ƒ Repairs & maintenance to grow based on past performance and/or likely growth;
ƒ Proposed capital expenditure and phasing based on investments recommended;
ƒ Additional O&M for new investments are also taken into account.

11.3 KEY ASSUMPTIONS


In forecasting income and expenditure, key assumptions and guiding principles adopted are
indicated in Table 11.1 below:

Table 11.1: Basic Assumptions for the FOP


No. Particulars Assumption for Forecast
A. REVENUE INCOME
1. Taxes
Property Tax
- ARV Revision 30% during FY 2008-09 and FY 2013-14
- Growth in Assessments Ceiling 7%
Gradually stabilize at 4-5%
- Collection Performance Arrear demand - 75%
Current demand - 85%
Other Taxes 5% annual growth
2. Water Supply
Water Tariff Revision 30% revision of base tariff during FY 2008-09 while commissioning
the new scheme
5% automatic revision every year as per prevailing practice and
GoTN Notification
Coverage Ceiling 85% of Property Tax Assessments
Connection Charges 20% increase every 3 years starting from FY 2008-09
Collection Performance Arrear demand - 65%
Current demand - 75%
3. Sewerage
Sewer Charges Revision 30% revision of base tariff during FY 2008-09 while commissioning
the new scheme
5% automatic revision every year as per prevailing practice and
GoTN Notification
Coverage Ceiling 75% of Property Tax Assessments
Connection Charges 25% increase every 3 years starting from FY 2008-09
Collection Performance Arrear demand - 70%
Current demand - 75%
4. Assigned Revenue
Other Assigned Revenues --
5. Other Revenue Items
Rent from Municipal Properties Ceiling 15%
Fees and User Charges Ceiling 20%
Sale and Hire Charges 15% annual growth
Revenue Grants, Contributions Ceiling 5%
and Subsidies
Other Income Ceiling 15%
B. REVENUE EXPENDITURE
1. Establishment 8% annual growth
2. Administrative Expenses 8% annual growth
3. Repairs and Maintenance - 20% annual growth
Existing Assets
4. Interest and Finance Charges - Based on annuity calculation on the loans outstanding
Others
5. Revenue Grants, Contributions Ceiling 5%
and Subsidies
6. Miscellaneous / Other Expenses Ceiling 10%
C. CAPITAL STRUCTURING
1. Capital Grants - GoI/UIDSSMT 80% of capital expenditure
2. Capital Grants - GoTN as 10% of capital expenditure
Counterpart Contribution
3. ULB as Counterpart Contribution 10% of capital expenditure

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 124 -

No. Particulars Assumption for Forecast


To be transferred from revenue surplus (primary operational surplus)
Resource gap to be met through debt
4. Loans/Borrowings 8% interest repayable in 15 years.
5. Investment phasing Optimum Scenario: As per the CIP under ‘optimum scenario’, full
investment.
Sustainable Scenario: As per the CIP under sustainable investment
level only.

11.4 SCENARIOS AND FINANCIAL PROJECTIONS


Based on the above assumptions and the proposed and prioritized CIP, separate FOPs have
been generated. As stated earlier, the investments pertaining to all sectors have been
incorporated in the FOP prepared for the ULB. Pertinent O&M expenses (on new assets)
and the receivables thereon are also incorporated into the FOP. The FOP is generated under
the following scenarios:

ƒ Base Case - Optimum Scenario: This scenario assumes the capital investment estimate
and the phasing as per the ‘Optimum Scenario’. The FOP has been generated assuming
full CIPs under the ‘Optimum Scenario’ for ULBs; and

ƒ Sustainable Scenario Option: This scenario is envisaged to ascertain a sustainable level


of the ULB for the proposed CIP considering the ULB’s capital investment capacity and
its capacity to maintain the new assets.

From the discussion with the CMA and stakeholders of the ULB it was observed that
Underground sewerage system takes the long-term priority of the town taking into
consideration huge capital investment requirements and operation and maintenance
requirements. Hence the study team worked out the implementation and financial operating
plan with and without Underground sewerage project. In short-term period, an interceptor
drains with treatment plant are suggested to control / minimize the sewage and sullage load
which are being disposed into the major water bodies in the town through road side drains.
FOP has been evolved for the following four cases.

♦ Case 1 – FOP under Sustainable Scenario within their Borrowing Capacity


♦ Case 2 – FOP without Underground Sewerage Project under Optimum Scenario
♦ Case 3 – FOP with Underground Sewerage Project under Optimum Scenario
♦ Case 4 – FOP within their Borrowing Capacity – Zero Grant

Even though scenarios are worked out, there is a possibility of reducing the capital
investment and thus increasing the borrowing / investment capacity of the ULB. Certain
projects have been identified, which can be outsourced or privatized, the list of which and
their costs are given as follows:

S.No. Projects Description Amount Remarks


(Rs. In Lakhs)
1 Roads Strengthening 157.78 Government periodically announces grant programs
existing roads for development or upgradation of roads. This
particular project identified can be posed under these
grant projects, in phases, as JnNURM / UIDSSMT
does not support individual projects, but takes an
integrated approach. Further, the ULB does not have
surplus financials to meet the expenditure by
themselves
Upgradation of 212.66 -do-
important roads
Formation of new 431.10 -do-
roads
2 Storm Water 2422.80 As said above, this can also be included in Govt.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 125 -

S.No. Projects Description Amount Remarks


(Rs. In Lakhs)
Drains sponsored programs as part of the road project.
3 Street lighting 456.24 It is now prevalent to take up maintenance of street
lighting by Energy Saving Companies, which are
being tested in municipalities. This can be done here,
where the initial investment will be made by the
ESCO, and they will maintain the street light system
for a particular concession period. This initiative can
be taken up by Sathuvachari, through the advice of
CMA
4 Solid Waste 435.14 Almost all municipalities in Tamil Nadu have now
management started privatizing most of their SWM activities, in
order to have better efficiency in service and also
cost-effective. This is cropping up in the light of the
Supreme Court ruling. It is felt that Sathuvachari shall
follow the same principle, so that there is a better
efficiency in service, and does ends up neither in
capital investment nor O&M costs.

Alternatively, if it is felt that the amount of garbage


generated is not attractive to a private investor, there
are programs coming up like Integrated Solid Waste
Management piloted by the TNUDF, where studies
have commissioned for Corporations. This study
envisages a single contract for primary, secondary
collection, transportation, composting and landfill
activities by one BOT operator. When there is a
cluster of ULBs, it would be an attractive investment
for the operator. In this context, Sathuvachari, which
is located in the vicinity of Vellore Region, is included
in the cluster development, and the on-going project
could be implemented in the future.
5 Remunerative Improvements of 12.23 This can be done in a PPP mode by allowing BOT
Proposals the Shopping operator to invest, construct, operate and transfer. In
Complex this process, Sathuvachari can also expect rental
constructed under income on a monthly / annual basis from the BOT
UIDSSMT operator. This will be a source to augment revenues.

Alternatively, ULB can also build and allow private


operators to maintain. However, in this case, there will
be an initial investment by the ULB. Moreover, private
operators have imaginative way of constructing in
order to attract business, which is not the objective of
any ULB. Therefore, it is better to go in for a BOT
option.
Construction of a 304.92 -do-
market complex
Construction of a 32.16 -do-
Marriage hall

In order to give a base scenario, as expected, none of the above measures are incorporated
in the FOP. Hence with the base case, the FOPs are worked out under each case. The
results of the FOP under the abovementioned cases are given in Annexure - 8,9,10 and 11.

Case 1: Capital Investment Considered under the Sustainable Scenario: This is a


scenario where the investments are sized according to the financial capabilities of the ULB.
This is worked out based on certain assumptions. The method of such workings and the
results thereon are given in the forthcoming sections.

Method and Assumption:

The sustainable scenario is prepared after taking into consideration, the revenue inflows and
outflows from the base scenario, i.e. the income from sewerage and water charges and O&M

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 126 -

on assets is taken. In order to arrive at the sustainability, three different parameters were
used which are,

• TE /TR <1
• DS /TR <=30%
• 30% of the operating surplus should be retained as surplus and the balance can only
be leveraged.

The least of the above 3 factors was arrived at as the possible annuities payable by the ULB.
With this a conversion factor was worked out to determine the Borrowing Capacity and the
Investment Capacity. The maximum sustainable investments for the next 5 years are
summarized as follows:

Table 11.2: Borrowing & Investment Capacity of Sustainable Case Scenario (Rs. In lakhs)
Details 2008-09 2009-10 2010-11 2011-12 2012-13 TOTAL
Borrowing Capacity 4.18 31.03 0.00 147.86 120.74 303.81
Investment Capacity 6.97 51.72 0.00 246.43 201.23 506.35

Therefore FOP for the revised investment estimates was worked out. It is quite obvious that
when there is no revenue deficit at the base scenario, there cannot be a revenue deficit in
this scenario. However a detailed FOP has been worked out with the basic assumption that
O&M is 2% on the overall investment. The summary of the results of the sustainable
scenario under this case is as follows:

Under this scenario, 40% of the proposed investment is funded through grant support from
GoI and GoTN under various schemes, and remaining 60% is from ULB contribution either
as a revenue surplus or loan from any financial institutions. Assumptions under this scenario
and means of finance
Table 11.3: Assumptions on Means of Finance (Rs. In Lakhs)
are given in the adjacent
Loan Assumptions 2008-09 2009-10 2010-11 2011-12 2012-13
table. The summary of Tenure 15 15 15 15 15
results from 2008-09 to Rate of Interest 9% 9% 9% 9% 9%
2012-13 (short-term) is Loan Amount 4.18 31.03 0.00 147.86 120.74
provided as follows:

Table 11.4: Summary of Sustainable Scenario (Under Case 1) (Rs. In lakhs)


Summary Statement 2008-09 2009-10 2010-11 2011-12 2012-13
Opening Balance 401.16 426.34 448.07 462.89 472.50
Revenue Receipts 371.69 406.10 445.62 518.57 577.90
Revenue Expenditure 346.51 384.37 430.80 508.96 559.51
Operating Ratio 0.93 0.95 0.97 0.98 0.97
Debt Servicing Ratio 7.25 7.01 6.16 8.00 8.80
Operating Deficit/Revenue Grant Requirement 0.00 0.00 0.00 0.00 0.00
Closing Balance 426.34 448.07 462.89 472.50 490.89
Capital Grants 2.09 15.52 0.00 73.93 60.37
ULB Contribution - Transfers from Revenue Surplus 0.70 5.17 0.00 24.64 20.12
Loans / Borrowings of ULB 4.18 31.03 0.00 147.86 120.74

It can be observed that there is


Short Term (Up to 2012-13) Maximum Minimum
operational surplus in most of the FY Borrowing Capacity (Rs. in lakhs) 147.86 0.00
during the short-term period and a Investment Capacity (Rs. in lakhs) 246.43 0.00
surplus is available in all the years, in
spite of the huge investments made. Long-Term (Up to 2027-28) Maximum Minimum
This is also due to income assumptions Borrowing Capacity (Rs. in lakhs) 1332.83 0.00
made on certain projects like Water Investment Capacity (Rs. in lakhs) 2221.39 0.00
Supply where user charges are
collected.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 127 -

Table 11.5: Estimated O&M Requirements for Proposed Capital Investments (Rs. In lakhs)
S.No O&M Costs % of O&M 2008-09 2009-10 2010-11 2011-12 2012-13
1 Water Supply Scheme 2% 17.67 17.98 13.16 0.00 0.00
2 Underground Sewerage Scheme &
Sanitation 2% 16.18 23.64 16.77 15.93 0.00
3 Roads, Traffic & Transportation 1.50% 3.11 4.50 7.26 0.00 0.00
4 Storm Water Drains 1.50% 6.84 7.53 2.73 2.73 2.73
5 Street Lighting 1% 3.56 0.88 0.12 0.00 0.00
6 Solid Waste Management 2% 0.02 4.38 4.15 0.16 0.00
7 Environment Improvement 2% 0.36 0.89 0.16 0.00 0.00
8 Remunerative Proposals 1% 2.45 1.05 0.00 0.00 0.00
9 Social Amenities 2% 1.27 0.55 0.00 0.00 0.00
10 Slum Upgradition 2% 0.34 1.13 1.47 0.00 0.00
11 Urban Governance 1% 0.50 0.50 0.50 0.50 0.00
Total 52.30 63.03 46.32 19.31 2.73
Cumulative O&M 52.30 115.33 161.65 180.96 183.69

However, based on assumptions, the capital components of the assumed investments are
the loans and the own contributions to be made by the ULBs. The interest portion is taken for
calculation of the revenue surplus; the principal repayment is taken as a capital expenditure.
It is seen from the results that the ULB generates a surplus even after meeting the ULB
contribution. However the figures given above are indicative as these are based on certain
assumptions. The actual working / financial structuring can be done only when the project
takes off.

Case 2: Capital Investment Considered under the Base Case – Optimum Scenario:
This scenario assumes the capital investment estimate and the phasing as per the ‘Optimum
Scenario’. The FOP has been generated assuming full CIPs excluding underground
sewerage project under the ‘Optimum Scenario’.

Capital Investment Considered for FOP Generation (Case 2: FOP without UGSS): In
order to formulate FOP, projects that are directly implementable and having the impact over
the finance of ULB are considered. In this case UGS scheme to the town is not considered
since implementation of this scheme requires heavy capital investment. Sector wise capital
investments considered are given in the following table.

Table 11.6: Proposed Capital Investment for FOP Generation – Without Underground Sewerage Project
Sl.No Sectors Estimated Capital Investment (Rs. In Lakhs) % to Total
1 Water Supply System 2,440.64 34.05
2 Sanitation & Interceptor Drain 61.31 0.86
3 Roads, Traffic and Transportation 991.94 13.84
4 Storm Water Drains 1,503.81 20.98
5 Street Lighting 456.24 6.36
6 Solid Waste Management 435.14 6.07
7 Environment Improvement 491.54 6.86
8 Remunerative Proposals 349.31 4.87
9 Social Amenities 90.96 1.27
10 Slum Upgradition 146.93 2.05
11 Urban Governance 200.18 2.79
Total Capital Investment 7,168.02 100.00

Assumptions:
Based on the phasing assumed Table 11.7: Assumptions on Means of Finance
the financials are done with Fund Option 2008-09 2009-10 2010-11 2011-12 2012-13
certain basic assumptions on Loan 50% 50% 45% 45% 40%
the means of finance. Loan Grant 30% 30% 40% 40% 30%
assumptions were made Own 20% 20% 15% 15% 30%
conservatively, and are an Total 100% 100% 100% 100% 100%
average of the various grants

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 128 -

and loans available. Moratorium


Table 11.8: Assumptions on Means of Finance (Rs. In Lakhs)
is not considered on a
conservative side. The O&M is Loan 2008-09 2009-10 2010-11 2011-12 2012-13
Assumptions
assumed based on sectors. The Tenure 15 15 15 15 15
following table summarizes the Rate of Interest 9% 9% 9% 9% 9%
outcome of the FOP under the
‘Base Case - Optimum Scenario’ against select key indicators.

FINANCIAL OPERATING PLAN - Base Case: Optimum Scenario (Under Case 2)


Existing (2002-03 to 2007-08) Minimum Maximum Average

OR (Ratio) 0.50 1.00 0.79


DSR (%) 0.99 7.32 4.48
Category 1
Short-Term (2008-09 to 2012-13)

OR (Ratio) 0.93 1.86 1.54


DSR (%) 7.15 99.69 67.35
Category 3
Long-Term (2008-09 to 2027-28)

OR (Ratio) 0.93 1.86 1.42


DSR (%) 0.13 99.69 47.39
Category 3
Note: 1: Financially Sound; 2: Financially Fragile; 3: Financially Insolvent

Under the above scenario (‘Base Case - Optimum Scenario’), if the full investment of
Rs.7168.02 Lakhs is assumed for ULB and the FOP is forecast based on the above
assumptions, the ULB will be in a deficit of Rs. 951.29 Lakhs by the year 2012-13 (Short
term Period). In Long-term period ULB still in a deficit position of Rs. 6451.08 Lakhs by the
year 2027-28 provided necessary financial reforms are accomplished within the
recommended duration.

Further, in order to meet resource requirements of its own contribution, the ULB would need
to take loan of Rs. 4055.90 Lakhs during this period. In order to sustain the proposed capital
investment, the ULB may require grant support from the GoTN and GoI to the extent of at
least Rs. 2867.21 Lakhs during this period. This is expected capital grant contribution from
the GoTN at and GoI at 10 percent each. In order to meet resource requirements of its own
contribution, the ULB would transfer its revenue surpluses of Rs.244.91 lakhs during this
short term period. The summary of results from 2008-09 to 2012-13 (short-term) is provided
as follows:
Table 11.9: Summary of Base Case – Optimum Scenario (Under Case 2) (Rs. In lakhs)
S.No Summary Statement 2008-09 2009-10 2010-11 2011-12 2012-13
1 Opening Balance 401.16 427.42 278.10 (74.76) (515.98)
2 Revenue Receipts 371.69 404.50 443.33 514.83 572.59
3 Revenue Expenditure 345.44 553.82 796.19 956.05 1007.90
4 Operating Ratio 0.93 1.37 1.80 1.86 1.76
5 Debt Servicing Ratio 7.15 50.20 88.61 99.69 91.11
6 Operating Deficit/Revenue Grant Requirement 0.00 149.32 352.86 441.22 435.31
7 Closing Balance 427.42 278.10 (74.76) (515.98) (951.29)
8 Capital Grant - GoI 0.00 487.18 518.67 343.42 47.95
9 Capital Grant - GoTN 0.00 487.18 518.67 343.42 47.95
10 ULB Contribution - Transfers from Revenue Surplus 0.00 28.47 15.98 49.31 65.01
11 ULB Contribution - Loan/Borrowings 0.00 1433.06 1540.04 980.94 78.85

It can be observed that there is no operational deficit during the short-term period, and a
deficit in a closing balance from FY2010-11 and FY2012-13, due to huge investments made.
This is also due to higher loan dependency for the projects identified under CDP since

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 129 -

revenue surplus is very minimal. However, based on assumptions, the capital components of
the assumed investments are the loans (Rs. 4055.90 lakhs) and the grants contributes
(Rs.2867.21 lakhs) to be made by the ULBs. The interest portion is taken for calculation of
the revenue surplus; the principal repayment is taken as a capital expenditure. The negative
surplus in the closing balance is due to transfers from revenue account to capital expenditure
in order to meet the ULB contribution.

Case 3: Capital Investment Considered under the Base Case – Optimum Scenario:
This scenario assumes the capital investment estimate and the phasing as per the ‘Optimum
Scenario’. The FOP has been generated assuming full CIPs under the ‘Optimum Scenario’.

Capital Investment Considered for FOP Generation (Case 3: FOP with UGSS): In order
to formulate FOP, projects that are directly implementable and having the impact over the
finance of ULB are considered. Under this case, Projects which are implemented by other
departments like widening of existing bridge, Construction of new by-pass road etc., are not
considered. Sector wise capital investments considered are given in the following table.

Table 11.10: Proposed Capital Investment for FOP Generation – With Underground Sewerage Project
Sl.No Sectors Estimated Capital Investment % to Total
(Rs. In Lakhs)
1 Water Supply Scheme 2,440.64 23.67
2 Underground Sewerage Scheme & Sanitation 3,625.43 35.16
3 Roads, Traffic & Transportation 991.94 9.62
4 Storm Water Drains 1,503.81 14.58
5 Street Lighting 456.24 4.42
6 Solid Waste Management 435.14 4.22
7 Environment Improvement 70.75 0.69
8 Remunerative Proposals 349.31 3.39
9 Social Amenities 90.96 0.88
10 Slum Upgradition 146.93 1.42
11 Urban Governance 200.18 1.94
Total Estimated Investment 10,311.35 100.00

Assumptions:

Based on the phasing assumed Table 11.11: Assumptions on Means of Finance


the financials are done with Fund Option 2008-09 2009-10 2010-11 2011-12 2012-13
certain basic assumptions on the Loan 50% 50% 45% 45% 40%
Grant 30% 30% 40% 40% 30%
means of finance. Loan
Own 20% 20% 15% 15% 30%
assumptions were made Total 100% 100% 100% 100% 100%
conservatively, and are an
average of the various grants
and loans available. Moratorium Table 11.12: Assumptions on Means of Finance (Rs. In Lakhs)
is not considered on a Loan 2008-09 2009-10 2010-11 2011-12 2012-13
conservative side. The O&M is Assumptions
assumed based on sectors. Tenure 15 15 15 15 15
Recent trends on O&M have Rate of Interest 9% 9% 9% 9% 9%
been adopted for making these
assumptions. The following table summarizes the outcome of the FOP under the ‘Base Case
- Optimum Scenario’ against select key indicators.

FINANCIAL OPERATING PLAN - Base Case: Optimum Scenario (Under Case 3)


Existing (2002-03 to 2007-08) Minimum Maximum Average

OR (Ratio) 0.50 1.00 0.79


DSR (%) 0.99 7.32 4.48
Category 1
Short-Term (2008-09 to 2012-13)

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 130 -

OR (Ratio) 0.93 2.03 1.58


DSR (%) 7.15 117.80 74.93
Category 3
Long-Term (2008-09 to 2027-28)

OR (Ratio) 0.87 2.03 1.41


DSR (%) 0.12 117.80 52.97
Category 3
Note: 1: Financially Sound; 2: Financially Fragile; 3: Financially Insolvent

Under the above scenario (‘Base Case - Optimum Scenario’), if the full investment of
Rs.10,311.35 Lakhs is assumed for ULB and the FOP is forecast based on the above
assumptions, the ULB will be in a deficit of Rs. 1,117.31 Lakhs by the year 2012-13 (Short
term Period). And it is still in deficit in the Long-term period also with the amount of
Rs.6,485.92 Lakhs by the year 2027-28 provided necessary financial reforms are
accomplished within the recommended duration.

Further, in order to meet resource requirements of its own contribution, the ULB would need
to take loan of Rs. 5,149.09 Lakhs during this period. In order to sustain the proposed capital
investment, the ULB may require grant support from the GoTN and GoI to the extent of at
least Rs. 4,124.54 Lakhs during this period. This is expected capital grant contribution from
the GoTN at and GoI at 10 percent each. The ULB would transfer an amount of Rs.424.30
lakhs from its Revenue surplus.

In order to meet resource requirements of its own contribution, the ULB would not be able to
transfer any investment from its revenue surpluses during this period. Public contribution in
the form of deposits collected for UGS to the tune of Rs. 613.42 lakhs need to be mobilized
by the ULB in advance. The summary of results from 2008-09 to 2012-13 (short-term) is
provided as follows:
Table 11.13: Summary of Base Case – Optimum Scenario (Under Case 3) (Rs. In lakhs)
S.No Summary Statement 2008-09 2009-10 2010-11 2011-12 2012-13
1 Opening Balance 401.16 427.42 250.34 (157.15) (692.28)
2 Revenue Receipts 371.69 406.10 445.62 518.57 721.35
3 Revenue Expenditure 345.44 583.18 853.10 1053.70 1146.38
4 Operating Ratio 0.93 1.44 1.91 2.03 1.59
5 Debt Servicing Ratio 7.15 57.23 100.92 117.80 91.52
6 Operating Deficit/Revenue Grant 0.00 177.08 407.48 535.13 425.03
Requirement
7 Closing Balance 427.42 250.34 (157.15) (692.28) (1117.31)
8 Capital Grant - GoI 0.00 621.20 694.78 502.69 207.22
9 Capital Grant - GoTN 0.00 621.20 694.78 502.69 207.22
10 ULB Contribution - Transfers from 0.00 30.07 18.27 53.06 213.76
Revenue Surplus
11 ULB Contribution - Loan/Borrowings 0.00 1669.75 1762.09 1309.34 407.91
12 Public Contribution – UGS Deposits 0.00 163.78 303.97 145.67 0.00

It can be observed that there is no operational deficit during the short-term and a deficit in a
closing balance in FY2010-11 to FY2012-13, due to huge investments made. This is also
due to higher loan dependency for the projects identified under CDP since revenue surplus is
very minimal. However, based on assumptions, the capital components of the assumed
investments are the loans (Rs. 5149.09 lakhs) and the own contributions (Rs. 424.30 lakhs)
to be made by the ULBs. The interest portion is taken for calculation of the revenue surplus;
the principal repayment is taken as a capital expenditure. The negative surplus in the closing
balance is due to transfers from revenue account to capital expenditure in order to meet the
ULB contribution.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 131 -

Case 4: Capital Investment Considered under the Sustainable Scenario – Zero Grant:
This is a scenario where the investments are sized according to the financial capabilities of
the ULB. This is worked out based on certain assumptions. The method of such workings
and the results thereon are given in the forthcoming sections.

Method and Assumption:

The sustainable scenario is prepared after taking into consideration, the revenue inflows and
outflows from the base scenario, i.e. the income from sewerage and water charges and O&M
on assets is taken. In order to arrive at the sustainability, three different parameters were
used which are,

• TE /TR <1
• DS /TR <=30%
• 30% of the operating surplus should be retained as surplus and the balance can only
be leveraged.

The least of the above 3 factors was arrived at as the possible annuities payable by the ULB.
With this a conversion factor was worked out to determine the Borrowing Capacity and the
Investment Capacity. The maximum sustainable investments for the next 5 years are
summarized as follows:

Table 11.14: Borrowing & Investment Capacity of Sustainable Case Scenario (Rs. In lakhs)
Details 2008-09 2009-10 2010-11 2011-12 2012-13 TOTAL
Borrowing Capacity 4.18 31.03 0.00 147.86 124.84 307.91
Investment Capacity 4.65 34.48 0.00 164.29 138.71 342.12

Therefore FOP for the


Table 11.15: Assumptions on Means of Finance (Rs. In Lakhs)
revised investment
estimates was worked out. Loan Assumptions 2008-09 2009-10 2010-11 2011-12 2012-13
Tenure 15 15 15 15 15
It is quite obvious that
Rate of Interest 9% 9% 9% 9% 9%
when there is no revenue
Loan Amount 4.18 31.03 0.00 147.86 124.84
deficit at the base
scenario, there cannot be
a revenue deficit in this scenario. However a detailed FOP has been worked out with the
basic assumption that O&M is 2% on the overall investment. The summary of the results of
the sustainable scenario under this case is as follows:

Under this scenario, 90% of the proposed investment is funded through loan funding, and
remaining 10% is from ULB contribution either as a revenue surplus or loan from any
financial institutions. Assumptions under this scenario and means of finance are given in the
adjacent table. The summary of results from 2008-09 to 2012-13 (Short-term) is provided as
follows:
Table 11.16: Summary of Sustainable Scenario – Zero Grant (Under Case 4)
(Rs. In lakhs)
Summary Statement 2008-09 2009-10 2010-11 2011-12 2012-13
Opening Balance 401.16 426.57 450.03 464.84 482.67
Revenue Receipts 371.69 406.10 445.62 518.57 577.90
Revenue Expenditure 346.28 382.65 430.80 500.75 552.85
Operating Ratio 0.93 0.94 0.97 0.97 0.96
Debt Servicing Ratio 7.25 7.01 6.16 8.00 8.86
Operating Deficit/Revenue Grant Requirement 0.00 0.00 0.00 0.00 0.00
Closing Balance 426.57 450.03 464.84 482.67 507.72
Capital Grants 0.00 0.00 0.00 0.00 0.00
ULB Contribution - Transfers from Revenue Surplus 0.46 3.45 0.00 16.43 13.87
Loans / Borrowings of ULB 4.18 31.03 0.00 147.86 124.84

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 132 -

It can be observed that there is


operational surplus in most of the FY Short Term (Up to 2012-13) Maximum Minimum
during the short-term period, and a deficit Borrowing Capacity (Rs. in lakhs) 147.86 0.00
in a closing balance in FY2012-13, due to Investment Capacity (Rs. in lakhs) 164.29 0.00
huge investments made. This is also due
Long-Term (Up to 2027-28) Maximum Minimum
to higher loan dependency for the projects Borrowing Capacity (Rs. in lakhs) 1412.76 0.00
identified under CDP since revenue Investment Capacity (Rs. in lakhs) 1569.73 0.00
surplus is very minimal.

However, based on assumptions, the capital components of the assumed investments are
the loans and the own contributions to be made by the ULBs. The interest portion is taken for
calculation of the revenue surplus; the principal repayment is taken as a capital expenditure.
It is seen from the results that the ULB generates a surplus even after meeting the ULB
contribution. However the figures given above are indicative as these are based on certain
assumptions. The actual working / financial structuring can be done only when the project
takes off.

Suggestions:

ƒ As mentioned in the earlier sections, the ULB can go in for BOT projects wherever
possible, in order to reduce initial investments, preferably in remunerative projects,
Sanitary Landfill and Composting Facility and also in traffic and transportation sector.
ƒ Energy efficiency measures can be adopted in order to reduce O&M costs in areas of
street lighting, etc.
ƒ The ULB contribution can be managed by the leveraging concept. A bridge loan can be
obtained from cheaper sources so that the initial upfront investment of ULB can be
avoided and as a result the negative closing balance can also be avoided. This can be
managed as there is still a revenue surplus available and repayments can be
accommodated.

Recommendations on Capital Investment Plan


ƒ It is recommended that the ULB plan for utilizing capital investment within their Investment Capacity (i.e. Rs. 342.12 Lakhs)
during the period from 2008-09 to 2012-13 to effectively manage the finances of the ULB.
ƒ In the case where the GoTN assures additional budgetary support through revenue grants for the O&M of the new assets
created, the ULB should explore capital investment plan under the ‘Optimum Scenario’.
ƒ The decision on the capital utilization under the ‘Optimum Scenario’ should be made only based on a commitment from the
GoTN on the extent of capital grant support and revenue grant support.

11.5 REVENUE ENHANCEMENT MEASURES


ULB often face the pressure of inadequate resources to meet recurring expenditure and
investment needs for core urban civic services. There is a growing realization among urban
managers on the need to innovate, especially in the context of declining state and central
government’s financial support to ULB, to sustain investments and to carry on their functions.
In addition to state level initiatives in the form of legislative and regulatory measures, ULBs
need to make efforts to enhance their resource base through a series of reforms at local
levels.

"Innovation" is now recognized as the key to success in resource mobilization efforts of ULB
to tap revenue sources, both tax and non-tax. In addition to raising municipal resources, ULB
need to adopt innovative mechanisms in cost cutting or expenditure management for
effective financial planning. Besides, additional resource mobilization at local government
levels is usually possible through "taxation" (under which property tax is the mainstay of
ULB) and "user charges".

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 133 -

In recent years, apart from internal resource mobilization, ULB need to tap funds in the form
of direct borrowings from Financial Institutions, capital markets (through municipal bonds), or
through appropriate financial intermediaries or institutions and various other arrangements
for attracting direct private investment (indirect access). In order to access such funds or
supplement resources by way of external borrowing, ULB need to assess their sustaining
capacities and requires steps to gain investor confidence by enhancing tax rates, improving
collection efficiencies, enabling public-private partnerships, etc.

This section of the report highlights the salient features of the innovative resource
mobilization practices need to be included in the ULB to enhance its revenue base to sustain
the proposed investments in the CDP:

1. Public Participation through Beneficiaries Contribution


2. Property Tax Rate Enhancement
3. Improving Property Tax Collection
4. Levy of New User Charges
5. Cost Reduction

1. Public Participation through Beneficiaries Contribution

Beneficiary’s contribution is emerging as an effective instrument for generating resources to


meet capital needs and sustaining investments. The beneficiary contribution can indeed be a
significant source of finance for local bodies, especially for financing capital-intensive
projects. ULB need to keep the debt component of the project fund as low as possible and
solicited beneficiary contribution to fund the project. Beneficiary’s contribution can be sort for
infrastructure projects like provision of Underground Sewerage scheme for the town at an
estimated investment of Rs.3,625.43 lakhs. Under this scheme ULB need to borrow a loan
amount of Rs.1,631.44 lakhs (45% of proposed investment) from the financial institutions.
ULB can levy a non-refundable, one-time deposit charge for domestic and non-domestic
connections to the tune of Rs. 5,000 and Rs. 8,000 per connection respectively in order to
reduce the loan amount considerably.

Public private partnership would be encouraged so as to complement the resources and the
efforts of the ULBs in development and provision of urban services. The Government would
take a leading role in creating & enabling environment for facilitating these partnerships.
Private sector participation would be encouraged across the following areas:

• Property and water tax assessment.


• Operation and maintenance of water treatment plants and pumping stations
• Municipal solid waste management
• Construction, operation and maintenance of bio-medical and hazardous waste
treatment facility
• Awareness campaigns for cleaner environment
• Maintenance of roads, public parks, streetlights and public toilets.
• Large scale township development projects.
• Construction of bridges, flyover and by-passes around town.
• Make non-performing municipal assets to performing assets by suitable methods.

2. Property Tax Rate Enhancement

Enhancement in tax rate is one of the essential requirement for the ULB to improve their
base of the own resources. As per SFC recommendations revision of Annual rental value
(ARV) has fallen due in 2003. Government of Tamil Nadu should implement the SFC
recommendation of revision of property tax every five years.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 134 -

3. Improving Property Tax Collection

Map based system of maintaining records using Geographic Information system (GIS) would
improve the coverage of information on the properties and widen the tax net.

Special tax collection camps and door-to-door campaigns need to be initiated for collection of
taxes and charges. Councilors shall take interest in organizing such camps, through which
people are encouraged to utilize facilities and pay taxes which will increase the collection
performance. The following revenue enhancement measures are suggested to improve the
revenue base of the ULB:

• Carrying out Legal and Procedural reforms for enhancement of property tax and its
effective collection.
• Comprehensive assessment of properties to enhance base of property tax
• Stricter enforcement of tax.
• Normalization of property valuation and tax assessment mechanism to capture
appreciation in value of property.
• Creation of a property valuation cell to ensure uniform procedures for valuation of
properties.
• Comprehensive communication with the public to address their concerns regarding
property tax assessment.
• Enhancement in the non-tax collection by improving the rate structure and collection
mechanism.
• New areas need to be explored for rent and fee collection.
• Computerization of database of properties and other income sources.
• Full cost recovery for urban utilities: Ensure cost recovery for urban utilities especially
water, through rationalization of tariff structure.

4. Levy of New User Charges

Imposition of Solid Waste Charges as an additional source of local revenue, which is a fairly
recent innovation can be tried.

Levy of vacant Land Tax (VLT) as per the GoTN provision will improve the revenue base and
it will also encourage the development of urban activities.

5. Cost Reduction

• Implementation of energy saving measures in street light sector will reduce the
energy cost considerably. An Energy Management Plan need to be prepared by the
ULB and an option/feasibility of privatization of O&M activities need to be studied.
Alternate energy sources shall be generated with the involvement of private
operators (i.e. Wind Mills) to subsidize the energy cost.
• Privatization of MSWM activities will reduce the operation cost and ensure better
service delivery since ULB lacks sufficient staff strength both at managerial and field
level.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 135 -

12
ASSET MANAGEMENT PLAN
12.1 OVERVIEW
This section focuses on priority asset management to inform, help and guide policymaking
by city governments. Assets can be used by the city administration to help them achieve
their objectives; yet studies find that municipal assets are often underutilized by the local
governments or improperly transferred or sold. Assets can be put into productive use, or they
can be acquired, sold, transformed or otherwise disposed of to benefit ultimately the
citizenry.

The ultimate purpose of an Asset Management Plan is to ensure that assets are operated
and maintained in a sustainable and cost effective manner, so that they provide the required
level of service for present and future customers.

“The combination of management, financial, economic, engineering and other practices,


applied to physical assets with the objective of providing the required level of service in
the most cost effective manner”.

And an Asset Management Plan is:


“A plan developed for the management of one or more infrastructure assets that
combines multi-disciplinary management techniques (including technical and financial)
over the life cycle of the asset in the most cost-effective manner to provide a specified
level of service”.

Asset management plan is “knowing” about assets, what they are, where they are, what
condition they are in, how much they are worth, what level of service is expected of them and
at what cost, how they are performing, what extra capacity they have, what future capacity is
required, when they need to be replaced/upgrade, what will the cost be to replace / upgrade,
what further works are required to meet future demand and what improvements are
programmed. A brief about Asset Management Process (AMP) is enclosed in Annexure - 10.

12.2 INVENTORY OF MUNICIPAL ASSETS


The Asset Management starts with the identification and inventory of assets that the
municipalities own, control, or administer and the inclusion of this listing in an orderly asset
management system. In some municipalities, a register of land and other assets includes
both private and public properties, a database that provides municipal government
information from which to manage real estate and infrastructure use, and to administer taxes
and services effectively. Maps and lists of real estate property, including surplus property
earmarked for disposal are available at Local Planning Authorities, but these properties do
not necessarily have assigned values. Long term planning document like Master Plan
incorporates a framework for planning the use and management of physical assets
especially land. There are significant differences in the availability of information because
cadastral registers for land have different time spans and years of operation, and municipal
authorities and communities assign different priorities to establishing effective registries.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 136 -

The first stage of implementation of an asset management program for municipal


infrastructure relies on the essential element of inventory. For each element in each category
of infrastructure it is fundamental to know about all as mentioned bellow:

• Available Assets
• Location of Assets
• Age of Assets
• Quantity of Assets
• Physical Characteristics of Assets

It is starting point and for the determination of the high level strategy and objectives of the
program. The inventory can consist of approximations of the quantity, size, materials, and
age of each category of asset. For the project level decisions more detail is necessary for
condition and performance assessment. This level of inventory detail can require a
commitment to a multi year program of data collection and field verification.

CLASSIFICATION

A useful distinction for the classification of properties is the division between core properties
or assets needed for the basic operation of the municipality and often assigned to the
municipal government by law, and surplus properties or assets that are not necessary for the
normal operations of the municipal government but are still in under public ownership. Assets
needed for the operation of the municipality are sometimes further differentiated according to
use: necessary governmental use or social use. Governmental use would refer to the assets
used in the provision of public goods and services such as municipal buildings, schools,
hospitals, and police and fire stations, where the goal would be efficient provision of public
services. Social use would refer to property used for parks and recreation.

SOME GUIDELINES FOR MUNICIPAL ASSET INVENTORY PREPARATION

A municipal asset inventory can be set up incrementally, based initially on existing


information, and improved through consultation, campaigns and surveys. The focus should
be on identifying major physical assets and subsequently on making this list publicly
available. The process should be seen as an ongoing effort and should be placed under a
responsible office or unit with appropriate mandate and resources. The basic approach
should be to:
• List major municipal assets
• Identify properties in use by major function
• Examine current development plans and requests for the modification of status of
property
o New uses
o Private sector interest, potential for sale, lease
o Proposal to use the asset by other municipal or government departments
o New public sector projects, might include public assets as well as private
assets in the proposal (e.g. road project)
• Identify properties that are vacant or otherwise indicated as surplus

12.2.1 CONDITION ASSESSMENT

Historically asset monitoring to determine condition has been subjective based on local
knowledge and experience. Formal procedures now exist to assess asset condition. The
development and continued use of condition assessment data will allow preparation of
verifiable predictive decay curves for particular asset types and hence permit prediction of
remaining life. Consideration of economic influences and other factors will also be required in
the adopted life for the asset type.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 137 -

By considering the current condition point on an assumed decay curve, the profile can
predict the effective life (time) before failure. This failure time can by physical end of life,
minimum level of acceptable service, or limit of capacity of the asset.

Condition assessment ranks assets on a five step scale as follows:


1. Very Good - Very good condition, where only normal maintenance is required.
2. Good - Minor defects only where minor maintenance is required to approximately 5% of
the asset.
3. Fair - Maintenance required returning to accepted level of service where significant
maintenance is required to 10-20% of the asset.
4. Poor - requires renewal where significant renewal or upgrade is required to 20-40% of
the asset.
5. Very Poor - Assets unserviceable where over 50% of the asset requires replacement.

It is not necessary to assess all assets immediately. It is only necessary to assess those that
are going to be critical in the next 5 years. The extent and repetition of condition assessment
will be influenced by:

• The criticality of the assets


• The type of assets
• The relative age of the assets
• The rate of deterioration of the assets
• The economic value of the outcomes to the business
• Unplanned maintenance history

Generally the older the assets the more frequent the assessment of condition is required. It
is necessary to know whether failure is imminent, and if previous assessments have shown
degradation, at what rate.

12.2.2 VALUATION OF MUNICIPAL ASSETS

Valuation of assets is an important consideration and challenge. Accurate information is


needed on the state, the financial value, and physical and environmental characteristics of
the assets that the municipal governments own or manage. The condition of municipal
assets is a factor that needs to be considered since assets such as infrastructure tend to
have a life cycle. A good understanding of the value of assets is needed when decisions are
to be made on sale or disposal of assets, when reinvestment efforts are needed or when
joint ventures, investments or partnerships are launched.

There are different methodologies for valuation of municipal assets depending on the
objectives for which this is done. For record keeping purposes, properties and their physical
and economic characteristics might be recorded according to the following normative criteria:

• Nominal book values, cadastral information, maps, number of property, etc.


• Replacement values (updated values to recent cost estimates, taking into consideration
depreciation due to technical obsolescence and wear and tear).
• Comparative market values of property. If it is real estate property, comparative values
and ranges for market transactions might be a good approximation. Rental values should
be noted if relevant. For very important items with a commercial opportunity cost,
engaging valuation consultants might be cost effective.
• Asset valuation with potential costs and benefits of alternative uses.
• Expected values: for properties that could have alternative economic use and that might
be subject to sales, transfer or negotiation for concessions or joint ventures, the
responsible official of asset management for the municipality could estimate an
opportunity cost as a minimum reservation price. The information asymmetries and
capacity between the local governments and the private sector are normally so high, that

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 138 -

for purposes of transaction, open bidding processes are recommended. As mentioned


above, asset management professionals could be retained in preparing internal
reservation prices.
• Social and cultural value of assets: these may not easily translate into financial values,
but these should be considered and from the perspectives of different segments of a
municipality. Assets such as sacred sites, historical markers or cultural treasures should
be noted on inventories. Before action is taken that in any way will affect these relevant
assets, very careful consideration should be given and consultations organized.

The financial valuation of properties and different forms of assets on a net present value (or
cost benefit) analysis framework might be appropriate, if the property has a minimum level of
value (defined as percent of total expenditures for the period, say initially 2% and upward)
and depending on the potential use of the asset. For smaller valued items, a more accessible
comparative conversion table could be used as the first approximation, with automatic
indicators adjusted for inflation and depreciation (both physical and technical) in order to
reduce administrative costs but keeping the system transparent. Capital valuation methods,
returns on assets, assessment of values from different perspectives and use of property,
should form part of the administrative tools of asset management.

12.3 ASSET DESCRIPTION

ULB’s assets include physical assets such as land, infrastructure and movable assets,
financial assets such as cash, stocks and bonds, and intangible assets such as goodwill.
Under this assignment the study team focus on first category, namely the major physical
(fixed) assets: land or real estate assets, which constitute a major portion of municipal
assets, and infrastructure such as buildings, water supply and related systems, road
networks, storm water drains, transportation and communication systems.

Considering the aforementioned Asset Management Process (AMP’s), following


infrastructure and land assets are identified in the ULB:

Infrastructure Assets cover accessories in the water supply system, sanitation facilities
provided by the local body, storm water drains both pucca and kutcha drains, roads of
different typology, various accessories involved in street lighting, solid waste equipments,
vehicles and communication system etc., Sector wise assets of Sathuvachari Municipality is
given in the following section.

Water Supply Sector:

All the units relating to water supply systems covering Head works, Transmission Ducts,
OHT’s, Reservoirs, Supply and distribution mains, House connections, Treatment units and
other related appurtenances that belong to the Municipality . The following table highlights
the list of water supply and the existing assets.

Type of Assets Quantity (Nos.) Remarks


Open Wells in River Palar 8 Installed during 2004-05
Infiltration Wells in River Palar 2 Installed during 1977
Pumping main from head works 15 600mm PSC pipes
OHT’s 9 21.75 LL
Distribution System 56 kms 3”PVC Pipes
Public Fountains 320 --
House Service Connections 6674 Unmetered Connections

Roads Sector:
Sl. No. Road Typology Length (in km)
1. Surfaced Roads
- Cement Concrete 17.92

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 139 -

Sl. No. Road Typology Length (in km)


- Blacktop/Asphalted 54.75
- WBM --
Sub Total (Surfaced Roads) 72.67
2. Non-Surfaced Roads
- Stone Slab 0
- Gravel 0
- Earthen 3.17
Sub Total (Non-Surfaced Roads) 3.17
Total (Municipal Roads) 75.84

Storm Water Drains Sector:


No. Description Length (km)
1. Open Drains (Pucca) 46.53
2. Open Drains (Kutcha) --
3. Closed Drains (Pucca) 0
Total 46.53

Solid Waste Management Sector:


No. Description Quantity (Nos.)
1. Tractor cum trailer 1
2. Tipper Mini Lorry 3
3. Tipper 1
4. Tricycles 21

Street Lighting Sector:


NO. Type of Fixtures Nos
1. Fluorescent (Tube Lights) 1700
2. High power fixtures 511
3 High mass light 12
Total 2223

12.4 PLAN FOR LAND ASSET MANAGEMENT


It is understandable from the vision statement arrived at the instance of CDP, the
stakeholders anticipated that the ULB could be the regional node. To achieve this vision,
investments need to be routed at appropriate projects. As the vision statement does not
directly lay to a specific project, concerted efforts are to be plowed in to achieve the vision.
City Development Plan is one such effort to identify projects for development and later
implemented under PPP, BOT, BOOT mode. The CDP looks the local body as a resource
center rather than only service provider and tries to emulate projects that are feasible to
attract private investments.

The following are the list of projects that are considered under the CDP for the optimum
utilization of land assets of the local body which in turn enhance the town as a tourist town
while keeping in mind a better quality of life of the people in the town has to be achieved.

• Improvements of the Shopping Complex constructed under UIDSSMT


• Construction of a market complex
• Construction of a Marriage hall

The aforementioned projects are identified by the study team based on the consultation with
the stakeholders and are proposed after conducting a reconnaissance survey of the project
sites. The identified projects aim for improvement of the quality of life of the people of the
ULB in terms of basic services and specialized services. The details of the above said
projects are presented in the subsequent sections of this report.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 140 -

12.5 O&M PLAN FOR SERVICES

The term ‘Operation and Maintenance’ (O&M) has been used as a general concept covering
a wide range of activities carried out by public utilities, government and communities in order
to sustain their services and to maintain existing capital assets.

Specifically, in the present context:

ƒ Operation refers to the procedures and activities involved in the actual delivery of
services, e.g. abstraction, treatment, pumping, transmission and distribution of drinking-
water.
ƒ Maintenance refers to activities aimed at keeping existing capital assets in serviceable
condition, e.g. cleaning of open drains, repairing public taps.

Under this assignment a review of O&M performance of the ULB has been performed
covering core infrastructure services.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 141 -

Following are the identified O&M impacts and ULB constraints during the stake holder’s consultation regarding service provision:

No Sector Component Issue/ Problem Statement/ O&M Impact ULB Constraint/ Capacity Assessment
O&M Aspect
1 Water Supply Transmission System Long length transmission High Energy Charges, High Risk of System Losses Cost Constraint, Lack of Dedicated Maintenance Staff, Lack
of Energy Efficiency Monitoring System
Distribution System Low Coverage through HSCs Lowered Revenue Stringent implementation and introducing a chargeable
system for PF based connections
Unauthorized Connections Risk of high UFW component Lack of efficient monitoring and curbing mechanism
System Losses - old lines Physical losses, low lpcd, low pressure, tail end areas Physical asset survey or records not available and Old
affected system not updated
2 Sanitation Liquid Waste No UGSS System Disposal into storm water drains impacts Cost constraint, Not able to provide safe collection and
environmental degradation. disposal system
Blockage in SWD frequently Lack of Dedicated Maintenance Staff
Pollution on water bodies, land and air. Lack of Environmental Management Plan and its
implementation
Solid Waste No Door – Door Collection Dumping of wastes in the site Lack of Sanitary Staff, Absence of public awareness,
Segregation at source not adequate
Secondary Transportation Double handling of wastes Sufficient vehicles for collection & transportation is absent
Treatment & Disposal of wastes Composting done for Biodegradable Waste, Land availability constraints,
Non-bio and Non-recyclable waste dumped causing Lack of infrastructure and equipment facility for disposal of
pollution of groundwater, air and land. non-biodegradable waste
Public Conveniences Lack of Toilet facility Disposal into drains and open defecation Cost constraints to provide facility
3 Storm Water Network Coverage Low Coverage Water stagnation on streets, reduced service life of Cost constraint
Drain roads.
Improper Network of Drains & Leads to unhygienic condition, Absence of proper disposal points, Absence of Storm Water
Garbage dumping Dumping of wastes causes SWD blockages Drain Master Plan
Reduced carrying capacity
Overflow during heavy flood
4 Roads, Traffic & Road Coverage Low coverage Recent developed and expansion areas less covered, Lack of dedicated staff, Cost constraint
Transportation % of surfaced / Paved roads are minimal
Improper Maintenance of Roads Frequent repair works, dusty road surface, hassle to Non-availability of road registers, poor workmanship, lack of
commuters skilled staff, cost constraint
Congested roads, Traffic conflict Increased Travel Time, Thrust on Environment Quality Absence of Traffic Operational & Management Plan
points
5 Street Lighting Coverage Low coverage Average spacing of street lights are more Cost constraint
Lack of power saving High Energy Charges, frequent repairs & replacements Cost constraint, lack of energy auditing
equipments of fixtures

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 142 -

12.5.1 OPERATIONAL STRATEGIES

The ULB requires monitoring the condition and performance of assets, and investigating any
system deficiencies, which are outside the parameters of the target level of service. It would
then identify the work required to correct defects and the most cost effective renewal option.
Monitoring activity would include:
ƒ Monitoring contractor performance
ƒ Analysis of customer complaint and service problem records
ƒ Proactive inspection of critical assets and report on condition
ƒ Analyzing condition reports provided by the Contractor during the day-to-day operation
of assets and,
ƒ As necessary, carrying out material testing to determine asset condition and decay
rates.

Assets are to be operated assets in accordance with the following current operating
procedures:
ƒ Inspect assets at least on a monthly basis
ƒ Provide appropriate supervision for installation of connections and other similar work.
ƒ Inspect and report on condition when working on the systems.

It is always necessary to minimize asset ownership costs:


ƒ Identify, evaluate and introduce new technologies and monitoring/control equipment that
may improve operational and management efficiency and modify standards as
appropriate.
Manage risk exposure:
ƒ Provide a prompt and effective response to system failures.
ƒ Maintaining appropriate insurance cover for key assets.
ƒ Undertaking structural checks of key assets.

12.5.2 MAINTENANCE STRATEGIES

The short-term maintenance strategy for the ULB is intended to retain the current levels of
service with respect to asset condition and functionality whilst minimizing costs. In the
longer-term maintenance activity will be modified as necessary to reflect: -
ƒ The age of assets relative to expected economic life cycle
ƒ The risk of failure of critical assets
ƒ Changes in the desired level of service
ƒ The nature and timing of asset upgrading/development works.

To achieve this, the following maintenance activities will be undertaken:

UNPLANNED MAINTENANCE

The activities in unplanned maintenance to be undertaken are as follows:


ƒ Maintain a suitable level of preparedness for prompt and effective response to
emergencies and asset failures by ensuring the availability of suitably trained and
equipped staff and service delivery contractors.
ƒ Ensure ready availability of serviceable spare parts and equipment necessary for the
prompt restoration of service.
ƒ Respond to asset failures due to structural integrity with the initial objective of restoring
service as quickly as possible by the most economic method available, making
temporary repairs if major repairs or renewals are required.
ƒ Emergency and incident investigation and works as appropriate.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 143 -

PLANNED (PREVENTATIVE) MAINTENANCE WORKS

Similarly the unplanned maintenance works include the following:

Undertake a programme of planned asset maintenance as necessary to:


ƒ Deliver the required levels of service.
ƒ Minimize the risk of equipment failure.
ƒ Ensure safety.
ƒ Avoid economic inefficiencies due to deferring maintenance.

Once a defect has been identified remedial work is programmed before the risk and
consequence of failure become unacceptable, with priority given to defects which:
ƒ are life threatening
ƒ are likely to cause premature failure prior to the next inspection
ƒ safety is compromised, or
ƒ If severe economic deterioration of an asset will occur.

When scheduling maintenance work it is planned to make the best use of available
resources wherever possible, including coordination of multiple repair works in the same
area. The upgrade and replacement of assets should be done with specifications identified
in the management plans and checked by design and necessary modeling.

The effectiveness of the preventative maintenance programmes are continuously monitored


and rescheduled as necessary to achieve efficiencies. The frequency and cost of all
maintenance activities are monitored wherever possible to enhance decision-making.

Maintenance work is aimed at ensuring the system functions properly. Many of the
maintenance activities are similar and follow comparable methodologies despite occurring in
different locations. Other beneficial effects also occur as a result of the maintenance e.g.
clearing of refuse and debris from the watercourses and outfalls has aesthetic benefits and
prevents ongoing gross contamination of the waterway.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 144 -

13
REFORM AGENDA AND ACTION PLAN
13.1 INTRODUCTION
Sathuvachari is a town with a projected population of 64,255 in 2021. In addition, it is
anticipated that another 10,000 will form the floating population component in the town. Re-
organization of institution, improvement and capacity building programs are required to meet
the needs of managing Sathuvachari by 2021. This chapter discusses the agenda for
institutional reforms in town governance and urban poor. It also reviews the institutional
reform initiatives already undertaken at the ULB level and State Government level to
successfully implement and operate the CDP projects

13.2 AGENDA AND OBJECTIVE OF INSTITUTIONAL AND POLICY REFORMS


The agenda for further institutional and policy reforms should be guided by the following
broad objectives:

• To institute a nodal agency, which could provide effective governance to the ULB;
• To ensure that the functions and powers of the agency and its constituents would
match their responsibilities and make them fully accountable.
• To enable clarity of jurisdiction of various agencies and entrusting pertinent
responsibilities.
• To configure the administration such that it reaches the people and vice versa, to
ensure appropriate problem solving mechanisms in place
• To evolve an effective system of Physical planning in the town, keeping in view the
needs in the context of Local Planning Area (LPA);
• To strengthen and build capacity within the ULB, its constituents and other agencies
entrusted with relevant tasks,; and
• To make the primary focus of the system and its constituents, the functional
requirements of management of Sathuvachari;

13.3 REFORMS
The ULBs of Tamil Nadu have been generally found to be proactive in their commitment to
introduce reforms at their level. All these reforms may be broadly categorized under the
following:

• Computerization Initiatives;
• Property Tax Reforms;
• Privatization Initiatives;
• Accounting Reforms; and
• Resource Mobilization Initiatives.

A brief description on the above reform initiatives and their current stage are given in the
following sections of this report.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 145 -

13.3.1 POLICY FRAMEWORK AND PRIORITY ACTIONS

As specified earlier, priority actions have been discussed and finalized by the stakeholders
for urban management and Sectoral reforms for the ULB. The following policy framework
and priority actions have thus been identified based on reported evaluations, discussions
and priority actions as required and mutually agreed upon by the stakeholders:

STRATEGY

ƒ Innovations both at policy and project levels to speed up the urban reform process.
ƒ Reforms to have in-built mechanism of participation and commitment.
ƒ Institutional strengthening and financial capacity building to be an integral part of the
reform measures.
ƒ Areas of reform measures include property tax, accounting and auditing and resource
mobilization and revenue enhancement.

PROPERTY TAX

ƒ Bringing transparency and uniformity in taxation policies.


ƒ Tax policy and operational procedures should be simple and clear.
ƒ Development of templates for property tax (for self-assessment) to increase tax
collection (without levying fresh taxes), including implementation strategies.
ƒ Mapping of properties and developing GIS-enabled property tax management system for
enhancing property tax net/coverage and better administration.
ƒ Collection of arrears through innovative ideas and approaches using tools for community
participation and fast track litigation methods.
ƒ Property tax base should be de-linked from rental value method and should be linked to
unit area or capital value method.

ACCOUNTING AND AUDITING

ƒ Accounting reforms - shifting from single entry cash based accounting system to accrual
based double entry accounting system.
ƒ Legislative changes in the accounting systems and reporting requirements.
ƒ Designing of accounting procedures.
ƒ Accounting manual - chart of accounts, budget codes, forms and formats, etc.
ƒ Standardized recognition norms for municipal assets and revenues.
ƒ Auditing of accounts should be carried out effectively and regularly to promote
transparency and accountability.

RESOURCE MOBILIZATION AND REVENUE ENHANCEMENT

ƒ Increasing revenue through measures for better coverage, assessment, billing,


collection and enforcement.
ƒ Controlling growth of expenditure.
ƒ Improving the organization and efficiency of the tax administration system.
ƒ Augmentation of resource mobilization/revenue generation from properties belonging to
ULB for improving the overall financial health.
ƒ Energy audit of fuel and energy consumption by various departments of ULB to minimize
expenditures on fuel and energy, including energy audit and metering of street lights.
ƒ Streamlining and strengthening of revenue base of the ULB:
o Strengthen the fiscal powers of ULB to fix tax rates, fee structure and user charges
through specific guidelines and notifications, which should find a place in the
Municipal Rules. Prepare model guidelines for the city to allow greater flexibility in
levying taxes, fees and user charges, borrowing funds and incurring expenditures;
o The annual report of the ULB shall devote a section highlighting the amounts of
subsidy given to a particular service, how the subsidy was funded, and who were

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 146 -

its beneficiaries;
o Implementation of MIS to provide relevant information on accounts, commercial
and operating systems for better decision-making and information dissemination to
citizens; and
o Application of e-Governance is equally important for municipal finance.

Apart from the above, following are some of other reform measures which should be
implemented to support the above identified key municipal reforms.

URBAN ENVIRONMENTAL MANAGEMENT

The costs of maintaining a healthy urban environment need to be recovered through various
municipal taxes and user charges following the “polluter pays” principle. For this, the
functional role of the ULB as envisaged in Item 8, 12th Schedule of the Constitution has to be
resolved keeping in view the role of the Tamil Nadu Pollution Control Board, and the
organizational and fiscal strength of the ULB.

ACCESS OF URBAN SERVICES TO THE POOR

Since “ability-to-pay” for the cost of environmental infrastructure service provision is an


important criterion, cross-subsidization of tariffs, innovative project structuring and user/
community participation is the means to ensure access of these services to the poor. Again
the functional and financial role of ULB with respect to the Items 10 and 11 of 12th Schedule
vis-à-vis those of central and state government agencies need to be resolved.

13.3.2 URBAN GOVERNANCE

Good governance in the municipal context stands on two broad principles, viz. transparency
and civic engagement and capacity building measures. Following sections highlight key
elements of the above two principles of good governance specific to the ULB.

TRANSPARENCY AND CIVIC ENGAGEMENT IN MUNICIPAL MANAGEMENT

Laws/rules/regulations specific to city/local issues should be employed to facilitate effective


implementation. These should be lucid and easily understood. Participatory mechanisms
should be so structured that they have legal standing and administrative control. Local
bodies should be responsive and innovative and involve community participation in civic
engagement as follows:
ƒ Specific code of conduct for municipal executives and elected representatives.
ƒ Public education, resource mobilization, good leadership and transparent processes
applied to municipal finance and development work.
ƒ Closer networking with media and their engagement in creating public awareness and
creating demand for good governance. Cautious engagement of private sector with
continuous monitoring is necessary.
ƒ Setting in place an active and online public Grievances’ Redressal System, with
automated department-wise complaint loading and monitoring system.
ƒ Instruments to improve efficiency through enhanced technical, administrative and
financial capacities.
ƒ Credit enhancement options other than state guarantees need to be adopted.
ƒ Preparation of annual Environmental Status Report through a multi-stakeholder
consultation process.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 147 -

CAPACITY BUILDING OF THE ULB

Following are some of the key aspects of capacity building measures for ULB:
ƒ The ULB shall maintain data to generate indicators as suggested in this document for
evaluating its performance.
ƒ Prepare and conduct capacity building programmes for elected representatives,
especially women representatives, with a view to enable them to focus on gender based
issues.
ƒ Promote the creation of interactive platforms for sharing municipal innovations, and
experiences among municipal managers.
ƒ Better human resource management through assessment of the training needs of
personnel involved in urban administration to enhance management and organizational
capabilities.
ƒ Assessment of fund requirement and resource persons to tackle the training needs of all
personnel.
ƒ Development of training material in the local language and impact and evaluation
studies of the training programmes.
ƒ Capacity building to better position the urban local body to employ highly qualified staff
and seek superior quality of out-sourced services.

As specified earlier, priority actions have been discussed and finalized by the stakeholders
for urban governance for the ULB. The following policy framework and priority actions have
been identified by the study team based on reported evaluations, discussions and priority
actions as required and mutually agreed upon by the stakeholders.

TECHNOLOGY INTERVENTIONS THROUGH COMPUTERIZATION

ƒ Billing and collection of taxes and user charges through e-services.


ƒ Speed up development of e-Governance system and accounting system.
ƒ Database management of assets, records, lands, properties, etc.

HUMAN RESOURCE DEVELOPMENT

ƒ Staffing pattern, organizational restructuring and performance appraisal.


ƒ Development of MIS for effective and efficient management & decision-making.
ƒ Publication of newsletters for creating awareness and participation.
ƒ Staff training, exposure visits and motivation programs to bring about awareness on
recent developments and technologies.

CITIZEN ORIENTATION AND INTERFACE

ƒ Conduct citizen satisfaction surveys & analysis on annual basis to assess citizen needs
and demands including satisfaction levels.
ƒ PR strategies to enhance community participation and create awareness.
ƒ Innovative citizen complaint redressal system including e-Governance.
ƒ Augment and strengthen new initiatives on citizen interface and orientation.
ƒ Regular interface with citizen associations/forum to understand public needs.

The above assignment has to be carried out by the ULB with full support from the GoTN.
The outcome of the above assignment shall provide clear guidelines and impetus to the
towns for good urban governance.

13.4 REFORM AGENDA AND TIMELINE


In addition to the aforementioned policy framework and priority actions, the GoI has
formulated a Reform Agenda to access financial assistance under the proposed UIDSSMT.
Adherence to this Reform Agenda and Timeline is mandatory for accessing funds under the

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 148 -

proposed UIDSSMT. This section provides a brief note on preparedness of the GoTN/ULB
and a broad timeline.

13.4.1 AGENDA FOR REFORMS AND TIME LINE


The main thrust of the UIDSSMT strategy of urban renewal is to ensure improvement in
urban governance so that ULBs become financially sound with enhanced credit rating and
ability to access the market capital for undertaking new programmes and expansion of
services. In this improved environment, there would be greater possibility of public-private
participation in provisioning of various services leading to more investment into the sector
and better delivery of urban services. To achieve this objective, the State Governments and
urban local bodies will be required to accept implementation of an agenda of reforms. The
reforms spelt out under UIDSSMT falls under two categories, viz. mandatory and optional. In
order to accomplish the desired reform agenda and to provide an holistic approach, it is
proposed to initiate various state level and city level reforms (termed as general reforms) to
facilitate smooth and effective implementation of all reforms identified/specified under the
UIDSSMT Guidelines. Accordingly, the suggested reform agenda has the following set of
reforms:

ƒ General Reforms - State Level Reforms (Reform Initiatives A.1 to A.3)


ƒ Mandatory Reforms - State Level Reforms (Reform Initiatives B.1 to B.7)
ƒ General Reforms - Urban Local Body Level Reforms (Reform Initiatives C.1 to C.5)
ƒ Mandatory Reforms - Urban Local Body Level Reforms (Reform Initiatives D.1 to D.5)
ƒ Optional Reforms (Reform Initiatives E.1 to E.10)

13.4.2 MANDATORY URBAN REFORMS


STATE-LEVEL REFORMS

ƒ Implementation of decentralization measures as envisaged in 74th CAA, 1992, of the


GoI: Functions specified in Schedule 12 have been incorporated into the municipal acts.
However, the functions of town planning, regulation of land use and construction of
buildings, water supply and sewerage have not yet been actually transferred to the
ULBs. Operationalization of this would be required through suitable institutional
changes, executive orders and some legal actions.
ƒ Repeal of Urban Land Ceiling and Regulation Act: This Act has been repelled in the
State.
ƒ Reform of Rent Control Laws: There is a Rent Control Act in the State.
ƒ Rationalization of Stamp Duty to bring it down to no more than 5 percent within the next
seven years: At present the Stamp Duty in the State is revised at 8 percent. Some states
like Maharashtra and Karnataka have already reduced their stamp duty to less than 5
percent. The experience is very positive with stamp duty revenues increasing due to
better compliance. The GoTN may consider reducing the Stamp Duty in a phased
manner.
ƒ Enactment of Public Disclosure Law: Public disclosure of municipal budget proposals,
performance, service levels and other information required by citizens on a six-month
basis through appropriate methods like display at ward/ zonal offices, newspapers, web
page, etc. This will increase transparency of the ULBs and bring in efficiency. This can
be done by incorporating new clauses in the Municipal Corporation and Municipal Acts.
ƒ Enactment of Community Participation Law: Institutionalizing citizen participation in
municipal affairs through community participation in different aspects of municipal
administration will improve the municipal citizen interface and enhance effectiveness of
administration. This also can be done by incorporating new clauses in the Municipal
Corporation and Municipal Acts.
ƒ Associating elected ULBs with City Planning and Civic Service Functions: Suitable
action suggested as under ‘Implementation of decentralization measures as envisaged
in 74th CAA, 1992, of the GoI may be taken.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 149 -

REFORMS AT ULB LEVEL

ƒ Adoption of modern, accrual-based double entry system of accounting in ULBs: At


present, the ULB maintains accounts on a cash based system. This is not sufficient to
get information on the financial health of the ULB and to improve the financial
management. The GoI and the Comptroller and Auditor General of India (C&AG) have
developed the National Municipal Accounting Manual (NMAM). There is need to
introduce modern, accrual-based double entry system of accounting in the ULB in line
with the above manual. As a first step, a State-Level Municipal Accounting Manual
should be prepared based on the NMAM.
ƒ Introduction of system of e-Governance in ULBs: Introduction of e-Governance in ULBs
is recommended to improve delivery of services and help them to create citizen-centric
and business-centric environments for good governance. This will also be in line with the
proposed e-Governance project of the GoI.
ƒ Reform of Property Tax in ULBs: Introduction of objective based property tax system
such as unit area and self-assessment systems will help rationalize the tax base.
Moreover, introduction of MIS and GIS based mapping will help to bring all properties
into the tax system and increase tax collection. Based on the experience of other states
it may be ascertained whether any changes in the Municipal Corporation Act are
needed.
ƒ Levy of reasonable user charges by ULBs to recover full cost of operation and
maintenance: At present cost recovery from urban water supply and sewerage services
is relatively low and unsatisfactory when compared with the incurred O&M expenditure.
Low cost recovery is one of the potential causes for poor efficiency of the services. It is
necessary that user charges for these services reflect the actual costs and recover at
least O&M costs.

Provision of basic services to urban poor: Provision of basic services to the urban poor
including security of tenure at affordable prices, improved housing, water supply, sanitation,
while ensuing delivery of other already existing universal services of the Government such
as education, health and social security is required.

13.4.3 ISSUES FOR APPROVAL OF THE GOTN

ƒ Town Planning: Views of the ULBs should be incorporated in town planning and
regulation of land use and building construction. Provisions may be made for obtaining
the views of municipal councils/corporations on development plans. Size of building (by
use) and layout plan will be decided from time to time through a Government Order.
Necessary changes may be made in the Town Planning Act and Rules.
ƒ Water Supply and Sewerage: Consequent to the 74th CAA, the ULBs are responsible for
ensuring these services to the citizens. Different options of service management either
by the ULB or by a private operator through a management contract can be explored.
Necessary amendments should be carried out to the applicable Acts and Rules in
accordance with set norms and standards by the GoTN/GoI in this regard.
ƒ Reduction in Stamp Duty: Stamp Duty to be reduced to 5 percent from the existing 8
percent over the next seven years at the rate of 0.50 percent per year. The Finance
Department may initiate the necessary action in this regard.
ƒ Public Disclosure: The existing Municipal Acts may be amended to incorporate a
provision for public disclosure of budgets, capital projects, revenue and expenditure,
level of services, etc. The type, periodicity and method of disclosure will be as per rules
made from time to time under these provisions in the Acts.
ƒ Increasing Community Participation: The Municipal Acts may be amended to enable
formation of area committees in municipal corporations and ward committees in
municipal councils. Number and manner of selection of members and functions of the
area/ward committees will be as per rules framed under provisions in the Acts from time
to time.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 150 -

ƒ Accounting System: Amend the Municipal Act to enable introduction of the accrual-
based double entry accounting system. Prepare a State-Level Municipal Accounting
Manual based on NMAM. The new system should be introduced in all municipal
corporations of the State.
ƒ E-Governance: e-Governance should be introduced in ULBs of the State. It should cover
the following functions in the first phase: (a) registration and issue of births/deaths
certificates; (b) payment of property tax, utility bills; (c) grievances and suggestions; (d)
building approvals; (e) procurement and monitoring of projects; (f) health programs; (g)
accounting system; and (h) personnel information system.
ƒ Property Tax: The applicable act should be amended to introduce the unit area and self-
assessment system for property tax. Rules for introduction of the unit area and self-
assessment system for property tax to be prepared under the applicable act.
ƒ User Charges: The ULB in the identified municipalities and town panchayats should
prepare an information system that provides data on O&M for water supply and
sewerage services. Pricing of water supply and sewerage services should reflect actual
costs and should cover O&M costs within five years. The GoTN will provide support to
ULBs to implement this reform.
ƒ Delivery of Services to Poor: The State Government should continuously support ULBs
to extend basic services to the urban poor. A policy paper on this subject should be
prepared.

Adherence to the above reform agenda and efficient implementation, especially the ULB
level reforms, would go a long way in improving the creditworthiness of the ULB and in
enhancing sustainability of the proposed capital investments. Based on the above, a
suggestive timeline for the reform agenda has been developed during the study process and
is furnished in Table 13.1.

Reforms already implemented by ULB would be discussed in detail during the next stake
holder’s consultation and also reforms which need to be implemented by the ULB and a time
frame for the implementation of the same would be presented to the stakeholders for further
refinement through consultation.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 151 -

Table 13.1: Suggestive Timeline for the Reform Agenda

Sl. Particulars/Items Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7


A. GENERAL REFORMS - STATE LEVEL REFORMS
A.1 Implementation of State Water Sector Reforms
Organize Reform Workshop
Review Present Policies
Strengthen Legislative Framework
Review Institutional Structure
Review Regulatory Arrangements
Prepare Roadmap for Implementation
Implement the Roadmap
A.2 Review the Municipal Acts
Review of Law in context of JNNURM / UIDSSMT
Link with Town Planning Law
Legal basis for DPC
Provision for Area Committee
Provision for Disclosure
Procedure Compliance for Amendment to Municipal Law
Amendment to Municipal Law
A.3 Development of Municipal Accounting Manual
Preparation of State Accounting Manual as per NMAM
State Municipal Accounting Manual

B. MANDATORY REFORMS - STATE LEVEL REFORMS


B.1 Implementation of Decentralization Measures as envisaged in 74th CAA, 1992 of the
GoI
Review Present Policies

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 152 -

Sl. Particulars/Items Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7


Strengthen Legislative Framework
Review Institutional Structure
Review Regulatory Arrangements
Prepare Roadmap for Implementation
Implement the Roadmap
B.2 Repeal of Urban Land Ceiling and Regulation Act ALREADY REPEALED
B.3 Reform of Rent Control Laws NOT RELEVANT
B.4 Rationalization of Stamp Duty to bring it down to less than 5 percent
Preparation and Approval of Cabinet Note on Stamp Duty Rationalization
Implementation and Rationalization to bring it down to less than 5 percent
Accomplishing desired Rationalization as per the JNNURM Guidelines
B.5 Enactment of Public Disclosure Law (as part of Reform Initiative A.2)
B.6 Enactment of Community Participation Law (as part of Reform Initiative A.2)
B.7 Associate elected ULBs - City Planning & Civic Services (as part of Reform Initiative
A.2)

C. GENERAL REFORMS - URBAN LOCAL BODY LEVEL REFORMS


C.1 Enhancement of Creditworthiness of the ULB
Review of Income and Expenditure
Identification of Steps to Increase Revenue
Finalization of Rules for Property Tax Assessment
Survey and GIS of Properties for Property Tax Assessment
Implementation of Resource/ Revenue Mobilization Measures
C.2 Improvement of Financial Management in the ULB
Appoint Local CA as Consultant
Training of Employees on new Accounting System

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 153 -

Sl. Particulars/Items Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7


Opening Balance Sheet
Parallel Accounting System
Shift to New System
Improved Expenditure Management
Improved Financial Management
Introduce Improved Audit System
C.3 Water and Sanitation Charges
Financial Diligence
Measures to Improve Cost Recovery
Energy Savings Plan
Prepare Implementation Plan
Implement Improvement Plan
C.4 Development of E-Governance System
Assess existing IT Initiatives
Develop Options to Introduce E-Governance System
Develop Service Delivery Strategy
Assessment of Functional Requirement
Develop Technical Options
Project Management Framework
Implementation Framework
Explore PPP Options
Initiate and/or Upgrade ULB Website
C.5 Devolution of Functions
City / Town Planning and Building Approvals
Water Supply and Sewerage

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu - 154 -

Sl. Particulars/Items Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7

D. MANDATORY REFORMS - URBAN LOCAL BODY LEVEL REFORMS


D.1 Accrual-based Double Entry Accounting System (as part of Reform Initiative C.2)
D.2 Introduction of System of E-Governance (as part of Reform Initiative C.4)
D.3 Reform of Property Tax in Urban Local Bodies (as part of Reform Initiative C.1)
D.4 Levy Reasonable User Charges - recover Full O&M Cost (as part of Reform Initiative
C.3)
D.5 Provision of Basic Services to Urban Poor ALREADY IN PLACE

E. OPTIONAL REFORMS
E.1 Revision of Bye-Laws - Building Approval Process
E.2 Simplification - Conversion Agriculture to Non-Agriculture Use
E.3 Property Title Certification System
E.4 Earmarking 20-25% Lands for EWS Housing
E.5 Computerization of Land & Property Registration NOT POSSIBLE TO INTRODUCE
E.6 Bylaws - Rainwater Harvesting Mandatory
E.7 Byelaws - Reuse of Recycled Water
E.8 Administrative Reforms - Reduction in Establishment
E.9 Structural Reforms
E.10 Encouraging Public-Private Partnerships

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 155

14
PROJECT RISKS, ENVIRONMENTAL AND
SOCIAL IMPACTS
14.1 PROJECT STRUCTURING OPTIONS AND ASSOCIATED RISKS
Project Structuring is an integral part of managing the lifecycle of major infrastructural
projects. This process has involved the systematic identification, analysis and evaluation of
risks across all fronts. The following figure illustrates the framework adopted for formulation
of project structuring and identification of associated risks in any kind of infrastructure
projects. The following diagram illustrates the determinants of project structuring:

Project Structure

14.2 PROJECT IMPACTS


Any infrastructure project improve general living standards within urban localities, they can
also have associated impacts on the local environment and people. The Project structuring
and associated risks can be done in three phases. The initial phase is the development and
design of the project and is normally denoted as Pre-construction phase in which both the
environmental and social screening can be brought out. Training for the understanding the
environmental issues to the project implementing authorities by means of capacity
building/create awareness on environmental issues, mitigation measures, Developing
environmental and social screening formats, information sharing on good practices etc. The
second phase is the construction phase, operation and maintenance phase and the last
phase is the closure of the project.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 156

14.2.1 ENVIRONMENTAL IMPACTS

Any development project is likely to have an influence on the environment. In order to predict
the impacts of proposed project over the environment an Environmental Impact Assessment
needs to be performed. “Environmental Impact Assessment can be defined as the process of
identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant
effects of development proposals prior to major decisions being taken and commitments
made”. The purpose of the assessment is to ensure that decision-makers consider
environmental impacts before deciding whether to proceed with new projects. Under this
assignment the following list of sectors are identified for development:
• Water Supply
• Underground Sewerage System
• Solid Waste Management (Landfill and Composting)
• Roads and Storm Water Drain Improvements
• Construction of Bus Stands, Shopping Complex and Marriage Halls.

Depending upon the infrastructure project the impact and measure may vary and are
discussed in the subsequent sections of this report.

A. WATER SUPPLY PROJECTS

These projects involve source creation or improvement of existing sources, laying of


conveying main, construction of water treatment plants, laying of internal distribution line,
construction of pumping stations, construction of overhead tanks, underground sumps etc.
The following environmental impacts need to be given attention while undertaking the
aforementioned activities:

DEVELOPMENT AND DESIGN PHASE

Potential impacts Action to be taken


Clearances ƒ All clearances required for Environmental aspects during construction shall be ensured and
made available before start of work.
Riparian conflicts ƒ Regulate extraction of water to reduce the effect of downstream users
Tree cutting ƒ Try saving trees by changing the alignment
ƒ Provide adequate tree protection (Tree guards)
ƒ Identify the number of trees that will be affected with girth size & species type.
ƒ Undertake afforestation in the nearby areas
ƒ Compensatory re-plantation of trees of at least twice the number of trees cut to be carried out
in the project area.
Utility Relocation ƒ Identify the common utilities to be affected such as: electric cables, electric poles, telephone
cables, water pipelines, public water taps etc.
ƒ Affected utilities shall be relocated with prior approval of the concerned agencies before
commencement of construction activities.
Planning Temporary ƒ Adequate actions to direct and regulate traffic shall be taken in consultation with the PIA,
Traffic Arrangements Dept. of Police to prevent jamming of roads during construction. While planning alternative
routes, care to be taken to minimize congestion and negative impacts at sensitive receptors
such as schools & hospitals.
Disposal of waste water ƒ The wastewater shall comply with the standards of TNPCB to let out into the
stream/nallah/open land/irrigation purposes, and necessary permission to be obtained from
the concerned department.
ƒ Ensure efficient working condition of the treatment plant.
Storage of materials ƒ The contractor shall identify the site for temporary use of land for construction sites/storage
of construction materials, etc.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 157

CONSTRUCTION AND OPERATION PHASE

Systems/ Impacts Action to be taken


Water Head Works
Change of stream course ƒ No appreciable change to stream course shall occur due to diversion channel and structures
due to diversion channels shall be constructed accordingly.
to construct intake
structures
Restoring river bed/water ƒ Ensure the restoring of river bed to its natural shape free from any construction debris that
source may obstruct flow.
Water quality at source ƒ Establish baseline water quality prior to initiation of construction and to be periodically
monitored and reported to the Engineer.
Construction of Transmission Mains
Protection of topsoil ƒ The top soil to be protected and compacted after completion of work, where pipelines run,
including open lands and agricultural lands.
Laying of pipeline ƒ Adequate precautions should be taken while laying water supply mains to avoid possibility of
cross connection with sewer lines
Water Treatment Plant / Booster Stations
Disposal of Sludge ƒ A suitable site should be identified for the safe disposal of sludge generated at the WTP site
and got approved by the Engineer. Prepare a sludge disposal plan that adheres to the same.
Distribution Network and OHTs
Laying of distribution ƒ Adequate precautions should be taken while laying water supply mains to avoid possibility of
pipelines cross connection with sewer lines.

B. UNDER GROUND SEWERAGE PROJECT

These projects involve developing the contour maps, laying of branch and main sewer lines,
conveying mains, pumping stations, treatment plant etc. The following environmental impacts
need to be given attention while undertaking aforementioned activities:

DEVELOPMENT AND DESIGN PHASE

Potential Impacts Action to be taken


Clearances ƒ All clearances required for Environmental aspects during construction shall be ensured and
made available before start of work.
Disposal of construction ƒ The contractor shall identify the sites for debris disposal and should be finalized prior to the
debris and excavated start of earthwork excavation; taking into account the following:
materials ƒ The dumping does not impact natural drainage courses.
ƒ Avoid disposal on productive land
Tree cutting ƒ Try saving trees by changing the alignment
ƒ Provide adequate tree protection (Tree guards)
ƒ Identify the number of trees that will be affected with girth size & species type.
ƒ Undertake afforestation in the nearby areas
ƒ Compensatory re-plantation of trees of at least twice the number of trees cut to be carried out
in the project area.
Utility Relocation ƒ Identify the common utilities to be affected such as: electric cables, electric poles, telephone
cables, water pipelines, public water taps etc.
ƒ Affected utilities shall be relocated with prior approval of the concerned agencies before
commencement of construction activities.
Planning Temporary ƒ Adequate actions to direct and regulate traffic shall be taken in consultation with the PIA, Dept.
Traffic Arrangements of Police to prevent jamming of roads during construction. While planning alternative routes,
care to be taken to minimize congestion and negative impacts at sensitive receptors such as
schools & hospitals.
Disposal of waste water ƒ The wastewater shall comply with the standards of TNPCB to let out into the
stream/nallah/open land/irrigation purposes, and necessary permission to be obtained from the
concerned department.
ƒ Ensure efficient working condition of the treatment plant.
Storage of materials ƒ The contractor shall identify the site for temporary use of land for construction sites/storage of
construction materials, etc.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 158

CONSTRUCTION AND OPERATION PHASE

Systems/ Impacts Action to be taken


Construction of Pumping / Lifting Stations
Locating of vents on ƒ While placing the vent shafts, precautions should be taken to minimize odour nuisance.
sewer system, low cost
sanitation and sewage
pumping stations
Disposal of silt/sludge ƒ A suitable site should be identified for the safe disposal of silt/ sludge generated at the
Pumping / Lifting station sites, which should be away from the water bodies, residential &
sensitive areas, agricultural areas and etc., and got approved by the Engineer.
Construction of Sewerage Treatment Plant
Contamination of ground ƒ Ground water quality may get contaminated due to leaching of waste water. So, the treated
water quality water quality shall comply with the standards laid down by the PCB for disposal onto land,
water body or for irrigation use.
ƒ Regular monitoring is required for the treated sewage quality and also the ground water
quality in the near by areas and ensure compliance with PCB standards.
Impact on surrounding ƒ To avoid problems of foul smell polluted air, insects, noise pollution and other problems buffer
areas zones to be provided in the form of Green Belt around the STP site.
Disposal of treated waste ƒ The treated water quality shall comply with the standards of TNPCB before letting out into the
water stream/nallah/open land/irrigation purposes, and necessary permission to be obtained from
the concerned department.
ƒ Ensure efficient working condition of the treatment plant
ƒ Prevent the pollution of stream water and other water bodies receiving STP discharge.
Disposal of Sludge ƒ A suitable site should be identified for the safe disposal of sludge generated at the WTP site
and got approved by the Engineer. Prepare a sludge disposal plan that adheres to the same.

C. SOLID WASTE MANAGEMENT (LANDFILL AND COMPOSTING)

These projects may include developing land fill, compost yards with washing facilities,
compound walls, purchase of vehicles for transporting the garbage, etc.,

PUBLIC HEALTH, OCCUPATIONAL HEALTH & SAFETY

Public health may be affected by the project activities by noise and dust pollution during the
construction phase especially during landscaping, provision of access road and site
preparation. The activities that affect public health during operation and its closure are given
below:

Operation phase & Closure Phase

Emission of bio-gas, high noise levels during loading and unloading and high dust level affect
public health, waste dispersion, bad odour and spreading of infectious diseases are other
factors that affect public health during the operation and closure phase of the projects.

SOCIO-ECONOMIC CONDITIONS

The socio-economic impacts of the proposed projects within the local area are given below:

During the Construction phase, employment and visual issues are the two major impacts.
The share of local employment needs to be considered carefully during all construction
activities. The Visual impacts will result from disposal of debris and dispersion of solid waste
generated from the workers.

Impact on the i) Employment and ii) prosperity in Business is the major socio-economic
impacts known to occur during the Operation phase. The locals are concerned about sharing
the job opportunities with others during this phase. This issue should be given more attention
with regard to training. As far as Business prosperity is concerned, the supply of spare parts
and consumable from local market is expected to enhance local life quality.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 159

Rehabilitation of landfill, Electricity generation and Treated leachate may be the other
impacts during project closure period. A program for designing a final landscape and site
restoration should be provided as far as rehabilitation of land fill is concerned. The electricity
generated from the biogas will be supplied to the locals. The treated leachate may be reused
for irrigation purpose.

FLORA AND FAUNA

The proposed activities that affect Flora and Fauna species during construction and
operation phase are given below:

During the Construction Phase, Flora and Fauna species may be affected by high dust
pollution and direct damage especially during landscaping, provision of access road, site
preparation and removal of soil cover.

During the Operation Phase, high dust level and dispersion of solid waste affect the flora and
fauna species during the project activities such as construction of new cells, loading,
unloading and transportation of solid waste.

WATER RESOURCES

The proposed activities that affect water resources during construction and operation phase
are given below:

Water resources may be affected due to the demand of water for soil compaction and
pollution of ground water during Construction phase. Ground water may be contaminated
due to the maintenance of machineries and resulting domestic waste water from workers.

Hazardous waste dumping and leachate leakages are the two major activities that affect the
water resources during Operation phase. Leachate treatment unit need to be installed on a
paved area to prevent ground water contamination and also a proper reuse and recycle
mechanism to be considered for the treated leachate.

ARCHAEOLOGY

Unseen archaeological remains (if any) might be affected during landscaping and site
preparation.

MITIGATION MEASURES AND MONITORING PROGRAM

Following are the mitigation measures that need to be implemented in order to reduce the
potential negative impacts:

• Dust level need to be controlled during construction activities and transportation of


materials.
• Proper handling of dispersed solid waste during transportation and storage.
• Proper handling and taking safety requirements for collection and storage of the solid
waste to prevent odour generation.
• Taking restrict control on animals and insects (vector diseases) like dogs, cats, rats
etc.
• Applying continuous cover over the cell during the operation to prevent odour impact.
• Control the existence of the scavengers at the solid waste landfill site to prevent firing
and dispersion of the wastes.
• Noise levels need to be controlled during the construction and operation activities.
• Monitoring programs need to be implemented covering monitoring of noise levels
and ambient air quality.
• Implementation of safety procedures and availability of safety equipment for workers.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 160

• Training and awareness programs for drivers and workers on proper handling of
waste and personal protective equipments. Conducting routine medical exams for
workers.
• Training of employees to identify hazardous waste and proper safety procedure on
handling and reporting such items.
• The domestic wastewater resulting during construction and operation phases need to
be collected and managed in safe manner.
• The endogenous trees or plants should be used when rehabilitant the site.
• Restrict activities as much as possible to the project site and allocate track roads for
construction.
• Hunting and collection of wildlife, especially residents and migratory raptures should
be strictly forbidden.

D. ROAD IMPROVEMENTS

Activities Management Measures


Pre-Construction Stage
Land Acquisition ƒ The acquisition of land and private properties will be carried out in accordance with the RAP and
R&R entitlement framework for the project.
ƒ It should be ensured that all R& R activities are to be completed before the construction activity
starts, on any sub-section of the project.
Tree Cutting ƒ Trees will be removed from the Corridor of Impact (CoI) and construction sites before
commencement of construction with prior intimation to the Forest Department. Prior permission
will be obtained from the District Collector.
ƒ Try saving trees by changing the alignment
ƒ Provide adequate tree protection (Tree guards)
ƒ Identify the number of trees that will be affected with girth size & species type.
ƒ Undertake afforestation in the nearby areas
ƒ Compensatory re-plantation of trees of at least twice the number of trees cut to be carried out in
the project area.
Utility Relocation ƒ Identify the common utilities to be affected such as: electric cables, electric poles, telephone
cables, water pipelines, public water taps etc.
ƒ Affected utilities shall be relocated with prior approval of the concerned agencies before
commencement of construction activities.
Replacement of ƒ All common amenities such as community sources of water, bus shelters etc., will be relocated
common amenities wherever necessary. The relocation site identification will be in accordance with the choice of the
community and completed before the construction starts

Activities Management Measures


Construction Stage
Clearance and ƒ Vegetation will be removed from the RoW before the commencement of construction and will be
grubbing carried out such that the damage or disruption to flora is minimal.
ƒ Only ground cover / shrubs that impinge directly on the permanent works or necessary temporary
works will be removed with prior approval from the engineer. The contractors, under any
circumstances will not damage trees (in addition to those already identified and felled with prior
permission from the forest department)
Excavations ƒ All excavations will be done in such a manner that the suitable materials available from excavation
are satisfactorily utilized.
ƒ The excavation shall conform to the lines, grades, side slopes and levels shown in the drawing or
as directed by the Engineer.
ƒ The contractor shall take adequate protective measures to see that excavation operations do not
affect or damage adjoining structures and water bodies.
Earth fill ƒ Embankment and other fill areas, unless and other wise permitted by the Engineer, be constructed
evenly over their full width and the contractor will control and direct movement of construction
vehicles and machinery over them.
Dust ƒ All earth work will be protected in a manner acceptable to the engineer to minimize generation of
dust
Compaction of soil ƒ To minimize soil compaction construction vehicles, machinery and equipment will move or be
stationed in designated area (RoW, haul roads as applicable) only
Silting, contamination ƒ Silt fencing to be provided around the stockpiles at the construction sites close to water bodies.
of water bodies ƒ Construction materials containing fine particles will be stored in an enclosure such that sediment –
laden water does not drain into the nearby water courses.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 161

Activities Management Measures


Environmental ƒ The contractor will undertake seasonal monitoring of air, water, and noise and soil quality through
Monitoring an approved monitoring agency.

E. CONSTRUCTION OF BUS STANDS, SHOPPING COMPLEX AND MARRIAGE HALLS

Activities Management Measures


Pre-Construction Stage
Land Acquisition ƒ The acquisition of land and private properties will be carried out in accordance with the RAP and
R&R entitlement framework for the project.
ƒ It should be ensured that all R& R activities are to be completed before the construction activity
starts, on any sub-section of the project.
Tree Cutting ƒ Trees will be removed from the site if arises and construction sites before commencement of
construction with prior intimation to the Forest Department. Prior permission will be obtained from
the District Collector.
ƒ Try saving trees by alternatives
ƒ Provide adequate tree protection (Tree guards)
ƒ Identify the number of trees that will be affected with girth size & species type.
ƒ Undertake afforestation in the nearby areas
ƒ Compensatory re-plantation of trees of at least twice the number of trees cut to be carried out in
the project area.
Utility Relocation ƒ Identify the common utilities to be affected such as: electric cables, electric poles, telephone
cables, water pipelines, public water taps etc.
ƒ Affected utilities shall be relocated with prior approval of the concerned agencies before
commencement of construction activities.
Replacement of ƒ All common amenities such as community sources of water, bus shelters etc., will be relocated
common amenities wherever necessary. The relocation site identification will be in accordance with the choice of the
community and completed before the construction starts

Activities Management Measures


Construction Stage
Clearance and ƒ Vegetation will be removed from the site before the commencement of construction and will be
grubbing carried out such that the damage or disruption to flora is minimal.
ƒ Only ground cover / shrubs that impinge directly on the permanent works or necessary temporary
works will be removed with prior approval from the engineer. The contractors, under any
circumstances will not damage trees (in addition to those already identified and felled with prior
permission from the forest department)
Excavations ƒ All excavations will be done in such a manner that the suitable materials available from excavation
are satisfactorily utilized.
ƒ The excavation shall conform to the lines, grades, side slopes and levels shown in the drawing or
as directed by the Engineer.
ƒ The contractor shall take adequate protective measures to see that excavation operations do not
affect or damage adjoining structures and water bodies.
Earth fill ƒ Embankment and other fill areas, unless and other wise permitted by the Engineer, be constructed
evenly over their full width and the contractor will control and direct movement of construction
vehicles and machinery over them.
Dust ƒ All earth work will be protected in a manner acceptable to the engineer to minimize generation of
dust
Compaction of soil ƒ To minimize soil compaction construction vehicles, machinery and equipment will move or be
stationed in designated area (RoW, haul roads as applicable) only
Silting, contamination ƒ Silt fencing to be provided around the stockpiles at the construction sites close to water bodies.
of water bodies ƒ Construction materials containing fine particles will be stored in an enclosure such that sediment –
laden water does not drain into the nearby water courses.
Environmental ƒ The contractor will undertake seasonal monitoring of air, water, and noise and soil quality through
Monitoring an approved monitoring agency.

14.2.2 SOCIAL IMPACTS

Social issues may arise in the proposed projects, if there is need for private land (or)
government land that has been occupied or encroached upon. Normally it arises due to the
implementation of project that results to:

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 162

1. Loss of assets,
2. Loss of income or means of livelihood, and
3. Indirect group oriented impacts due to loss of access to common properties and
resources

For mitigating the social Impacts, the need for Resettlement and Rehabilitation plan or Social
Management Plan is to be prepared when the land which is acquired /alienated or
transferred results in involuntary displacement and /or loss of livelihood, sources of income
and access to common properties/ resources on which people depend for economic, social
and cultural needs irrespective of their legal status.

OBJECTIVES OF SOCIAL MANAGEMENT PLAN

The main objective of preparing any social management plan/ RAP should be resettlement
and rehabilitating of project affected persons with the aim of improving their living standard.
A base line survey can be carried to understand the social economic of the project affected
persons, plans for minimizing land acquisition/ alienation and transfer of R&R by exploring
alternate designs and or technology. The local body during the project appraisal will address
the availability of alternate design, site and its suitability, etc and choose the alternate that
requires the least land and that involves least R&R

R&R IMPLEMENTATION

It should precede the project activities and the process of R&R will be completed before the
commencement of the project activities.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 163

15
TECHNICAL ASSISTANCE
15.1 INTRODUCTION
The objective of the Technical Assistance (TA) is to strengthen project management and
institutional capabilities, and improve overall readiness for project implementation by the
ULB. TA shall assist the ULBs, to efficiently and effectively manage, coordinate, implement,
and monitor the Projects identified, including the institutional and financial reform initiatives
under the CDP. The key outcome of TA shall be (i) identification of key project personnel and
creation of project management and project implementation units; (ii) training for the
executing and implementing agencies to familiarize them with policies and procedures;
(iii) completion of consultants’ selection and prequalification of contractors; (iv) preparation of
standard bid documents for works and procurement of goods, materials, machinery and
supplies; (v) identification of required land and acquisition notification with disclosure to
affected people issued by the implementation agencies and prepared resettlement
guidelines; and (vi) introduction of institutional and financial reforms. The TA shall assist the
ULBs in conducting public awareness and stakeholder consultations to improve
understanding and acceptance of the Project and build consensus for introducing institutional
and policy reforms outlined in UIDSSMT, whose completion is expected in March 2012.

15.2 METHODOLOGY AND KEY ACTIVITIES


As each ULB has its own historical background, institutional arrangements, financial situation
and project implementation experience, the needs and readiness for capacity building will
differ. To support up-front capacity building, each ULB should formulate a nodal body for the
Project implementation, and to identify the department responsible for each of the three
components of the Project. Key activities under each TA component include the following:

1. Component A: Project Implementation Support and Establishment of Managerial Structure

The TA shall refine the managerial and personnel structure for the ULB, and prepare a
detailed ToR for the key personnel. The TA shall assist the ULB to define their clear role in
undertaking activities under the CDP. In doing so, the TA has to prepare an operational
manual defining the role of each entity in implementing the Project and delegating suitable
powers. Furthermore, the TA has to strengthen the supervisory capacity of CMA, TNUDF/
TUFIDCO, the ULBs in monitoring activities related to project implementation.

The TA shall implement the project management systems and procedures proposed in the
CDP. They include, among others, overall project management, contract management,
project performance monitoring and evaluation, procurement, recruitment of consultants,
project accounting, construction supervision, fund management, and reporting. The TA has
to assist the ULB in preparing for project start-up activities, including, among others,
preparing of short-range action plans, recruiting and training staff, establishing a steering
committee and a central-level project management unit (PMU) within CMA/ TNUDF/
TUFIDCO and state-level PMUs and project implementation units (PIUs), satisfying the
conditions for loan effectiveness, short listing, and recruiting of project consultants, preparing
budgets and early disbursement requests, preparing standard procurement documents and
contracts, and firming up arrangements for land acquisition and resettlement.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 164

The TA shall assist the ULB in learning about TNUDF/ TUFIDCO policies and procedures for
procurement, recruitment of consultants, disbursement, fund management, environmental
and social safety guards, corruption prevention, auditing, reporting, and other key aspects of
project operations. Furthermore, the TA need to help train the ULB personnel in planning,
leading, organizing, and coordinating project activities through participatory workshops and
on-the-job involvement in project management. These activities shall be carried out after an
assessment of the training needs of project states and ULBs.

2. Component B: Institutional and Financial Reforms

The TA consultants need to assist the ULB in carrying out urban management, institutional,
and financial reforms recommended by the GoI/GoTN. This include strengthening of ULB
with severe deficiencies; initiation of water utilities arrangement in ULB; improvement of
urban planning; and improvement of property taxation and user charges for such services as
water supply, sewerage, and solid waste management. The following specific activities have
to be undertaken in the ULB:

(i) Verify and evaluate infrastructure assets in the ULB.


(ii) Prepare and digitize the customer database.
(iii) Assess human resource capacities and deficiencies in the various sectors, and
formulate options for the current employees in the sector.
(iv) Assess and register property (for tax purposes) and develop a database supported by
a management information system/geographical information system to increase
property tax and tariff revenues.

3. Component C: Public Relations and Stakeholder Consultation

The TA has to assist the ULB in organizing and carrying out stakeholder consultation and
awareness campaigns to (i) improve public understanding and acceptance of the Project,
and (ii) seek feedback and build consensus for introducing the institutional reforms
recommended by the GoI/GoTN.

15.3 IMPLEMENTATION ARRANGEMENTS


First step towards implementing the projects, ULB may have to establish a tri party
agreement with CMA and TNUDF/ TUFIDCO. A Draft Memorandum of Agreement (MoA) is
enclosed in the Annexure – 13 and 14 for review.

ULB shall be the Executing Agency for the TA, and is responsible for overall coordination
with the CMA. A central-level steering committee and a Project Monitoring Unit (PMU) need
to be established within CMA, and a state-level steering committee and PMU / Project
Implementation Unit (PIU) is to be established. CMA shall provide full administrative and
technical support to the appointed consultants and coordinate activities with the ULB.

Recently, Municipal Administration and Water Supply (MAWS) Department has issued a G.O
dated 11-04-2008 on the subject of delegation of additional powers and functions to Local
governments (Refer Annexure – 15 for G.O. No.61). A plan like the City Development Plan
(CDP) is the first step to accomplish the G.O issued by MAWS department. ULB need to
implement the CDP identified projects under phased manner considering the priority of the
stakeholders of the town in conjunction with the policy of GoTN and CMA. The
implementation framework for the identified projects is given in the following sections of this
report.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 165

16
IMPLEMENTATION FRAMEWORK
16.1 AGENCIES INVOLVED
The ULBs are presently governed by seven Acts, one each for six city Municipal
Corporations and one for Municipalities and Town Panchayats. The Town Panchayats which
were governed by the Tamil Nadu Panchayats Act (1958) were brought under Tamil Nadu
District Municipalities Act (1920) consequent on the historic 74th Constitutional Amendment
Act (74th CAA) and on the basis of conformity legislations adopted by the State Legislature
from 1st June 1994.

The town Administration is vested with the Local body. With the enactment of Tamil Nadu
Urban Local Bodies Act 1998, a full-fledged local body came into function with an elected
Chairperson and Councilors. The ULB discharges various obligatory and discretionary
functions as per the provisions of the TN ULB Act, 1998, and provides various specified civic
services/infrastructure facilities to the citizens of the town. Apart from the ULB, there are
other Government departments and their directorates with development related
responsibilities and functions. The following table provides an insight into the development
related responsibilities and functions of various Government departments/institutions in the
region which have a direct bearing on service provision and delivery:

Table 16.1: Development Related Responsibilities and Functions of Various State Government Departments / Institutions
Sl. Name of the Department/ Responsibilities and Functions
No. Institution
1. Local Planning Authority, ƒ LPA was constituted under the Town & Country Planning Act, 1971.
(LPA) ƒ Responsible for development of Local Planning area.
ƒ Preparation of interim, comprehensive and zonal development plans.
ƒ Enforcement of the provisions of the development plan, zoning regulations and
planning and building standards by way of issuing permissions for construction of
buildings.
ƒ Preparation of development schemes and its implementation.
ƒ All Town planning functions, development controls and building / layout sanctions.
ƒ Principal objectives of the authority include creation of housing stock, creation of
commercial complexes, improvement of city level infrastructure, environmental
improvement, parks and plantations in colonies, blocks, institutions and roadsides.
2. Public Works Department ƒ Responsible for construction, repair and maintenance of buildings and other related
(PWD) structures financed from the state and capital budget allocations of the GoTN.
ƒ Also responsible for ensuring that no encroachment or structure, whether
temporary or permanent is erected on the land and property under the control of
PWD. It is also responsible for eviction of such encroachments as per the GoTN
rules.
ƒ Maintaining a register of land, buildings and properties belonging to the GoTN and
under the administration of PWD.
3. Highways Department, ƒ Responsible for construction, repair and maintenance of roads, bridges, flyovers
and other related structures financed from the state and capital budget allocations
of the GoTN.
ƒ All major arterial roads and link roads that enable links to other parts of the district
and state are under the control of the Highways department.
4. Tamil Nadu Water Supply and ƒ Responsible for construction and maintenance of water supply (combined),
Drainage Board (TWAD) sanitation and sewerage schemes on behalf of local bodies at ULB cost and in
cases of CWSS, appropriate bulk supply charges.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 166

Sl. Name of the Department/ Responsibilities and Functions


No. Institution
5. Water Resources ƒ Responsible for maintenance of major rivers / tanks/ irrigation canals and
Organization, (WRO), GoTN construction and maintenance of major dams including Rain water Harvesting
Works under the ownership of PWD within the state.
7. Tamil Nadu Pollution Control ƒ Responsible for pollution control and environmental protection
Board, (TNPCB) ƒ Dealing with environmental monitoring, certification/clearances and pollution control
in the State
ƒ Also undertakes environmental planning studies, district profiles and environmental
management plans
8. Directorate of Town & ƒ Advises the GoTN on matters pertaining to urban and regional planning
Country Planning, (DTCP) ƒ Supervises the functioning of the respective Local Planning Authority
9. a) Industries Department, ƒ Responsible for planning and establishment of industrial zones in the State.
GoTN ƒ Responsible for development of industrial estates and industrial areas in districts,
b) Small Industries creation of industrial infrastructure and amenities there in.
Development Corporation
(SIDCO), GoTN
10. Tamil Nadu Tourism ƒ Responsible for identification and development of tourism importance sites,
Development Corporation, publicity and development of infrastructure facilities. Arrangement of different
(TTDC) tourism packages covering different tourist sites.
11. Tamil Nadu Slum Clearance ƒ Develops improvement schemes for notified/regularized slum settlements in the
Board, (TNSCB) state of Tamil Nadu; and
ƒ Infrastructure provision is financed through loans and grants from GoTN and GoI.
12. Tamil Nadu Housing Board, ƒ Responsible for construction of Group tenements and individual houses for Low,
(TNHB) Middle and High-Income Groups.
13. Tamil Nadu Electricity Board, ƒ Responsible for provision of electricity and maintenance within the state.
(TNEB)
14. Tamil Nadu State Transport ƒ Responsible for provision of transport facilities through operating buses to the
Corporation, (TNSTC) various destinations within state and to neighbouring states as well.
ƒ Responsible for administration and maintenance of buses owned by the TNSTC.
15. Hindu Religious and ƒ Responsible for administration and maintenance of Temples within the state of
Charitable Endowments Tamil Nadu.
Administration Department,
(HR&CE), GoTN
16. 1. Archaeological Survey ƒ Responsible for identification, protection and preservation of ancient monuments of
of India (ASI), GoI national and state importance.
2. State Archaeological ƒ Also responsible for excavation of new sites of archaeological importance.
Department, GoTN
Source: Analysis

Following table provides an insight into the institutional responsibilities, including the roles
played by the private sector for various urban infrastructure and services:

Table 16.2: Institutional Responsibility - Urban Infrastructure


Urban Infrastructure Planning and Design Construction Operation and
Maintenance
Water Supply Local Body/TWAD Local Body/TWAD Local Body
Sewerage Local Body/TWAD Local Body/TWAD Local Body
Sanitation Local Body Local Body Local Body
Storm Water Drainage – PWD/WRO PWD/WRO Local Body
Major Drains & Canals
Storm Water Drainage & Related Highways Department Highways Department Local Body
Structures along major
roads/highways
Storm Water Drainage – Local Body Local Body Local Body
Minor Drains
Solid Waste Management Local Body Local Body Local Body with Private
Sector Participation
Roads (including Flyovers) - Highways Department Highways Department Highways Department
Major Roads
Municipal Roads (including Local Body Local Body Local Body
Flyovers) - Minor/Internal Roads
Street Lighting Local Body Local Body Local Body with Private
Sector Participation
Source: Analysis

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 167

16.2 PROJECT FORMULATION


Pursuant to identification of the required investments, development of Detailed Project
Reports is an important activity that will essentially jump-start the pre-implementation
process. The following recommendations are made to ensure effective project formulation:

ƒ A “Project Formulation & Design Coordination Committee” at the regional level to cover
all the identified ULBs may be instituted which may be composed of senior engineers
from relevant departments, boards and experts who are involved in related engineering,
research and development activities
ƒ A central design database shall be developed by the Committee containing the following
information:
ƒ Design infrastructure (specifications and drawings) from earlier contracts and on the
existing system.
ƒ Design information on the proposed improvements.
ƒ Details and data on surveys and field investigations performed (topographical/
geotechnical /traffic volume counts, etc. as applicable).
ƒ The aforementioned database shall be upgraded and validated into a “Project
Implementation and Commissioning Database”, which is explained in the following
section.
ƒ The Committee shall also ensure efficient and reliable data sharing between the various
entities that are involved in preparation of the projects for subsequent implementation;
this measure is intended to mitigate and possibly prevent/ significantly reduce future
rework and ensure timely implementation in a cost effective manner.
ƒ It is also recommended that the aforementioned Committee be involved in the
implementation stage to ensure that the design intent is conveyed into system
implementation, operation and maintenance.

16.3 PROJECT MANAGEMENT


It is recommended to appoint a Project Management Consultant (PMC) who will be entrusted
with, but not necessarily be limited to, the following responsibilities:

ƒ Overall project management including financial (specific to project-related investment)


management.
ƒ Field coordination of capital works between the client, contractor and design consultant
to ensure that the approved design intent is conveyed into implementation and that
system operation reflects the same.
ƒ Quality control and specification compliance in all spheres of equipment, labour, material
and construction methods.
ƒ Verification and provision of critical decision-making support and recommendations on
change orders and/or physical contingencies.
ƒ Facilitate approvals from pertinent authorities for implementation, commissioning and
licenses to operate.
ƒ Enforce stringent adherence to an Environmental Management Plan that should be
developed specific to each project/sectoral improvement.
ƒ Facilitate creation and operation of a “Project Implementation & Commissioning
Database” which shall contain at a minimum, the following information:
ƒ All information from the Central Design Database;
ƒ Documentation pertaining to the present project:
ƒ Design
ƒ Specifications
ƒ Drawings
ƒ Change orders
ƒ As-built drawings
ƒ Communication/correspondence files.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 168

ƒ It is also imperative for the Project Management Consultant (PMC) to perform the
aforementioned responsibilities to the highest degree of quality since this database will
be the ultimate record of the project for future upgrades/modifications.
ƒ Specific attention needs to be paid to documentation/correspondence files since these
files will provide future insight to the past chronology of events, issues, resolutions and
other relevant information.
ƒ The PMC must also facilitate and assist in implementing a system for sequentially and
chronologically appending future modifications to the database, so that all changes made
are accurately reflected and available for future reference.
ƒ The PMC should involve the ULB officials in the process so as to take up further such
projects bythemselves.

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 169

17
THE WAY FORWARD
17.1 TASKS SO FAR COMPLETED
Phase I: As a first phase activity of the assignment, the study team introduced the study for
preparation of CDP for Sathuvachari to all Stakeholders in the project area, detailed out the
concept and framework of CDP, methodology proposed by the study team, framework for the
consultative process etc., through discussions and at the end, conducted the first Workshop.

As a separate activity, the study team provided Data Collection Formats (DCF) to the
concerned ULB officials. Discussions were also held as to how to assess the gap between
demand and supply on various fronts. An Inception report of present scenarios in various
development sectors and a draft Vision Statement was made involving the stakeholders and
a report submitted. Subsequent to the submission of the report, a review meeting was
convened in the town by the RDMA in the town and the inception report prepared by the
consultants was then approved.

Phase II: A Second Regional level Stakeholders’ Workshop was organized subsequent to
submission of the Inception Report. During this second workshop the study team had
detailed out the outcome of Inception Report and also evolved a framework for further
consultations. The issues identified in various sectors of development of Sathuvachari town,
were presented and the “Vision Statement” for the town for a horizon period of ten years was
also derived and finalized in consultation with the stakeholders during this workshop.

The draft ‘Vision’ arrived in the first workshop was finalized and the broad mission / focus
areas were identified during the consultation with stakeholders then. The study team also
formulated a ‘Strategic Framework’ and identified ‘objectives’ under each of the focus areas,
‘primary strategies’ and also ‘supporting strategies / actions’ needed to achieve the ‘Vision’.

In addition, the study team prepared a list of projects to be taken up, based on the strategies
evolved, for achieving the ‘Vision’ envisaged. The list of projects was also derived through
consultations with elected representatives, ULB officials and other non-government
organizations in the field.

Sectoral investments for these projects and the ‘Capital Investment Needs’ of the town have
been assessed and the ‘Capital Investment Program’ (through a consultative process) was
evolved based on Capital Investment Needs of Sathuvachari Town for the listed projects. In
continuation an ‘Asset Management Plan’ covering O&M of services and land assets vested
with the ULB is also drafted. The study team has also undertaken the Environmental and
Social Assessment of the listed projects. All these inputs under Phase II form the
Intermediate Status Report for Sathuvachari.

Phase III: Findings of the aforementioned Intermediate Status Report for Sathuvachari has
been presented to the review committee members and obtained approval for the same.

After finalizing the projects / actions required for the development of Sathuvachari town, a
Financial Operating Plan (FOP) has been evolved for next 10 years incorporating the above
and it is included in this Draft Final Report (DFR). DFR also highlights the revenue
enhancement measures, sustainable investment mechanism, O&M requirements and debt

Community Consulting India Private Limited


City Development Plan for Sathuvachari Town Draft Final Report
Vellore District, Tamilnadu 170

servicing requirements based on project sizing. Also attention has been given to cover
project implementation and action plans for the identified capital investments.

For the successful implementation of the identified projects, an implementation mechanism,


type of technical assistance required, role and responsibilities of each Stakeholder has been
arrived at Third Stakeholders Consultation process. Also reform measures for an effective
governance and financial management are suggested in this Draft Final Report along with a
Draft MoA.

17.2 THE WAY FORWARD


After the submission of this Draft Final Report, findings and proposed capital investments
would be presented and discussed in the review meeting. A Fourth workshop involving the
review committee members, ULB and relevant stakeholders will also be organized in this
regard. Comments, suggestions and modifications obtained from review comments will be
suitably incorporated in the Final Report and presented to pertinent authorities, including the
ULB Council, for approval.