You are on page 1of 29
Ygl _s.t jL_alf yialg EMIRATES VALLEY CONTRACTING Ref.: EV/Cons/Q/055/2018 30/08/2018 M.S\ Renders Engineering Consultants Dubai, U.A.E. P.O. Box 96386 Tel. No.: 04 252 1611 Fax. No.: 04 252 1633 Dear Sir, Project: (G+4+ROOF) LABOR ACC. On Plot No. 284-0184 at Alttay For Mr. Mohamed Abdulrahman Ali Nagi Alzarouni & Others SUB: Tender Offer Thank you for inviting Emirates Valley Contracting L.L.C. to submit an offer for the above mentioned project. We enclose for your kind attention our best offer for the sum of AED. 12,995,410.00 (Only Twelve Million Nine Hundred Ninety-Five Four Hundred Ten Dirhams). Including all works listed in your drawings as per the attached detailed enclosed Bill of Quantity and in accordance to your specifications issued along with this tender. Our quotation excludes any Governmental or Master Developer fees. We trust the above meets your requirements, and we are looking forward to work for you in this project. Yours Truly, Tel: +9714 2861336 Fax: +9714 2861339 P.0.Box 79965, Dubai - UAE BILLNO.1 Description ‘The Contractor shall notify the authorities and the police of his activities and shall tske all necessary action and precautions as, required with respect 10 road usage, public safety and any particular restrictions to be observed. Roads and access ways shall be kept in clean conditions and clear for public access and usage. Any damage shall be immediately repaired and at the end of the Contract roads and access ways, including footpaths, etc. shall be reinstated to their original condition. “The Contractor shall include such sums, as he considers necessary to cover his obligations, liabilities and services under the Conditions of Contact. DIMENSIONS ‘Any work which has been manufactured from drawing dimensions ‘without a physical check onsite, and subsequently does not fit in place or does not provide sufficient tolerance will be adapted or replaced as direcsed by the Engineer. The Contractor will be erirely responsible for al expenses and delays due to rectification ‘work or replacements. ‘Sign board Contractor to install and erect ZNO. OF project signboard of the design as per drawing (size 12*6 ft consultant board), ‘The signboard should be erected on steel posts including, night Tights sm ‘The Contractor shall eet such site howrdings a5 are necassry 10 cnelose the sito of tho Works. The hoarding construction shell be accepable to the Municipality and be t© the approval of the Engineer. Provide lockable gates. and adapt’ to suit the CConiracior’s operations. TEMPORARY OFFICE ACCOMMODATION FOR THE ENGINEER ‘The Contractor shall provide and maintain an air-conditioned office on the site with telephone, fax and office furmiture for the ‘the consultant Engineer and his staff. To Engineer approval ‘The Contractor shall provide meeting room with big table and & chairs, Total PRELIMINARIES Unit | Qty. Rates Total tem 10,000/,| = 1 0ce] tem 00,000} tem INCLUDED tem Tem 50,00CO/\- 120,00 — tem lem J0,000/|- pus |3!70a)) SH eters SA. pupar-ta. Ror BILLNO.1 ‘PRELIMINARIES Description Unit Qty. Rates Dhs Total STING. ‘The Contractor shal allow for ascertaining the position of any live services within the existing building and within the confines of the site and for accurately marking such services of a site layout ravings, two copies of which shall be submitted to the Engineer for record purposes. Any services found must not be disturbed but shall be reported to the Engineer. The Contractor will be held responsible for fully maintaining all existing services and drainage to other premises during the progress of the works and shall take steps to prevent interference with or interuption of it. No diversion of such services, etc. shall be carried out without wr insirections from the Engineer and any temporary disconnection shall be done at such times as may be directed by the Engineer. ‘Any accidental damage must be reported to the Engineer immediately and the Contractor shall pay for any charges incurred for repairs and reinstatement SITE ADMINISTRATION ‘The Contractor shall provide sufficient approved staff on site to perform the administrative duties involved in executing the Contract. Such staff shall be properly qualified to perform their respective duties and shall not be removed from the site or replaced without the prior permission ofthe Engineer. SECURIT} ‘The Contractor shall allow for protecting the Site and Works from unauthorized entry ‘The Contractor shall control the labor foree to ensure that they do not cause a mulsance or trespass onto unauthorized areas and ‘adjacent properties “The Contractor shall provide all necessary watching and lighting by day and by night to protect all public and private traffic on and inthe vicinity of the Works. ‘The Contractor shall take all precautions to prevent the outbreak of fire nd shall provide adequate firefighting appliances on site at stetegic and clearly defined points to the approval of the Engineer. Item tem Item Item Item Item 10,000 20008 20,000, Total 2 92,000,

You might also like