REQUEST FOR INSPECTION

Project Name Y COMPLEX PROJECT Ref. No : RFI / / SP /


Contractor MYANMAR D & C
Request Date
Solider Pile Works
Subject
( Position, Drilling, Depth & Vertical, Casting, H-Beam Installation)
Pile Ref. No Solider Pile H-Beam 300x300x94 kg/m with Bored Hole 600mm

Based on Specifications, Approved Drawings, Method Statement


Date & Time for Date :
Inspection Time :

BORING DETAIL CONCRETE DETAIL


Bored Hole Diameter (mm) : Concreting Method : Tremie
Casing Top Level : (+GL) Concrete Grade (f'cu) : 15 MPa
Ground Level : Concrete Volume Theoretical
Design Toe Level (m) : (-GL) (m^3) Actual
Actual Toe Level (m) : (-CL) Concrete Supplier :
Penetration Length (m) : (-CL) No. of Test Tubes Taken :
Design Pile Length (m) Time Concrete Started :
Actual Pile Length (m) Time Concrete Ended:
Concrete Top Level (m) : (-CL) Stabilising Fluid : Polymer
Casing Length (m) : Coordinate Design Actual
Time Boring Started : X (mm) :
Time Boring Ended : Y (mm) :
H-BEAM DETAIL
Steel Grade : H-Beam Top Level :
Yield Strength (Fy) : Time Installing Started :
Dimension : Time Installing Ended :
Length(m) :
MYANMAR D & C FUJITA CORPORATION
Prepared By Confirmed By Checked By Approved By
Name: Name: Name: Name:

Date : Date : Date : Date :

Signature: Signature: Signature: Signature:

Note: 01 original for the Client, 01 hardcopy for the Contractor,


Acceptance on inspection request shall be given to the Contractor,signed by the Client
INSPECTION SHEET
Request No: RFI / / SP /
Date:
Work item: Pile Position
Ref. Pile No :
Location :
Based on: Specifications, Approved drawings, Method Statement

Sketch:

Design Actual Difference


Description Specification Tolerance Evaluation
(mm) (mm) (mm)

1. Verify pile Centerline ~ Offset Peg 1 OK/ NOT OK


location prior +/- 75mm
setting of casing Centerline ~ Offset Peg 2 OK/ NOT OK

2. Check the Easting OK/ NOT OK


position of Coordinate +/- 75mm
installed casing Northing OK/ NOT OK

Length (mm) OK/ NOT OK

Diameter (mm) OK/ NOT OK


3. Casing
Thickness (mm) OK/ NOT OK

Top Level ( GL+) OK/ NOT OK

Remark:

Acceptance

Submitted By Myanmar D&C Signature Checked By Fujita Corporation Signature

Name : Name :

Date : Date :

Time : Time :

FUJITA CORPORATION
INSPECTION SHEET
Request No: RFI / / SP /
Date:
Work item: Quality of Polymer Slurry
Ref. Pile No :
Location :
Based on: Specifications, Approved drawings, Method Statement

Sketch:
Water Supply from Silo

Mixing Polymer

Polymer Slurry Tank Drilling Borehole

Treat Polymer recovery

Polymer Slurry Tank Casting Concrete

Polymer Flow Chart

Density Viscosity Sand Content


No. Test Location Date & Time PH Value Evaluation
(g/ml) (sec) (%)
Standard values > 1.01 32-70 8-11.5 Less than 1%

1 Before Drilling (Tank) OK/ NOT OK

2 During Drilling (10 m) OK/ NOT OK

3 Before Casting OK/ NOT OK

*Polymer mix design is (1.0-1.2)Kg in 1000 Litre of water for normal soil conditon.
Remark:

Acceptance

Submitted By Myanmar D & C Signature Checked By Fujita Corporation Signature


Name : Name :
Date : Date :
Time : Time :

FUJITA CORPORATION
INSPECTION SHEET
Request No: RFI / / SP /
Date:
Work item: Drilling Depth & Diamater & Vertical
Ref. Pile No :
Location :
Based on: Specifications, Approved drawings, Method Statement

Sketch:

Casing Top Level


GL
Casing
Ground Level

Penetration Length
Pile

Started
Boring Time
Ended

Total Drilling Time


Pile Toe Level

No. Description Design Actual Difference Remark


1 Casing Top Level
2 Ground Level
5 Pile Toe Level
6 Penetration Length
7 Pile Length
8 Thickeness of Sediments
9 Penetration Length after cleaning

Remark:

Acceptance

Submitted By Myanmar D & C Signature Checked By Fujita Corporation Signature

Name : Name :

Date : Date :

Time : Time :

FUJITA CORPORATION
INSPECTION SHEET
Request No: RFI / / SP/
Date:
Work item: Pouring Concrete
Ref. Pile No :
Location :
Based on: Specifications, Approved drawings, Method Statement

Sketch :

Slump Pouring Time Concrete Volume Concrete Depth Tremie Length


No. Truck No. Arrival Time Other
(mm) Start Finish Unit Total Comp. Actual 3.12 2.25 0.75
1
2
3
4
5
6
7
8
9
10
Total Concrete Volume (m^3) : Total Length of Tremie Pipe
Final Concrete Casting Level : Concrete Supplier
Number of Concrete Samples Taken: Concrete Slump
*Polymer level should be kept 2~3 m below top of casing
Remark *Tremie pipe must be sunk into concrete at least 3 m.

Submitted By Myanmar D & C Signature Checked By Fujita Corporation Signature


Name: Name:
Date: Date:
Time: Time:

FUJITA CORPORATION
INSPECTION SHEET
Request No: RFI / / SP /
Date:
Work item: H-Beam Installation
Ref. Pile No :
Location :
Based on: Specifications, Approved drawings, Method Statement

Sketch:

H-Beam Top Level


GL Casing Top Level

Casing Ground Level

Penetration Length Concret Top Level


Pile

Pile Toe Level

No. Description Design Actual Difference Remark


1 Casing Top Level
2 Ground Level
5 Pile Toe Level
6 Concrete Top Level
7 H-Beam Top Level

Description Specifications Evaluation Remark


Check H-Beam Quality As per approved MOS & Drawing OK / NOT OK
Check Dimension of H-Beam As per approved MOS & Drawing OK / NOT OK
Check Welding Quality for Joint As per approved MOS & Drawing OK / NOT OK
Check Centre of H-Beam As per approved MOS & Drawing OK / NOT OK
Check Verticality of H-Beam As per approved MOS & Drawing OK / NOT OK

*Attached Shop Drawing

Submitted By Myanmar D & C Signature Checked By Fujita Corporation Signature

Name : Name :

Date : Date :

Time : Time :

FUJITA CORPORATION