Introduction.....................................................................................................................................................4
AF
Housing............................................................................................................................................................10
Community..................................................................................................................................................14
Connectivity................................................................................................................................................18
Commercial..................................................................................................................................................26
Community Partners
T
• Patrick McVerry, City of Kalamazoo Parks & • Jodi Michaels, Vine Resident
Recreation • Jeremy Cole, Neighborhood Builders LLC
• Kim Cummings, Building Blocks • Debra Miller, City of Kalamazoo CPED
• Rebecca Degraw, Building Blocks
• Matt Lager, Kalamazoo Neighborhood Housing
Vine Neighborhood Association
•
•
•
•
•
•
•
Services (KNHS)
AF
Christina Anderson, City of Kalamazoo CPED
Erin Denay, Open Roads Bike Program
Ryan Shank, City of Kalamazoo Public Safety
David Boysen, City of Kalamazoo Public
Safety
Shaun Wright, Community Home Works
Steve Walsh, Vine Neighborhood Association
James Baker, City of Kalamazoo Public
(VNA) Board
•
Services
• Matt Lechel, OnePlace
• Sally Reynolds, Douglas & Son, Fruit of the
MSU Planning Practicum Class
Vine • Kayla Turner
DR
• Jason Morris, Douglas & Son • Brad Gately
• Carrie Drake, Building Blocks • Alex Riguardi
• Chris Moore, Kalamazoo Collective Housing • Sean Walbridge
• Emily Kastner, Read and Write Kalamazoo • Hunter Whitehill
(RAWK)
• Sonja Dean, Local Initiative Support Vine Residents
Corporation X Number of residents helped inform this plan.
• Med Blinkiewicz, Kalamazoo Youth Development
Network (KYD Net)
City of Kalamazoo
• Kevin Ford, City of Kalamazoo CPED
• Sharon Ferraro, City of Kalamazoo CPED • Kathleen Reilly, City of Kalamazoo CPED
• Peter Aerts, City of Kalamazoo Parks & • Amanda Cockroft, City of Kalamazoo CPED
Recreation
3
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
Introduction
During the Imagine Kalamazoo 2025 (IK2025) planning process, neighborhood plans were identified as a need.
Neighborhood plans allow the neighborhood to focus on their neighborhood vision and realize the community’s
T
Strategic Vision with small-scale or focused planning work. This resident driven process allows neighborhoods to
take control of their future. The neighborhood planning process as laid out in the 2025 Master Plan does not have a
required focus beyond aligning with the Strategic Vision and 2025 Master Plan goals. Through this process residents
are encouraged to think about everything that impacts their daily wellbeing and futures. The resulting plans are
comprehensive and leverage collaboration to achieve results.
The Vine Neighborhood is the oldest and most central of the neighborhoods. It is south of downtown, east of Western
AF
Michigan University and west of Bronson Methodist Hospital. In total, Vine is approximately 1 square mile in size. Vine
Neighborhood has a population of approximately 5,572 (Esri Business Analyst, 2017), and is one of the most dense
neighborhoods in the City.
DR
4
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
T
AF
DR
Table 1.4 Neighborhood Historical Timeline: Generated with help from Sharon Ferraro, Historic Preservation Coordinator, and
Steve Walsh, Executive Director of VNA (2018)
5
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
Neighborhood Planning Process
January February & March April May - August September 2018 & Beyond
T
previous community neighborhood goals & plan goes action steps
plans & to create plan neighborhood to Planning to turn the
engagement neighborhood plan Commission vision into
vision reality!
1 2 3 4 5 6
1
VINE
VILLAGE
PLAN
REVIEW
IK 2025
ENGAGEMENT
SURVEY LAUNCH AF
COALITION
FORMED
ENGAGE
COMMUNITY
MEETING
FOCUS GROUPS
ALIGN WITH
STRATEGIC
VISION
POP UP
ENGAGEMENT
YOUTH
ENGAGEMENT
EVENT
CONFIRM
ONLINE
SURVEY
MOMENTUM
BUILDING
PROJECT
CELEBRATION
EVENT
CELEBRATE
AMENDMENT
TO MASTER
PLAN
QUICK WIN
PROJECT
WORK
ACT
TOGETHER
TO COMPLETE
ACTION
STEPS
VINE VILLAGE—
for improvement. This survey feedback combined with the A VIBRANT COMMUNITY,
FULL OF POSSIBILITIES
Vine Village Plan as well as Vine Neighborhood IK2025
input established a clear starting point for discussions.
6
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
parks & gardens, walkability, on-street parking, defining
vine, and 2018 construction projects. Vine also held focus
group meetings to dive deeper into topics that weren’t
discussed at the community meeting, but were identified as
topics that needed to be discussed at that meeting. Focus
T
groups were help on the topics of housing and youth.
4
AF
drafted to be Specific, Measurable, Achievable, Realistic,
and Timely (S.M.A.R.T.) and align with the Strategic Vision.
The goals and actions were then structured into a draft of
the neighborhood plan.
7
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
Strategic Vision Alignment
SP CC IPP ER SC YD CN SD EV GG
Environmental Responsibility
Strategic Vision Goal
Youth Development
T Good Governance
Shared Prosperity
Economic Vitality
Safe Community
Connected City
Imagine Vine Neighborhood Plan Goals
Housing
Increase housing options
AF
Create a stable supply of affordable housing
•
•
8
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
SP CC IPP ER SC YD CN SD EV GG
Environmental Responsibility
Strategic Vision Goal
T Youth Development
Good Governance
Shared Prosperity
Economic Vitality
Safe Community
Connected City
Environment, Parks, & Food Access
AF
Increase access to healthy food options
•
•
Commercial
Stimulate local business growth and economic vitality in
•
Vine
9
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
Housing
VISION: Develop housing opportunities that meet the needs of Vine’s diverse population.
T
affordability, and keep some of the younger
residents in the neighborhood.
2
Create a stable supply of affordable 12.9% Renter
housing
Vine seeks to implement tools and programs that 14% Owner
Renter occupied
Occupied
Owner Occupied
3
for residents.
AF
will create a stable and affordable housing supply
Affordability in Vine
Vacant
Vacant
10
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
T
Housing Goals & Actions ER CN SD
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
F
Increase Housing Options
Attend zoning meetings to
Change zoning to allow for Attend zoning meetings to provide input and show support, Change zoning to allow for
2019 Time
accessory dwelling units provide input and show support help in outreach and education accessory dwelling units
to residents - VNA
A
Encourage mixed use developments Attend zoning meetings to provide input and show support,
uses in nodes and commercial 2019 Time
in commercial areas provide input and show support help in outreach and education
corridors
to residents - VNA
R
Research tools to help create and
Complete research on different Complete legal and economic
maintain affordable housing (CLT,
tools that may be used in the analysis to understand feasibility Mid Time
inclusionary zoning, Historic TIF
Vine - VNA of tools
District etc.)
Implement tools that research Attend any relevant community Collaborate with City to Implement the tool that is
Mid $
uncovers meetings and show support implement the chosen tool - VNA decided on
D
Develop partnerships to help
Take advantage of job training
Expand access to job training increase awareness and access Explore partnerships to increase
programs, provide input on Long $$
programs to existing job training programs - job training access for residents
barriers to participation
VNA, Metro
Support expansion of programs that Increase awareness of existing Provide information on programs
Help inform neighbors of
promote homeownership (rent-to- programs through outreach to once a year by including in Mid $
programs that are available
own, loans, etc.) residents– KNHS, VNA mailing such as from the curb
11
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
T
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
Enact a Truth-in- Sale of Housing Provide input and support Provide input and support
Draft and enact ordinance 2020 Time
(TISH) ordinance. ordinance enactment ordinance enactment
F
Promote and expand participation Develop partnership to help
Ensure staff are aware of
in home buying programs that promote program and attract
programs supporting purchasing Mid $
encourage employees of large new residents - VNA, Bronson,
a home in the City
Kalamazoo companies to buy in Vine WMU, K College
Develop tools to assist property owners in understanding, navigating, and funding maintenance or improvements to their homes;
A
including historic structures and energy efficiency
Partner with other historic
districts to create informational
Utilize the hub to get needed materials
Work with other historic information, tell neighbors about • Create list of contractors Provide information and other
R
neighborhoods to create central hub the resource, provide feedback • Explanation of approval resources available to historic 2019 Time
of historic district information on additional information that process with steps district home owners
would be helpful • Tips and tricks for
maintaining property
-VNA
D
Develop informational material on
Provide feedback on processes Gather resident feedback on Take information collected and
processes for external maintenance
involved in housing that are current process and experience, create one-page descriptions and Mid Time
and distribute (existing simple steps
confusing or unknown share information with City or how-tos
how-tos)
12
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Ambassador Program to create
Organize volunteers to be “wizards” and supply them with
neighborhood knowledge on fixing Volunteer to be a “Wizard” Mid $$
“Wizards” -VNA the information needed to be an
up homes and going through historic
effective ambassador
district process
F
Expand marketing and outreach
Expand programs to assist Participate in programs and Support expanded outreach,
to ensure residents know about
homeowners with installation of inform neighbors of the include information in Welcome Short $
existing opportunities – CHW,
energy efficient implementations opportunities packets
VNA
A
2018 Vine Historic Districts
D R Legend
National Historic District
Local Historical District
Vine Neighborhood Boundary
Parcel
13
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
Community
VISION: Vine offers unique opportunities for all ages to feel a part of the Vine community. Residents are
aware of all community news and events.
Support Youth Development and create Continue to build and maintain a sense
1 opportunities for youth voice
4 of community in the neighborhood and
neighborhood safety
T
Vine has slowly been gaining more and more
When asked about Vine, residents often say that
families with kids or young couples. To ensure
the community is one of the biggest attractions
that all residents needs and interest are met
to living here. Vine wants to continue to build that
Vine is looking to better understand what youth
social capital and support efforts that create an
want and to create opportunities for meaningful
even stronger sense of community and promote
engagement.
neighborhood safety.
2 AF
Promote local arts and music
Vine has a vibrant community full of artists talented
in many medias, including infamous house music
shows in basements. Vine sees this as a true asset
and wants to help it thrive, and leverage it to
encourage continued investment in the community.
Enrollment in Vine
Graduate
Graduate or Professional
Professional Program
or
Program 379
379
College
College 1344
1344
Improve communications between
3 residents and Vine Neighborhood Grade 9-12
Grade 9-12 73
73
Association
Vine wants to ensure that Vine Neighborhood Grade 5-8
Grade 5-8 77
77
Series1
SOURCE: ESRI 2011-2015 ACS
HAPPENING NOW
Vine Neighborhood Association
has partnered with the
Kalamazoo Youth Development
Network to better understand
how to serve Vine youth.
14
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
Community Goals & Actions SP CC IPP YD CN SD EV GG
T
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
F
2019 Time
youth representative. Board • Identify Vine youth to sit on
board - KYD Network, VNA
A
Engage RAWK as a current neighborhood Organize writing contest to show-off
Encourage youth to participate,
asset and work jointly to hold Vine Youth talent in the Newsletter - Short Time
volunteer to support event
neighborhood writing contest for youth. RAWK, VNA
R
Coalition composed of one undergraduate Volunteer to sit on the board VNA Short $
student each from WMU and K College. • The Coalition should identify
projects that will build student
and resident relations
D
• Develop relationship with El Sol
Support El Sol Elementary School through - KYD Network, VNA
inquiry of needs and formation of volunteer • Work with VNA and KYD Mid Time
network. Network to identify ways that El
Sol could be supported - El Sol
Work with WMU and K student Develop relationship with student Assist with identifying the
organizations to host events in Vine that Volunteer to help organize and groups and plan event(s) - VNA appropriate permits and
Long $
welcome students (especially those new run events Work with VNA to host student help shepard through
to Kalamazoo) event(s) – RSOs process
15
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
neighborhood partners public right-of-way
• Submit art • Install winning artwork in and other event
Hold an art contest in the neighborhood. Short $
• Volunteer to help with event Neighborhood (either at VNA/ related permits
partner locations or in public • Assist with permitting
space) - VNA for permanent art
F
installation as needed
A
art on city approved surfaces and other infrastructure Mid $
infrastructure as canvasses for local art.
-VNA to have artistic elements
installed within certain
parameters
Provide input on space design Assist with site plan review
Design and implement a neighborhood • Identify sites, create design
R
and community needs for the process and help shepard Long $$$
space for gatherings. proposal, and implement - VNA
space through
D
in charge of social media and Mid Time
presence for Vine Neighborhood. platforms to support growth in VNA
communications - VNA Board
presence
Organize a volunteer team to welcome Volunteer to be a part of the Organize welcome team - VNA
new residents to the neighborhood with a welcome team Develop welcome kit and distribute Short Time
‘welcome kit’. to Vine residents – Welcome team
Renovate the VNA building to include a Organize fundraising campaign, Assist with navigating
space open for public access M-F, 8am- develop site plan, and complete site plan review and help Long $$$
5pm. renovations shepard through process
16
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Continue to engage house leaders on Continue to engage house leaders
Volunteer to help with clean- Coordinate refuge pick-up
having safe parties and neighborhood and organize neighborhood clean- Short Time
ups for clean-ups
clean-ups ups - VNA
Create community events (parades, Organize and host events with Assist with any permits
F
Volunteer to help organize or
festivals, concerts, etc.) to bring neighbors community partners - VNA, or processes needed for Mid $$
staff events
together community partners events
A
lights, art) to mitigate blight – VNA, Short $
leveraging artist community in Vine while lights, art) to mitigate blight needed
Building Blocks
creating more inviting places
R
complete other place making to install public art, plant
benches on main roads in neighborhood site and install art Mid $$
activities trees or place benches.
to placemake and create identity Build benches, and acquire trees to
Organize an effort to do some Install streetscaping in
place along main corridors -VNA
place making prioritized areas.
D
project you would like to lead in lead efforts that build the sense of Short Time
neighbors together creating social capital
the neighborhood community
17
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
Connectivity
VISION: Vine has clear and safe infrastructure for all users to navigate Vine with ease.
T
Though Vine is almost completely covered with Residents would like to see more infrastructure for
sidewalks, several of those sidewalks are in bikes, particularly north south connections, and
great disrepair and are difficult to pass over in a improved bus stops. This will help residents access
wheel chair or with a stroller. Making repairs to other parts of the City and for Kalamazoo residents
the sidewalk system and the installation of safe to more easily access Vine.
crossings in key locations is one of the top priorities
for Vine residents. Vine 2017 Sidewalk Audit
2 street lighting
AF
Improve Neighborhood safety through
parks.
Create Uniform and easy to understand Total 3,480 Sidewalk squares need repair
4 parking regulations Vine Neighborhood
Vine neighborhood has 22 different parking
regulations. This can be confusing and difficult to
Sidewalk Audit
navigate for residents and visitors. Residents would April 2017
like to see a uniform and comprehensive approach
to parking in the neighborhood.
TOTAL 3,480 SIDEWALK SQUARES NEED REPAIR
T
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
F
leading to the new grocery store, around
Continue to inform VNA of assessment with major Repair and improve sidewalks
schools, and leading to downtown using Mid $$
sidewalk issues as they arise changes or every few years- in target areas
resident and walkability assessment to identify
VNA
target areas.
A
connection to Maple Middle. Middle
Design a safer crossing for pedestrians and Study, design, and install
cyclist at Michigan, Oakland, Stadium and a safer crossing for the Long $$$$
Lovell intersection intersection
R
Crosstown and Park refugee
D
work with public schools to Mid $
Maple Middle other feedback opportunities City application
complete the process
Paint crosswalks and install pedestrian
crossing signs where added visibility is needed Paint crosswalks and install
Mid $
connecting to schools, commercial areas, and signs
parks
19
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Improve neighborhood safety through improved lighting
Prioritize lighting leading to and in the Assist in researching and Install street lights designed to
neighborhood commercial node, schools, submitting grants for shine specifically on sidewalk Long $$
and parks sustainable lighting - VNA and street, in priority locations
F
Install crosswalk reflectors to major
Install cross walk reflectors Short $
intersections.
Create porch light campaign
to encourage neighbors to
Leave porch light on, leave their lights on, research
Encourage home owners to leave porch
A
encourage neighbors to do the funding opportunities to Short $
lights on throughout the night.
same provide porch or yard lights
to residents – VNA, Building
Blocks
Research potential
Limit light pollution by Installing fixtures sustainability or dark sky Install shielded lights
Mid $$
R
that are fully shielded. grants to support shielded throughout the neighborhood
light installation
D
plants - VNA corridors
Organize artists and Assist in getting needed
Plant trees and paint decorative volunteers to paint crosswalks permissions and technical
Short $
crosswalks along Lovell into downtown and acquire and plant trees assistance. Assist in Acquiring
-VNA trees
Install curb bump outs on Westnedge in Complete process to install Work with MDOT to Install
Mid $$
commercial node bump-outs -MDOT bump outs
20
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Work with City and Traffic Board to develop Use resident feedback
Attend traffic board to talk Attend traffic board to talk about
new parking plan for Vine based on to inform new parking Short Time
about parking in Vine parking in Vine - VNA
feedback gathered regulations
Install new signs, inform
Install new signage in accordance with Inform residents of parking
F
residents of new parking Short $
newly created parking plan changes
regulations
A
Install buffered bike lanes Mid $$
Westnedge and Park improvements - VNA
Help inform residents of
Install bike lanes on Vine and Lovell Paint bike lanes Short $
improvements - VNA
Install a protected bike lane or shared use Help inform residents of Install the best option for safe
R
Long $$
path on Howard improvements - VNA cycling on Howard
Install branded wayfinding signage
directing to downtown, the farmer’s
Work with City to design, Provide technical assistance
market, Vine Corners, and campus. Install Mid $
purchase, and install signs and right of acquisition
bike route signs on Forest, Merrill, Davis,
D
and Wheaton
Improve bus stops to include seating, Attend communtiy meetings Improve bus stops with
Support ADA bus stop
lighting, shelters where possible, and to provide feedback on bus informational signs, shelters and Mid $$
improvement
signage with route information. system and stops lighting– Metro
T
A new grocery store will be opening at the southern Vine would like to take advantage of unused
end of Vine. Though this development will greatly spaces to increase access to food. Whether it is in
increase resident’s access to fresh and healthy the tree lawn, in parks, or even on roofs, residents
Mi
Ma
Academy
Devisser
BRONSON PARKhealthy,
growing fresh foods.
access to affordable and healthy foods.
Kalamazoo Mall
South
COLLEGE PARK
South
Saint John
Normal View
Lovell
LOVELL PARK
Monroe
Eldred
Stanwood
AF Bellevue
Rose
Stone
Vine Parks
Locust
an
Mic
hig
ch
iga
n Cedar
in parks and open spaces
in
Mi
Ma
Academy
East Campus
Pearl
Normal Gladys
um BRONSON PARKDevisser
di
n
higaCOLLEGE a Vine is environmentally conscious and would
Kalamazoo Mall
Potter
Mic PARK
St South Walnut
Saint John
likeBurnham
to encourage native plantings to support the
Normal View
Hoffman
LOVELL PARK
Lovell
DUTTON
Oak
Eldred
Stanwood
Bellevue
Stone
Walwood
Locust
n
an
Joh
hig
s
Cedar
es
Mic
Pr
Centra
Van Vranken
Vine
East Campus
Pearl
Potter
St
l
aw
Walnut Ranney
Increase Outdoor recreation
Ott
4
Village
Hoffman Burnham
Osborne
Barry DUTTON
Oak
Walwood
PARK Minor Burr Oak
n
Davis
Joh
Short
s
es
Pr
Centra
Van Vranken
Newton
Eato Wall
Cas
n Austin
Wall
PARK
nt
a
Wheaton
Ke
aw
Ranney
Ott
Village
advantage of the parks to its south, Axtell and
Newell
Osborne
Bra
Short
D
Lo
ng
WESTNEDGE
PO
PARK Forest
Wall
Wall
programming that encourages a healthy lifestyle
nt
Burdick
Wheaton
Ke
N St
Molhoeks
W
oc
kb
Newell
TO
Mc Courtie
Vandersalm Den Adel
ge
Merrill
SS
to
Park
ss
Axtell
Lo
o
O
S
Cr
Bra
nd
R
Lo
AXTELL
N
High
ng
Pioneer
PO
Oa
Forest
CREEK
Burdick
Ca
N St
lh Molhoeks
W
oc
ou
PARK
k
n
TO
br
n
id
Mc Courtie
ow
SS
st
HAPPENING NOW
os
Rose
Lo
O
Cr
d
R
lan
AXTELL
C
High Pioneer
Park
CREEK Emerson
Westnedge
PARK
Balch
Howard Park will reopen in the
Davis Reed
Rose
Emerson
Hillcrest
Westnedge
Bushouse
Stearns
Howard
Reed
Park
Maple
Hillcrest
Maple
was something Vine residents
Bushouse
Stearns
Park
Imagine Kalamazoo.
end Park
Park Vine Boundary
Vine Boundary
22
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
Environment & Food Access Goals & Actions IPP ER CN
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Work collaboratively to fund
Build Hoop house on vacant lot where Volunteer to help build and
and build the hoop house – Help with any site plan needs Short $$
community garden is at 615 S. Westnedge. maintain hoop house(s)
Common Ground, VNA
F
Develop partnerships to
advocate with Westnedge
Collaborate with Westnedge Market to Advocate for fresh foods in the
Market for fresh food options Short Time
incorporate fresh food options. Market
– Farmer’s Market, KVCC,
A
Common Ground, VNA
R
Organize volunteers to carpool
Set up a carpool system for grocery Volunteer to drive or help
to grocery stores – Building Short Time
shopping. manage carpool
Bocks, VNA
Attract food truck(s) for events or on a Create schedule of events in Help connect VNA to food
Short Time
D
fixed schedule. Vine – VNA, partners trucks to create a schedule
23
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
Plant edible landscaping in Develop partnership and Help with any right-of way
underutilized pocket parks, vacant lots, volunteer base to plant and permissions that may be
Volunteer to help plant and
and intersections (including the linear maintain edible landscaping needed Short $
maintain gardens
park at the intersection of Lovell and – Common Ground, Building Assist with any site plan
T
Oakland). Blocks, VNA processes that may be needed
Work with existing gardens
Support existing tool-sharing
and partners to increase Help with any site plan
shed to expand so that residents Use the tool share, volunteer to
F
amount of tools and if needed processes or permits that may Mid $$
collectively own equipment needed for help manage it
additional storage locations - be needed
maintenance of edible landscaping.
Common Grounds, VNA
A
Work with City and residents to
Plant native and/or maintain trees that Assist with tree acquisition and
Volunteer to help plant identify trees and locations for Long $$
provide shading. planting
additional plantings – VNA
R
Implement ‘no-mow’ zones in passive Help spread information about
parks like Westnedge and future pocket no-mow zones and their Create and implement policy Short Time
parks. purpose – Common Grounds
D
Work with WMU and K to
develop standards , distribute
to neighbors, develop program Encourage developers use the
Create recommended landscape
Follow standards once created that helps those interested standards when thinking about Mid Time
standards that promote native species.
change the landscaping at landscaping
their home - WMU, K College,
VNA
24
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Volunteer to help clean-up that will help keep the Long $$$
allow for such uses as fishing, kayaking, or volunteers – Building
ponds clean like preventing
Stand Up Paddle- Boarding. Blocks, VNA
stormwater run-off
F
Install outdoor exercise equipment or Develop partnership with
Use the equipment, provide Install some exercise
establish a fitness trail in Davis Street Park gardens to place equipment Mid $$
feedback on how it works equipment in parks
or other suitable location. – VNA, Common Grounds
A
Organize exercise classes
Increase park programming, incorporating from local nonprofits or
Assist with any permits or
such activities as: yoga, movie nights, businesses to be hosted at
Participate in events permissions needed to use Mid $
environmental education camps, and parks in Vine, Partner with
R
parks for events
outdoor boot camps. local groups to create other
outdoor opportunities - VNA
D
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
25
Commercial
VISION: Vine has thriving businesses and a strong sense of place.
T
Stimulate local business growth and
1 economic vitality in Vine HAPPENING NOW
Vine already has some great businesses and
Midtown Market, a new grocery
continues to gain more, there are some actions store, and Ace hardware are
that can be taken to support businesses and attract moving into 412 Howard – just
new businesses into some of the remaining vacant south of Vine.
2
management.
Neighborhood
AF
particular on the southern edge is storm water
26
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025
Commercial Goals & Actions CN EV
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Stimulate local business growth and economic vitality in Vine
Create a partnership with local
artist and makers to partner Change the zoning ordinance
Change zoning code to allow for the use Time-
F
with businesses to create to allow for projecting signs in 2018
of projecting signs outside of the CBD. $
projecting signs once allowed commercial nodes
- VNA
Create refurbishment program for Explore different funding Explore different funding
businesses that need assistance with options to create a program options to create a program
A
Long $$$
building repairs, maintenance, and façade (maybe a historic TIF district) - (maybe a historic TIF district)
improvements. VNA and set-it up
R
outside of commercial node changes
D
- VNA
Promote walkable mixed use Provide feedback and Provide feedback and support
developments on key corridors, such as support zoning changes at zoning changes at commission Change zoning 2019 Time
Burdick and Westnedge commission - VNA
27
imagine kalamazoo 2025 IMAGINE VINE NEIGHBORHOOD PLAN
ACTION NEIGHBOR PARTNER CITY TIMELINE COSTS
T
Design a new logo for Vine, representing determine if new logo is
Provide feedback on logo Short Time
the new vision needed, develop new logo if
needed - VNA
F
Install banners along Crosstown, Oakland, Create banners and install
Assist with Banner installation Mid $
Howard, and Burdick along main corridors - VNA
A
Organize event, partners, and
Volunteer to help with the Assist with permit process and
Host a city-wide event showcasing Vine volunteers- VNA, Building Mid $
event any permissions needed
Blocks
R
Partner with local historians
to do walking tours, home
Establish a program to reinforce history Attend events, vounteer to tours, and develop story-
Short Time
and stories of Vine. help organize events telling signs to install around
the neighborhood to highlight
D
Vine’s history - VNA
28
IMAGINE VINE NEIGHBORHOOD PLAN imagine kalamazoo 2025