FREQUENCY STABILIZER IN
Montréal, QC, Canada, May 9‐11, 2016
TRANSMISSION SYSTEMS
E. SPAHIC, S. LETZGUS, G. BECK, G. KUHN,
V. HILD
SIEMENS GERMANY
Paper ID112
1
New Energy mix ‐> Grid stability jeopardized
CIGRE‐IEC 2016 Colloquium on EHV and UHV
• Current situation:
Montréal, QC, Canada, May 9‐11, 2016
– Conventional power plants delivering energy & system
requirements
• Future development:
– Significant increase of energy from renewables
– Thermal and nuclear power plants retirements and shut down
due to new environmental policies
• Transmission system stability requirements:
– Frequency control i.e. inertia
– Voltage control i.e. reactive power
– Short circuit power
50,1 50,2
Initial response
Hsys = 36 s
Primary reserve 50,0 Hsys = 21 s
50,0
Secondary reserve Hsys = 16 s
Frequency [Hz]
49,8 Hsys = 11 s
Frequency [Hz]
49,9
49,6
49,8
49,4
49,7 49,2
ROCOF
49,6 49,0
0 5 Time [s] 10 15
‐15 0 15 30 45 60 75 90 105 120
Time [s]
• High frequency drop in case of generation outage today
• In future the ROCOF (df/dt) will be higher and frequency deviation
also (df) since inertia reduced.
• Increase of inertia one of the key issues for the future
3
Future development of inertia – critical!
CIGRE‐IEC 2016 Colloquium on EHV and UHV
• Strong increase of renewables and phase out of classical power
Montréal, QC, Canada, May 9‐11, 2016
generators:
• Significant decrease of system inertia, especially in times with high
renewable penetration
• Similar results for short circuit current and voltage conditions
• Actions necessary!
4
SVC PLUS Frequency Stabilizer ‐> Frequency and voltage stability
CIGRE‐IEC 2016 Colloquium on EHV and UHV
improvement
Montréal, QC, Canada, May 9‐11, 2016
• STATCOM with power intensive storage for short time
• Operations in 4 PQ‐quadrants +/‐50 Mvar and +/‐50 MW for app. 8s
• Significantly smaller footprint (app. 3000 m2 for 50 MVA)
• Significantly lower costs comparing with other technologies
5
SVC PLUS Frequency Stabilizer ‐> significant frequency
CIGRE‐IEC 2016 Colloquium on EHV and UHV
performance improvement
Montréal, QC, Canada, May 9‐11, 2016
• Use Case United Kingdom Summer 2024 “Go Green”, Outage of
HVDC interconnector with France.
50,2
50,0
With SVC PLUS Frequency Stabilizer
49,8
Frequency [Hz]
@500 MW
49,6 With SVC PLUS Frequency Stabilizer
@250 MW
49,4
49,2
Without SVC PLUS
49,0
Frequency Stabilizer
48,8
0 5 10 15 20 25 30 35 40
Time [s]
• Flexible application of the SVC PLUS Frequency Stabilizer ‐> operation
at full power or at e.g. 50%. Different impacts. “Smart” application.
6
SVC PLUS Frequency Stabilizer and Power Oscillation Damping
CIGRE‐IEC 2016 Colloquium on EHV and UHV
• STATCOM can impact (reduce) the POD by changing the reactive
Montréal, QC, Canada, May 9‐11, 2016
power at one of the grid points
• With active power injection/storage the impact on the POD much
higher.
2,5
2,0
1,5
Power [GW]
Without SVC PLUS Frequency Stabilizer
1,0 With SVC PLUS Frequency Stabilizer
Active power from/into SVC PLUS Frequency Stabilizer
0,5
0,0
‐0,5
0 1 2 3 4 5 6 7 8 9 10
Time [s]
• Lower POD and faster dampening with SVC PLUS Frequency Stabilizer
7
SVC PLUS Frequency Stabilizer – Test facility and results
CIGRE‐IEC 2016 Colloquium on EHV and UHV
• Two towers with 1,65 MW total power
Montréal, QC, Canada, May 9‐11, 2016
• Measurement results for active/reactive power
1,2
1,0 Active power
0,8 Reactive power
Power [pu]
0,6
0,4
0,2
0,0
‐0,2
‐0,4
0 1 2 3 4 5 6 7 8 9
Time [s]
8
Conclusions
CIGRE‐IEC 2016 Colloquium on EHV and UHV
• Future networks with increased renewables are facing challenges like
Montréal, QC, Canada, May 9‐11, 2016
lack of inertia
• MMC STATCOM with power intensive energy storage (also called SVC
PLUS Frequency Stabilizer) can actively support the grid
• Based on the proven technologies SVC PLUS and supercaps
• Frequency support is being 50,0
made by releasing active 49,8
power into the grid (for
49,6
frequency dips) or by taking
Frequency (Hz)
active power from the grid 49,4
SVC PLUS FS for
(frequency rise). 49,2
frequency suppport
• Voltage support in steady state 49,0
and during disturbance 48,8
0 10 20 30 40
• Successful lab‐tests with Time (s)
1,65 MW
9