3 GEOTHERMAL DESIGN
3.1 CALCULATE DESIRED CAPACITY
3.2 CALCULATE NECESSARY UNDERGROUND INFRASTRUCTURE
3.3 CALCULATE NECESSARY DEPTH UNDERGROUND
3.4 CALCULATE REQUIRED PUMPING POWER
3.5 SPEC A PUMP
3.6 SPEC A TURBINE TO POWER THE PUMP
6 INSULATION DESIGN
6.1 CALCULATE HEAT TRANSFER VERSUS COST FOR DIFFERENT R-VALUES
6.2 CHOSE A DESIRABLE R-VALUE
6.3 SPEC AN INSULATION TO PROVIDE REQUIRED R-VALUE
6.4 GET COST ESTIMATES FOR REQUIRED INSULATION
6 YIA, DAVID
2 YIA, DAVID VILTERS
2 YIA, DAVID VILTERS
2 YIA
2 DAVID
4 YIA, DAVID
6 KALE, ADAM
4 KALE, ADAM
2 KALE
4 KALE, ADAM
4 JACK, DAVID
4 JACK, DAVID
4 JACK, DAVID
8 JACK, DAVID
2 JACK
2 DAVID
8 YIA, ADAM
10 YIA, ADAM
2 ADAM
6 YIA, ADAM SOLIDWORKS
8 JACK, KALE
2 JACK
5 JACK, KALE
2 KALE
12 JACK, KALE
10 JACK, KALE
5 YIA, JACK
2 YIA ANSYS
2 YIA, JACK
4 YIA, JACK
4 ADAM, JACK NATURAL VALLEY
4 ADAM, JACK
4 ADAM, JACK
2 ADAM, JACK
5 KALE, DAVID
5 KALE, DAVID
10 KALE, DAVID
10 KALE, DAVID