You are on page 1of 1

15700

IS STRINGENT

SPWD WITH

Provide "Vent" &


"Drain" notch at
centre as shown

FLANGE
0.3
If any part is to be deleted, retain the
0.3 part no. and write 'Deleted' in front of it.
OFFSET INSIDE BY 0.3 mm FROM

FLANGE

135 83
10.09.2010 CHK DNG

(Resubmit)
CHK
DNG
C/L of anchor C/L of
bolt away from anchor bolt
base plate-1 closer to
base plate-1

C/L of anchor C/L of


bolt away from anchor bolt
base plate-1 closer to
base plate-1
56: IMPACT TEST(WHERE APPLICABLE), CHEMICAL ANALYSIS(INCL. CARBON EQUIVALENT), PULL OUT TEST OF TUBE
TO TUBESHEET JOINT, MOCK UP TEST FOR TUBE TO TUBESHEET JOINT ARE TO BE PERFORMED FOR THIS EQUIPMENT.
For this exchanger, insulation cleats/rods are
required at shell barrel & shell bonnet T.L. only.
Item No.67, 68, 69, & 70 are not required.

020-E-007A/B

6
6

Dimensions selected for the test flange / test ring assembly,


it's strength and it's smooth functioning during hydrotest is
the vendor's responsibility.