You are on page 1of 5

China Harbour Engineering Co.L.L.C.

RISK ASSESSMENT SHEET FOR PAINTING WORKS

RISK LEVEL ESTIMATOR

SEVERITY

SLIGHTLY HARMFUL HARMFUL EXTREMELY HARMFUL


(1) (2) (3)
HIGHLY UNLIKELY TRIVIAL RISK *ACCEPTABLE RISK MODERATE RISK
LIKELIHOOD
(1) (1) (2) (3)
UNLIKELY * ACCEPTABLE RISK MODERATE RISK SUBSTANTIAL RISK
(2) (2) (4) (6)
LIKELY MODERATE RISK SUBSTANTIAL RISK UNACCEPTABLE RISK
(3) (3) (6) (9)

MAIN CONTRACTOR : ORIGINATOR: APPROVED BY : SUB-CONTRACTOR :

CHINA HARBOUR ENGINEERING CO LLC


Mazrui & Hawi Painting Co. W.L.L.
(PROJECT HSE ENGINEER ) ( PROJECT MANGER )

1
China Harbour Engineering Co.L.L.C.

RISK ASSESSMENT SHEET FOR PAINTING WORKS

RISK LEVEL ACTION AND TIMESCALE

TRIVIAL
No action is required and no documentary records need to be kept.
(1)

*ACCEPTABLE No additional controls are required. Consideration may be given to a more cost-effective solution or
(2) Improvement that imposes no additional cost burden. Motoring is required to ensure that the controls are maintained.

Efforts should be made to reduce the risk, but the costs of prevention should be carefully measured and limited, if risk
reduction measures become apparent, they should be implemented within a defined time period.
MODERATE
(3-4)
Where the moderate risk is associated with extremely harmful consequences, further assessment may be necessary to
establish more precisely the likelihood of harm as a basis for determining the need to improve control measures.

SUBSTANTIAL Work should not be started until the risk has been reduced considerable. Resources may have to be allocated to reduce
(6) the risk. Where risk resolves and work in progress general care, should be taken.

UNACCEPTABLE Work should not be started or continued until the risk has been reduced. if it is not possible to reduce risk even with
(9) unlimited resources , work has to remain prohibited.

* acceptable here means that risk has been reduced to the lowest level that is reasonably practicable.

**** use of basic PPE such as Safety Shoes, Hard Hat and High Visibility Vest are always mandatory.

2
China Harbour Engineering Co.L.L.C.

RISK ASSESSMENT SHEET FOR PAINTING WORKS

RISK LEVEL RISK LEVEL


WHO BEFORE AFTER
ACTIVITY MIGHT BE HAZARDS CONTROL CONTROLS CONTROL ACTION BY
HARMED

L Sv R L Sv R
Delivery, Workers Hand and foot injury 2 2 4 Wear hand gloves and safety footwear 1 1 1 F/S
Storage & involve
Storage areas shall be as per MSDS. Good
Handling Fire / Flammable materials 2 2 4 1 1 1 PE / SO
ventilation and provision of Fire Extinguisher
Use of JCB equipment in shifting materials. If a
worker is required to manually carry the
Lower back pain 2 2 4 materials only carry less quantity. Lift the 1 1 1 PE
materials from the ground by bending knees
and keep the load close to the body.
Material arrangement and segregation, keep
Tripping Hazards 2 1 2 the working area and walkway free from 1 1 1 F/S
obstructions and loose materials
Struck by Forklift Ensure that operator is licensed. Unloading
Equipment / fall of 2 3 6 area must be barricaded and ensure that 1 2 2 SK / Operator
materials materials are secured while unloading.
Chemical spill / Ensure that storage areas are provided with
F/S
environmental 2 2 4 trays or banded. Storage area must comply on 1 1 1
S/O
the requirements as per MSDS

LEGEND : PM- PROJECT MANGER , CM-CONSTRUCTION MANGER , PE- PROJECT ENGINEER , SK -STORE KEEPER, SO- SAFETY OFFICER ,F/S-FOREMAN/SUPERVISOR, AC-ALL CONCERNED, ES-EQUIPMENT SUPV

3
China Harbour Engineering Co.L.L.C.

RISK ASSESSMENT SHEET FOR PAINTING WORKS

RISK LEVEL RISK LEVEL


WHO BEFORE AFTER
ACTIVITY MIGHT BE HAZARDS CONTROL CONTROLS CONTROL ACTION BY
HARMED

L Sv R L Sv R
Painting Workers Use of painting tools with long handle to avoid
Works involved works at height. Use of mobile scaffolding. F/S
Fall from height 2 2 4 1 2 2
(Internal Other groups Scaffolding must be inspected by the competent S/O
around the person and scaff tag system must be completed.
walls and
area (Enclose areas) Water respiratory equipment
ceiling) AC F/S
Paint Fumes / Inhalation 2 2 4 recommended by manufacturer. Ensure proper 1 1 1
ventilation by providing fans
S/O
Provide secondary containers. Used brush & rollers
Chemical spill 2 2 4 1 2 2 F/S
shall be washed only at designated washing areas.
Skin and eye irritation 2 2 4 Wear cover all and safety glass / face shield 1 1 1 A/C F/S
Rotating parts of equipment
2 3 6 Ensure that rotating parts are with cover / guards 1 1 1 F/S
/compressor
Painting Workers Scaffolding shall be erected with proper outriggers
Works involved and/or attached to building structure. Full body
(External Other groups harness is mandatory If there is no provision of
walls and around the Fall from height 2 3 6 wire mesh on the railings. Scaffolding shall be 1 2 2 PE F/S S/O
ceilings) area erected by trained personnel and inspected by
competent person. Scaffolding tag system shall be
in place.
Provide secondary containment. Used brush and
Chemical spill 2 2 4 1 2 2 F/S
rollers shall be washed only at designated areas.

LEGEND : PM- PROJECT MANGER , CM-CONSTRUCTION MANGER , PE- PROJECT ENGINEER , SK -STORE KEEPER, SO- SAFETY OFFICER ,F/S-FOREMAN/SUPERVISOR, AC-ALL CONCERNED, ES-EQUIPMENT SUPV

4
China Harbour Engineering Co.L.L.C.

RISK ASSESSMENT SHEET FOR PAINTING WORKS

RISK LEVEL RISK LEVEL


WHO BEFORE AFTER
MIGHT CONTROL CONTROL
ACTIVITY HAZARDS CONTROLS ACTION BY
BE
HARMED
L Sv R L Sv R
AC F/S
Skin & eye irritation 2 2 4 Wear cover all and safety glass / face shield 1 1 1
Rotating parts of equipment /
2 3 6 Ensure that rotating parts are with cover / guards 1 1 1 F/S
compressor
Rotating parts of equipment /
2 3 6 Ensure that rotating parts are with cover / guards 1 1 1 F/S
compressor
Housekeeping Workers
Dust inhalation 2 2 4 Dust mask shall be used 1 1 1 F/S
involved
Other
Material arrangement and segregation, keep the
groups
Tripping hazards 2 1 1 working area and walkway free from any 1 1 1 F/S
around the
obstructions and loose materials
area

LEGEND : PM- PROJECT MANGER , CM-CONSTRUCTION MANGER , PE- PROJECT ENGINEER , SK -STORE KEEPER, SO- SAFETY OFFICER ,F/S-FOREMAN/SUPERVISOR, AC-ALL CONCERNED, ES-EQUIPMENT SUPV