Professional Documents
Culture Documents
2014
Module Code:
PTRL29H02/EAX_6_292
2013 / 2014
Module Title
Surface Production Facilities
Module Leader Semester: One
Dr. Atef Abdallah Abdelhady
Equipment allowed
Non-programmable calculator
Instructions to Students
Good Luck,,,
(a) Mention objectives of surface production facilities for offshore and onshore? (5 marks)
(b) Draw flow diagram for oil and gas well surface facilities? (5 marks)
(c) Explain hydrocarbon properties which will effect on process design? (7 marks)
(d) How to handle wet crude oil in process plant facilities? (8 marks)
(a) A one desalting unit is used to treat 1000 BPD of net oil. The oil entering the first stage contains 5
percent water having 50000 PPM salt and 1.07specific gravity determine the salt content of the oil in
pounds per thousands of bbl. (7marks)
(b) What are Amine sweetening gas process mechanisms to remove acid gas? (8 marks)
(c) Discuss selection criteria for oil and gas heat exchangers? (5 marks)
(d) What are advantage and disadvantage of absorption dehydration method? (5 marks)
Question-3[Total 25 marks]
(a) Draw process flow diagram of absorption dehydration process unit? (7 marks)
(b) What are factors affecting the efficiency of desalting process? (5 marks)
(c) Describe data and information is required for the design water treatment system? (5 marks)
(d) Determine the amount of glycol needed to inhibit hydrate formation in flow line. Gas well produces
15 mmscfd , 1000 bbl of water per day, and 500 bbl per day of condensate having density of 300 lb
per bbl and flow line temperature is 65 F and hydrate formation temperature is 75F. The ratio of the
lbs of glycol in vapor per mmscf of gas to the weight of glycol in water is 0.95.The molecular weight
of glycol is 62.07 and K value is 2200. ( 8 marks)
(a) Mention types of valves are used in oil and gas facilities? (5 marks)
(b) What is design conditions required for oil field heater trater? (7 marks)
(c) What are reasons to clean or pig oil and gas pipelines? (5 marks)
(d) Determine salt content by PTB of crude oil 1000 bbl produced from new produced well has
water cut 15 Present and water salinity 45,000 ppm at 25 C ? (8 marks)