dmin = 10.91 cm
drec = 13.56 cm
h d
Mmax= 133.0 [Ton-cm]
r= 2.5 cm
ELEM. Md Md b h bw hf d Ay DISTRIBUCIÓN
[Ton-m] [Ton-cm] [cm] [cm] [cm] [cm] [cm] [cm^2]
VIGAS PÓRTICO EJE-2 (PRIMER PISO)
M- 0.450 45.0 25.0 50.0 - - 47.5 0.260 2 Æ 10 + 1 Æ 12
M+ 1.200 120.0 25.0 50.0 - - 47.5 0.698 2 Æ 12 + 2 Æ 10
M- 1.330 133.0 25.0 50.0 - - 47.5 0.775 2 Æ 12 + 2 Æ 12
M+ 0.550 55.0 25.0 50.0 - - 47.5 0.318 2 Æ 12 + 2 Æ 12
M- 0.850 85.0 25.0 50.0 - - 47.5 0.493 2 Æ 12 + 2 Æ 12
M+ 0.570 57.0 25.0 50.0 - - 47.5 0.330 2 Æ 12 + 2 Æ 12
M- 1.330 133.0 25.0 50.0 - - 47.5 0.775 2 Æ 12 + 2 Æ 12
M+ 1.120 112.0 25.0 50.0 - - 47.5 0.651 2 Æ 12 + 2 Æ 12
M- 0.080 8.0 25.0 50.0 - - 47.5 0.046 2 Æ 12 + 2 Æ 12
M+ 0.000 0.0 25.0 50.0 - - 47.5 0.000 2 Æ 12 + 2 Æ 12
M- 0.000 0.0 25.0 50.0 - - 47.5 0.000 2 Æ 12 + 2 Æ 12
4.80 4.20
REDUCCION DE MOMENTOS BHRAUL
Mr = M - 0.5*q*L*0.5*c
q= (q1 + q2) /2
L= (L1 + L2)/2
L1 = 4.800 m
L2 = 4.200 m L= 4.50 m
q1 = 1.210 Ton/m
q2 = 1.210 Ton/m q= 1.21 Ton/m
c= 0.25 m
Mr= 0.990 [Ton-m]
As >= (3,3/1000)*Ac
As` >= [(3,3/1000)*Ac]*30/100 A= 1.25 cm2
As >= 0,25*(fcd/fyd)*W1/h
W1 = I/Ycg
dmin = 37.27 cm
drec = 46.33 cm
h d
Mmax= 1552.0 [Ton-cm]
r= 2.5 cm
ELEM. Md Md b h bw hf d Ay DISTRIBUCIÓN
[Ton-m] [Ton-cm] [cm] [cm] [cm] [cm] [cm] [cm^2]
VIGAS PÓRTICO EJE-5 (PRIMER PISO)
M- 11.580 1158.0 25.0 50.0 - - 47.5 7.403 2 Æ 12 + 4 Æ 12
M+ 12.850 1285.0 25.0 50.0 - - 47.5 8.329 2 Æ 12 + 4 Æ 10
M- 14.990 1499.0 25.0 50.0 - - 47.5 9.958 2 Æ 12 + 4 Æ 12
M+ 7.310 731.0 25.0 50.0 - - 47.5 4.481 2 Æ 12 + 3 Æ 12
M- 10.800 1080.0 25.0 50.0 - - 47.5 6.849 2 Æ 12 + 3 Æ 12
M+ 7.440 744.0 25.0 50.0 - - 47.5 4.566 2 Æ 12 + 2 Æ 12
M- 13.520 1352.0 25.0 50.0 - - 47.5 8.829 2 Æ 12 + 3 Æ 12
M+ 11.240 1124.0 25.0 50.0 - - 47.5 7.160 2 Æ 12 + 4 Æ 12
M- 15.520 1552.0 25.0 50.0 - - 47.5 10.377 2 Æ 12 + 4 Æ 12
M+ 9.940 994.0 25.0 50.0 - - 47.5 6.249 2 Æ 12 + 3 Æ 12
M- 13.430 1343.0 25.0 50.0 - - 47.5 8.761 2 Æ 12 + 4 Æ 12
M+ 9.370 937.0 25.0 50.0 - - 50.0 5.515 2 Æ 12 + 3 Æ 12
M- 14.050 1405.0 25.0 50.0 - - 49.9 8.666 2 Æ 12 + 4 Æ 12
4.80 4.80 4.20 4.20 4.80 4.80
REDUCCION DE MOMENTOS
Mr = M - 0.5*q*L*0.5*c
q= (q1 + q2) /2
L= (L1 + L2)/2
L1 = 3.500 m
L2 = 3.400 m L= 3.45 m
q1 = 2.600 Ton/m
q2 = 2.600 Ton/m q= 2.60 Ton/m
c= 0.25 m
Mr= 14.959 [Ton-m]
As >= (3,3/1000)*Ac
As` >= [(3,3/1000)*Ac]*30/100 A= 1.25 cm2
As >= 0,25*(fcd/fyd)*W1/h
W1 = I/Ycg
dmin = 32.79 cm
drec = 40.75 cm
h d
Mmax= 1201.0 [Ton-cm]
r= 2.5 cm
ELEM. Md Md b h bw hf d Ay DISTRIBUCIÓN
[Ton-m] [Ton-cm] [cm] [cm] [cm] [cm] [cm] [cm^2]
VIGAS PÓRTICO EJE-8 (PRIMER PISO) X=5.35m
M- 4.670 467.0 25.0 50.0 - - 47.5 2.796 2 Æ 10 + 1 Æ 12
M+ 5.130 513.0 25.0 50.0 - - 47.5 3.084 2 Æ 12 + 2 Æ 10
M- 6.080 608.0 25.0 50.0 - - 47.5 3.685 2 Æ 12 + 2 Æ 12
M+ 3.000 300.0 25.0 50.0 - - 47.5 1.771 2 Æ 12 + 2 Æ 12
M- 4.680 468.0 25.0 50.0 - - 47.5 2.802 2 Æ 10 + 1 Æ 12
M+ 3.220 322.0 25.0 50.0 - - 47.5 1.904 2 Æ 10 + 1 Æ 12
M- 4.840 484.0 25.0 50.0 - - 47.5 2.902 2 Æ 10 + 1 Æ 12
M+ 3.730 373.0 25.0 50.0 - - 47.5 2.215 2 Æ 10 + 1 Æ 12
M- 12.010 1201.0 25.0 50.0 - - 47.5 7.714 2 Æ 10 + 1 Æ 12
M+ 11.250 1125.0 25.0 50.0 - - 47.5 7.168 2 Æ 10 + 1 Æ 12
M- 11.950 1195.0 25.0 50.0 - - 47.5 7.670 2 Æ 10 + 1 Æ 12
M+ 13.820 1382.0 25.0 50.0 - - 50.0 8.475 2 Æ 10 + 1 Æ 12
4.80 4.80 4.20
REDUCCION DE MOMENTOS
Mr = M - 0.5*q*L*0.5*c
q= (q1 + q2) /2
L= (L1 + L2)/2
L1 = 6.900 m
L2 = 2.100 m L= 4.50 m
q1 = 1.760 Ton/m
q2 = 1.760 Ton/m q= 1.76 Ton/m
c= 0.25 m
Mr= 14.125 [Ton-m]
As >= (3,3/1000)*Ac
As` >= [(3,3/1000)*Ac]*30/100
As >= 0,25*(fcd/fyd)*W1/h
W1 = I/Ycg