LARGO ANCHO ALTO

OE 2.1.2 m3 29.916768
EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS
EJE 1-1 TRAMO a-b 1 1 3.5084 0.4 0.8 1.122688
EJE 1-1 TRAMO b-c 1 1 3.4888 0.4 0.8 1.116416
EJE 1-1 TRAMO c-d 1 1 3.4888 0.4 0.8 1.116416
EJE 1-1 TRAMO d-e 1 1 3.6139 0.4 0.8 1.156448
EJE 2-2 TRAMO a-b 1 1 0.525 0.4 0.8 0.168
EJE 2-2 TRAMO b-c 1 1 0.855 0.4 0.8 0.2736
EJE 2´-2´ TRAMO a-b 1 1 3.06 0.4 0.8 0.9792
EJE 2´-2´ TRAMO b-c 1 1 2.21 0.4 0.8 0.7072
EJE 2´-2´ TRAMO c-d 1 1 2.98 0.4 0.8 0.9536
EJE 2´´-2´´ TRAMO d-e 1 1 1.31 0.4 0.8 0.4192
EJE 3´-3´ TRAMO a-b 1 1 0.23 0.4 0.8 0.0736
EJE 3´´- 3´´ TRAMO a-b 1 1 2.1 0.4 0.8 0.672
EJE 5-5 TRAMO a-c 1 1 6.14 0.4 0.8 1.9648
EJE 5-5 TRAMO c-e 1 1 3.78 0.4 0.8 1.2096
EJE 7-7 TRAMO a-b 1 1 3.51 0.4 0.8 1.1232
EJE 7-7 TRAMO b-c 1 1 3.49 0.4 0.8 1.1168
EJE 7-7 TRAMO c-d 1 1 3.49 0.4 0.8 1.1168
EJE 7-7 TRAMO d-e 1 1 3.61 0.4 0.8 1.1552
EJE a-a TRAMO 1-2 1 1 3.12 0.4 0.8 0.9984
EJE a-a TRAMO 2-4 1 1 3.23 0.4 0.8 1.0336
EJE a-a TRAMO 4-6 1 1 3.21 0.4 0.8 1.0272
EJE a-a TRAMO 6-7 1 1 3.09 0.4 0.8 0.9888
EJE b´-b´ TRAMO 2-3 1 1 0.65 0.4 0.8 0.208
EJE b´´-b´´ TRAMO 2-4 1 1 1.3 0.4 0.8 0.416
EJE b´´´-b´´´ TRAMO 3-6 1 1 1.91 0.4 0.8 0.6112
EJE c-c TRAMO 1-3 1 1 1.53 0.4 0.8 0.4896
EJE c-c TRAMO 4-7 1 1 2.65 0.4 0.8 0.848
EJE c´-c´ TRAMO 2-3 1 1 0.54 0.4 0.8 0.1728
EJE d-d TRAMO 1-3 1 1 2.08 0.4 0.8 0.6656
EJE d´-d´ TRAMO 5-7 1 1 5.74 0.4 0.8 1.8368
EJE e-e TRAMO 1-3 1 1 5.54 0.4 0.8 1.7728
EJE e-e TRAMO 3-4 1 1 2 0.4 0.8 0.64
EJE e-e TRAMO 5-7 1 1 5.51 0.4 0.8 1.7632
HOJA DE METRADO DE CARGAS
PROYECTO : LOCAL COMUNAL DE LA COMUNIDAD DE LA COMUNIDAD CAMPESINA DE SAN FRANCISCO DE ASIS DE YARUSYACAN
DISTRITO : SAN FRANSISCO DE ASIS
PROVINCIA : PASCO
FECHA : 11/11/2018 REGIÓN : PASCO

MEDIDAS
N. DESCRIPCIÓN UNIDAD CANTIDAD N. DE VECES SUBTOTAL TOTAL
LARGO ANCHO ALTO
ESTRUCTURAS
OE 2.2 CONCRETO SIMPLE
OE 2.2.1 CONCRETO EN CIMIENTO CORRIDO m3 29.916768
EJE 1-1 TRAMO a-b 1 1 3.5084 0.4 0.8 1.122688
EJE 1-1 TRAMO b-c 1 1 3.4888 0.4 0.8 1.116416
EJE 1-1 TRAMO c-d 1 1 3.4888 0.4 0.8 1.116416
EJE 1-1 TRAMO d-e 1 1 3.6139 0.4 0.8 1.156448
EJE 2-2 TRAMO a-b 1 1 0.525 0.4 0.8 0.168
EJE 2-2 TRAMO b-c 1 1 0.855 0.4 0.8 0.2736
EJE 2´-2´ TRAMO a-b 1 1 3.06 0.4 0.8 0.9792
EJE 2´-2´ TRAMO b-c 1 1 2.21 0.4 0.8 0.7072
EJE 2´-2´ TRAMO c-d 1 1 2.98 0.4 0.8 0.9536
EJE 2´´-2´´ TRAMO d-e 1 1 1.31 0.4 0.8 0.4192
EJE 3´-3´ TRAMO a-b 1 1 0.23 0.4 0.8 0.0736
EJE 3´´- 3´´ TRAMO a-b 1 1 2.1 0.4 0.8 0.672
EJE 5-5 TRAMO a-c 1 1 6.14 0.4 0.8 1.9648
EJE 5-5 TRAMO c-e 1 1 3.78 0.4 0.8 1.2096
EJE 7-7 TRAMO a-b 1 1 3.51 0.4 0.8 1.1232
EJE 7-7 TRAMO b-c 1 1 3.49 0.4 0.8 1.1168
EJE 7-7 TRAMO c-d 1 1 3.49 0.4 0.8 1.1168
EJE 7-7 TRAMO d-e 1 1 3.61 0.4 0.8 1.1552
EJE a-a TRAMO 1-2 1 1 3.12 0.4 0.8 0.9984
EJE a-a TRAMO 2-4 1 1 3.23 0.4 0.8 1.0336
EJE a-a TRAMO 4-6 1 1 3.21 0.4 0.8 1.0272
EJE a-a TRAMO 6-7 1 1 3.09 0.4 0.8 0.9888
EJE b´-b´ TRAMO 2-3 1 1 0.65 0.4 0.8 0.208
EJE b´´-b´´ TRAMO 2-4 1 1 1.3 0.4 0.8 0.416
EJE b´´´-b´´´ TRAMO 3-6 1 1 1.91 0.4 0.8 0.6112
EJE c-c TRAMO 1-3 1 1 1.53 0.4 0.8 0.4896
EJE c-c TRAMO 4-7 1 1 2.65 0.4 0.8 0.848
EJE c´-c´ TRAMO 2-3 1 1 0.54 0.4 0.8 0.1728
EJE d-d TRAMO 1-3 1 1 2.08 0.4 0.8 0.6656
EJE d´-d´ TRAMO 5-7 1 1 5.74 0.4 0.8 1.8368
EJE e-e TRAMO 1-3 1 1 5.54 0.4 0.8 1.7728
EJE e-e TRAMO 3-5 1 1 2 0.4 0.8 0.64
EJE e-e TRAMO 5-7 1 1 5.51 0.4 0.8 1.7632
HOJA DE METRADO DE CARGAS
PROYECTO : LOCAL COMUNAL DE LA COMUNIDAD DE LA COMUNIDAD CAMPESINA DE SAN FRANCISCO DE ASIS DE YARUSYACAN
DISTRITO : SAN FRANSISCO DE ASIS
PROVINCIA : PASCO
FECHA : 11/11/2018 REGIÓN : PASCO

OE 2.2.2 CONCRETO EN SOBRECIMIENTO m3 5.00549475


EJE 1-1 TRAMO a-b 1 1 3.5084 0.15 0.35 0.184191
EJE 1-1 TRAMO b-c 1 1 3.4888 0.15 0.35 0.183162
EJE 1-1 TRAMO c-d 1 1 3.4888 0.15 0.35 0.183162
EJE 1-1 TRAMO d-e 1 1 3.6139 0.15 0.35 0.18972975
EJE 2-2 TRAMO a-b 1 1 0.525 0.15 0.3 0.023625
EJE 2-2 TRAMO b-c 1 1 0.725 0.15 0.3 0.032625
EJE 2´-2´ TRAMO a-b 1 1 3.31 0.15 0.3 0.14895
EJE 2´-2´ TRAMO b-c 1 1 2.09 0.15 0.3 0.09405
EJE 2´-2´ TRAMO c-d 1 1 2.74 0.15 0.3 0.1233
EJE 2´´-2´´ TRAMO d-e 1 1 1.31 0.15 0.3 0.05895
EJE 3´-3´ TRAMO a-b 1 1 0.5 0.15 0.3 0.0225
EJE 3´´- 3´´ TRAMO a-b 1 1 2.38 0.15 0.3 0.1071
EJE 5-5 TRAMO a-c 1 1 6.39 0.15 0.3 0.28755
EJE 5-5 TRAMO c-e 1 1 4.05 0.15 0.3 0.18225
EJE 7-7 TRAMO a-b 1 1 3.51 0.15 0.35 0.184275
EJE 7-7 TRAMO b-c 1 1 3.49 0.15 0.35 0.183225
EJE 7-7 TRAMO c-d 1 1 3.49 0.15 0.35 0.183225
EJE 7-7 TRAMO d-e 1 1 3.61 0.15 0.35 0.189525
EJE a-a TRAMO 1-2 1 1 3.12 0.15 0.35 0.1638
EJE a-a TRAMO 2-4 1 1 3.23 0.15 0.35 0.169575
EJE a-a TRAMO 4-6 1 1 3.21 0.15 0.35 0.168525
EJE a-a TRAMO 6-7 1 1 3.09 0.15 0.35 0.162225
EJE b´-b´ TRAMO 2-3 1 1 0.9 0.15 0.3 0.0405
EJE b´´-b´´ TRAMO 2-4 1 1 0.75 0.15 0.3 0.03375
EJE b´´´-b´´´ TRAMO 3-6 1 1 1.76 0.15 0.3 0.0792
EJE c-c TRAMO 1-3 1 1 1.26 0.15 0.3 0.0567
EJE c-c TRAMO 4-7 1 1 2.38 0.15 0.3 0.1071
EJE c´-c´ TRAMO 2-3 1 1 0.67 0.15 0.3 0.03015
EJE d-d TRAMO 1-3 1 1 2.08 0.15 0.3 0.0936
EJE d´-d´ TRAMO 5-7 1 1 5.83 0.15 0.3 0.26235
EJE e-e TRAMO 1-3 1 1 5.54 0.15 0.55 0.45705
EJE e-e TRAMO 3-5 1 1 2 0.15 0.55 0.165
EJE e-e TRAMO 5-7 1 1 5.51 0.15 0.55 0.454575