You are on page 1of 26

CUADRO DE METRADOS

PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED


UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL

01.00.00 OBRAS PROVISIONALES


01.01.00 CASETA P/GUARDIANIA Y DEPOSITO
M2 20.00 4.00 80.00
01.02.00 CARTEL DE OBRA 80.00
UND 3.00 1.00 3.00
3.00
02.00.00 TRABAJOS PRELIMINARES
02.01.00 MOVILIZACON Y DESMOVILIZACION DE MAQUINARIA
GLB 1.00 1.00 1.00
02.02.00 TRAZO Y REPLANTEO 1.00
CHACHANI +000 +100 M 0.001 101.30 0.10
+100 +200 M 0.001 100.30 0.10
+200 +300 M 0.001 100.00 0.10
+300 +347 M 0.001 47.00 0.05
NARANJOS +00 +026 M 0.001 26.40 0.03
GERANIOS +00 +035.5 M 0.001 28.09 0.03
PORTALES +00 +052 M 0.001 52.57 0.05
MERCEDES +00 +049.5 M 0.001 49.89 0.05
M 0.001 49.00 0.05
BENTIN +00 +054.5 M 0.001 54.84 0.05
CHALLAPAMPA +147.25 M 0.001 147.25 0.15
CHALLAPAMPA +153.35 M 0.001 6.10 0.01
0.76
02.03.00 DEMOLICION DE EMPEDRADO
NARANJOS +00 +026 M3 1.00 0.15 26.40 4.51 17.86
GERANIOS +00 +035.5 M3 1.00 0.15 28.09 4.55 19.17
CHALLAPAMPA +147.25 M3 1.00 0.15 147.25 6.00 132.53
+153.35 M3 1.00 0.15 6.10 9.76 8.93
178.49
02.04.00 DEMOLICION DE CONCRETO
PORTALES +00 +052 M3 1.00 0.15 52.57 4.08 32.17
MERCEDES +00 +049.5 M3 1.00 0.15 49.89 3.62 27.09
M3 1.00 0.15 49.00 5.44 39.98
BENTIN +00 +054.5 M3 1.00 0.15 54.84 3.09 25.42
M3 1.00 0.15 14.04 2.52 5.31
129.97
02.05.00 DEMOLICION DE CARPETA
CHACHANI +100 M3 1.00 0.05 101.30 6.00 30.39
+200 M3 1.00 0.05 100.30 6.00 30.09
+300 M3 1.00 0.05 100.00 6.00 30.00
+347 M3 1.00 0.05 47.00 6.00 14.10
104.58
03.00.00 PAVIMENTOS
03.01.00 EXPLANACIONES
03.01.01 CORTE DE TERRENO
CHACHANI 0+00 0+02 M3 1.00 0.27 20.26 8.30 45.40
0+02 0+04 M3 1.00 0.27 20.26 7.30 39.93
0+04 0+06 M3 1.00 0.27 20.26 6.38 34.90
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
0+06 0+08 M3 1.00 0.27 20.26 6.09 33.31
0+08 0+10 M3 1.00 0.27 20.26 6.25 34.19
0+10 0+12 M3 1.00 0.27 20.26 6.42 35.12
0+12 0+14 M3 1.00 0.27 20.06 6.57 35.58
0+14 0+16 M3 1.00 0.27 20.06 6.28 34.01
0+16 0+18 M3 1.00 0.27 20.06 6.01 32.55
0+18 0+20 M3 1.00 0.27 20.06 6.00 32.50
0+20 0+22 M3 1.00 0.27 20.06 5.97 32.33
0+22 0+24 M3 1.00 0.27 20.00 5.81 31.37
0+24 0+26 M3 1.00 0.27 20.00 5.75 31.05
0+26 0+28 M3 1.00 0.27 20.00 5.67 30.62
0+28 0+30 M3 1.00 0.27 20.00 5.51 29.75
0+30 0+32 M3 1.00 0.27 20.00 5.41 29.21
0+32 0+34 M3 1.00 0.27 20.00 5.32 28.73
0+34 0+34.7 M3 1.00 0.27 7.00 4.90 9.26
NARANJOS +00 +026 M3 1.00 0.17 26.40 3.92 17.59
GERANIOS +00 +035.5 M3 1.00 0.17 28.09 3.37 16.09
PORTALES +00 +052 M3 1.00 0.17 52.57 4.07 36.37
MERCEDES +00 +049.5 M3 1.00 0.17 49.89 3.60 30.53
M3 1.00 0.17 49.00 5.44 45.32
BENTIN +00 +054.5 M3 1.00 0.17 54.84 2.70 25.17
M3 1.00 0.17 14.04 2.52 6.01
CHALLAPAMPA 0+00 M3 0.17 10.00 11.39 19.36
0+01 M3 0.17 10.00 8.08 13.74
0+02 M3 0.17 10.00 7.97 13.55
0+03 M3 0.17 10.00 7.85 13.35
0+04 M3 0.17 10.00 7.74 13.16
0+05 M3 0.17 10.00 7.63 12.97
0+06 M3 0.17 10.00 8.01 13.62
0+07 M3 0.17 10.00 9.67 16.44
0+08 M3 0.17 10.00 8.22 13.97
0+09 M3 0.17 10.00 7.38 12.55
0+10 M3 0.17 10.00 7.39 12.56
0+11 M3 0.17 10.00 7.40 12.58
0+12 M3 0.17 10.00 7.41 12.60
0+13 M3 0.17 10.00 7.42 12.61
0+14 M3 0.17 7.25 7.44 9.17
M3 0.17 6.10 9.76 10.12
969.27
03.01.02 ELIMINACION DE MATERIAL EXCEDENTE
EMPEDRADO M3 178.49
CONCRETO M3 129.97
CARPETA M3 104.58
CORTE M3 969.27
1,382.31
ABUNDAMIENTO M3 345.58
1,727.89
03.02.00 PAVIMENTO ADOQUINADO
03.02.01 REFINE Y COMPACTACION DE SUBRASANTE (INCLUYE AGUA)
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
CHACHANI 0+00 0+02 M2 1.00 20.26 8.30 168.16
0+02 0+04 M2 1.00 20.26 7.30 147.90
0+04 0+06 M2 1.00 20.26 6.38 129.26
0+06 0+08 M2 1.00 20.26 6.09 123.38
0+08 0+10 M2 1.00 20.26 6.25 126.63
0+10 0+12 M2 1.00 20.26 6.42 130.07
0+12 0+14 M2 1.00 20.06 6.57 131.79
0+14 0+16 M2 1.00 20.06 6.28 125.98
0+16 0+18 M2 1.00 20.06 6.01 120.56
0+18 0+20 M2 1.00 20.06 6.00 120.36
0+20 0+22 M2 1.00 20.06 5.97 119.76
0+22 0+24 M2 1.00 20.00 5.81 116.20
0+24 0+26 M2 1.00 20.00 5.75 115.00
0+26 0+28 M2 1.00 20.00 5.67 113.40
0+28 0+30 M2 1.00 20.00 5.51 110.20
0+30 0+32 M2 1.00 20.00 5.41 108.20
0+32 0+34 M2 1.00 20.00 5.32 106.40
0+34 0+34.7 M2 1.00 7.00 4.90 34.30
NARANJOS +00 +026 M2 1.00 26.40 3.92 103.49
GERANIOS +00 +035.5 M2 1.00 28.09 3.37 94.66
PORTALES +00 +052 M2 1.00 52.57 4.07 213.96
MERCEDES +00 +049.5 M2 1.00 49.89 3.60 179.60
M2 1.00 49.00 5.44 266.56
BENTIN +00 +054.5 M2 1.00 54.84 2.70 148.07
M2 1.00 14.04 2.52 35.38
CHALLAPAMPA 0+00 M2 1.00 10.00 11.39 113.90
0+01 M2 1.00 10.00 8.08 80.80
0+02 M2 1.00 10.00 7.97 79.70
0+03 M2 1.00 10.00 7.85 78.50
0+04 M2 1.00 10.00 7.74 77.40
0+05 M2 1.00 10.00 7.63 76.30
0+06 M2 1.00 10.00 8.01 80.10
0+07 M2 1.00 10.00 9.67 96.70
0+08 M2 1.00 10.00 8.22 82.20
0+09 M2 1.00 10.00 7.38 73.80
0+10 M2 1.00 10.00 7.39 73.90
0+11 M2 1.00 10.00 7.40 74.00
0+12 M2 1.00 10.00 7.41 74.10
0+13 M2 1.00 10.00 7.42 74.20
0+14 M2 1.00 7.25 7.44 53.94
M2 1.00 6.10 9.76 59.54
4,438.34
03.02.02 BASE GRANULAR SELECCIONADA
CHACHANI 0+00 0+02 M3 1.00 0.20 20.26 8.30 33.63
0+02 0+04 M3 1.00 0.20 20.26 7.30 29.58
0+04 0+06 M3 1.00 0.20 20.26 6.38 25.85
0+06 0+08 M3 1.00 0.20 20.26 6.09 24.68
0+08 0+10 M3 1.00 0.20 20.26 6.25 25.33
0+10 0+12 M3 1.00 0.20 20.26 6.42 26.01
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
0+12 0+14 M3 1.00 0.20 20.06 6.57 26.36
0+14 0+16 M3 1.00 0.20 20.06 6.28 25.20
0+16 0+18 M3 1.00 0.20 20.06 6.01 24.11
0+18 0+20 M3 1.00 0.20 20.06 6.00 24.07
0+20 0+22 M3 1.00 0.20 20.06 5.97 23.95
0+22 0+24 M3 1.00 0.20 20.00 5.81 23.24
0+24 0+26 M3 1.00 0.20 20.00 5.75 23.00
0+26 0+28 M3 1.00 0.20 20.00 5.67 22.68
0+28 0+30 M3 1.00 0.20 20.00 5.51 22.04
0+30 0+32 M3 1.00 0.20 20.00 5.41 21.64
0+32 0+34 M3 1.00 0.20 20.00 5.32 21.28
0+34 0+34.7 M3 1.00 0.20 7.00 4.90 6.86
NARANJOS +00 +026 M3 1.00 0.20 26.40 3.92 20.70
GERANIOS +00 +035.5 M3 1.00 0.20 28.09 3.37 18.93
PORTALES +00 +052 M3 1.00 0.20 52.57 4.07 42.79
MERCEDES +00 +049.5 M3 1.00 0.20 49.89 3.60 35.92
M3 1.00 0.20 49.00 5.44 53.31
BENTIN +00 +054.5 M3 1.00 0.20 54.84 2.70 29.61
M3 1.00 0.20 14.04 2.52 7.08
CHALLAPAMPA 0+00 M3 1.00 0.20 10.00 11.39 22.78
0+01 M3 1.00 0.20 10.00 8.08 16.16
0+02 M3 1.00 0.20 10.00 7.97 15.94
0+03 M3 1.00 0.20 10.00 7.85 15.70
0+04 M3 1.00 0.20 10.00 7.74 15.48
0+05 M3 1.00 0.20 10.00 7.63 15.26
0+06 M3 1.00 0.20 10.00 8.01 16.02
0+07 M3 1.00 0.20 10.00 9.67 19.34
0+08 M3 1.00 0.20 10.00 8.22 16.44
0+09 M3 1.00 0.20 10.00 7.38 14.76
0+10 M3 1.00 0.20 10.00 7.39 14.78
0+11 M3 1.00 0.20 10.00 7.40 14.80
0+12 M3 1.00 0.20 10.00 7.41 14.82
0+13 M3 1.00 0.20 10.00 7.42 14.84
0+14 M3 1.00 0.20 7.25 7.44 10.79
M3 1.00 0.20 6.10 9.76 11.91
887.67
03.02.03 EXTENDIDO Y COMPACTADO DE BASE (INCLUYE AGUA)
CHACHANI 0+00 0+02 M3 1.00 20.26 8.30 168.16
0+02 0+04 M3 1.00 20.26 7.30 147.90
0+04 0+06 M3 1.00 20.26 6.38 129.26
0+06 0+08 M3 1.00 20.26 6.09 123.38
0+08 0+10 M3 1.00 20.26 6.25 126.63
0+10 0+12 M3 1.00 20.26 6.42 130.07
0+12 0+14 M3 1.00 20.06 6.57 131.79
0+14 0+16 M3 1.00 20.06 6.28 125.98
0+16 0+18 M3 1.00 20.06 6.01 120.56
0+18 0+20 M3 1.00 20.06 6.00 120.36
0+20 0+22 M3 1.00 20.06 5.97 119.76
0+22 0+24 M3 1.00 20.00 5.81 116.20
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
0+24 0+26 M3 1.00 20.00 5.75 115.00
0+26 0+28 M3 1.00 20.00 5.67 113.40
0+28 0+30 M3 1.00 20.00 5.51 110.20
0+30 0+32 M3 1.00 20.00 5.41 108.20
0+32 0+34 M3 1.00 20.00 5.32 106.40
0+34 0+34.7 M3 1.00 7.00 4.90 34.30
NARANJOS +00 +026 M3 1.00 26.40 3.92 103.49
GERANIOS +00 +035.5 M3 1.00 28.09 3.37 94.66
PORTALES +00 +052 M3 1.00 52.57 4.07 213.96
MERCEDES +00 +049.5 M3 1.00 49.89 3.60 179.60
M3 1.00 49.00 5.44 266.56
BENTIN +00 +054.5 M3 1.00 54.84 2.70 148.07
M3 1.00 14.04 2.52 35.38
CHALLAPAMPA 0+00 M3 1.00 10.00 11.39 113.90
0+01 M3 1.00 10.00 8.08 80.80
0+02 M3 1.00 10.00 7.97 79.70
0+03 M3 1.00 10.00 7.85 78.50
0+04 M3 1.00 10.00 7.74 77.40
0+05 M3 1.00 10.00 7.63 76.30
0+06 M3 1.00 10.00 8.01 80.10
0+07 M3 1.00 10.00 9.67 96.70
0+08 M3 1.00 10.00 8.22 82.20
0+09 M3 1.00 10.00 7.38 73.80
0+10 M3 1.00 10.00 7.39 73.90
0+11 M3 1.00 10.00 7.40 74.00
0+12 M3 1.00 10.00 7.41 74.10
0+13 M3 1.00 10.00 7.42 74.20
0+14 M3 1.00 7.25 7.44 53.94
M3 1.00 6.10 9.76 59.54
4,438.34
03.02.04 ARENA BASE
CHACHANI 0+00 0+02 M3 1.00 0.04 20.26 8.30 6.73
0+02 0+04 M3 1.00 0.04 20.26 7.30 5.92
0+04 0+06 M3 1.00 0.04 20.26 6.38 5.17
0+06 0+08 M3 1.00 0.04 20.26 6.09 4.94
0+08 0+10 M3 1.00 0.04 20.26 6.25 5.07
0+10 0+12 M3 1.00 0.04 20.26 6.42 5.20
0+12 0+14 M3 1.00 0.04 20.06 6.57 5.27
0+14 0+16 M3 1.00 0.04 20.06 6.28 5.04
0+16 0+18 M3 1.00 0.04 20.06 6.01 4.82
0+18 0+20 M3 1.00 0.04 20.06 6.00 4.81
0+20 0+22 M3 1.00 0.04 20.06 5.97 4.79
0+22 0+24 M3 1.00 0.04 20.00 5.81 4.65
0+24 0+26 M3 1.00 0.04 20.00 5.75 4.60
0+26 0+28 M3 1.00 0.04 20.00 5.67 4.54
0+28 0+30 M3 1.00 0.04 20.00 5.51 4.41
0+30 0+32 M3 1.00 0.04 20.00 5.41 4.33
0+32 0+34 M3 1.00 0.04 20.00 5.32 4.26
0+34 0+34.7 M3 1.00 0.04 7.00 4.90 1.37
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
NARANJOS +00 +026 M3 1.00 0.04 26.40 3.92 4.14
GERANIOS +00 +035.5 M3 1.00 0.04 28.09 3.37 3.79
PORTALES +00 +052 M3 1.00 0.04 52.57 4.07 8.56
MERCEDES +00 +049.5 M3 1.00 0.04 49.89 3.60 7.18
M3 1.00 0.04 49.00 5.44 10.66
BENTIN +00 +054.5 M3 1.00 0.04 54.84 2.70 5.92
M3 1.00 0.04 14.04 2.52 1.42
CHALLAPAMPA 0+00 M3 1.00 0.04 10.00 11.39 4.56
0+01 M3 1.00 0.04 10.00 8.08 3.23
0+02 M3 1.00 0.04 10.00 7.97 3.19
0+03 M3 1.00 0.04 10.00 7.85 3.14
0+04 M3 1.00 0.04 10.00 7.74 3.10
0+05 M3 1.00 0.04 10.00 7.63 3.05
0+06 M3 1.00 0.04 10.00 8.01 3.20
0+07 M3 1.00 0.04 10.00 9.67 3.87
0+08 M3 1.00 0.04 10.00 8.22 3.29
0+09 M3 1.00 0.04 10.00 7.38 2.95
0+10 M3 1.00 0.04 10.00 7.39 2.96
0+11 M3 1.00 0.04 10.00 7.40 2.96
0+12 M3 1.00 0.04 10.00 7.41 2.96
0+13 M3 1.00 0.04 10.00 7.42 2.97
0+14 M3 1.00 0.04 7.25 7.44 2.16
M3 1.00 0.04 6.10 9.76 2.38
177.53
03.02.05 ADOQUINADO DE CONCRETO
CHACHANI 0+00 0+02 M2 1.00 20.26 8.30 168.16
0+02 0+04 M2 1.00 20.26 7.30 147.90
0+04 0+06 M2 1.00 20.26 6.38 129.26
0+06 0+08 M2 1.00 20.26 6.09 123.38
0+08 0+10 M2 1.00 20.26 6.25 126.63
0+10 0+12 M2 1.00 20.26 6.42 130.07
0+12 0+14 M2 1.00 20.06 6.57 131.79
0+14 0+16 M2 1.00 20.06 6.28 125.98
0+16 0+18 M2 1.00 20.06 6.01 120.56
0+18 0+20 M2 1.00 20.06 6.00 120.36
0+20 0+22 M2 1.00 20.06 5.97 119.76
0+22 0+24 M2 1.00 20.00 5.81 116.20
0+24 0+26 M2 1.00 20.00 5.75 115.00
0+26 0+28 M2 1.00 20.00 5.67 113.40
0+28 0+30 M2 1.00 20.00 5.51 110.20
0+30 0+32 M2 1.00 20.00 5.41 108.20
0+32 0+34 M2 1.00 20.00 5.32 106.40
0+34 0+34.7 M2 1.00 7.00 4.90 34.30
NARANJOS +00 +026 M2 1.00 26.40 3.92 103.49
GERANIOS +00 +035.5 M2 1.00 28.09 3.37 94.66
PORTALES +00 +052 M2 1.00 52.57 4.07 213.96
MERCEDES +00 +049.5 M2 1.00 49.89 3.60 179.60
M2 1.00 49.00 5.44 266.56
BENTIN +00 +054.5 M2 1.00 54.84 2.70 148.07
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
M2 1.00 14.04 2.52 35.38
CHALLAPAMPA 0+00 M2 1.00 10.00 11.39 113.90
0+01 M2 1.00 10.00 8.08 80.80
0+02 M2 1.00 10.00 7.97 79.70
0+03 M2 1.00 10.00 7.85 78.50
0+04 M2 1.00 10.00 7.74 77.40
0+05 M2 1.00 10.00 7.63 76.30
0+06 M2 1.00 10.00 8.01 80.10
0+07 M2 1.00 10.00 9.67 96.70
0+08 M2 1.00 10.00 8.22 82.20
0+09 M2 1.00 10.00 7.38 73.80
0+10 M2 1.00 10.00 7.39 73.90
0+11 M2 1.00 10.00 7.40 74.00
0+12 M2 1.00 10.00 7.41 74.10
0+13 M2 1.00 10.00 7.42 74.20
0+14 M2 1.00 7.25 7.44 53.94
M2 1.00 6.10 9.76 59.54
4,438.34
03.02.06 ARENA SELLO
CHACHANI 0+00 0+02 M3 1.00 0.01 20.26 8.30 1.68
0+02 0+04 M3 1.00 0.01 20.26 7.30 1.48
0+04 0+06 M3 1.00 0.01 20.26 6.38 1.29
0+06 0+08 M3 1.00 0.01 20.26 6.09 1.23
0+08 0+10 M3 1.00 0.01 20.26 6.25 1.27
0+10 0+12 M3 1.00 0.01 20.26 6.42 1.30
0+12 0+14 M3 1.00 0.01 20.06 6.57 1.32
0+14 0+16 M3 1.00 0.01 20.06 6.28 1.26
0+16 0+18 M3 1.00 0.01 20.06 6.01 1.21
0+18 0+20 M3 1.00 0.01 20.06 6.00 1.20
0+20 0+22 M3 1.00 0.01 20.06 5.97 1.20
0+22 0+24 M3 1.00 0.01 20.00 5.81 1.16
0+24 0+26 M3 1.00 0.01 20.00 5.75 1.15
0+26 0+28 M3 1.00 0.01 20.00 5.67 1.13
0+28 0+30 M3 1.00 0.01 20.00 5.51 1.10
0+30 0+32 M3 1.00 0.01 20.00 5.41 1.08
0+32 0+34 M3 1.00 0.01 20.00 5.32 1.06
0+34 0+34.7 M3 1.00 0.01 7.00 4.90 0.34
NARANJOS +00 +026 M3 1.00 0.01 26.40 3.92 1.03
GERANIOS +00 +035.5 M3 1.00 0.01 28.09 3.37 0.95
PORTALES +00 +052 M3 1.00 0.01 52.57 4.07 2.14
MERCEDES +00 +049.5 M3 1.00 0.01 49.89 3.60 1.80
M3 1.00 0.01 49.00 5.44 2.67
BENTIN +00 +054.5 M3 1.00 0.01 54.84 2.70 1.48
M3 1.00 0.01 14.04 2.52 0.35
CHALLAPAMPA 0+00 M3 1.00 0.01 10.00 11.39 1.14
0+01 M3 1.00 0.01 10.00 8.08 0.81
0+02 M3 1.00 0.01 10.00 7.97 0.80
0+03 M3 1.00 0.01 10.00 7.85 0.79
0+04 M3 1.00 0.01 10.00 7.74 0.77
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
0+05 M3 1.00 0.01 10.00 7.63 0.76
0+06 M3 1.00 0.01 10.00 8.01 0.80
0+07 M3 1.00 0.01 10.00 9.67 0.97
0+08 M3 1.00 0.01 10.00 8.22 0.82
0+09 M3 1.00 0.01 10.00 7.38 0.74
0+10 M3 1.00 0.01 10.00 7.39 0.74
0+11 M3 1.00 0.01 10.00 7.40 0.74
0+12 M3 1.00 0.01 10.00 7.41 0.74
0+13 M3 1.00 0.01 10.00 7.42 0.74
0+14 M3 1.00 0.01 7.25 7.44 0.54
M3 1.00 0.01 6.10 9.76 0.60
44.38
04.00.00 CONCRETO SIMPLE
04.01.00 VEREDAS
04.01.01 DEMOLICION VEREDAS
CHACHANI LADO ESTE M3 1.00 0.15 48.00 1.00 7.20
M3 1.00 0.15 20.05 1.00 3.01
M3 1.00 0.15 39.59 1.00 5.94
M3 1.00 0.15 39.04 1.00 5.86
M3 1.00 0.15 40.77 1.00 6.12
M3 1.00 0.15 42.88 1.00 6.43
M3 1.00 0.15 23.19 1.00 3.48
M3 1.00 0.15 37.62 1.00 5.64
M3 1.00 0.15 26.43 1.00 3.96
CHACHANI LADO OESTE M3 1.00 0.15 36.60 1.00 5.49
M3 1.00 0.15 10.62 1.00 1.59
M3 1.00 0.15 32.05 1.00 4.81
M3 1.00 0.15 31.85 1.00 4.78
M3 1.00 0.15 18.41 1.00 2.76
M3 1.00 0.15 16.31 1.00 2.45
M3 1.00 0.15 45.66 1.00 6.85
M3 1.00 0.15 70.88 1.00 10.63
M3 1.00 0.15 40.40 1.00 6.06
M3 1.00 0.15 29.51 1.00 4.43
NARANJOS M3 1.00 0.25 26.40 0.60 3.96
PORTALES M3 2.00 0.15 52.57 0.60 9.46
MERCEDES M3 2.00 0.15 49.89 0.60 8.98
M3 1.00 0.15 49.00 0.60 4.41
M3 1.00 0.15 18.98 0.60 1.71
M3 1.00 0.15 31.28 0.60 2.82
BENTIN M3 2.00 0.15 54.84 0.60 9.87
138.69
04.01.02 EXCAVACION VEREDAS Area sección
CHACHANI LADO ESTE M3 1.00 48.00 0.04 1.92
M3 1.00 20.05 0.04 0.80
M3 1.00 39.59 0.04 1.58
M3 1.00 39.04 0.04 1.56
M3 1.00 40.77 0.04 1.63
M3 1.00 42.88 0.04 1.72
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
M3 1.00 23.19 0.04 0.93
M3 1.00 37.62 0.04 1.50
M3 1.00 26.43 0.04 1.06
CHACHANI LADO OESTE M3 1.00 36.60 0.04 1.46
M3 1.00 10.62 0.04 0.42
M3 1.00 32.05 0.04 1.28
M3 1.00 31.85 0.04 1.27
M3 1.00 18.41 0.04 0.74
M3 1.00 16.31 0.04 0.65
M3 1.00 45.66 0.04 1.83
M3 1.00 70.88 0.04 2.84
M3 1.00 40.40 0.04 1.62
M3 1.00 29.51 0.04 1.18
CHALLAPAMPA M3 1.00 6.10 0.04 0.24
M3 2.00 1.60 0.04 0.13
M3 2.00 5.36 0.04 0.43
NARANJOS M3 2.00 26.40 0.04 2.11
PORTALES M3 2.00 52.57 0.04 4.21
MERCEDES M3 2.00 49.89 0.04 3.99
M3 1.00 49.00 0.04 1.96
M3 1.00 18.98 0.04 0.76
M3 1.00 31.28 0.04 1.25
BENTIN M3 2.00 54.84 0.04 4.39
45.46
04.01.03 ELIMINACION DE MATERIAL EXCEDENTE %
M3 138.69 1.25 173.36
M3 45.46 1.25 56.83
230.19
04.01.04 NIVELACION Y COMPACTACION VEREDAS
CHACHANI LADO ESTE M2 1.00 48.00 1.00 48.00
M2 1.00 20.05 1.00 20.05
M2 1.00 39.59 1.00 39.59
M2 1.00 39.04 1.00 39.04
M2 1.00 40.77 1.00 40.77
M2 1.00 42.88 1.00 42.88
M2 1.00 23.19 1.00 23.19
M2 1.00 37.62 1.00 37.62
M2 1.00 26.43 1.00 26.43
CHACHANI LADO OESTE M2 1.00 36.60 1.00 36.60
M2 1.00 10.62 1.00 10.62
M2 1.00 32.05 1.00 32.05
M2 1.00 31.85 1.00 31.85
M2 1.00 18.41 1.00 18.41
M2 1.00 16.31 1.00 16.31
M2 1.00 45.66 1.00 45.66
M2 1.00 70.88 1.00 70.88
M2 1.00 40.40 1.00 40.40
M2 1.00 29.51 1.00 29.51
CHALLAPAMPA M2 1.00 6.10 1.00 6.10
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
M2 2.00 1.60 1.00 3.20
M2 2.00 5.36 1.00 10.72
NARANJOS M3 2.00 26.40 0.60 31.68
PORTALES M3 2.00 52.57 0.60 63.08
MERCEDES M3 2.00 49.89 0.60 59.87
M3 1.00 49.00 0.60 29.40
M3 1.00 18.98 0.60 11.39
M3 1.00 31.28 0.60 18.77
BENTIN M3 2.00 54.84 0.60 65.81
949.88
04.01.05 EMPEDRADO VEREDAS
CHACHANI LADO ESTE M2 1.00 48.00 1.00 48.00
M2 1.00 20.05 1.00 20.05
M2 1.00 39.59 1.00 39.59
M2 1.00 39.04 1.00 39.04
M2 1.00 40.77 1.00 40.77
M2 1.00 42.88 1.00 42.88
M2 1.00 23.19 1.00 23.19
M2 1.00 37.62 1.00 37.62
M2 1.00 26.43 1.00 26.43
CHACHANI LADO OESTE M2 1.00 36.60 1.00 36.60
M2 1.00 10.62 1.00 10.62
M2 1.00 32.05 1.00 32.05
M2 1.00 31.85 1.00 31.85
M2 1.00 18.41 1.00 18.41
M2 1.00 16.31 1.00 16.31
M2 1.00 45.66 1.00 45.66
M2 1.00 70.88 1.00 70.88
M2 1.00 40.40 1.00 40.40
M2 1.00 29.51 1.00 29.51
CHALLAPAMPA M2 1.00 6.10 1.00 6.10
M2 2.00 1.60 1.00 3.20
M2 2.00 5.36 1.00 10.72
NARANJOS M2 2.00 26.40 0.60 31.68
PORTALES M2 2.00 52.57 0.60 63.08
MERCEDES M2 2.00 49.89 0.60 59.87
M2 1.00 49.00 0.60 29.40
M2 1.00 18.98 0.60 11.39
M2 1.00 31.28 0.60 18.77
BENTIN M2 2.00 54.84 0.60 65.81
949.88
04.01.06 ENCOFRADO VEREDAS
CHACHANI LADO ESTE M2 1.00 0.42 48.00 20.16
M2 1.00 0.42 20.05 8.42
M2 1.00 0.42 39.59 16.63
M2 1.00 0.42 39.04 16.40
M2 1.00 0.42 40.77 17.12
M2 1.00 0.42 42.88 18.01
M2 1.00 0.42 23.19 9.74
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
M2 1.00 0.42 37.62 15.80
M2 1.00 0.42 26.43 11.10
CHACHANI LADO OESTE M2 1.00 0.42 36.60 15.37
M2 1.00 0.42 10.62 4.46
M2 1.00 0.42 32.05 13.46
M2 1.00 0.42 31.85 13.38
M2 1.00 0.42 18.41 7.73
M2 1.00 0.42 16.31 6.85
M2 1.00 0.42 45.66 19.18
M2 1.00 0.42 70.88 29.77
M2 1.00 0.42 40.40 16.97
M2 1.00 0.42 29.51 12.39
CHALLAPAMPA M2 2.00 0.42 6.10 5.12
M2 2.00 0.42 1.60 1.34
M2 2.00 0.42 5.36 4.50
JUNTAS M2 16.00 0.15 1.00 2.40
M2 6.68 0.15 1.00 1.00
M2 13.20 0.15 1.00 1.98
M2 13.01 0.15 1.00 1.95
M2 13.59 0.15 1.00 2.04
M2 14.29 0.15 1.00 2.14
M2 7.73 0.15 1.00 1.16
M2 12.54 0.15 1.00 1.88
M2 8.81 0.15 1.00 1.32
M2 12.20 0.15 1.00 1.83
M2 3.54 0.15 1.00 0.53
M2 10.68 0.15 1.00 1.60
M2 10.62 0.15 1.00 1.59
M2 6.14 0.15 1.00 0.92
M2 5.44 0.15 1.00 0.82
M2 15.22 0.15 1.00 2.28
M2 23.63 0.15 1.00 3.54
M2 13.47 0.15 1.00 2.02
M2 6.14 0.15 1.00 0.92
NARANJOS M2 2.00 0.42 26.40 22.18
PORTALES M2 2.00 0.42 52.57 44.16
MERCEDES M2 2.00 0.42 49.89 41.91
M2 2.00 0.42 49.00 41.16
M2 2.00 0.42 18.98 15.94
M2 2.00 0.42 31.28 26.28
BENTIN M2 2.00 0.42 54.84 46.07
Juntas M2 8.80 0.15 0.60 0.79
M2 17.52 0.15 0.60 1.58
M2 16.63 0.15 0.60 1.50
M2 16.33 0.15 0.60 1.47
M2 6.33 0.15 0.60 0.57
M2 10.43 0.15 0.60 0.94
M2 18.28 0.15 0.60 1.65
562.02
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
04.01.07 VEREDA DE CONCRETO F'C=140KG/CM2 e=0.05
CHACHANI LADO ESTE M2 1.00 48.00 1.00 48.00
M2 1.00 20.05 1.00 20.05
M2 1.00 39.59 1.00 39.59
M2 1.00 39.04 1.00 39.04
M2 1.00 40.77 1.00 40.77
M2 1.00 42.88 1.00 42.88
M2 1.00 23.19 1.00 23.19
M2 1.00 37.62 1.00 37.62
M2 1.00 26.43 1.00 26.43
CHACHANI LADO OESTE M2 1.00 36.60 1.00 36.60
M2 1.00 10.62 1.00 10.62
M2 1.00 32.05 1.00 32.05
M2 1.00 31.85 1.00 31.85
M2 1.00 18.41 1.00 18.41
M2 1.00 16.31 1.00 16.31
M2 1.00 45.66 1.00 45.66
M2 1.00 70.88 1.00 70.88
M2 1.00 40.40 1.00 40.40
M2 1.00 29.51 1.00 29.51
CHALLAPAMPA M2 1.00 6.10 1.00 6.10
M2 2.00 1.60 1.00 3.20
M2 2.00 5.36 1.00 10.72
NARANJOS M2 2.00 26.40 0.60 31.68
PORTALES M2 2.00 52.57 0.60 63.08
MERCEDES M2 2.00 49.89 0.60 59.87
M2 1.00 49.00 0.60 29.40
M2 1.00 18.98 0.60 11.39
M2 1.00 31.28 0.60 18.77
BENTIN M2 2.00 54.84 0.60 65.81
949.88
04.01.08 JUNTAS ASFALTICAS
M 16.00 1.00 16.00
M 6.68 1.00 6.68
M 13.20 1.00 13.20
M 13.01 1.00 13.01
M 13.59 1.00 13.59
M 14.29 1.00 14.29
M 7.73 1.00 7.73
M 12.54 1.00 12.54
M 8.81 1.00 8.81
M 12.20 1.00 12.20
M 3.54 1.00 3.54
M 10.68 1.00 10.68
M 10.62 1.00 10.62
M 6.14 1.00 6.14
M 5.44 1.00 5.44
M 15.02 1.00 15.02
M 23.42 1.00 23.42
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
M 13.47 1.00 13.47
M 9.50 1.00 9.50
M 8.80 0.60 5.28
M 17.52 0.60 10.51
M 16.63 0.60 9.98
M 16.33 0.60 9.80
M 6.33 0.60 3.80
M 10.43 0.60 6.26
M 18.28 0.60 10.97
272.48
04.02.00 SARDINELES DE CONCRETO
04.02.01 EXCAVACION SARDINELES
CHACHANI M3 7.00 0.15 7.30 0.20 1.53
M3 2.00 0.15 4.92 0.20 0.30
M3 1.00 0.15 4.88 0.20 0.15
M3 1.00 0.15 6.92 0.20 0.21
NARANJOS M3 5.00 0.15 3.92 0.20 0.59
GERANIOS M3 6.00 0.15 3.37 0.20 0.61
PORTALES M3 10.00 0.15 4.07 0.20 1.22
MERCEDES M3 9.00 0.15 3.60 0.20 0.97
BENTIN M3 7.00 0.15 2.70 0.20 0.57
M3 3.00 0.15 6.24 0.20 0.56
CHALLAPAMPA M3 1.00 0.15 11.39 0.20 0.34
M3 1.00 0.15 7.98 0.20 0.24
M3 1.00 0.15 59.45 0.20 1.78
M3 2.00 0.15 9.09 0.20 0.55
M3 2.00 0.15 6.05 0.20 0.36
M3 2.00 0.15 14.39 0.20 0.86
CRUCE TREN M3 1.00 0.25 11.24 1.15 3.23
14.07
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE %
M3 14.07 1.25 17.58
17.58
04.02.03 ENCOFRADO Y DESENCOFRADO SARDINELES
CHACHANI M2 17.00 0.30 7.30 37.23
M2 4.00 0.30 4.92 5.90
M2 2.00 0.30 4.88 2.93
M2 2.00 0.30 6.92 4.15
NARANJOS M2 10.00 0.30 3.92 11.76
GERANIOS M2 12.00 0.30 3.37 12.13
PORTALES M2 20.00 0.30 4.07 24.42
MERCEDES M2 18.00 0.30 3.60 19.44
BENTIN M2 14.00 0.30 2.70 11.34
M2 6.00 0.30 6.24 11.23
CHALLAPAMPA M2 2.00 0.30 11.39 6.83
M2 2.00 0.30 7.98 4.79
M2 2.00 0.30 59.45 35.67
M2 2.00 0.30 8.86 5.32
M2 2.00 0.30 9.09 5.45
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
M2 2.00 0.30 6.05 3.63
M2 2.00 0.30 14.39 8.63
210.86
04.02.04 CONCRETO SARDINELES
CHACHANI M3 7.00 0.30 7.30 0.20 3.07
M3 2.00 0.30 4.92 0.20 0.59
M3 1.00 0.30 4.88 0.20 0.29
M3 1.00 0.30 6.92 0.20 0.42
NARANJOS M3 5.00 0.30 3.92 0.20 1.18
GERANIOS M3 6.00 0.30 3.37 0.20 1.21
PORTALES M3 10.00 0.30 4.07 0.20 2.44
MERCEDES M3 9.00 0.30 3.60 0.20 1.94
BENTIN M3 7.00 0.30 2.70 0.20 1.13
M3 3.00 0.30 6.24 0.20 1.12
CHALLAPAMPA M3 1.00 0.30 11.39 0.20 0.68
M3 1.00 0.30 7.98 0.20 0.48
M3 1.00 0.30 59.45 0.20 3.57
M3 1.00 0.30 8.86 0.20 0.53
M2 2.00 0.30 9.09 0.20 1.09
M2 2.00 0.30 6.05 0.20 0.73
M2 2.00 0.30 14.39 0.20 1.73
CRUCE TREN M3 1.00 0.25 11.24 1.15 3.23
25.43
04.02.05 TARRAJEO SARDINELES
CHACHANI M2 7.00 7.30 0.20 10.22
M2 2.00 4.92 0.20 1.97
M2 1.00 4.88 0.20 0.98
M2 1.00 6.92 0.20 1.38
NARANJOS M2 5.00 3.92 0.20 3.92
GERANIOS M2 6.00 3.37 0.20 4.04
PORTALES M2 10.00 4.07 0.20 8.14
MERCEDES M2 9.00 3.60 0.20 6.48
BENTIN M2 7.00 2.70 0.20 3.78
M2 3.00 6.24 0.20 3.74
CHALLAPAMPA M2 1.00 11.39 0.20 2.28
M2 1.00 7.98 0.20 1.60
M2 1.00 59.45 0.20 11.89
M2 1.00 8.86 0.20 1.77
M2 2.00 9.09 0.20 3.64
M2 2.00 6.05 0.20 2.42
M2 2.00 14.39 0.20 5.76
74.00
04.02.06 PASTO CULTIVADO EN ESQUEJES
M2 1.00 7.98 1.20 9.58
M2 1.00 59.45 1.20 71.34
80.92
04.02.07 ACERO F'y=4,200 kg/cm2
CRUCE TREN kg 1.00 14.00 11.20 1.01 158.37
kg 1.00 56.00 2.66 1.01 150.45
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
308.82
04.03.00 GRADAS
04.03.01 EXCAVACION PARA GRADAS
M3 26.00 0.30 1.00 0.50 3.90
3.90
04.03.02 ELIMINACION DE MATERIAL EXCEDENTE %
M3 1.00 3.90 1.25 4.88
4.88
04.03.03 NIVELACION Y APISONADO
M3 26.00 1.00 0.50 13.00
13.00
04.03.04 CONCRETO F'C=140 KG/CM2 GRADAS A=
M3 26.00 0.28 1.00 7.28
7.28
04.03.05 ENCOFRADO Y DESENCOFRADO GRADAS
M2 52.00 0.18 1.00 9.10
M2 52.00 0.28 14.56
A= 23.66
04.03.06 ENLUCIDO GRADAS
M2 52.00 0.18 1.00 9.10
M2 52.00 0.28 14.56
A=
M2 52.00 1.00 0.25 13.00
36.66
04.04.00 RAMPAS VEHICULARES
04.04.01 EXCAVACION PARA RAMPAS
M3 24.00 0.12 3.00 1.00 8.28
8.28
04.04.02 ELIMINACION DE MATERIAL EXCEDENTE %
M3 1.00 8.28 1.25 10.35
10.35
04.04.03 NIVELACION Y APISONADO
M3 24.00 3.00 1.00 72.00
72.00
04.04.04 CONCRETO F'C=140 KG/CM2 RAMPAS A=
M3 24.00 0.28 3.00 20.16
20.16
04.04.05 ENCOFRADO Y DESENCOFRADO RAMPAS
M2 48.00 0.28 1.00 13.44
A= 13.44
04.04.06 ENLUCIDO RAMPAS
M2 22.00 3.00 1.03 67.98
67.98
05.00.00 CONCRETO ARMADO
05.01.00 ALCANTARILLA
05.01.01 EXCAVACION PARA ALCANTARILLA
CHACHANI M3 3.00 0.60 6.05 0.90 9.80
CHALLAPAMPA M3 1.00 0.60 8.63 0.90 4.66
M3 1.00 0.60 11.27 0.90 6.09
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
4.66
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE %
M3 4.66 1.25 5.83
5.83
05.01.03 ENCOFRADO ALCANTARILLA
CHACHANI M2 12.00 0.60 6.05 43.56
CHALLAPAMPA M2 4.00 0.60 8.63 20.71
M2 4.00 0.60 11.27 27.05
27.05
05.01.04 CONCRETO ALCANTARILLA A=
CHACHANI M3 3.00 0.34 6.05 6.17
CHALLAPAMPA M3 1.00 0.34 8.63 2.93
M3 1.00 0.34 11.27 3.83
12.94
05.01.05 ACERO ALCANTARILLA F'y=4,200 kg/cm2
kg 3.00 8.00 6.05 1.01 146.65
kg 3.00 30.25 1.70 0.57 87.94
kg 1.00 8.00 8.63 1.01 69.73
kg 1.00 43.15 1.70 0.57 41.81
kg 1.00 8.00 11.27 1.01 91.06
kg 1.00 56.35 11.27 0.57 361.99
799.18
05.01.06 RIELES ALCANTARILLA
6.05 M 3.00 24.20 1.12 81.31
8.63 M 1.00 34.52 1.12 38.66
11.27 M 1.00 45.08 1.12 50.49
170.46
05.01.07 TUBERIA 8"PVC
M 1.00 25.07 25.07
M 1.00 5.21 5.21
M 1.00 49.97 49.97
M 1.00 5.08 5.08
M 1.00 50.72 50.72
M 1.00 4.49 4.49
140.54
05.02.00 CANALIZACION
05.02.01 EXCAVACION PARA CANAL
CHALLAPAMPA M3 1.00 0.60 19.00 0.90 10.26
10.26
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE %
M3 10.26 1.25 12.83
12.83
05.02.03 ENCOFRADO CANAL
CHALLAPAMPA M2 1.00 0.40 19.00 7.60
7.60
05.02.04 CONCRETO CANAL A=
CHALLAPAMPA M3 1.00 0.34 19.00 6.46
TECHO CANAL 2 M3 1.00 0.10 11.27 0.95 1.07
7.53
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
05.02.05 ACERO CANAL F'y=4,200 kg/cm2
CHALLAPAMPA kg 1.00 8.00 19.00 1.01 153.52
kg 1.00 95.00 1.70 0.57 92.06
TECHO CANAL 2 kg 2.00 5.00 10.51 1.01 106.15
kg 1.00 52.55 0.90 1.01 47.77
399.49
05.02.07 TUBERIA 8"PVC
M 1.00 3.00 3.00
3.00
06.00.00 CARPINTERIA METALICA
06.01.00 PANEL METALICO TUBO 32, MALLA 2X2, PERFIL 1 1 /22X 1 1/2"
UND 26.00 26.00
26.00
07.00.00 INSTALACIONES ELECTRICAS
07.01.00 SUMINISTRO E INSTALACION PARA REEMPLAZO DE LUMINARIAS 70 W
UND 33.00 33.00
33.00
08.00.00 SEÑALIZACION
08.01.00 SEÑALES REGULADORAS
UND 6.00 6.00
6.00
08.02.00 SEÑALES PREVENTIVAS
UND 10.00 10.00
10.00
08.03.00 PINTURA DE TRAFICO
DIVISORA CHACHANI M2 1.00 347.00 0.15 52.05
DIVISORA CHALLAPAMPA M2 1.00 147.25 0.15 22.09
DE BORDE CHACHANI M2 2.00 347.00 0.15 104.10
DE BORDE CHALLAPAMPA M2 2.00 147.25 0.15 44.18
CRUCEROS PEATONALES M2 15.00 6.40 3.00 288.00
DE BORDE PASAJES M2 2.00 26.46 0.15 7.94
M2 2.00 30.12 0.15 9.04
M2 2.00 51.75 0.15 15.53
M2 2.00 49.43 0.15 14.83
M2 2.00 54.68 0.15 16.40
CHALLAPAMPA M2 1.00 67.93 0.90 61.14
635.28
08.04.00 REDUCTORES DE VELOCIDAD TIPO GIBAS
UND 4.00 1.00 1.00 4.00
4.00
09.00.00 PRUEBAS DE LABORATORIO
09.01.00 DISEÑO DE MEZCLAS
140, 210, 350 UND 3.00 1.00 1.00 3.00
3.00
09.02.00 PRUEBAS DE CALIDAD DEL CONCRETO
UND 10.00 1.00 1.00 10.00
10.00
09.03.00 PRUEBAS DE COMPACTACION (PROCTOR MODIFICADO)
UND 10.00 1.00 1.00 10.00
CUADRO DE METRADOS
PROYECTO: MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR DEL BARRIO LA MERCED
UBICACIÓN: LA MONTAÑITA, CERRO COLORADO, AREQUIPA
FECHA: JUNIO 2012
PARTIDA UND CANT ALTO LARGO ANCHO SUB-TOTAL TOTAL
10.00
02.02.00 TRAZO Y REPLANTEO
CHACHANI +000 +100 M 1.00
+100 +200 M 1.00
+200 +300 M 1.00
+300 +347 M 1.00

NARANJOS +00 +026 M 1.00


GERANIOS +00 +035.5 M 1.00
PORTALES +00 +052 M 1.00
MERCEDES +00 +049.5 M 1.00
BENTIN +00 +054.5 M 1.00
CHALLAPAMPA +147.25 M 1.00
CHALLAPAMPA +153.35 M 1.00

02.03.00 DEMOLICION DE EMPEDRADO


NARANJOS +00 +026 M3 1.00
GERANIOS +00 +035.5 M3 1.00
CHALLAPAMPA +147.25 M3 1.00
+153.35 M3 1.00

02.04.00 DEMOLICION DE CONCRETO


PORTALES +00 +052 M3 1.00
MERCEDES +00 +049.5 M3 1.00
BENTIN +00 +054.5 M3 1.00
M3 1.00

02.05.00 DEMOLICION DE CARPETA


CHACHANI +100 M3 1.00
+200 M3 1.00
+300 M3 1.00
+347 M3 1.00

DESCRIPCION DE LAS VIAS VEREDAS (M2) BERMA VERDE (M2)


DEMANDA OFERTA BRECHA BRECHA DEMANDA
LONGITUDES VEREDAS
NOMBRE VEREDA VEREDA VEREDAS EN BERMA
(M) CON
TOTAL EXISTENTE MAL ESTADO TOTAL
PROYECTO
AV.CHACHANI 348.60 649.86 649.86 649.86 649.86 0
PSJE.NARANJOS 26.40 31.68 15.84 15.84 31.68 0
PSJE.GERANIOS 28.09 34.43 0 0 34.428 0
PSJE.PORTALES 52.57 63.08 31.54 31.54 63.084 0
PSJE.MERCEDES 49.89 119.42 29.93 29.93 119.424 0
PSJE.BENTIN 54.84 65.81 0 0 65.808 0
AV.CHALLAPAMPA 153.35 20.02 263.54 0 283.56 80.92
TOTALES 713.74 984.30 990.72 727.18 1,247.84 80.92

04.01.01 DEMOLICION VEREDAS


CHACHANI LADO ESTE M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
CHACHANI LADO OESTE M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15

NARANJOS M3 1.00 0.25


PORTALES M3 2.00 0.15
MERCEDES M3 2.00 0.15
M3 1.00 0.15
M3 1.00 0.15
M3 1.00 0.15

BENTIN M3 2.00 0.15

04.01.07 VEREDA DE CONCRETO F'C=140KG/CM2 e=0.05


CHACHANI LADO ESTE M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
CHACHANI LADO OESTE M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00
M2 1.00

CHALLAPAMPA M2 1.00
M2 2.00
M2 2.00

NARANJOS M2 2.00
PORTALES M2 2.00
GERANIOS M2 2.00
MERCEDES M2 2.00
M2 1.00
M2 1.00
M2 1.00

BENTIN M2 2.00
-
101.30 101.30
100.30 100.30
100.00 100.00
47.00 47.00
348.60
26.40 26.40
28.09 28.09
52.57 52.57
49.89 49.89
54.84 54.84
147.25 147.25
6.10 6.10
153.35 713.74

0.15 26.40 5.14 20.35


0.15 28.09 4.55 19.17
0.15 147.25 6.00 132.53
0.15 6.10 9.76 8.93
180.98

0.15 52.57 5.28 41.64


0.15 49.89 4.82 36.07
0.15 54.84 4.29 35.29
0.15 14.04 2.52 5.31
118.30

0.05 101.30 6.00 30.39


0.05 100.30 6.00 30.09
0.05 100.00 6.00 30.00
0.05 47.00 6.00 14.10
348.60 6.00 2,091.60 104.58

BERMA VERDE (M2) VIA Y COMPLEMENTARIOS (M2)


OFERTA BRECHA BRECHA OFERTA DEMANDA BRECHA
CONCRETO EMPEDRADO PAVIMENTO
BERMA BERMAS EN BERMAS CON ASFALTO EN PAVIMENTO
EN MAL EN MAL CON
EXISTENTE MAL ESTADO PROYECTO MAL ESTADO TOTAL
ESTADO ESTADO PROYECTO
0 0 0 2,091.60 0 0 2,091.60 2,147.54
0 0 0 0 0 135.70 135.70 103.49
0 0 0 0 0 127.81 127.81 94.66
0 0 0 0 277.57 0 277.57 213.96
0 0 0 0 240.47 0 240.47 446.16
0 0 0 0 35.38 0 35.38 183.45
0 0 80.92 0 0 943.04 943.04 1,249.08
0 0 80.92 2,091.60 553.42 1,206.54 3,851.56 4,438.34

03.02.05 ADOQUINADO DE CONCRETO


48.00 1.00 7.20 CHACHANI 0+00 0+02
20.05 1.00 3.01 0+02 0+04
39.59 1.00 5.94 0+04 0+06
39.04 1.00 5.86 0+06 0+08
40.77 1.00 6.12 0+08 0+10
42.88 1.00 6.43 0+10 0+12
23.19 1.00 3.48 0+12 0+14
37.62 1.00 5.64 0+14 0+16
26.43 1.00 3.96 0+16 0+18
36.60 1.00 5.49 0+18 0+20
10.62 1.00 1.59 0+20 0+22
32.05 1.00 4.81 0+22 0+24
31.85 1.00 4.78 0+24 0+26
18.41 1.00 2.76 0+26 0+28
16.31 1.00 2.45 0+28 0+30
45.66 1.00 6.85 0+30 0+32
70.88 1.00 10.63 0+32 0+34
40.40 1.00 6.06 0+34 0+34.7
29.51 1.00 4.43
649.86 NARANJOS +00 +026
26.40 0.60 3.96 GERANIOS +00 +035.5
52.57 0.60 9.46 PORTALES +00 +052
49.89 0.60 8.98 MERCEDES +00 +049.5
49.00 0.60 4.41
18.98 0.60 1.71
31.28 0.60 2.82 BENTIN +00 +054.5
99.26
54.84 0.60 9.87
138.69 CHALLAPAMPA 0+00
0+01
48.00 1.00 48.00 0+02
20.05 1.00 20.05 0+03
39.59 1.00 39.59 0+04
39.04 1.00 39.04 0+05
40.77 1.00 40.77 0+06
42.88 1.00 42.88 0+07
23.19 1.00 23.19 0+08
37.62 1.00 37.62 0+09
26.43 1.00 26.43 0+10
36.60 1.00 36.60 0+11
10.62 1.00 10.62 0+12
32.05 1.00 32.05 0+13
31.85 1.00 31.85 0+14
18.41 1.00 18.41
16.31 1.00 16.31
45.66 1.00 45.66
70.88 1.00 70.88
40.40 1.00 40.40
29.51 1.00 29.51
649.86
6.10 1.00 6.10
1.60 1.00 3.20
5.36 1.00 10.72
20.02
26.40 0.60 31.68
52.57 0.60 63.08
28.69 0.60 34.43
49.89 0.60 59.87
49.00 0.60 29.40
18.98 0.60 11.39
31.28 0.60 18.77
119.42
54.84 0.60 65.81
OS (M2)
BRECHA
DRENAJE DRENAJE CON
EXISTENTE PROYECTO
(ML) (ML)
0 18.15 DRENAJE
26.40 26.40 INCLINACION A ACEQUIA
28.09 28.09 INCLINACION A ACEQUIA
52.57 52.57 INCLINACION A ACEQUIA
49.89 49.89 INCLINACION A ACEQUIA
54.84 54.84 INCLINACION A ACEQUIA
0 19.90 DRENAJE
211.79 249.84

M2 1.00 20.26 8.30 168.16


M2 1.00 20.26 7.30 147.90
M2 1.00 20.26 6.38 129.26
M2 1.00 20.26 6.09 123.38
M2 1.00 20.26 6.25 126.63
M2 1.00 20.26 6.42 130.07
M2 1.00 20.06 6.57 131.79
M2 1.00 20.06 6.28 125.98
M2 1.00 20.06 6.01 120.56
M2 1.00 20.06 6.00 120.36
M2 1.00 20.06 5.97 119.76
M2 1.00 20.00 5.81 116.20
M2 1.00 20.00 5.75 115.00
M2 1.00 20.00 5.67 113.40
M2 1.00 20.00 5.51 110.20
M2 1.00 20.00 5.41 108.20
M2 1.00 20.00 5.32 106.40
M2 1.00 7.00 4.90 34.30
2,147.54
M2 1.00 26.40 3.92 103.49
M2 1.00 28.09 3.37 94.66
M2 1.00 52.57 4.07 213.96
M2 1.00 49.89 3.60 179.60
M2 1.00 49.00 5.44 266.56
446.16
M2 1.00 54.84 2.70 148.07
M2 1.00 14.04 2.52 35.38
183.45
M2 1.00 10.00 11.39 113.90
M2 1.00 10.00 8.08 80.80
M2 1.00 10.00 7.97 79.70
M2 1.00 10.00 7.85 78.50
M2 1.00 10.00 7.74 77.40
M2 1.00 10.00 7.63 76.30
M2 1.00 10.00 8.01 80.10
M2 1.00 10.00 9.67 96.70
M2 1.00 10.00 8.22 82.20
M2 1.00 10.00 7.38 73.80
M2 1.00 10.00 7.39 73.90
M2 1.00 10.00 7.40 74.00
M2 1.00 10.00 7.41 74.10
M2 1.00 10.00 7.42 74.20
M2 1.00 7.25 7.44 53.94
M2 1.00 6.10 9.76 59.54
1,249.08