Professional Documents
Culture Documents
Approximate Slope
run, x rise, y
1 0
1 1.75
1 1.5
1 1.75
1 2
1 1.5
1 2
1 1
1 1.5
Shrinkage (%)
10
11
9.25
8.5
9
10
16.5
Steel Diameter Commercial Length
10 6
12 7.5
16 9
20 10.5
25 12
28
32
36
List Group
Structural Excavation
Base
Total Length = 1.4 + 2(0.2) = 1.80 m
Total Width = 1.4 + 2(0.2) = 1.80 m
Base Area = 1.8 x 1.8 = 3.24 m
Top
Run 1
Rise 0
m
m
m
m
4.86