Company Name : GADANG WORKS SDN. BHD.

B
End User : IKM Bintulu
Project Code : 8103
Project Description: DISTILLATION COLUMN PILOT PLANT
Document Number:

Item Description Manufacturing


1 PUSHBUTTON (GREEN) TEND
2 SELECTOR SWITCH TEND
3 PUSHBUTTON (RED) TEND
4 EMERGENCY STOP TEND
5 FILTER
6 AC BRUSHLESS FAN HSY
7 LED INDICATOR (GREEN) SALZER
8 ISOLATED SWITCH EMA
9 PANEL SOCKET MENNEKES
10 40A/2POLE RCCB ABB
11 20A/2POLE MCB ABB
12 6A/2POLE MCB ABB
13 24VDC 10A POWER SUPPLY WAGO
14 CONTACTOR 3 POLE (MC) LS
15 CONTACTOR 3 POLE (MC) LS
16 CONTACTOR 3 POLE (MC) LS
17 3-PIN SOCKET
18 CENTRAL PROCESSING UNIT (CPU) S7-1200 SIEMENS
19 2X ANALOG INPUT SIEMENS
20 8X ANALOG OUTPUT SIEMENS
21 CONTROLLER FOR SOLENOID CONTROL VALVE BURKERT
22 RELAY 2 POLE (R) CARLO GAVANZZI
23 SINGLE LAYER TERMINAL BLOCK WAGO
24 SINGLE LAYER TERMINAL BLOCK WAGO
25 SINGLE LAYER TERMINAL BLOCK WAGO
26 STOPPER WAGO
27 POLYESTER ENCLOSURE CVS
SHEET 1 O
BILL OF MATERIAL BILL NO.:
CONTRACT:
REFERENCES:
PRPD:
ALYA

Model Location Quantity


V1-LO:01, V1-LO:02 2
TN2IS27G-L1A V1-LO:03, V1-LO:06, V1-LO:07, V1-LO:09 3
TN2IS27R-L1A V1-LO:04, V1-LO:05 2
TN2BKR-1B V1-LO:08 1
V2-LO:10 1
AF12038HBL V2-LO:11 1
SZ22-C302 V3-LO:12 1
P11-32A(3P) V3-LO:13 1
NEM-CEE-32-6H V3-LO:14 1
FH202 AC-40 R01-LO:15 1
SH202 L C20 R01-LO:16, R01-LO:17, R01-LO:18, R01-LO:19 5
SH202 L C10 R01-LO:21, R01-LO:22 2
HPH IND. R01-LO:20, 1
MC-40a METASOL R01-LO:22 1
MC-22b METASOL R02-LO:23 2
MC-9b METASOL R02-LO:25, R02-LO:26 2
1
CPU114C DC/DC/RLY R02-LO:24, R02-LO:27 1
SM1231 RTD R03-LO:28 2
SM1232 AQ R03-LO:29 2
178363 R03-LO:30, R03-LO:31 2
RMIA21024 VDC-M R03-LO:32, R03-LO:33 8
20061201 R03-LO:34, R03-LO:35, R03-LO:36, R03-LO:37 3
20041201 9
20021201 18
249-116 16
600X1000 1
SHEET 1 OF 1