ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO

TIPO DE CONTRATO: CONTRATO DE OBRA A PRECIOS UNITARIOS


N° DE CONTRATO: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CONTRATISTA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SUPERVISIÓN: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE
REFERENCIAS:
PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

LOCALIZACIÓN EN CARPETA POR


SECCIÓN DESCRIPCIÓN
SECCIÓN
1 INGENIERÍA DEL PROYECTO
1.1 DISEÑO DE MEZCLAS DE CONCRETO SEC.01 CARPETA 1 DE 1
1.2 DISEÑO DE MEZCLA HOLCIM SEC.01 CARPETA 1 DE 1
1.2 DISEÑO DE MEZCLA CEMEX CONCRETOS SEC.01 CARPETA 1 DE 1
2 INGENIERÍA DE DETALLE
2.1 PLANOS AS-BUILT PLANOS DE TALLER SEC. 02 CARPETA 1 DE 2
2.2 PLANOS AS-BUILT PLANOS DE CELDAS SEC. 02 CARPETA 2 DE 2
3 MANUALES
3.1 PLAN DE ASEGURAMIENTO DE CALIDAD SEC. 03 CARPETA 1 DE 1
3.2 PROCEDIMIENTOS ADMINISTRATIVOS SEC. 03 CARPETA 1 DE 1
3.3 PLAN DE PRUEBAS E INSPECCIÓN SEC. 03 CARPETA 1 DE 1
4 PROCEDIMIENTOS
4.1 PROCEDIMIENTOS CONSTRUCTIVOS SEC. 04 CARPETA 1 DE 1
4.1.1 01-PC-NAICM-FDPC-PROC. CONSTRUCTIVO DE FAB. DE PILOTES DE CONRETO SEC. 04 CARPETA 1 DE 1
4.1.2 02-PC-NAICM-HDPTC-HINCADO DE PILOTES PPD 40 X 40 SEC. 04 CARPETA 1 DE 1
4.1.3 03-PC-NAICM-HDPET-HINCADO DE PILOTES 50 X 50 SEC. 04 CARPETA 1 DE 1
4.1.4 04-PC-NAICM-PDCPP-PRUEBAS DINAMICAS SEC. 04 CARPETA 1 DE 1
4.1.5 05-PC-NAICM-HDPIND-HINCADO DE PILOTES INDICADORES 50 X 50 SEC. 04 CARPETA 1 DE 1
4.1.6 06-PC-NAICM-PITPI ID Y TRAZAB PILOTES CONTROL SEC. 04 CARPETA 1 DE 1
4.1.7 07-PC-NAICM-PCTRPC. PROC. PARA CARGA Y TRANS. DE PILOTES CONCRETO SEC. 04 CARPETA 1 DE 1
4.1.8 08-PC-NAICM-HDPIND-HINCADO DE PILOTES INDICADORES 40 X 40 SEC. 04 CARPETA 1 DE 1
4.2 PROCEDMIENTOS DEL PLAN DE ASEGURAMIENTO DE CALIDAD SEC. 04 CARPETA 1 DE 1
4.2.1 01 PAD-NAICM-PCD-01 CONTROL DE DOCUMENTOS SEC. 04 CARPETA 1 DE 1
4.2.2 02 PAD-NAICM-PCSSC-01 COMPRAS SEC. 04 CARPETA 1 DE 1
4.2.3 03 PAD-NAICM-PIT-01 TRAZABILIDAD SEC. 04 CARPETA 1 DE 1
4.2.4 04 PAD-NAICM-PCP-02 CONTROL DE PROCESO SEC. 04 CARPETA 1 DE 1
4.2.5 05 PAD-NAICM-PAIC-01 AUDITORIAS INTERNAS DE CALIDAD SEC. 04 CARPETA 1 DE 1
4.2.6 06 PAD-NAICM-PCPNC-01 PRODUCTO NO CONFORME SEC. 04 CARPETA 1 DE 1
4.2.7 07 PAD-NAICM-PAPC-01 ACCIONES PREVENTIVAS Y CORRECTIVAS SEC. 04 CARPETA 1 DE 1
4.2.8 08 PAD-NAICM-PAM-00 ACCIONES DE MEJORA SEC. 04 CARPETA 1 DE 1
5 ACREDITACIONES DE LABORATORIOS Y CALIBRACIONES DE EQUIPOS
5.1 EQUIPOS E INSTRUMENTOS DE MEDICIÓN SEC.05 CARPETA 1 DE 1
5.2 VERIFICACIÓN Y CALIBRACIÓN SEC.05 CARPETA 1 DE 1
5.3 DOCUMENTACIÓN DE LABORATORIO DE PRUEBAS DINAMICAS DE PILOTES SEC.05 CARPETA 1 DE 1
5.4 ACREDITACIONES ema SEC.05 CARPETA 1 DE 1
5.5 ACREDITACIÓN ema EN RAMA CONST. UNI. AUTONOMA DE NUEVO LEÓN SEC.05 CARPETA 1 DE 1
5.6 ACREDITACIÓN ema EN RAMA METAL MECÁNICA LAB. DE CONTROL S.A. DE C.V. SEC.05 CARPETA 1 DE 1
5.7 ACREDITACIÓN ema EN RAMA CONST. LABORATORIO LACECO S.A. DE C.V. SEC.05 CARPETA 1 DE 1
6 CERTIFICADOS DE MATERIALES Y FICHAS TÉCNICAS
6.1 CERTIFICADOS DE MATERIALES SEC. 06 CARPETA 1 DE 1
6.1.2 ACERO DE REFUERZO SEC. 06 CARPETA 1 DE 1
6.1.3 ZUNCHOS SEC. 06 CARPETA 1 DE 1
6.1.4 ACERO DE PRESFUERZO SEC. 06 CARPETA 1 DE 1
6.1.5 CEMENTO SEC. 06 CARPETA 1 DE 1
6.1.6 CONECTORES SEC. 06 CARPETA 1 DE 1
6.1.7 ADITIVOS PARA CONCRETO SEC. 06 CARPETA 1 DE 1
6.1.8 MICROSILICA SEC. 06 CARPETA 1 DE 1
6.1.9 CEMENTO SEC. 06 CARPETA 1 DE 1

Página 1 ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD


6.2 FICHAS TÉCNICAS SEC. 06 CARPETA 1 DE 1
6.3 MICROSILICA SEC. 06 CARPETA 1 DE 1
ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO
TIPO DE CONTRATO: CONTRATO DE OBRA A PRECIOS UNITARIOS
N° DE CONTRATO: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CONTRATISTA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SUPERVISIÓN: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE
REFERENCIAS:
PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

LOCALIZACIÓN EN CARPETA POR


SECCIÓN DESCRIPCIÓN
SECCIÓN
6.4 CONECTORES SEC. 06 CARPETA 1 DE 1
6.5 ACERO DE REFUERZO G 52 SEC. 06 CARPETA 1 DE 1
6.6 ADITIVOS PARA CONCRETO SEC. 06 CARPETA 1 DE 1
6.7 PROTECTO GROUT NM SEC. 06 CARPETA 1 DE 1
6.8 MASTEREMACO S488 CI SEC. 06 CARPETA 1 DE 1
6.9 EUCON W.O SEC. 06 CARPETA 1 DE 1
6.10 EUCON CIA SEC. 06 CARPETA 1 DE 1
6.11 EUCON MSA ADITIVO EN POLVO, PARA CONCRETO SEC. 06 CARPETA 1 DE 1
7 REPORTES DE PRUEBAS DE CALIDAD
7.1.1 RESISTENCIA A LA COMPRESIÓN DE LA MUESTRA 01 A LA 700 SEC.07 CARPETAS 01 DE 12
7.1.2 RESISTENCIA A LA COMPRESIÓN DE LA MUESTRA 701 A LA 1350 SEC.07 CARPETAS 02 DE 12
7.1.3 RESISTENCIA A LA COMPRESIÓN DE LA MUESTRA 1351 A LA 1913 SEC.07 CARPETAS 03 DE 12
7.2 AGREGADOS PARA CONCRETO ARENA-GRAVA SEC.07 CARPETAS 04 DE 12
7.2.1.1 INFORME ANÁLISIS FÍSICO-QUÍMICO. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.1.2 INFORME DETERMINACIÓN DE PARTÍCULAS LIGERAS SEC.07 CARPETAS 04 DE 12
7.2.1.3 INFORME DETER. DE TERRONES DE ARCILLA Y PARTÍCULAS DELEZNABLES SEC.07 CARPETAS 04 DE 12
7.2.1.4 INFORME CITEC-PR-16-146 DETERMINACIÓN DEL EQUIVALENTE DE ARENA SEC.07 CARPETAS 04 DE 12
7.2.1.5 INFORME CITEC-PR-16-146 ANÁLISIS FÍSICO DE ARENA SEC.07 CARPETAS 04 DE 12
7.2.1.6 INFORME CITEC-PR-16-146 DETERMINACIÓN DE LA SANIDAD SEC.07 CARPETAS 04 DE 12
7.2.1.7 INFORME CITEC-PR-16-134 REACCIÓN ÁLCALI-AGREGADO. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.1 CITEC-PR-16-147 ANÁLISIS FÍSICO-QUÍMICO. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.2 CITEC-PR-16-147 DESGASTE DE LOS ÁNGELES. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.3 CITEC-PR-16-147 DETERMINACIÓN DE PARTÍCULAS LIGERAS. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.4 CITEC-PR-16-147 DETERMINACIÓN DEL COEFICIENTE VOLUMÉTRICO. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.5 CITEC-PR-16-147 REP. ANÁLISIS FÍSICO -GRANULOMETRÍA- DE GRAVA. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.6 CITEC-PR-16-147 REPORTE DETERMINACIÓN DE LA SANIDAD. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.7 CITEC-PR-16-147 REP. DETERMINACIÓN DE PIEZAS PLANAS Y ALARGADAS. HOLCIM SEC.07 CARPETAS 04 DE 12
7.2.2.8 CITEC-PR-16-134 REACCIÓN ÁLCALI-AGREGADO. HOLCIM SEC.07 CARPETAS 04 DE 12
7.3 INFORME DE RESULTADOS INSUMOS PARA CONCRETO. HOLCIM SEC.07 CARPETAS 04 DE 12
7.3.1 CEMENTO SEC.07 CARPETAS 04 DE 12
7.3.1.1 INF. DE RESULTADOS CEMENTO CPO 30 R RS/BRA DEL 01-AGO AL 01 SEP 2016 SEC.07 CARPETAS 04 DE 12
7.3.2 CENIZA VOLANTE SEC.07 CARPETAS 04 DE 12
7.3.2.1 REACTIVIDAD CENIZA VOLANTE. HOLCIM SEC.07 CARPETAS 04 DE 12
7.3.3 AGUA PARA CONCRETO SEC.07 CARPETAS 04 DE 12
7.3.3.1 INFORME 093/2016 DETERMINACIÓN DEL ANÁLISIS FÍSICO QUÍMICO AGUA. HOLIM SEC.07 CARPETAS 04 DE 12
7.3 ACERO SEC.07 CARPETAS 04 DE 12
7.4 PERMEABILIDAD SEC.07 CARPETAS 04 DE 12
7.5 CEMENTO SEC.07 CARPETAS 04 DE 12
7.6 PRUEBAS DINÁMICAS DEL INFORME No.01 AL 08 SEC.07 CARPETAS 05 DE 12
7.6.1 PRUEBAS DINÁMICAS DEL INFORME No.09 AL 11 SEC.07 CARPETAS 06 DE 12
7.6.2 PRUEBAS DINÁMICAS DEL INFORME No.12 AL 15 SEC.07 CARPETAS 07 DE 12
7.6.3 PRUEBAS DINÁMICAS DEL INFORME No.16 AL 18 SEC.07 CARPETAS 08 DE 12
7.6.4 PRUEBAS DINÁMICAS DEL INFORME No.19 AL 20 SEC.07 CARPETAS 09 DE 12
7.6.5 PRUEBAS DINÁMICAS DEL INFORME No.21 AL 22 SEC.07 CARPETAS 10 DE 12
7.6.6 PRUEBAS DINÁMICAS DEL INFORME No.23 AL 24 SEC.07 CARPETAS 11 DE 12
7.6.7 PRUEBAS DINÁMICAS DEL INFORME No.25 AL 27 SEC.07 CARPETAS 12 DE 12

Página 2 ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD


ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO
TIPO DE CONTRATO: CONTRATO DE OBRA A PRECIOS UNITARIOS
N° DE CONTRATO: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CONTRATISTA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SUPERVISIÓN: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE
REFERENCIAS:
PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

LOCALIZACIÓN EN CARPETA POR


SECCIÓN DESCRIPCIÓN
SECCIÓN
8 LISTAS DE VERIFICACIÓN FABRICACIÓN, HINCADO Y CONTROL GEOMETRICO
8.1 ACTAS DE TENSADO TORON SEC.08 CARPETA 01 DE 63
8.2 TRAZABILIDAD SEC.08 CARPETA 01 DE 63
8.3 REMISIONES DE DOSIFICACIÓN DE MEZCLA SEC.08 CARPETA 01 DE 63
8.4 ACTAS DE NACIMIENTO, HINCADO Y CONTROL GEOMÉTRICO SEC.08 CARPETA 02 DE 63
8.4.1 TORRE DE CONTROL CELDAS TC-A1-A2 SEC.08 CARPETA 02 DE 63
8.4.2 TORRE DE CONTROL CELDAS TC-A3-A4 SEC.08 CARPETA 03 DE 63
8.4.3 TORRE DE CONTROL CELDAS TC-A5-A6 SEC.08 CARPETA 04 DE 63
8.4.4 TORRE DE CONTROL CELDAS TC-A7-A8 SEC.08 CARPETA 05 DE 63
8.4.5 TORRE DE CONTROL CELDAS TC-A9-A10-A11 SEC.08 CARPETA 06 DE 63
8.5 CENTRO DE TRANSPORTE TERRESTRE SEC.08 CARPETA 07 DE 63
8.5.1 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA A-B-C SEC.08 CARPETA 07 DE 63
8.5.2 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA C SEC.08 CARPETA 08 DE 63
8.5.3 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA D 1ERA SEC.08 CARPETA 09 DE 63
8.5.4 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA D 2DA SEC.08 CARPETA 10 DE 63
8.5.5 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA E 1ERA SEC.08 CARPETA 11 DE 63
8.5.6 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA E 2DA SEC.08 CARPETA 12 DE 63
8.5.7 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA F SEC.08 CARPETA 13 DE 63
8.5.8 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA G-H-I SEC.08 CARPETA 14 DE 63
8.5.9 CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CUBIERTA SEC.08 CARPETA 15 DE 63
8.6 PUENTES FIJOS SEC.08 CARPETA 16 DE 63
8.6.1 PUENTES FIJOS DEL 01 AL 11 SEC.08 CARPETA 16 DE 63
8.6.2 PUENTES FIJOS DEL 12 AL 20 SEC.08 CARPETA 17 DE 63
8.6.3 PUENTES FIJOS DEL 21 AL 30 SEC.08 CARPETA 18 DE 63
8.6.4 PUENTES FIJOS DEL 31 AL 41 SEC.08 CARPETA 19 DE 63
8.6.5 PUENTES FIJOS DEL 42 AL 50 SEC.08 CARPETA 20 DE 63
8.7 EDIFICIO TERMINAL SEC.08 CARPETA 21 DE 63
8.7.1 EDIFICIO TERMINAL CELDAS E.T. PINDICADORES SEC.08 CARPETA 21 DE 63
8.7.2 EDIFICIO TERMINAL CELDAS E.T. CELDA 01 SEC.08 CARPETA 22 DE 63
8.7.3 EDIFICIO TERMINAL CELDAS E.T. CELDA 2C 1ERA SEC.08 CARPETA 23 DE 63
8.7.4 EDIFICIO TERMINAL CELDAS E.T. CELDA 2C 2DA SEC.08 CARPETA 24 DE 63
8.7.5 EDIFICIO TERMINAL CELDAS E.T. CELDA 2D 1ERA SEC.08 CARPETA 25 DE 63
8.7.6 EDIFICIO TERMINAL CELDAS E.T. CELDA 2D 2DA SEC.08 CARPETA 26 DE 63
8.7.7 EDIFICIO TERMINAL CELDAS CELDA A1 E.T. PERIMETRAL SEC.08 CARPETA 27 DE 63
8.7.8 EDIFICIO TERMINAL CELDAS E.T. CELDA A02 SEC.08 CARPETA 28 DE 63
8.7.9 EDIFICIO TERMINAL CELDAS E.T. CELDA A02 SEC.08 CARPETA 29 DE 63
8.7.10 EDIFICIO TERMINAL CELDAS E.T. CELDA A03 SEC.08 CARPETA 30 DE 63
8.7.11 EDIFICIO TERMINAL CELDAS E.T. CELDA A03 SEC.08 CARPETA 31 DE 63
8.7.12 EDIFICIO TERMINAL CELDAS E.T. CELDA A04-05 SEC.08 CARPETA 32 DE 63
8.7.13 EDIFICIO TERMINAL CELDAS E.T. CELDA A06 SEC.08 CARPETA 33 DE 63
8.7.14 EDIFICIO TERMINAL CELDAS E.T. CELDA A07 SEC.08 CARPETA 34 DE 63
8.7.15 EDIFICIO TERMINAL CELDAS E.T. CELDA A08 1RA SEC.08 CARPETA 35 DE 63
8.7.16 EDIFICIO TERMINAL CELDAS E.T. CELDA A08 2DA SEC.08 CARPETA 36 DE 63
8.7.17 EDIFICIO TERMINAL CELDAS E.T. CELDA A08 3RA SEC.08 CARPETA 37 DE 63
8.7.18 EDIFICIO TERMINAL CELDAS E.T. CELDA A09 1RA SEC.08 CARPETA 38 DE 63
8.7.19 EDIFICIO TERMINAL CELDAS E.T. CELDA A09 2DA SEC.08 CARPETA 39 DE 63
8.7.20 EDIFICIO TERMINAL CELDAS E.T. CELDA A10 1RA SEC.08 CARPETA 40 DE 63
8.7.21 EDIFICIO TERMINAL CELDAS E.T. CELDA A10 2DA SEC.08 CARPETA 41 DE 63

Página 3 ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD


8.7.22 EDIFICIO TERMINAL CELDAS E.T. CELDA A11 1RA SEC.08 CARPETA 42 DE 63
8.7.23 EDIFICIO TERMINAL CELDAS E.T. CELDA A11 2DA SEC.08 CARPETA 43 DE 63
ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO
TIPO DE CONTRATO: CONTRATO DE OBRA A PRECIOS UNITARIOS
N° DE CONTRATO: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CONTRATISTA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SUPERVISIÓN: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE
REFERENCIAS:
PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

LOCALIZACIÓN EN CARPETA POR


SECCIÓN DESCRIPCIÓN
SECCIÓN
8.7.24 EDIFICIO TERMINAL CELDAS E.T. CELDA A12 SEC.08 CARPETA 44 DE 63
8.7.25 EDIFICIO TERMINAL CELDAS E.T. CELDA A12 SEC.08 CARPETA 45 DE 63
8.7.26 EDIFICIO TERMINAL CELDAS E.T. CELDA A13 SEC.08 CARPETA 46 DE 63
8.7.27 EDIFICIO TERMINAL CELDAS E.T. CELDA A13 SEC.08 CARPETA 47 DE 63
8.7.28 EDIFICIO TERMINAL CELDAS E.T. CELDA A14 SEC.08 CARPETA 48 DE 63
8.7.29 EDIFICIO TERMINAL CELDAS E.T. CELDA A14 SEC.08 CARPETA 49 DE 63
8.7.30 EDIFICIO TERMINAL CELDAS E.T. CELDA A15 SEC.08 CARPETA 50 DE 63
8.7.31 EDIFICIO TERMINAL CELDAS E.T. CELDA A15 SEC.08 CARPETA 51 DE 63
8.7.32 EDIFICIO TERMINAL CELDAS E.T. CELDA A16 SEC.08 CARPETA 52 DE 63
8.7.33 EDIFICIO TERMINAL CELDAS E.T. CELDA A16 SEC.08 CARPETA 53 DE 63
8.7.34 EDIFICIO TERMINAL CELDAS E.T. CELDA A17 SEC.08 CARPETA 54 DE 63
8.7.35 EDIFICIO TERMINAL CELDAS E.T. CELDA A17 SEC.08 CARPETA 55 DE 63
8.7.36 EDIFICIO TERMINAL CELDAS E.T. CELDA A18 SEC.08 CARPETA 56 DE 63
8.7.37 EDIFICIO TERMINAL CELDAS E.T. CELDA A18 SEC.08 CARPETA 57 DE 63
8.7.38 EDIFICIO TERMINAL CELDAS E.T. CELDA A19 SEC.08 CARPETA 58 DE 63
8.7.39 EDIFICIO TERMINAL CELDAS E.T. CELDA A19 SEC.08 CARPETA 59 DE 63
8.7.40 EDIFICIO TERMINAL CELDAS E.T. CELDA A20 SEC.08 CARPETA 60 DE 63
8.7.41 EDIFICIO TERMINAL CELDAS E.T. CELDA A20 SEC.08 CARPETA 61 DE 63
8.7.42 EDIFICIO TERMINAL CELDAS E.T. CELDA A21 SEC.08 CARPETA 62 DE 63
8.7.43 EDIFICIO TERMINAL CELDAS E.T. CELDA A22 SEC.08 CARPETA 63 DE 63
9 CERTIFICACIONES
9.1 CERTIFICACIONES DEL CONTRATISTA SEC.09 CARPETA 1 DE 1
9.2 CURRICULA DE LA EMPRESA PRUEBAS DINÁMICAS EN PILOTES SEC.09 CARPETA 1 DE 1
9.3 CERTIFICACIÓN LEED GREEN ASSOCIATE SEC.09 CARPETA 1 DE 1
9.4 CERTIFICACIONES Y CURRICULA DE LA EMPRESA LACECO SEC.09 CARPETA 1 DE 1
9.5 CERTIFICACIONES Y CURRICULA DE LA EMPRESA LABORATORIO DE CONTROL SEC.09 CARPETA 1 DE 1
9.6 Certificaciones ACI (American Concrete Institute) De obra de la Contratista SEC.09 CARPETA 1 DE 1
9.7 Certificaciones ACI (American Concrete Institute) Gami, Ingeniería e Instalaciones SEC.09 CARPETA 1 DE 1
9.8 Organigrama de Control de Calidad Gami, Ingeniería e Instalaciones SEC.09 CARPETA 1 DE 1
9.9 Inspecciones de Terminación (Preliminar, Aprobación Final) SEC.09 CARPETA 1 DE 1
9.10 Cartas de Nombramiento para el Control de Calidad SEC.09 CARPETA 1 DE 1
10 MEDIO AMBIENTE/ SISTEMA LEED
10.1 MEDIO AMBIENTE/PROTOCOLO LEED
11 ASEGURAMIENTO DE CALIDAD
11.1 REPORTES DIARIOS DE CONTROL DE CALIDAD SEC. 11 CARPETA 1 DE 1
11.2 REPORTES SEMANALES DE CONTROL DE CALIDAD SEC. 11 CARPETA 1 DE 1
11.3 REPORTES MENSUALES DE CONTROL DE CALIDAD SEC. 11 CARPETA 1 DE 1
11.4 LISTAS DE VERIFICACIÓN DE LA FASE PREVIA-FINAL SEC. 11 CARPETA 1 DE 1
11.5 CIERRE DE NO CONFORMIDADES SEC. 11 CARPETA 1 DE 1
11.6 MINUTAS DE REUNIÓN SEMANAL DE CONTROL DE CALIDAD SEC. 11 CARPETA 1 DE 1
11.7 BITACORAS DE CURADO DE PILOTES SEC. 11 CARPETA 1 DE 1

SECCIÓN ANEXO VIADUCTO AREA FRONTAL LADO TIERRA


Página 4 1 LISTAS DE VERIFICACIÓN, FABRICACIÓN, HINCADO Y CONTROL GEOMETRICO ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD
1.1 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-2 ANEXO CARPETA 01 DE 17
1.2 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-3 ANEXO CARPETA 02 DE 17
ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO
TIPO DE CONTRATO: CONTRATO DE OBRA A PRECIOS UNITARIOS
N° DE CONTRATO: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CONTRATISTA: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SUPERVISIÓN: XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE
REFERENCIAS:
PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

LOCALIZACIÓN EN CARPETA POR


SECCIÓN DESCRIPCIÓN
SECCIÓN
1.3 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-4, B-6 ANEXO CARPETA 03 DE 17
1.4 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-7, B-8 ANEXO CARPETA 04 DE 17
1.5 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-9, B-10 ANEXO CARPETA 05 DE 17
1.6 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-11, B-12 ANEXO CARPETA 06 DE 17
1.7 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-13, B-14 ANEXO CARPETA 07 DE 17
1.8 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-15, B-16 ANEXO CARPETA 08 DE 17
1.9 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-17, B-18 ANEXO CARPETA 09 DE 17
1.10 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-19, B-20 ANEXO CARPETA 10 DE 17
1.11 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-21, B-22 ANEXO CARPETA 11 DE 17
1.12 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-23, B-27 ANEXO CARPETA 12 DE 17
1.13 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-24, B-28 ANEXO CARPETA 13 DE 17
1.14 AREA FRONTAL LADO TIERRA VIADUCTO CELDAS B-26, B-32 ANEXO CARPETA 14 DE 17
2 PRUEBAS DE LABORATORIO
2.1 PRUEBAS DE CONTROL DE CALIDAD PARA AGREGADOS ANEXO CARPETA 15 DE 17
2.2 DETERMINACIÓN DEL ANÁLISIS FISICOQUÍMICO DEL AGUA ANEXO CARPETA 15 DE 17
2.3 DETERMINACIÓN DEL INTEMPERISMO ACELERADO SANIDAD (GRAVA Y ARENA) ANEXO CARPETA 15 DE 17
2.4 ANALISIS PETROGRÁFICO DE AGREGADOS ANEXO CARPETA 15 DE 17
2.5 ENSAYES DEL ACERO DE REFUERZO ANEXO CARPETA 15 DE 17
2.6 INFORMES DE ACERO DE REFUERZO VARILLA No.10 ANEXO CARPETA 15 DE 17
2.7 INFORMES DE ACERO DE REFUERZO ZUNCHO ANEXO CARPETA 15 DE 17
2.8 INFORMES DE ACERO DE REFUERZO TORON DE ½” ANEXO CARPETA 15 DE 17
2.9 NFORMES DE ACERO DE REFUERZO CONECTORES ANEXO CARPETA 15 DE 17
3 PRUEBAS DE PERMEABILIDAD POR EL MÉTODO DE RESISTIVIDAD ELÉCTRICA ANEXO CARPETA 15 DE 17
4 ENSAYES A LA COMPRESIÓN SIMPLE DE LAS MUESTRAS DE CONCRETO ANEXO CARPETA 15 DE 17
5 ACTIVIDADES DE CONTROL DE CALIDAD ANEXO CARPETA 16 DE 17
5.1 CERTIFICADOS DE ACERO ANEXO CARPETA 16 DE 17
5.2 CERTIFICADOS DE VARILLA DEL No.10 ANEXO CARPETA 16 DE 17
5.3 CERTIFICADOS DEL ZUNCHO ANEXO CARPETA 16 DE 17
5.4 CERTIFICADOS DEL TORON ANEXO CARPETA 16 DE 17
5.5 CERTIFICADOS DEL CEMENTO ANEXO CARPETA 16 DE 17
5.6 CERTIFICADOS DE LOS ADITIVOS ANEXO CARPETA 16 DE 17
5.7 BITACORA DE MANTENIMIENTO DE LA PLANTA DE CONCRETOS MECANO ANEXO CARPETA 16 DE 17
5.8 BOLETAS DE DOSIFICACIÓN DE LA MEZCLA DE CONCRETO ANEXO CARPETA 16 DE 17
5.9 LISTAS DE VERIFICACIÓN DE LA FASE PREVIA/FINAL ANEXO CARPETA 16 DE 17
5.10 BITACORA DE CURADO DE PILOTES ANEXO CARPETA 16 DE 17
5.11 MINUTAS DE CONTROL DE CALIDAD INTERNAS ANEXO CARPETA 16 DE 17
6 REPORTES DE CONTROL DE CALIDAD ANEXO CARPETA 16 DE 17
6.1 REPORTES DE CONTROL DE CALIDAD DIARIOS ANEXO CARPETA 16 DE 17
6.2 REPORTES DE CONTROL DE CALIDAD SEMANALES ANEXO CARPETA 16 DE 17
6.3 REPORTES DE CONTROL DE CALIDAD MENSUALES ANEXO CARPETA 16 DE 17
7 TRAZABILIDAD DE FABRICACIÓN DE PILOTES PARA EL VIADUCTO ANEXO CARPETA 16 DE 17
8 RESULTADOS DE PRUEBAS DINÁMICAS ANEXO CARPETA 16 DE 17
9 PLANOS AS-BUILT DEL AFLT ANEXO CARPETA 17 DE 17
10 CONVENIOS MODIFICATORIOS ANEXO CARPETA 17 DE 17

Página 5 ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD