Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

CORN AND RICE MILL PROJECTS

I.2 PROJECT COMPONENTS

Capacity
Facilities
No. of (ton/hour) Specification/Description
please enumerate; use separate sheet, if
Units or Area
necessary)
(sq./M)
1. Main Components 22 pcs 7 to 8 tons per hr comprises of screw conveyor driven by various hp's ranges 1 to 5 hp , bucket
a, Conveying Systems 8 pcs on paddy elevators from 2 to 7.5 hp . Construction : Mild steel , tool steel shafts, PE
b. holding tanks/bins buckets, steel rollers and PVC food grade flat belts
Construction bins : mild steel , complete with pneumatic gates

a. Drying (method)

Mechanical 4 units 12 tonner partial vertical dryer , complete with furnace

Solar construction : 8 inch thick concrete pavement

b. Cleaning/Hulling 7 pcs 7 to 8 tons per hr comprises of 1 unit siever or pre cleaner 1700 X 1750 X 3250 mm size model
on paddy SLT1-60NA, 3 units paddy husker model clc 600C 1020x755x1320 mm size, 1
unit husk blower FLG -C150 A , 2 sets cyclone for husk C-170LB , 2 units
airlocks, 1 set husk aspirator HR 6O A

c. Shaking/Separating 2 units 9.6 tons each mdel BG 24C , paddy separator complete with feeding tanks and destoner

d. Polishing 2 units 4-6 tons CDA-60C whitening machine

2 units 6-8 tons CBL - 8C polishing machine

e. Grinding
none

f. All in one machine for 1 lot 6 to 8 tons 1. hopper scale 2 paddy husker 3 husk aspirator 4 paddy cleaner 5 rice
cleaning/polishing/grinding cleaner 6 paddy separator , 7 whitening 8 destoner 11 rice polishing
12 length grader

g. Weighing and Packaging 1 unit 15 tons shutter scale , complete with belt conveyor, sewing machine , electronic
control, industrial sewing machine

h. Others, specify 1 unit 6 - 8 tons electronic control, complete with chute, tank and compressed air pipeline
color sorter

2. Storage Facility
a. Fuel Storage
none

b. Product Storage 3580 tons capacity for palay


2 units 5047 tons capacity for rice

Project Name: ____________________________________________________


Page 1 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

c. Palay/corn Storage

d. Others, specify

3. Air pollution control Facility


a. Cyclone Dust Collector 1 unit paddy husker , 1 unit husk aspirator , 1 unit at rice cleaner, 1 unit at
paddy separator, 2 units at whitening machine, 2 units at polishing macine , i
unit for husk

b. Rice Hulls Storage Bins 2 units each 40 tons each hull bin , mild steel contruction

4. Power source/supply
a. Electric source 440 VAC, 3 phase , 60 hz

b. Genset 440 VAC , 3 phase 60 hz

5. Water source / supply

6. Waste water management Facility/


septic tank

7. Solid waste management Facility

8. Drainage System

9. Support Facilities
a. Workers quarters

b. Admin building

c. Motor pool facility

d. Others, specify

Project Name: ____________________________________________________


Page 2 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

I.3 UTILITIES/REQUIREMENTS (Operation Phase):


Power/Energy and Water Requirements
Utilities Estimated Demand/ Source Breakdown Projected breakdown
Consumption (Total) from Source specified
Grid KWh
Power/Electricity 500 to 600 kwh local cooperative

KWh

Generator Set KWh


750 kva

Others, please specify: KWh

Local Water Utility Provider m3/day


Water

m3/day
Well in: (specify location): m3/day

Spring in: (specify location): m3/day

River, Lake or other surface m3/day


water : (specify name &
location)

Others, please specify: m3/day

Power/Energy and Water Efficiency Measures (if any)

Utilities Proposed Estimated Savings Estimated Total Savings


Efficiency/Conservation for each Measure
Measures
Power/ Electricity KWh KWh
power factor correction system Php 30,000 to Php 40,000.00
per month

KWh

Project Name: ____________________________________________________


Page 3 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

Water Rainwater collection system m3/day m3/day


with total capacity of

Others, please specify: m3/day

I.4 MANPOWER & TIMETABLE OF CONSTRUCTION

Proposed Start of Construction

Proposed Start of Commissioning

Proposed Start of Commercial Operation

Phase Expertise/Skills Requirement per Expertise/Skill Total Requirement


per project phase
a. Construction

b. Operation

I.5 INDICATIVE PROJECT COST (Initial Investment):

PhP __________ US $ ___________ _ (specify if with foreign investment)

Project Name: ____________________________________________________


Page 4 of 4