Electrical部工作计划及跟进表 Electrica

一、上周工作完成情况 20190402-20190802
Work completed last week
A. 部门工作计划 Department Work Plan: 6项
B.领导交办任务 Leadership/Supervisor Assignment: 项
上周工作总结
C.上周顺延工作 Last Week Job: 项
Last week's work summary
D. 临时新增工作Temporary extra work:1 项
合计Total: 7 项

编号
工作项目 Work items 具体事项 Specific matters
No.

System Overview
Boiler Make up System Start, Running and Stop

1 Operation Regulation of Boiler Make Up Water Treatment Make up Water System Backwash and Regeneration
Make up Water System Auto Operation
Acid (Caustic) Delivery
Common Failures and Troubleshooting
二、本周工作计划 20191102-20191502
Work plan this week

编号
工作项目 Work items 具体事项 Specific matters
No.

1 Interview
Collective Training Evaluation
填写说明 Completion Instructions:
1、具体事项,是对工作项目的任务动作的具体分解The specific matter is the specific decomposition of the task action of the work item;
2、任务来由,可以是部门工作计划、领导交办、上周工作顺延 The task is based on the department's work plan, leadership assignment, and last week's work delay;
3、任务难度,分为简单(部门内事务性、例行性工作),中级(跨部门协调、总结性工作),较难(超出职责范围的工作;创新性工作)三类 The difficulty of the task is
divided into three categories, simple (internal departmental affairs, routine work), intermediate level (inter-departmental coordination, summative work), difficult (work beyond the
scope of responsibility; innovative work) .
4、实施情况,分为进度和质量两个维度叙述。进度包括,完成、按计划进行中、延迟,若未完成则需列明完成百分比,若延迟则列明原因;质量包括,质量可控、质量不
达标 The implementation is divided into two dimensions: progress and quality. The progress includes completion, scheduled progress, delay. if not completed, the percentage of
completion is required; if delaied, please list the reason. quality includes, quality is controllable, quality is not up to standard
工作计划及跟进表 Electrical Department Work Plan and Follow-up form

按计划完成Completed as planned:7 项
延迟完成 Delayed:0 项
完成比例Completion ratio:100 %

需要配合的资源
计划完成时间 (如有) 任务难度
工作要求和目标 任务来由 Resources that 责任人
Planned Task
Job requirements and goals Task By need to be Responsible
completion time difficulty
coordinated (if
any)
A 2019 Feb, 04 HR Edi
A 2019 Feb, 05 HR Edi
Understand the Operation Regulation of Boiler A 2019 Feb, 06 HR Edi
Make Up Water Treatment A 2019 Feb, 07 HR Edi
A 2019 Feb, 07 HR Edi
A 2019 Feb, 08 HR Edi

需要配合的资源
(如
计划完成时间 任务难度
工作要求和目标 任务来由 有)Resources
Planned Task 责任人Responsible
Job requirements and goals Task By that need to be
completion time difficulty
coordinated (if
Evaluate how far the technicians understands any)
the material shared during the Phase I A 2019 Feb, 11 HR Edi, Welmoran, Zang Wei, Nazmah
Collective Operation and Maintenance
Technicians Training
em;
ent, and last week's work delay;
创新性工作)三类 The difficulty of the task is
mmative work), difficult (work beyond the

则列明原因;质量包括,质量可控、质量不
lay. if not completed, the percentage of
汇报时间或完成时
实施情况描述 实施进度
执行人员 间
Implementation Implementation
executive staff Reporting time or
description progress
completion time

Edi, All technician grup B Done 100% 2019 Feb, 04


Edi, All technician grup B Done 100% 2019 Feb, 05
Edi, All technician grup B Done 100% 2019 Feb, 06
Edi, All technician grup B Done 100% 2019 Feb, 07
Edi, All technician grup B Done 100% 2019 Feb, 07
Edi, All technician grup B Done 100% 2019 Feb, 08

实施情况描述 实施进度 汇报时间或完成时


执行人员executive staff Implementation Implementation 间 Reporting time
description progress or completion time

Edi, All Technician


每周工作完成情况汇总表 Weekly work co

计划完成时间
编号 工作要求和目标 任务来由
工作项目 Work items 具体事项 Specific matters Planned
No. Job requirements and goals Task By
completion time

System Overview A 2019 Feb, 04


Boiler Make up System Start, Running and Stop A 2019 Feb, 05
Make up Water System Backwash and Regeneration Understand the Operation Regulation of Boiler A 2019 Feb, 06
1 Operation Regulation of Make Up Water Treatment
Make up Water System Auto Operation A 2019 Feb, 07
Acid (Caustic) Delivery A 2019 Feb, 07
Common Failures and Troubleshooting A 2019 Feb, 08
ork completion list

需要配合的资源
(如 汇报时间或完成时
任务难度 实施情况描述 实施进度
有)Resources 责任人
Task 执行人员executive staff Implementation Implementation 间 Reporting time
that need to be Responsible
difficulty description progress or completion time
coordinated (if
any)
HR Edi Edi, All technician grup B Done 100% 2019 Feb, 04
HR Edi Edi, All technician grup B Done 100% 2019 Feb, 05
HR Edi Edi, All technician grup B Done 100% 2019 Feb, 06
HR Edi Edi, All technician grup B Done 100% 2019 Feb, 07
HR Edi Edi, All technician grup B Done 100% 2019 Feb, 07
HR Edi Edi, All technician grup B Done 100% 2019 Feb, 08