You are on page 1of 12

CRONOGRAMA DE ADQUISI

OBRA : "CONSTRUCCION DEL CERCO PERIMÉTRICO Y CONTROL DE ACCESO


GRAU, SECTOR LA CRUZ DE LA MUNICIPALIDAD PROVINCIAL DE SAN IG
CAJAMARC
PRECIO
DESCRIPCION UND. S/.

OPERARIO hh 22.78
OFICIAL hh 18.25
PEON hh 16.46
TOPOGRAFO hh 24.70
ALAMBRE NEGRO RECOCIDO N° 8 kg 5.00
ALAMBRE NEGRO RECOCIDO N° 16 kg 5.00
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 3.50
CLAVOS PARA MADERA CON CABEZA DE 3" kg 5.00
TUBO DE FIERRO DE 100x50x2.0 mm m 21.67
TUBO DE FIERRO DE 50x50x2.0 mm m 12.50
TUBERIA PVC-SAP ELECTRICA DE 3/4" X 3 m (20 mm) m 5.00
CURVAS PVC-SAP ELECTRICAS 3/4" (20 mm) und 0.80
TUBERIA PVC-SAP C-10 C/R DE 1/2" X 5 m und 9.00
TUBERIA PVC SAP C-10 PARA AGUA INC. EXCAVACION E INSTALACION m 5.69
TUBERIA PVC SAP C-10 PARA DESAGUE INC. EXCAVACION E INSTALACION m 12.77
CODO PVC-SAP C/R 1/2" X 90° und 1.50
CODO PVC SAP S/P 4" X 45° und 5.00
CODO VENTILACION PVC SAL 4" X 90° und 8.00
CODO PVC SAL 2" X 45° und 2.00
CODO PVC SAL 2" X 90° und 2.00
TAPON MACHO PVC-SAP C/R 1/2" und 1.00
TAPON MACHO PVC-SAP C/R 2" und 1.50
TAPON MACHO PVC-SAP C/R 4" und 2.00
ADAPTADOR PVC-SAP C/R 1/2" und 1.00
ADAPTADOR PVC-SAP C/R 2" und 1.30
ADAPTADOR PVC-SAP S/P 4" und 1.80
TUBERIA PVC-SAL 2" X 3 m und 14.00
TUBERIA PVC-SAL 1/2" X 5 m m 1.80
TUBERIA PVC-SAL 4" X 3 m m 8.33
TEE PVC-SAL 4" und 8.00
TRAMPA "S" PVC SAL DE 2" und 15.00
REDUCCION PVC-SAL DE 4" A 2" und 5.00
TRAMPA "P" PVC SAL DE 2" und 15.00
SOMBRERO DE VENTILACION PVC-SAL DE 2" und 6.00
YEE PVC SAL 4" x 2" und 5.00
YEE PVC SAL 2" x 2" und 6.00
PRECIO
DESCRIPCION UND. S/.

YEE PVC SAL 4" x4 " und 12.00


PIEDRA CHANCADA 1/2" m3 130.00
PIEDRA MEDIANA m3 40.00
PIEDRA GRANDE DE 8" m3 50.00
ARENA FINA m3 80.00
ARENA GRUESA m3 80.00
HORMIGON m3 120.00
AGUA PUESTA EN OBRA m3 2.00
CURVAS PVC-SEL und 1.00
MELAMINE; E = 15mm m2 40.00
PUERTA DE MELAMINE INCLUYE ACCESORIOS E INSTALACION glb 250.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 28.00
YESO BOLSA 28 kg bol 7.00
CODO PVC DE 4" x 90° und 8.00
CODO PVC DE 2" x 90° und 2.50
CODO PVC, DE 1/2" x 90° und 1.00
CODO PVC C/R. Ø 1/2" x 90° und 1.00
CODO PVC DE 1/2" x 90° und 1.00
TEE PVC, DE Ø 1/2" und 1.50
LADRILLO KK. DE ARCILLA 9X12X24 CM. TIPO IV und 0.86
PERNOS AUTOPERFORANTES und 0.20
PERNOS PARA SUJECION DE URINARIO und 2.00
PUERTA METALICA glb 250.00
VENTANA METALICA DE 0.50X0.40 INCL. INSTALACION glb 100.00
VENTANA METALICA DE 0.90X1.20 INCL. INSTALACION glb 195.00
VENTANA METALICA DE 0.6X0.30M INCL. INSTALACION glb 50.00
VENTANA METALICA DE 1.65X0.40 INCL. INSTALACION glb 119.00
VENTANA METALICA DE 1.40X0.4M INCL. INSTALACION glb 100.00
PEGAMENTO EN POLVO PARA CERÁMICO (BOLSA 25 Kg) bol 18.00
PEGAMENTO PVC gal 140.00
SILICONA und 18.00
PEGAMENTO PARA PORCELANATO bol 25.00
CERAMICA CELIMA SERIE AMERICA PISO/PARED DE 0.30X0.30 BLANCO m2 30.00
CERAMICA 0.30X0.30 cm m2 28.00
PORCELANATO DE 60X60CM m2 40.00
MADERA TORNILLO p2 4.00
PUERTA DE MADERA INCLUYE ACCESORIOS E INSTALACION glb 300.00
PUERTA METALICA INCLUYE ACCESORIOS E INSTALACION glb 3,500.00
PUERTA METALICA DE 4X5M INCLUYE ACCESORIOS E INSTALACION glb 2,400.00
REGLA DE MADERA p2 6.50
BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/2" inc. INSTALACION und 20.00
CERRADURA GEO PUERTA INTERIOR Y DORMITORIO und 60.00
PRECIO
DESCRIPCION UND. S/.

PICAPORTE und 14.00


LIJA PARA FIERRO plg 2.00
LIJA PARA PARED plg 1.00
PINTURA LATEX SUPERMATE gal 25.00
PINTURA ESMALTE SINTETICO gal 45.00
PINTURA BASE gal 35.00
PINTURA ANTICORROSIVA gal 45.00
THINNER gal 20.00
SELLADOR gal 35.00
CINTA AISLANTE rll 2.00
CINTA TEFLON und 1.00
VIDRIOS m2 180.00
SUMIDERO DE BRONCE DE 2" und 2.00
UÑAS DE SUJECION PARA LAVATORIO und 5.00
TRAMPA P CROMADA P/LAVAT. 1 1/4" und 15.00
REGISTRO CROMADOS ROSCADO DE 4" und 12.00
LAVATORIO OVALIN GR. STD BLANCO (TREBOLCENTRO) und 190.00
INODORO TANQUE NORMAL INCLUYE ACCESORIOS und 190.00
URINARIO NACIONAL CADET und 120.00
TUBERIA SEL 12mm (1/2") m 1.20
VALVULA COMPUERTA DE 1/2" und 30.00
SOLDADURA ELECTRICA CELLOCORD kg 14.50
LLAVE PARA LAVATORIO und 30.00
LLAVE DE DUCHA und 85.00
LLAVE PARA URINARIO und 90.00
LLAVE DE PASO DE 1/2" und 17.00
LAMPARA FLUORESCENTE und 25.00
INTERRUPTOR DIFERENCIAL 2 x 25Ax220v - 60 HZ und 45.00
INTERRUPTOR TERMOMAGNÉTICO 2X25AX220V - 60 HZ und 45.00
INTERRUPTOR SIMPLE BIPOLAR und 15.00
INTERRUPTOR DOBLE und 15.00
CRUCETAS und 0.10
CAJA OCTOGONAL und 2.00
CAJA RECTANGULAR PVC und 5.00
CAJA RECTANGULAR und 2.00
CAJA CUADRADA DE FIERRO GALVANIZADO 100 X 100 X50 mm und 10.00
CAJA PREFABRICADA DE CONCRETO und 55.00
CABLE THW # 14 AWG 2.5 MM2 m 1.80
CABLE THW # 12 AWG 4 MM2 m 2.00
CABLE THW # 10 mm m 2.00
MEDIDOR DE LUZ und 300.00
FRAGUA PARA CERÁMICA kg 10.00
PRECIO
DESCRIPCION UND. S/.

TABLERO DE 8 POLOS und 80.00


AGUA und 2.00
ALUZINC m2 25.00
ESTACION TOTAL hm 18.75
HERRAMIENTAS MANUALES %mo
REGLA DE ALUMINIO und 5.00
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 5.00
CARGADOR FRONTAL hm 140.00
VOLQUETE DE 10 M3 hm 100.00
MAQUINA DE SOLDAR 295 A día 80.00
VIBRADOR DE CONCRETO 4 HP 1.25" hm 3.00
VIBRADOR A GASOLINA día 2.00
MEZCLADORA DE CONCRETO hm 25.00
MEZCLADORA DE TROMPO 9 P3 (8 HP) hm 25.00
CIZALLA ELECTRICA DE FIERRO día 10.00
VIBRADOR DE CONCRETO 4 HP 1.25" hm 3.00
SC REJA METALICA glb 180.00
TOTALES
AVANCE MENSUAL
AVANCE MENSUAL ACUMULADO
ADQUISICION DE MATERIALES
OL DE ACCESO DEL PROYECTO MUNICIPAL PARA USOS MULTIPLES DEL JR MIGUEL
IAL DE SAN IGNACIO, DISTRITO DE SAN IGNACIO, PROVINCIA SAN IGNACIO -
CAJAMARCA"
PRESUPUESTO MES 01 MES 02 MES 03 MES 04
CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.

1,331.20 30,324.81 134.78 3,070.29 345.55 7,871.63 654.56 14,910.88 196.31


260.35 4,751.38 54.45 993.71 89.33 1,630.27 97.44 1,778.28 19.13
1,564.71 25,755.05 359.98 5,925.27 467.67 7,697.85 456.67 7,516.79 280.39
4.76 117.45 2.34 57.80 1.45 35.82 0 0.00 0.97
27.61 138.03 5.60 28.00 17.78 88.90 3.56 17.80 0.67
227.07 1,135.33 67.55 337.75 77.66 388.30 62.67 313.35 19.19
2,194.25 7,679.87 757.67 2,651.85 875.78 3,065.23 560.80 1,962.80
53.12 265.60 23.56 117.80 29.56 147.80 0.00
61.50 1,332.71 0.00 61.50 1,332.71 0.00
95.96 1,199.50 0.00 95.96 1,199.50 0.00
28.80 144.00 0.00 23.56 117.80 5.24 26.20
20.00 16.00 0.00 20.00 16.00 0.00
6.00 54.00 0.00 6.00 54.00 0.00
1,013.00 5,763.97 256.00 1,456.64 356.50 2,028.49 400.5 2,278.85
194.00 2,477.38 87.67 1,119.55 87.67 1,119.55 18.66 238.29
40.00 60.00 0.00 40.00 60.00 0.00
8.00 40.00 0.00 8.00 40.00 0.00
10.00 80.00 0.00 10.00 80.00 0.00
5.00 10.00 0.00 5.00 10.00 0.00
26.00 52.00 0.00 26.00 52.00 0.00
20.00 20.00 0.00 20.00 20.00 0.00
82.70 124.05 0.00 82.70 124.05 0.00
43.00 86.00 0.00 43.00 86.00 0.00
20.00 20.00 0.00 20.00 20.00 0.00
82.70 107.51 0.00 82.70 107.51 0.00
43.00 77.40 0.00 43.00 77.40 0.00
36.81 515.34 26.67 373.38 10.14 141.96 0.00
86.97 156.54 1.80 3.24 85.17 153.31 0.00
43.00 358.19 0.00 43.00 358.19 0.00
8.00 64.00 0.00 8.00 64.00 0.00
8.00 120.00 0.00 8.00 120.00 0.00
43.00 215.00 0.00 43.00 215.00 0.00
4.00 60.00 0.00 4.00 60.00 0.00
8.00 48.00 0.00 8.00 48.00 0.00
13.00 65.00 0.00 13.00 65.00 0.00
5.00 30.00 0.00 5.00 30.00 0.00
PRESUPUESTO MES 01 MES 02 MES 03 MES 04
CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.

6.00 72.00 0.00 6.00 72.00 0.00


7.52 977.02 0.00 2.34 304.20 4.2 546.00 0.98
2.85 113.90 0.00 0.56 22.40 1.56 62.40 0.73
15.92 796.00 0.00 4.67 233.50 5.89 294.50 5.36
16.43 1,314.53 0.00 5.56 444.80 6.67 533.60 4.2
18.17 1,453.35 4.00 320.00 5.80 464.00 7.31 584.80 1.06
381.83 45,819.22 44.56 5,347.20 156.77 18,812.40 67.89 8,146.80 112.61
17.51 35.02 1.78 3.56 5.67 11.34 8.89 17.78 1.17
26.00 26.00 0.00 26.00 26.00 0.00
14.40 576.00 0.00 0.00 14.4
12.00 3,000.00 0.00 0.00 0.00 12
875.78 24,521.93 345.56 9,675.68 233.33 6,533.24 195.67 5,478.76 101.22
8.92 62.41 4.56 31.92 4.36 30.52 0.00
10.00 80.00 0.00 10.00 80.00 0.00
185.40 463.50 0.00 185.40 463.50 0.00
41.00 41.00 0.00 41.00 41.00 0.00
20.00 20.00 0.00 20.00 20.00 0.00
124.70 124.70 0.00 124.70 124.70 0.00
14.00 21.00 0.00 14.00 21.00 0.00
7,600.32 6,536.28 0.00 567.78 488.29 4566.78 3,927.43 2465.76
919.52 183.90 0.00 16.67 3.33 879.77 175.95 23.08
16.00 32.00 0.00 16.00 32.00 0.00
4.00 1,000.00 0.00 0.00 4 1,000.00
2.00 200.00 0.00 0.00 2 200.00
2.00 390.00 0.00 0.00 2 390.00
2.00 100.00 0.00 0.00 2 100.00
4.00 476.00 0.00 0.00 4 476.00
4.00 400.00 0.00 0.00 4 400.00
10.08 181.37 0.68 12.24 5.50 99.00 3.67 66.06 0.23
0.86 120.83 0.86 120.40 0.00 0.00
1.22 21.92 0.00 0.00 0.00 1.22
1.41 35.15 0.00 0.00 0.00 1.41
29.88 896.40 0.00 0.00 0.00 29.88
21.53 602.70 0.00 0.00 0.00 21.52
70.30 2,812.00 0.00 0.00 0.07 2.80 70.23
1,132.59 4,530.36 345.56 1,382.24 455.55 1,822.20 331.48 1,325.92
8.00 2,400.00 0.00 0.00 0.00 8
1.00 3,500.00 0.00 0.00 0.00 1
1.00 2,400.00 0.00 0.00 0.00 1
6.64 43.14 6.64 43.16 0.00 0.00
54.00 1,080.00 0.00 0.00 0.00 54
8.00 480.00 0.00 0.00 0.00 8
PRESUPUESTO MES 01 MES 02 MES 03 MES 04
CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.

18.00 252.00 0.00 0.00 0.00 18


15.75 31.49 0.00 0.00 15.75 31.50
129.86 129.86 0.00 0.00 129.86 129.86
43.27 1,081.74 0.00 0.00 43.27 1,081.75
2.97 133.74 0.00 0.00 2.97 133.65
15.75 551.11 0.00 0.00 15.75 551.25
9.45 425.14 0.00 0.00 9.45 425.25
6.30 125.97 0.00 6.30 126.00 0.00
25.97 909.02 12.34 431.90 13.63 477.05 0.00
0.12 0.24 0.12 0.24 0.00 0.00
20.54 20.54 0.00 0.00 0.00 20.54
6.84 1,231.20 0.00 6.84 1,231.20 0.00
12.00 24.00 0.00 12.00 24.00 0.00
2.00 10.00 0.00 2.00 10.00 0.00
4.00 60.00 0.00 4.00 60.00 0.00
10.00 120.00 0.00 10.00 120.00 0.00
2.00 380.00 0.00 2.00 380.00 0.00
8.00 1,520.00 0.00 8.00 1,520.00 0.00
4.00 480.00 0.00 4.00 480.00 0.00
48.76 58.51 0.00 0.00 48.76 58.51
6.00 180.00 0.00 6.00 180.00 0.00
15.75 228.32 0.00 15.75 228.38 0.00
6.00 180.00 0.00 6.00 180.00 0.00
2.00 170.00 0.00 2.00 170.00 0.00
4.00 360.00 0.00 4.00 360.00 0.00
3.00 51.00 0.00 3.00 51.00 0.00
18.00 450.00 0.00 18.00 450.00 0.00
3.00 135.00 0.00 3.00 135.00 0.00
6.00 270.00 0.00 6.00 270.00 0.00
4.00 60.00 0.00 4.00 60.00 0.00
2.00 30.00 0.00 2.00 30.00 0.00
205.00 20.50 0.00 0.00 205 20.50
10.00 20.00 0.00 0.00 10 20.00
10.00 50.00 0.00 0.00 10 50.00
18.00 36.00 0.00 0.00 18 36.00
2.00 20.00 0.00 0.00 2 20.00
2.00 110.00 0.00 0.00 2 110.00
241.40 434.52 0.00 0.00 241.4 434.52
48.00 96.00 0.00 0.00 48 96.00
1.80 3.60 0.00 0.00 0.00 1.8
2.00 600.00 0.00 0.00 0.00 2
20.15 201.52 0.00 0.00 0.00 20.15
PRESUPUESTO MES 01 MES 02 MES 03 MES 04
CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT.

3.00 240.00 0.00 0.00 0.00 3


5.73 11.46 1.23 2.46 2.34 4.68 2.11 4.22 0.05
114.94 2,873.50 0.00 0.00 114.94 2,873.50
4.76 89.16 1.23 23.06 1.56 29.25 1.45 27.19 0.52
1,639.85 0.00 0.00 0.00
26.75 133.77 26.75 133.75 0.00 0.00
6.07 30.34 6.07 30.35 0.00 0.00
4.07 570.02 3.45 483.00 0.62 86.80 0.00
4.07 407.16 1.34 134.00 2.73 273.00 0.00
2.43 194.36 2.43 194.40 0.00 0.00
6.47 19.42 6.47 19.41 0.00 0.00
1.31 2.63 1.31 2.62 0.00 0.00
34.42 860.40 34.42 860.50 0.00 0.00
1.44 36.00 1.44 36.00 0.00 0.00
4.10 41.02 4.10 41.00 0.00 0.00
12.13 36.39 3.40 10.20 6.78 20.34 1.95 5.85
76.10 13,698.00 0.00 0.00 76.1
S/.223,538.25 S/.35,474.56 S/.65,832.37 S/.58,881.58 S/.61,710.81
100.00% 15.87% 29.45% 26.34% 27.61%
100.00% 15.87% 45.32% 71.66% 99.27%
TERIALES
IPAL PARA USOS MULTIPLES DEL JR MIGUEL
N IGNACIO, PROVINCIA SAN IGNACIO -
MES 04
PARCIAL

4,471.94
349.12
4,615.22
23.96
3.35
95.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MES 04
PARCIAL

0.00
127.40
29.20
268.00
336.00
84.80
13,513.20
2.34
0.00
576.00
3,000.00
2,834.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,120.55
4.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.14
0.00
21.96
35.25
896.40
602.56
2,809.20
0.00
2,400.00
3,500.00
2,400.00
0.00
1,080.00
480.00
MES 04
PARCIAL

252.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.60
600.00
201.50
MES 04
PARCIAL

240.00
0.10
0.00
9.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13,698.00
S/.61,710.81
27.61%
99.27%