DATE- 20\12\2018

MOM :- MR. Chetan Bhandale, MR . Kulkarni, Mr Bhargava, Mr Jhaffar.

1. Start of MTNL station


 Pier shall be in the scope of simplex & viaduct is in the scope of RCC.
 Radius of curvature adopted is 150 m.
2. Feasibiliy check of launching scheme from RE walls & Bridge – p37 location.
 Infringement of launching crane boom during construction in airport funnel zone.
(Feasibility study & Movie Bhargava).
3. Launching scheme is require dto launch the girders.
4. Pier NO. 545 chainages required – 545 is the common pier of Simplex & Rpa
5. J. kumar flyover portal, set curve by overlapping.
6. Bullet train survey is todo . Skew angle is to mentioned.
7. River / Modarssa . Pier inside or back of Modarsa has to be shifted .
8. Kapodia Nagar to kanakia – 70 m width service road .
9. Launching scheme & feasibility for constraints portion
10. SCLR portal road.
11. LBS Hallav- cantilever .
12. Drain drawings.
13. Railway – shift alignment by 1m.
14. Kept at 16.415
15. Nada alignment check.
16. Mother Dairy cross –section check.
17. Nalaa details to ensure location of pier between 2 piers.