You are on page 1of 3

LEVELS

LEGEND

GL

TO SANDERAO

TO BALOTRA

SOMA
R1 22-05-18 REVISED AS PER PLAN AND PROFILE SHARMA SANDEEP

REV. DATE DESCRIPTION Engr. D/M


CLIENT:- EPC CONTRACTOR:- AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: DESIGN DIRECTOR: PROJECT: DRAWING TITLE : GENERAL ARRANGEMENT DRAWING OF DATE:
Up-gradation to two lane with paved shoulder for DRAWN MANOJ EXIST. CH. :
ACCRETE CONSULTING KHANNA GOYAL BOX CULVERT (1x3.0mx4.0m) WITH
section from Km 58.000 to Km 91.600 (excluding ch NOV, 2017
ENGINEERS PVT. LTD. DESIGNERS LLP., RAJESH GUPTA CUSHION AT C.A. CH.- 89+750
H.G. Infra Engineering Ltd. (59.460 to 62.900), (73.120 to 75.920), (82.650 to DESIGNED AYUSH C.A. CH. : 89+750
NM-8, SONA TOWER, OLD DLF OFFICE NO 416, 85.300)) Balotra to Sanderao via Jalore (excluding SCALE: DRG. NO: SHEET: REV:
H.G. Infra Engineering Ltd. COMMERCIAL COMPLEX, SECTOR-47, SOHNA
GURGAON-122001 ongoing BOT project) section of NH 325 in the state AS SHOWN AT A2 1069/BAL-SAN/NH-325/ST/CBC/89+750/101
CE (NH) PWD, RAJASTHAN ROAD, GURGOAN CHECKED R. GUPTA PROP. CH. : 89+777 SIZE DRAWING 1 OF 2 R1 I0
of Rajasthan on EPC mode.
GL GL GL GL GL GL

, 
LEGEND

SOMA
R1 22-05-18 REVISED AS PER PLAN AND PROFILE SHARMA SANDEEP

REV. DATE DESCRIPTION Engr. D/M


CLIENT:- EPC CONTRACTOR:- AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: DESIGN DIRECTOR: PROJECT: DRAWING TITLE : GENERAL ARRANGEMENT DRAWING OF DATE:
Up-gradation to two lane with paved shoulder for DRAWN MANOJ EXIST. CH. :
ACCRETE CONSULTING KHANNA GOYAL BOX CULVERT (1x3.0mx4.0m) WITH
section from Km 58.000 to Km 91.600 (excluding ch NOV, 2017
ENGINEERS PVT. LTD. DESIGNERS LLP., RAJESH GUPTA CUSHION AT C.A. CH.- 89+750
H.G. Infra Engineering Ltd. (59.460 to 62.900), (73.120 to 75.920), (82.650 to DESIGNED AYUSH C.A. CH. : 89+750
NM-8, SONA TOWER, OLD DLF OFFICE NO 416, 85.300)) Balotra to Sanderao via Jalore (excluding SCALE: DRG. NO: SHEET: REV:
H.G. Infra Engineering Ltd. COMMERCIAL COMPLEX, SECTOR-47, SOHNA
GURGAON-122001 ongoing BOT project) section of NH 325 in the state AS SHOWN AT A2 1069/BAL-SAN/NH-325/ST/CBC/89+750/101
CE (NH) PWD, RAJASTHAN ROAD, GURGOAN CHECKED R. GUPTA PROP. CH. : 89+777 SIZE DRAWING 2 OF 2 R1 I0
of Rajasthan on EPC mode.
SOMA
R1 22-05-18 REVISED AS PER PLAN AND PROFILE SHARMA SANDEEP

REV. DATE DESCRIPTION Engr. D/M


CLIENT:- EPC CONTRACTOR:- AUTHORITY ENGINEER: PROOF CONSULTANT: SAFETY CONSULTANT: DESIGN DIRECTOR: PROJECT: DRAWING TITLE : REINFORCEMENT DETAIL OF BOX CULVERT DATE:
Up-gradation to two lane with paved shoulder for DRAWN MANOJ EXIST. CH. :
ACCRETE CONSULTING KHANNA GOYAL (1x3.0mx4.0m) WITH CUSHION AT C.A. CH.- 89+750 NOV, 2017
section from Km 58.000 to Km 91.600 (excluding ch
ENGINEERS PVT. LTD. DESIGNERS LLP., RAJESH GUPTA
H.G. Infra Engineering Ltd. (59.460 to 62.900), (73.120 to 75.920), (82.650 to DESIGNED AYUSH C.A. CH. : 89+750
NM-8, SONA TOWER, OLD DLF OFFICE NO 416, 85.300)) Balotra to Sanderao via Jalore (excluding SCALE: DRG. NO: SHEET: REV:
H.G. Infra Engineering Ltd. COMMERCIAL COMPLEX, SECTOR-47, SOHNA
GURGAON-122001 ongoing BOT project) section of NH 325 in the state AS SHOWN AT A2 1069/BAL-SAN/NH-325/ST/CBC/89+750/201
CE (NH) PWD, RAJASTHAN ROAD, GURGOAN CHECKED R. GUPTA PROP. CH. : 89+777 SIZE DRAWING 1 OF 1 R1 I0
of Rajasthan on EPC mode.

You might also like