CHAPTER 7

STIRRUPS & LATERAL


TIES

113 | R e i n f o r c e d C o n c r e t e
For 2.5m length For 4m length
Fy.i Fy.j Fy.i Fy.j
Roof Deck 29.8153 -40.8584 59.6266 -68.7806
4th Floor 43.5958 -93.8601 80.3822 -105.107
3rd Floor -63.9952 -125.568 79.8022 -119.987
2nd Floor -74.0392 -134.992 80.3879 -125.973

For lengths 2.5m

2ND FLOOR 121.40


VS = − 90.05 = 71.82 kN
0.75

b = 280 mm d = 357.5 mm
(verify if the section is adequate to carry
f’c = 28 MPa fy = 230 MPa
the shear)
Use 10 mm Ø RSB
0.66√f ′ c bw d = 0.66 √28 (280) (357.5)
= 349590 N = 349.59 kN > Vs (OK!)
Solution: 𝜋
Av = 2Ab = 4 (10)2 (2)
Av = 50 𝜋 mm2

𝐴𝑣 𝑓𝑦 𝑑 50𝜋 (230)(357.5)
S= =
Vs 71820 N
S = 179.84 mm “say” 170 mm

For maximum spacing,

0.33√𝑓 ′ 𝑐 𝑏𝑤 𝑑 = 0.33√28 (280)(357.5)


134.992 − 74.0392 Vu − 74.0392 = 174.79 kN > VS
=
2.5 2.5 − (0.3575 + 0.2) d 357.5
So, 𝑠𝑚𝑎𝑥 = 2 = 2 =
Vu = 121.40 kN 178.75 𝑜𝑟 600mm

VC = 0.17𝜆√f ′ c bd Therefore, use s = 170 mm


Vc = 0.17 (1) √28 (280) (357.5)
Vc = 90045.50 N = 90.05 kN
TOTAL
ØVc = 0.75 (90.05) DISTANCE
SPACING LENGTH
ØVc = 67.54 kN < Vu FROM
SUPPORT
Rest @
STIRRUPS ARE NECESSARY 170mm

Vu
Vs = − Vc
ϕ

114 | R e i n f o r c e d C o n c r e t e
3RD FLOOR 𝐴𝑣 𝑓𝑦 𝑑 50𝜋 (280)(357.5)
S= =
Vs 41040 N
b = 280 mm d = 357.5 mm S = 314.71 mm “say” 290 mm
f’c = 28 MPa fy = 230 MPa

Use 10 mm Ø RSB For maximum spacing,

Solution: 0.33√𝑓 ′ 𝑐 𝑏𝑤 𝑑 = 0.33√28 (280)(357.5)


= 174.79 kN > VS

d 357.5
So, 𝑠𝑚𝑎𝑥 = 2 = 2 =
178.75 𝑜𝑟 600 mm

Therefore, use s = 290 mm

TOTAL
DISTANCE
SPACING LENGTH
FROM
SUPPORT
125.568 − 63.9952 Vu − 63.9952 REST @
= 290mm
2.5 2.5 − (0.3575 + 0.2)

Vu = 98.322 kN 3 @ 150mm 450 mm 1290 mm


Rest @
VC = 0.17𝜆√f ′ c bd 150mm
Vc = 0.17 (1) √28 (280) (357.5)
Vc = 90045.50 N = 90.05 kN
4TH FLOOR
ØVc = 0.75 (90.05)
b = 280 mm d = 357.5 mm
ØVc = 67.54 kN < Vu
f’c = 28 MPa fy= 230 MPa
STIRRUPS ARE NECESSARY
Use 10 mm Ø RSB
Vu
Vs = − Vc
ϕ Solution:
98.32
VS = 0.75 − 90.05 = 41.04 kN

(verify if the section is adequate to carry


the shear)

0.66√f ′ c bw d = 0.66 √28 (280) (357.5)


= 349590 N = 349.59 kN >
Vs (OK!)
𝜋
Av = 2Ab = 4 (10)2 (2)
Av = 50 𝜋 mm2

115 | R e i n f o r c e d C o n c r e t e
93.8601 43.5958
= Use 10 mm Ø RSB
𝑥 2.5 − 𝑥

x = 1.71 Solution:

93.8601 Vu
=
1.71 1.71 − (0.3575 + 0.2)

Vu = 63.26 kN

VC = 0.17𝜆√f ′ c bd
Vc = 0.17 (1) √28 (280) (357.5)
Vc =90045.50 N = 90.05 kN

ØVc = 0.75 (90.05)


ØVc = 67.54 kN > Vu
40.8584 29.8153
=
but, 𝑥 2.5−𝑥

1 1 x = 1.45
ØVc = 2 (67.54) = 33.77 kN
2
40.8584 𝑉𝑢
then, =
1.45 1.45 − (0.2575 + 0.2)
1
Vu = 27.97 kN
Vu > 2 ØVc
VC = 0.17𝜆√f ′ c bd
𝑑 357.5
s=2= = 178.75 mm “say” 150 mm Vc = 0.17 (1) √28 (200) (257.5)
2
Vc = 46327.11 N = 46.33 kN

ØVc = 0.75 (46.33)


Solving for minimum area of stirrup: ØVc = 34.75 kN > Vu

𝑏𝑤 𝑠 but,
Av = 3 𝑓𝑦
280 (150) 1 1
Av = = 60.87 mm2 ØVc = 2 (34.75) = 17.375 kN
3 (230) 2

Therefore, use s = 150 mm then,


1
Vu > 2 ØVc
TOTAL
DISTANCE 𝑑 257.5
SPACING LENGTH
FROM s = 2 = 2 = 128.75 mm “say” 110 mm
SUPPORT Solving for minimum area of stirrup:
Rest @
𝑏𝑤 𝑠
150mm Av = 3 𝑓𝑦
ROOF DECK 200 (110)
Av = = 31.88 mm2
3 (230)
b = 200 mm d =257.5 mm
f’c = 28 MPa fy= 230 MPa Therefore, use s = 110 mm

116 | R e i n f o r c e d C o n c r e t e
TOTAL
DISTANCE
SPACING LENGTH
FROM
SUPPORT
Rest @
110mm

For lengths 4m

2ND FLOOR 97.19


VS = − 90.05 = 39.54 kN
0.75

b = 280 mm d = 357.5 mm
(verify if the section is adequate to carry
f’c = 28 MPa fy= 230 MPa
the shear)
Use 10 mm Ø RSB
0.66√f ′ c bw d = 0.66 √28 (280) (357.5)
Solution: = 349588.41 N = 349.59 kN > Vs (OK!)

𝜋
Av = 2Ab = 4 (10)2 (2)
Av = 50 𝜋 mm2

𝐴𝑣 𝑓𝑦 𝑑 50𝜋 (230)(357.5)
S= =
Vs 39540 N
S = 326 mm “say” 300 mm

125.973 80.3879
= For maximum spacing,
𝑥 4−𝑥

x = 2.44 0.33√𝑓 ′ 𝑐 𝑏𝑤 𝑑 = 0.33√28 (280)(357.5)


= 174.79 kN > VS
125.973 Vu
= d 357.5
2.44 2.44 − (0.3575 + 0.2) So, 𝑠𝑚𝑎𝑥 = 2 = 2 =
178.75 𝑜𝑟 600mm
Vu = 97.19 kN
Therefore, use s = 300 mm
VC = 0.17𝜆√f ′ c bd
Vc = 0.17 (1) √28 (280) (357.5) TOTAL
Vc = 90045.50 N = 90.05 kN DISTANCE
SPACING LENGTH
FROM
ØVc = 0.75 (90.05) SUPPORT
ØVc = 67.54 kN < Vu Rest @ 300mm

STIRRUPS ARE NECESSARY

Vu
Vs = − Vc
ϕ

117 | R e i n f o r c e d C o n c r e t e
3RD FLOOR Av = 50 𝜋 mm2

b = 280 mm d = 357.5 mm 𝐴𝑣 𝑓𝑦 𝑑 50𝜋 (230)(357.5)


f’c = 28 MPa fy= 230 MPa S= =
Vs 32780 N
S = 394.01 mm “say” 370 mm
Use 10 mm Ø RSB

Solution: For maximum spacing,

0.33√𝑓 ′ 𝑐 𝑏𝑤 𝑑 = 0.33√28 (280)(357.5)


= 174.79 kN > VS

d 357.5
So, 𝑠𝑚𝑎𝑥 = 2 = = 178.5 𝑠𝑎𝑦 𝑠 =
2
170 𝑜𝑟 600 mm

Therefore, use s = 170 mm

119.987 79.8022 TOTAL


=
𝑥 4−𝑥 DISTANCE
SPACING LENGTH
FROM
x = 2.40 SUPPORT
Rest @
119.987 Vu 170mm
=
2.40 2.40 − (0.3575 + 0.2)
Vu = 92.12 kN
4TH FLOOR
VC = 0.17𝜆√f ′ c bd
Vc = 0.17 (1) √28 (280) (357.5) b = 280 mm d = 357.5 mm
Vc = 90045.50 N = 90.05 kN f’c = 28 MPa fy = 230 MPa

ØVc = 0.75 (90.05) Use 10 mm Ø RSB


ØVc = 67.54 kN < Vu
Solution:
STIRRUPS ARE NECESSARY

Vu
Vs = − Vc
ϕ
92.12
VS = 0.75 − 90.05 = 32.78 kN

(verify if the section is adequate to carry


the shear)

0.66√f ′ c bw d = 0.66 √28 (280) (357.5)


= 349588.41 N = 349.59 kN
105.107 80.3822
> Vs (OK!) =
𝑥 4−𝑥
𝜋
Av = 2Ab = 4 (10)2 (2)
x = 2.27

118 | R e i n f o r c e d C o n c r e t e
SUPPORT
105.107 Vu
=
2.27 2.27 − (0.3575 + 0.2)
Vu = 79.29 kN Rest @ 170
mm
VC = 0.17𝜆√f ′ c bd
Vc = 0.17 (1) √28 (280) (357.5) ROOF DECK
Vc = 90045.50 N = 90.05 kN
b = 200 mm d = 257.5 mm
ØVc = 0.75 (90.05) f’c = 28 MPa fy= 230 MPa
ØVc = 67.54 kN < Vu Use 10 mm Ø RSB

STIRRUPS ARE NECESSARY Solution:

Vu
Vs = − Vc
ϕ
79.29
VS = 0.75 − 90.05 = 15.67 kN

(verify if the section is adequate to carry


the shear)

0.66√f ′ c bw d = 0.66 √28 (280) (357.5)


= 349588.41 N = 349.59 kN > Vs (OK!)
68.7806 59.6266
𝜋
Av = 2Ab = 4 (10)2 (2) =
𝑥 4−𝑥
Av = 50 𝜋 mm2
x = 2.14
𝐴𝑣 𝑓𝑦 𝑑 50𝜋 (230)(357.5)
S= = 68.7806 𝑉𝑢
Vs 15670 N =
2.14 2.14 − (0.2575 + 0.2)
S = 824.24 mm “say” 800 mm
Vu = 54.08 kN

For maximum spacing, VC = 0.17𝜆√f ′ c bd


Vc = 0.17 (1) √28 (200) (257.5)
0.33√𝑓 ′ 𝑐 𝑏𝑤 𝑑 = 0.33√28 (280)(357.5) Vc = 46273.13 N = 46.27 kN
= 174.79 kN > VS
ØVc = 0.75 (46.27)
d 357.5 ØVc = 34 kN < Vu
So, 𝑠𝑚𝑎𝑥 = 2 = 2 =
178.75 𝑠𝑎𝑦 170 𝑜𝑟 600 mm STIRRUPS ARE NECESSARY

Vu
Therefore, use s = 170 mm Vs = − Vc
ϕ
54.08
VS = 0.75 − 46.27 = 25.84 kN
TOTAL
SPACING LENGTH DISTANCE (verify if the section is adequate to carry
FROM the shear)

119 | R e i n f o r c e d C o n c r e t e
0.66√f ′ c bw d = 0.66 √28 (200) (257.5)
= 179858.17 N = 179.86 kN
> Vs (OK!)
𝜋
Av = 2Ab = 4 (10)2 (2)
Av = 50 𝜋 mm2

𝐴𝑣 𝑓𝑦 𝑑 50𝜋 (200)(257.5)
S= =
Vs 25840 N
S = 313.07 mm ≈ 290 mm

For maximum spacing,

0.33√𝑓 ′ 𝑐 𝑏𝑤 𝑑 = 0.33√28 (200)(257.5)


= 89.93 kN > VS

d 257.5
So, 𝑠𝑚𝑎𝑥 = 2 = 2 =
128.75𝑜𝑟 600 mm

Therefore, use s = 290 mm

TOTAL
DISTANCE
SPACING LENGTH
FROM
SUPPORT
Rest @ 290
mm

120 | R e i n f o r c e d C o n c r e t e