Nundun Gopee LTd 5/22/2018

ENT Hospital Vacoas


Reinforcement Summary

Bar Diameter (mm) Sub-Total steel required Amount of Steel


8 10 12 16 20 25 (tn) (tn) Consumed (tn)
Description Amount of Steel (tn)
Raft
B1 0.000 0.000 0.000 0.000 75.748 0.000 75.748
B2 0.000 0.000 0.000 0.000 78.165 0.000 78.165
T1 0.000 0.000 0.000 47.625 0.000 0.000 47.625
T2 0.000 0.000 0.000 44.983 0.000 0.000 44.983 246.522 172.565
Additional Bars 0.000 0.000 0.000 44.351 2.320 0.000 46.670 46.670 23.335
Pedestal Bars 0.000 0.000 21.322 1.630 37.599 7.923 68.474 68.474 20.542
Column Raft to Ground Floor 26.046 6.742 0.000 11.116 26.104 5.160 75.169 75.169 19.544
Sump 0.000 0.097 0.255 0.698 7.570 0.000 8.620 8.620 5.603
Ramp Starter Reinforcement 0.000 0.000 0.313 0.000 0.000 0.000 0.313 0.313 0.203
UG tank with cut out details 0.000 1.340 9.372 7.615 12.387 0.000 30.714 30.714 24.571
Retaining Wall 0.000 13.592 59.315 0.000 0.000 72.907 72.907 11.446
Beam XB23 0.371 0.000 0.000 1.017 0.000 0.000 1.388 1.388 1.110
Beam YB10 0.163 0.000 0.182 0.806 0.000 0.000 1.151 1.151 0.920
Ramp 1 - Beam and Slab 0.660 2.916 0.000 0.238 0.801 1.550 6.166 6.166 4.624
Ground Floor as at 25.05.2018 0.000 2.750 4.935 0.900 1.453 0.979 11.017 11.017 11.017
Void in GF 0.000 0.000 0.000 0.000 2.224 0.000 2.224 2.224 2.224
Total (tn) 571 298
Amount of Steel brought to site (tn) 507