CHAPTER 2

DEAD LOADS & LIVE LOAD

4|ReinforcedConcrete
DEAD LOADS

 Slab  Exterior Wall & Interior Wall


ρ = (23.6 kN/m3) (0.15) ω = (2.84 kPa + 0.48kPa) (3)
ρ = 3.54 kPa = 9.96 kN/m

 Ceiling (Plaster on tile or concrete)  Partition Wall


(Table 204-2 from NSCP 2015) ω = (2.84 kPa) (3) = 8.52 kN/m
ρ = 0.48 kPa
 Parapet
 Tiles (Ceramic or quarry tile 20mm ω = (2.84 kPa + 0.48 kPa) (1.5)
on 25mm mortar bed) = 4.98 kN/m
(Table 204-2 from NSCP 2015)
ρ = 1.10 kPa

 Other Loads

a. Electrical
ρ = 5% of slab
ρ = 5 % (3.54) = 0.18 kPa

b. Plumbing
ρ = 5% of slab
ρ = 5% (3.54) = 0.18 kPa

c. Sprinkler
ρ = 7% of slab
ρ = 7% (3.54) = 0.25 kPa

TOTAL DEAD LOAD = 5.73 kPa = 6 kPa

... USE ρ = 6 kPa for dead load


computations

5|ReinforcedConcrete
DEAD LOAD COMPUTATIONS
(2nd to 4th Floor)

TRANSVERSE

Frame 1 (A-B)(C-E)(F-G) Frame 1 (B-C)(E-F)


ρs (6)(5) ρs (6)(3)
ω= = + 9.96 ω= = + 9.96
3 3 3 3
= 19.96 kN/m = 15.96 kN/m

Frame 2 (A-B)(C-E)(F-G) Frame 2 (B-C)(E-F)


ρs (2) (6)(5)(2) ρs (2) (6)(3)(2)
ω= = + 9.96 ω= = = 12 kN/m
3 3 3 3
= 29.96 kN/m

Frame 3 (A-B)(C-E)(F-G) Frame 3 (B-C)(E-F)


ρs (2) (6)(5)(2) ρs (2) (6)(3)(2)
ω= = + 9.96 ω= = = 12 kN/m
3 3 3 3
= 29.96 kN/m

Frame 4 (A-B)(C-E)(F-G) Frame 4 (B-C)(E-F)


ρs (2) (6)(5)(2) ρs (2) (6)(3)(2)
ω= = + 9.96 ω= = = 12 kN/m
3 3 3 3
= 29.96 kN/m

Frame 5 (A-B)(C-E)(F-G) Frame 5 (B-C)(E-F)


ρs (2) (6)(5)(2) ρs (2) (6)(3)(2)
ω= = + 9.96 ω= = = 12 kN/m
3 3 3 3
= 29.96 kN/m

Frame 6 (A-B)(C-E)(F-G) Frame 6 (B-C)(E-F)


ρs (2) (6)(5)(2) ρs (2) (6)(3)(2)
ω= = + 9.96 ω= = = 12 kN/m
3 3 3 3
= 29.96 kN/m

6|ReinforcedConcrete
Frame 7 (A-B)(C-E)(F-G) Frame 7 (B-C)(E-F)
ρs (2) (6)(5)(2) ρs (2) (6)(3)(2)
ω= = + 9.96 ω= = = 12 kN/m
3 3 3 3
= 29.96 kN/m

Frame 8 (A-B)(C-E)(F-G) Frame 8 (B-C)(E-F)


ρs (6)(5) ρs (6)(3)
ω= = + 9.96 ω= = + 9.96
3 3 3 3
= 19.96 kN/m = 15.96 kN/m

LONGITUDINAL
Note: m = short distance over long distance. In this case, 3 is the short distance and 5 is the long distance. Hence, 3
over 5 is equal to 0.6 (m=0.6).

Frame A (1-8) Frame G (1-8)


ρs (6)(5) ρs (6)(5)
ω= = + 9.96 ω= = + 9.96
3 3 3 3
= 19.96 kN/m = 19.96 kN/m

Frame B (1-7) Frame B (7-8)


ρs ρs ρs ρs
ω= + (3 – m2) ω= + (3 – m2)
3 6 3 6
(6)(5) (6)(3) (6)(5) (6)(3)
ω= + (3 – 0.62) + 9.96 ω= + (3 – 0.62)
3 6 3 6
= 27.88 kN/m = 17.92 kN/m

Frame C (1-7) Frame C (7-8)


ρs ρs ρs ρs
ω= + (3 – m2) ω= + (3 – m2)
3 6 3 6
(6)(5) (6)(3) (6)(5) (6)(3)
ω= + (3 – 0.62) + 9.96 ω= + (3 – 0.62)
3 6 3 6
= 27.88 kN/m = 17.92 kN/m

7|ReinforcedConcrete
Frame D (1-7) Frame D (7-8)
ρs (2) (6)(5)(2) ρs (2) (6)(5)(2)
ω= = + 9.96 ω= = = 20 kN/m
3 3 3 3
= 29.96 kN/m

Frame E (1-7) Frame E (7-8)


ρs ρs ρs ρs
ω= + (3 – m2) ω= + (3 – m2)
3 6 3 6
(6)(5) (6)(3) (6)(5) (6)(3)
ω= + (3 – 0.62) + 9.96 ω= + (3 – 0.62)
3 6 3 6
= 27.88 kN/m = 17.92 kN/m

Frame F (1-7) Frame F (7-8)


ρs ρs ρs ρs
ω= + (3 – m2) ω= + (3 – m2)
3 6 3 6
(6)(5) (6)(3) (6)(5) (6)(3)
ω= + (3 – 0.62) + 9.96 ω= + (3 – 0.62)
3 6 3 6
= 27.88 kN/m = 17.92 kN/m

8|ReinforcedConcrete
DEAD LOAD COMPUTATIONS
(Roof Deck)

 Slab b. Plumbing
ρ = (23.6 kN/m ) (0.15)
3 ρ = 5% of slab
ρ = 3.54 kPa ρ = 5% (3.54) = 0.18 kPa

 Plaster Ceiling (Plaster on tile or c. Sprinkler


concrete) ρ = 7% of slab
(Table 204-2 from NSCP 2015) ρ = 7% (3.54) = 0.25 kPa
ρ = 0.24 kPa

 Concrete Fill Finish (per mm TOTAL = 5.54 kPa = 5.6 kPa


thickness)
ρ = (0.023 kPa) (50mm)
ρ = 1.15 kPa ... USE ρ = 5.6 kPa for dead load
computations
 Other Loads

a. Electrical
ρ = 5% of slab
ρ = 5 % (3.54) = 0.18 kPa

TRANSVERSE

Frame 1 (A-B)(C-E)(F-G) Frame 1 (B-C)(E-F)


ρs (5.6)(5) ρs (5.6)(3)
ω= = + 4.98 ω= = + 4.98
3 3 3 3
= 14.31 kN/m = 10.58 kN/m

Frame 2 (A-B)(C-E)(F-G) Frame 2 (B-C)(E-F)


ρs (2) (5.6)(5)(2) ρs (2) (5.6)(3)(2)
ω= = ω= =
3 3 3 3
= 18.67 kN/m = 11.2 kN/m

9|ReinforcedConcrete
Frame 3 (A-B)(C-E)(F-G) Frame 3 (B-C)(E-F)
ρs (2) (5.6)(5)(2) ρs (2) (5.6)(3)(2)
ω= = ω= =
3 3 3 3
= 18.67 kN/m = 11.2 kN/m

Frame 4 (A-B)(C-E)(F-G) Frame 4 (B-C)(E-F)


ρs (2) (5.6)(5)(2) ρs (2) (5.6)(3)(2)
ω= = ω= =
3 3 3 3
= 18.67 kN/m = 11.2 kN/m

Frame 5 (A-B)(C-E)(F-G) Frame 5 (B-C)(E-F)


ρs (2) (5.6)(5)(2) ρs (2) (5.6)(3)(2)
ω= = ω= =
3 3 3 3
= 18.67 kN/m = 11.2 kN/m

Frame 6 (A-B)(C-E)(F-G) Frame 6 (B-C)(E-F)


ρs (2) (5.6)(5)(2) ρs (2) (5.6)(3)(2)
ω= = ω= =
3 3 3 3
= 18.67 kN/m = 11.2 kN/m

Frame 7 (A-B)(C-E)(F-G) Frame 7 (B-C)(E-F)


ρs (2) (5.6)(5)(2) ρs (2) (5.6)(3)(2)
ω= = ω= =
3 3 3 3
= 18.67 kN/m = 11.2 kN/m

Frame 8 (A-B)(C-E)(F-G) Frame 8 (B-C)(E-F)


ρs (5.6)(5) ρs (5.6)(3)
ω= = + 4.98 ω= = + 4.98
3 3 3 3
= 14.31 kN/m = 10.58 kN/m

10 | R e i n f o r c e d C o n c r e t e
LONGITUDINAL
Note: m = short distance over long distance. In this case, 3 is the short distance and 5 is the long distance. Hence, 3
over 5 is equal to 0.6 (m=0.6).

Frame A (1-8) Frame G (1-8)


ρs (5.6)(5) ρs (5.6)(5)
ω= = + 4.98 ω= = + 4.98
3 3 3 3
= 14.31 kN/m = 14.31 kN/m

Frame B (1-8) Frame C (1-8)


ρs ρs ρs ρs
ω= + (3 – m2) ω= + (3 – m2)
3 6 3 6
(5.6)(5) (5.6)(3) (5.6)(5) (5.6)(3)
ω= + (3 – 0.62) ω= + (3 – 0.62)
3 6 3 6
= 16.73 kN/m = 16.73 kN/m

Frame D (1-8) Frame E (1-8)


ρs (2) (5.6)(5)(2) ρs ρs
ω= = ω= + (3 – m2)
3 3 3 6
= 18.67 kN/m (5.6)(5) (5.6)(3)
ω= + (3 – 0.62)
3 6
= 16.73 kN/m
Frame F (1-8)
ρs ρs
ω= + (3 – m2)
3 6
(5.6)(5) (5.6)(3)
ω= + (3 – 0.62)
3 6
= 16.73 kN/m

11 | R e i n f o r c e d C o n c r e t e
LIVE LOAD COMPUTATIONS
(2nd to 4th Floor)

Note: m = short distance over long distance. In this case, 3 is the short distance and 5 is the long distance. Hence, 3
over 5 is equal to 0.6 (m=0.6).

Rooms: ρ = 1.9 kPa


Corridor: ρ = 3.8 kPa

Beam 1 (1-7) Beam 1 (7-8)


ρs (1.9)(5) ρs (3.8)(5)
ω= = ω= =
3 3 3 3
= 3.17 kN/m = 6.33 kN/m

Beam 2 (1-7) Beam 2 (7-8)


ρs ρs ρs ρs
ω= + (3 – m2) ω= + (3 – m2)
3 6 3 6
(1.9)(5) (3.8)(3) (3.8)(5) (3.8)(3)
ω= + (3 – 0.62) ω= + (3 – 0.62)
3 6 3 6
= 8.18 kN/m = 11.35 kN/m

Beam 3 (1-7) Beam 3 (7-8)


ρs (2) (1.9)(5) ρs (2) (3.8)(5)
ω= = (2) ω= = (2)
3 3 3 3
= 6.33 kN/m = 12.66 kN/m

Beam 4 (Frame 1) Beam 4 (Frame 8)


ρs (1.9)(5) ρs (3.8)(5)
ω= = ω= =
3 3 3 3
= 3.17 kN/m = 6.33 kN/m

12 | R e i n f o r c e d C o n c r e t e
Beam 5 (Frame 1) Beam 5 (Frame 8)
ρs (3.8)(3) ρs (3.8)(3)
ω= = ω= =
3 3 3 3
= 3.8 kN/m = 3.8 kN/m

Beam 6 (1-6) Beam 6 (Frame 7)


ρs (2) (1.9)(5) ρs ρs
ω= = (2) ω= +
3 3 3 3
= 6.33 kN/m (1.9)(5) (3.8)(5)
ω= +
3 3
= 9.5 kN/m

Beam 7 (2-7)
ρs (2) (3.8)(3)
ω= = (2)
3 3
= 7.6 kN/m

13 | R e i n f o r c e d C o n c r e t e
LIVE LOAD COMPUTATIONS
(Roof Deck)

Note: m = short distance over long distance. In this case, 3 is the short distance and 5 is the long distance. Hence, 3
over 5 is equal to 0.6 (m=0.6).

Rooms: ρ = 1.9 kPa


Corridor: ρ = 1.9 kPa

Beam 1 (1-8)
ρs (1.9)(5)
ω= =
3 3
= 3.17 kN/m

Beam 2 (1-8)
ρs ρs
ω= + (3 – m2)
3 6
(1.9)(5) (1.9)(3)
ω= + (3 – 0.62)
3 6
= 5.67 kN/m

Beam 3 (1-8)
ρs (2) (1.9)(5)
ω= = (2)
3 3
= 6.33 kN/m

Beam 4 (Frame 1 & Frame 8)


ρs (1.9)(5)
ω= =
3 3
= 3.17 kN/m

14 | R e i n f o r c e d C o n c r e t e
Beam 5 (Frame 1 & Frame 8)
ρs (1.9)(3)
ω= =
3 3
= 1.9 kN/m

Beam 6 (1-6)
ρs (2) (1.9)(5)
ω= = (2)
3 3
= 6.33 kN/m

Beam 6 (Frame 7)
ρs ρs
ω= +
3 3
(1.9)(5) (1.9)(5)
ω= +
3 3
= 6.33 kN/m

Beam 7 (2-7)
ρs (2) (1.9)(3)
ω= = (2)
3 3
= 3.8 kN/m

15 | R e i n f o r c e d C o n c r e t e