You are on page 1of 5

GAS TRANSMISSION & REGASIFICATION (GTR)

OVERSEA BUSINESS TRAVEL PLAN

PROJECT NAME To Perform Engineering, Procurement, Installation and


Commissioning of New LV Switchgear at Segamat Operation Centre
(SOC), Johor
REF NO Date 26th – 28th March 2019
PROJECT COST F.009.03PRJ18.00010 – Replacement LV Switchboard MCC 203-Z-
CENTRE 100 SOC
DESTINATION PT. TAMCO Indonesia
Blok F, No.36, Jalan Jababeka Raya
Jababeka Industrial Estate, Cikarang Utara,
Bekasi 17530 Indonesia
PURPOSE OF To attend technical discussion and witness Factory Acceptance Test
TRAVEL (FAT) and Performance Test of new LV Switchgear at PT. TAMCO
INDONESIA
1.0 OBJECTIVE

To seek VP/CEO of PGB approval for Business Travel Plan (BTP) for attend technical
discussion, witness Factory Acceptance Test (FAT) and Performance Test of new LV
Switchgear at PT. TAMCO Indonesia, Blok F, No.36, Jalan Jababeka Raya, Jababeka
Industrial Estate, Cikarang Utara, Bekasi 17530, tentatively on 26th – 28th March 2019 for
Segamat Operation Centre.

2.0 BACKGROUND

2.1 SOC, Gas Transmission & Regasification (GTR) of PETRONAS Gas Berhad
(PGB), had purchased new Low Voltage LV Switchgear MCC 203 – Z – 100 as
per approved CAPEX budget for FY2018.

2.2 Based on Asset Life Study Conducted in 2017, considering the severity of the
criticality and product was discontinued since in 1995, it was proposed to purchase
Low Voltage Switchgear MCC 203 – Z – 100 to replace the existing LV Switchgear.

3.0 JUSTIFICATION

3.1 Part of the quality control requirements for the LV Switchgear, FAT shall be
conducted. This shall be done prior to deliver to the site to verify on the operational
requirements, protection & control system, cooling system and performance of the
unit meeting design intent.

3.2 The FAT as stated in PTS 13.11.02 is a hold point and shall be carried to
guarantee the operational of LV Switchgear as per agreed testing plan/procedure
and complies with the requirements.
3.3 Participations of PGB representatives in this FAT is crucial as per following
reason:

3.3.1 To participate and witness all the testing in ensuring the quality and
performance of new LV Switchgear.
3.3.2 To ensure that the measurement of new LV Switchgear shall suit the
existing facilities including ATS, Transformer as well as monitoring &
safeguarding cabling.
3.3.3 To verify and confirm on any technical matters and ensure timely
resolution of any technical and design issues.
3.3.4 To avoid reworks and miss-communication with regards to subject
matters which may impact the delivery of the equipment.
3.3.5 Opportunity to learn and discuss the best engineering practices which
can be applied during operation according to manufacturer
recommendation.

3.4 This intent has been reviewed and approved with full endorsement by GPU
Electrical Technical Authority, Ir. Azwanizam Che Abd Rahman.

4.0 TRAVELLING ITINERARY & EXPENSES

4.1 The following staffs are nominated to attend this FAT:


Ir. AZWANIZAM BIN CHE ABD RAHMAN
Principal Generation (Engineering & Technical Services)
Gas Processing & Utilities, PGB

4.2 The detail travel plan and estimated travelling cost is in Attachment 1

4.3 As there may be future changes on the travel plan due to emergencies, flight/hotel
limitations, a blanket approval with the basis above is requested for travel by the
nominated staff during the duration stated above.

4.4 The travel cost for this travel is estimated to be RM 1,720.00 and is within the
allocated and available amount in the approved budget of RM 32,800.00

4.5 The following WBS has been assigned for the travelling claims for this project:
F.009.03PRJ18.00010

5.0 RECCOMMENDATION

VP/CEO of PGB is recommended to approve this Business Travel Plan for FAT – technical
discussion and witness Factory Acceptance Test (FAT) and Performance Test of new LV
Switchgear at PT. TAMCO Indonesia, Blok F, No.36, Jalan Jababeka Raya, Jababeka
Industrial Estate, Cikarang Utara, Bekasi 17530 Indonesia

Travel Plan 26th – 28th March 2019 (Including Travelling)


Detail Itinerary ATTACHMENT 1
Estimated Cost RM 1,720.00
Prepared by:

MOHD LUTFI BIN MAHALI


Executive (Electrical)
Engineering & Technical Services,
Gas Transmission & Regasification Division,
PETRONAS Gas Berhad

Proposed by: Reviewed by: Endorsed by:

M Amriel B Abdull Roni Kamarozaman B Hussin Burhan B Abdullah


Head (Electrical) Head (ETS), Head (GTR),
Engineering & Technical Engineering & Technical Gas Transmission &
Services, Services, Regasification Division,
Gas Transmission & Gas Transmission & PETRONAS Gas Berhad
Regasification Division, Regasification Division,
PETRONAS Gas Berhad PETRONAS Gas Berhad

APPROVED / NOT APPROVED

Comment (if any)

……………………………………. …………………………………………………………
KAMAL BAHRAIN B AHMAD
VP / CEO, PETRONAS GAS BERHAD …………………………………………………………
ATTACHMENT 1
Project Title: Engineering, Procurement, Installation and Commissioning of New LV
Switchgear At Segamat Operation Centre (SOC), Johor

Date : 26th – 28th March 2019


Venue : PT. TAMCO Indonesia, Blok F, No.36, Jalan Jababeka Raya, Jababeka
Industrial Estate, Cikarang Utara, Bekasi 17530 Indonesia

No Name Staff ID Designation Department


Ir Azwanizam B Che Abd Engineering & Technical
1 115367 Principal Generation
Rahman Services

Proposed Itinerary:

Day Date Itinerary/Activity


• Depart from KLIA (KUL) to Jakarta (CGK)
• Arrive at Jakarta (CGK)
1 26/3/2019 • Local transport to Cikarang & accommodation check-in
around Cikarang area

• Local transport to TAMCO PT Indonesia


• Meeting with key personnel
• FAT briefing by Factory
2 27/3/2019
• Factory Inspection test
• Technical discussion

• Test report inspection & signing


• Technical discussion
• Logistic arrangement
• Local transport & accommodation check-out
3 28/3/2019
• Local transport to Jakarta (CGK)
• Depart from Jakarta (CGK) to KLIA (KUL)
• Arrive at KLIA (KUL)

Proposed Detail Cost Breakdown:

Estimated No of No of
No Description Total Cost (RM)
Rate Days Person
Flight Ticket:
1 RM 668 .00 Return 1 RM 668.00
KLIA – JAKARTA – KLIA
Taxi:
2 Airport – Hotel RM 220.00 Return 1 RM 220.00
Hotel – Airport
3 Lodging RM 206.00 2 1 RM 412.00
4 Meal Allowance RM 140.00 3 1 RM 420.00

TOTAL RM 1,720.00

You might also like