You are on page 1of 2

ACCOMMODATION BUILDING

3 3
3 Length 1 x 1 Square tube 2 Length 1 x 3 Rectangular tube
4 4
1 Length Double Head 1 Length Double Sill
1 Length Double Jamb 12 ft. Double Head
12 ft. Double Sill 6 ft. Double Jamb
1 Length locks tile 14 ft. Locks tile
2 Length Inter Locker 1 Length Bottom Rail
1 Length Top Rail 12 ft. Bottom Rail
12 ft. Top Rail 39 Length YC Perimeter Frame
17 Length YC Mounting 8 Length YC Center Frame
84 Length YC Molding 56 Length YC Panel Frame
10 Length Swap-on B-cover 340 pcs. 4 Bar Hinger 12”
7 pcs. FL # 12 1 pc. FL # 10
16 pcs. SD Nylon Roller 170 CAM Handle Right
1
12 Length x 1 x 1 Angle 2 kilos channelizing
8
1 1
10 Gross 8 x Metal screw 5 Gross 8 x 1 wood screw
2 2
1 1 1
10 Box x Rivets 22 Sheet 72 x 96 Clear
8 2 6
4 Box Sealant 5 Box Tox #5

PHARMACY

12 Length YC Perimeter Frame 9 Length YC Center Frame


35 Length YC Panel Frame 35 Length YC Molding
186 pcs. 4 Bar Hinges 12” 93 pcs. Cam Handle Right
1
5 Length x 1 x 1 Angle 2 Box Tox # 5
8
1
16 Sheet 72 x 96 clear 2 Box Sealant
4
MALE & FEMALE CR
7 Length Perimeter Frame 2 Length Center Frame
10 Length Panel Frame 10 Length Molding
1
1 Length x 1 x 1 Angle 52 pcs. 4 Bar Hinges 12”
8
1 1
26 pcs. Cam Handle 1 Box x Rivets
8 2
1
1 Gross. 8 x 1 Wood Screw 1 Box Tox # 5
2
1
1 Box Sealant 2 Sheet 72 x 96 clear
4

PUMP ROOM & GENERATOR ROOM

1
4 Sheet 72 x 96 Bronze
4
1
40 Length angle
2
10 Tube Sealant

GARBAGE DISPOSAL
1
2 Sheet 72 x 96 Bronze
4
1 Tube Sealant Clear
1
12 Length angle
2

You might also like