PRESUPUESTO BASE
ITEM DESCRIPCIÓN UND.
CANT. PRECIO UNIT.
2030200010005 FLEJE DE ACERO INOXIDABLE DE 19mm m 15 6.66
2040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.9266 4.98
2040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 49.7776 5.62
204010009 BENTONITA SODICA (BOLSA DE 30 KG) und 6 20.17
204020010 ANGULO "L" DE 3.5" x 3.5" x 3/8" m 4.5 25.71
204020011 ANGULO "L" DE 2" x 2" x 1/4" m 6.5 14.9
204020012 ANGULO "L" DE 4" x 4" x 1/4" m 24 31.17
204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 159.915 2.84
2040600010018 AZA DE TAPA FIERRO LISO DE 5/8" und 10 8.94
2040600010019 FIERRO LISO DE 3/8" m 3.5 3.42
2041200010005 CLAVOS PARA MADERA CON CABEZA (Ø PROMEDIO) kg 49.386 4.02
2042400160001 ABRAZADERA DE FIERRO GALVANIZADO C/2 OREJAS 3/4" und 112 0.55
204250007 CABLE DE ACERO TIPO SIEMENS MARTIN DE 10mmØ, 7 HILOS m 30 3.23
2050100010003 TUBERIA PVC-SAP ELECTRICA DE 3/4" X 3 m (20 mm) m 319.3803 2.34
2050100010005 TUBERIA PVC-SAP ELECTRICA DE 1" X 3 m (25 mm) m 396.4275 2.78
2050100010007 TUBERIA PVC-SAP ELECTRICA DE 1¼" X 3 m (35 mm) m 35.6685 3.93
2050200010002 TUBERIA PVC-SAP ELECTRICA DE 3/4" X 3 m (20 mm) m 319.3803 2.34

CALENDARIO MATERIALES 1
ESPINO
INGENIERIA Y CONSTRUCCION
2050200010003 CURVAS PVC-SAP ELECTRICAS 1" (25 mm) und 79.9651 1.84
2050200010004 CURVAS PVC-SAP ELECTRICAS 1¼" (35 mm) und 3.1456 4.47
2050300010002 UNIONES PVC-SAP 3/4" ELECTRICAS (20 mm) und 112.4815 0.54
2050300010004 UNIONES PVC-SAP 1¼" ELECTRICAS (35 mm) und 7.9999 1.41
2050400010002 CONEXIONES PVC-SAP 3/4" ELECTRICAS (20 mm) und 292.2536 0.45
2050400010004 CONEXIONES PVC-SAP 1¼" ELECTRICAS (35 mm) und 7.9999 0.99
2050700020004 TUBERIA PVC-SAP C-10 S/P DE 3/4" X 5 m m 2.5 2.61
2050700020035 TUBERIA PVC SAP DE 1" m 36 3.42
2070100010003 PIEDRA CHANCADA 3/4" m3 29.6345 88.18
207010017 PIEDRA OVER 4" - 6" m3 3.6645 47.28
207010025 PIEDRA CANTO RODADO 1" - 2" m3 83.2545 57.79
2070200010001 ARENA FINA m3 0.046 36.91
2070200010002 ARENA GRUESA m3 29.1288 33.75
2070500010003 TIERRA DE CHACRA O VEGETAL m3 18 53.28
210040005 BLOQUE DE CONCRETO ARMADO DE 0,40x0,40x0,20m und 3 69.12
213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 453.1994 23.1
2130100050002 CEMENTO CONDUCTIVO BOLSA DE 25 kg bol 6 133.55
2130300010001 YESO BOLSA 28 kg bol 11.3265 14.89
2150200020036 REJILLA DE SEGURIDAD ACERO Ø 5/8", a=0.25, h=0.45 und 2 18.72
216010020 LADRILLO KK DE ARCILLA, STANDAR (9X12X24cm) und 45.36 0.79
PERFIL DE F°G° TIPO U DE 2 1/2" X 4 X 3/16" ESPESOR X 3m DE
217010007 und 1 35.53
LONGITUD
222080012 PEGAMENTO PARA PVC gal 15.9233 117.39
2221000010003 SILICONA NEGRA (TUBO MEDIANO) und 1 29.61
231130001 MADERA CACHIMBO p2 576.483 4.26
240020001 PINTURA ESMALTE gal 0.7551 44.5
241010005 CINTA AUTOFUNDENTE PARA EXTREMO DE CABLE m 3 6.53
241020001 CINTA AISLANTE rll 13.4914 5.25
241050005 CINTA SEÑALIZADORA PARA CABLES ELECTRICOS m 396.4275 0.43
243160002 REGLA DE MADERA p2 0.072 5.77
251030008 TORNILLO AUTORROSCANTE DE 1/16" X 1 1/2" und 224 0.15

CALENDARIO MATERIALES 2
ESPINO
INGENIERIA Y CONSTRUCCION
251040001 STOVE-BOLTS und 112 0.43
262030003 INTERRUPTOR DIFERENCIAL 2 X 25 A und 13 87.79
2620400010017 INTERRUPTOR TERMOMAGNETICO 2 X 40A und 1 31.16
2620400010019 INTERRUPTOR TERMOMAGNETICO 2 X 20A und 6 26.26
2620400010026 INTERRUPTOR TERMOMAGNETICO 2 X 30A und 1 30.97
2620400010033 INTERRUPTOR TERMOMAGNETICO 2 X 50A und 1 34.02
2620400010050 INTERRUPTOR TERMOMAGNETICO 2 X 15A und 9 21.94
2620500040021 INTERRUPTOR SIMPLE PVC und 9 6.49
262050010 INTERRUPTOR DOBLE PVC und 9 11.44
2621300010004 TOMACORRIENTE UNIVERSAL DOBLE + L.T. und 56 11.44
2621400010030 PLACA PVC SIMPLE und 9 12.38
2621400010031 PLACA PVC DOBLE und 54 13.23
2621400010033 PLACA A PRUEBA DE AGUA IDROBOX und 11 48.72
2630200010014 POSTE DE C.A.C. DE 9 M/200 DAN (INCLUYE PERILLA) und 4 500.68
263040003 POSTE DE ACERO DE Ø4", H=4m, e=3mm und 34 696.87
2680100010005 CAJA OCTOGONAL FIERRO GALVANIZADO 100X50 mm und 42 5.98
2680900010004 CAJA RECTANGULAR FIERRO GALVANIZADO 100x55x50 mm und 74 3.11
2681000010002 CAJA CUADRADA DE FIERRO GALVANIZADO 100 X 100 X50 mm und 1 3.9
TAPA METALICA DE 0.60X0.60m. CON PLANCHA ESTRIADA
2683000010006 und 10 107.78
Ø1/8", INCLUYE CANDADO
270010031 CABLE BIPLASTO 3X14 AWG m 30.3612 5.15
2700200010058 CABLE N2XOH 10 mm2 m 102.5 3.85
2700200010060 CABLE NH80 4mm2 m 468.4088 1.59
2700200010061 CABLE NH80 2.5mm2 m 470.0199 1.07
2700200010062 CABLE N2XOH 6 mm2 m 1071.0272 2.94
2700200010063 CABLE N2XOH 4 mm2 m 540.4931 1.44
270110340 LUMINARIA CON REJILLA CON DOS LAMPARAS LED DE 18W und 18 157.27
270110346 LUMINARIA TIPO EXTERIOR LED de 70 w und 34 832.29
LUMINARIA TIPO REJILLA DE 4 TUBOS LED DE 8W PARA
270110347 und 12 142.92
EMPOTRAR 600 DE
LUMINARIA LED (A) X 600 (L), 32W PARA ADOSAR
EMERGENCIA
270110348 und 11 110.7
372MMX129MMX127MM
270120029 CAJA DE DERIVACIÓN DE ACOMETIDAS und 2 60.8

CALENDARIO MATERIALES 3
ESPINO
INGENIERIA Y CONSTRUCCION
2702200010006 CABLE 1-1x35mm2 CPI m 241.5 20.33
2710000010002 CONDUCTOR Cu TIPO N2XHO, BIPOLAR O TRIPOLAR 10mm2 m 48 20.03
271010063 CONDUCTOR DE PUESTA A TIERRA DE COBRE RECOCIDO, CABLEADO DE 16mm2, 7 H m 3 9.8
271020002 EMPALME ACOMETIDA DERIVACIÓN 6-10MM2 1KV und 10 24.8
271050156 ALAMBRE DE ACERO N°12 PARA ENTORCHADO m 9 0.5
271050157 ARANDELA CUDRADA CURVA DE 57x57x5mm, AGUJERO DE 18mmØ und 14 0.82
271050158 ARANDELA DE ANCLAJE DE ACERO DE 102x102x5mm CON AGUJERO CENTRAL DE 18mmØ
und 3 4.09
PERNO ANGULAR CON OJAL-GUARDACABO DE 16mm 203 x L,
271050159 und 3 10.41
CON TUERCA Y CONTRAT.
271050161 HEBILLA DE ACERO INOXIDABLE PARA FLEJE DE 19mm und 16 1.33
271050162 CONECTOR BIMETALICO LICO TIPO CUÑA, SEGUN REQUERIMIENTO und 4 11.32
271050165 CONECTOR BIMETALICO AISLADO TIPO PERFORACION (PIERCING) AI 16mm2 /Cu 4-10mm2
und 8 6.77
271050166 CONECTOR BIMETALICO AISLADO TIPO COMPRESION AI-25mm2 /Cu 4-10mm2, PAR und 4 9.39
PERNO CON GANCHO, DE 16mmØx305mm LONG, PROVISTO
271050167 und 4 8.53
DE TUERCA
GRAPA Y CONTRAT. ANGULAR DE ALEACION TIPO
DE SUSPENSION
271050174 und 1 5.66
MANITO CON REVESTIMIENTO
271050176 CABLE DE COBRE 10 mm2 NH80 m 36 5.49
271060002 CONDUCTOR DE COBRE RECODIO DESNUDO DE 16mm2 m 33 4.28
272010001 ACCESORIOS EN "T" (180 - 100 mm) und 2 193.6
272010114 CURVA DE 25mm Ø DE PVC SAP - 90° und 4 1.88
272030003 SOPORTE METALICO Ø 1/4" (Incluye sujetador) und 60 13.36
272040023 CONECTORES DE COBRE TIPO A/B und 3 4.78
272040042 VARILLA DE COBRE DE 3/4" X 2.40 m und 3 287.46
272040043 REGISTRO CON TAPA PARA POZO DE PUESTA A TIERRA und 3 38.49
2720400440001 DOSIS ECOGEL 8KG. bol 6 81.6
272040056 CONECTOR DE BRONCE TIPO AB und 6 4.99
ELECTRODO DE ACERO RECUBIERTO DE COBRE DE 16mm Ø x
272040057 und 3 156.34
2.40m
272050015 TARUGO DE1/16"X 1 1/2" und 224 0.43
272050017 GRAPA PARALELA 3 PERNOS P/CAB. CU. 10-2/0AWG und 6 40.05
272070007 CORREA PLASTICA DE AMARRE und 16 0.05
VARILLA DE ANCLAJE DE ACERO, DE 16mmØx2400mm DE
272070048 und 3 39.69
LONG. PROVISTO DE OJAL-GUARDACABO
272070049 CORREA PLASTICA DE AMARRE DE 170mm DE LONGITUD,COLOR NEGRO und 4 0.05

CALENDARIO MATERIALES 4
ESPINO
INGENIERIA Y CONSTRUCCION
272070050 GRAPA DE ANCLAJE CONICA und 4 8.5
273010021 CONECTOR BIMETÁLICO AISLADO TIPO COMPRESION Al-25mm2 / Cu.-16mm2 pza 6 8.92
2730400010004 CONECTOR DOBLE VIA BIMETALICO PARA CABLE DE ACERO DE 10mmØ Y COBRE D und 3 7.28
TABLERO DE DISTRIBUCION CON BARRA DE COBRE
274010013 und 1 183.29
ELECTROLITICO (10 POLOS) CON BARRA DE COBRE
TABLERO DE DISTRIBUCION
274010014 und 1 709
ELECTROLITICO (22 POLOS) CON BARRA DE COBRE
TABLERO DE DISTRIBUCION
274010015 und 1 208.65
ELECTROLITICO (18 POLOS)
274010016 TABLERO GENERAL EMPOTRADO DE 04 POLOS und 1 27.33
276010010 WINCHA METALICA und 1.1327 33.15
290130022 AGUA PUESTA EN OBRA m3 19.3105 5.25
2901400030013 CINTA DE GOMA AUTOFUNDENTE HASTA 1000 V m 2.4 6.53
COSTO TOTAL INSUMOS

CALENDARIO MATERIALES 5
ESPINO
INGENIERIA Y CONSTRUCCION
CALENDARIO DE REQUERIMIENTO DE MATERIALES
RUTA

COEF REQUERIMIENTO - MES 01 REQUERIMIENTO - MES 02 REQUERIMIENTO - MES


COSTO TOTAL
INICIO METRADO PPTO % METRADO PPTO % METRADO
99.90 0% 0.00 0% 15.00 99.900 100%
4.61 0% 0.00 0% 0.93 4.610 100%
279.75 0% 0.00 0% 49.78 279.763 100%
121.02 0% 0.00 0% 6.00 121.020 100%
115.70 0% 0.00 0% 4.50 115.700 100%
96.85 0% 0.00 0% 6.50 96.850 100%
748.08 1% 0.00 0% 24.00 748.080 100%
454.16 0% 0.00 0% 159.92 454.174 100%
89.40 0% 0.00 0% 10.00 89.400 100%
11.97 0% 0.00 0% 3.50 11.970 100%
198.53 0% 1.890 7.60 4% 47.50 190.948 96%
61.60 0% 0.00 0% 8.00 4.400 7%
96.90 0% 0.00 0% 30.00 96.900 100%
747.35 1% 0.00 0% 44.98 105.253 14%
1102.07 1% 0.00 0% 396.43 1102.077 100%
140.18 0% 0.00 0% 35.67 140.186 100%
747.35 1% 0.00 0% 68.38 160.010 21% 120

CALENDARIO MATERIALES 6
ESPINO
INGENIERIA Y CONSTRUCCION
147.14 0% 0.00 0% 79.97 147.149 100%
14.06 0% 0.00 0% 3.15 14.080 100%
60.74 0% 0.00 0% 15.69 8.473 14%
11.28 0% 0.00 0% 8.00 11.280 100%
131.51 0% 0.00 0% 43.28 19.475 15%
7.92 0% 0.00 0% 8.00 7.920 100%
6.53 0% 0.00 0% 2.50 6.530 100%
123.12 0% 0.00 0% 36.00 123.120 100%
2613.17 2% 0.00 0% 29.63 2612.773 100%
173.26 0% 0.00 0% 3.66 173.047 100%
4811.28 4% 0.00 0% 83.25 4811.020 100%
1.70 0% 0.00 0% 0.05 1.848 109%
983.10 1% 0.00 0% 29.12 982.803 100%
959.04 1% 0.00 0% 18.00 959.040 100%
207.36 0% 0.00 0% 3.00 207.360 100%
10468.91 9% 0.00 0% 453.19 10468.693 100%
801.30 1% 0.00 0% 6.00 801.300 100%
168.65 0% 11.330 168.70 100% 0.000 0%
37.44 0% 0.00 0% 2.00 37.440 100%
35.83 0% 0.00 0% 45.36 35.830 100%
35.53 0% 0.00 0% 1.00 35.530 100%
1869.24 2% 0.00 0% 9.31 1092.903 58%
29.61 0% 0.00 0% 1.00 29.610 100%
2455.82 2% 7.540 32.12 1% 568.94 2423.683 99%
33.60 0% 0.750 33.37 99% 0.000 0%
19.59 0% 0.00 0% 2.00 13.060 67% 1
70.83 0% 0.00 0% 5.68 29.820 42%
170.46 0% 0.00 0% 396.43 170.461 100%
0.42 0% 0.00 0% 0.07 0.408 97%
33.60 0% 0.00 0% 16.00 2.400 7%

CALENDARIO MATERIALES 7
ESPINO
INGENIERIA Y CONSTRUCCION
48.16 0% 0.00 0% 18.00 7.740 16%
1141.27 1% 0.00 0% 4.00 351.160 31%
31.16 0% 0.00 0% 0.000 0%
157.56 0% 0.00 0% 2.00 52.520 33%
30.97 0% 0.00 0% 0.000 0%
34.02 0% 0.00 0% 1.00 34.020 100%
197.46 0% 0.00 0% 3.00 65.820 33%
58.41 0% 0.00 0% 2.00 12.980 22%
102.96 0% 0.00 0% 1.00 11.440 11%
640.64 1% 0.00 0% 9.00 102.960 16%
111.42 0% 0.00 0% 2.00 24.760 22%
714.42 1% 0.00 0% 9.00 119.070 17%
535.92 0% 0.00 0% 1.00 48.720 9%
2002.72 2% 0.00 0% 5.00 2503.400 125%
23693.58 21% 0.00 0% 0.000 0%
251.16 0% 0.00 0% 6.00 35.880 14%
230.14 0% 0.00 0% 12.00 37.320 16%
3.90 0% 0.00 0% 0.000 0%
1077.80 1% 0.00 0% 10.00 1077.800 100%
156.36 0% 0.00 0% 0.000 0% 4.04
394.63 0% 0.00 0% 102.50 394.630 100%
744.77 1% 0.00 0% 57.48 91.393 12%
502.92 0% 0.00 0% 74.84 80.079 16%
3148.82 3% 0.00 0% 1070.00 3145.800 100%
778.31 1% 0.00 0% 540.49 778.304 100%
2830.86 2% 0.00 0% 0.000 0% 2
28297.86 25% 0.00 0% 0.000 0%
1715.04 2% 0.00 0% 0.000 0% 2
1217.70 1% 0.00 0% 0.000 0% 2
121.60 0% 0.00 0% 2.00 121.600 100%

CALENDARIO MATERIALES 8
ESPINO
INGENIERIA Y CONSTRUCCION
4909.70 4% 0.00 0% 241.50 4909.700 100%
961.44 1% 0.00 0% 48.00 961.440 100%
29.40 0% 0.00 0% 3.00 29.400 100%
248.00 0% 0.00 0% 10.00 248.000 100%
4.50 0% 0.00 0% 9.00 4.500 100%
11.48 0% 0.00 0% 14.00 11.480 100%
12.27 0% 0.00 0% 3.00 12.270 100%
31.23 0% 0.00 0% 3.00 31.230 100%
21.28 0% 0.00 0% 16.00 21.280 100%
45.28 0% 0.00 0% 4.00 45.280 100%
54.16 0% 0.00 0% 8.00 54.160 100%
37.56 0% 0.00 0% 4.00 37.560 100%
34.12 0% 0.00 0% 4.00 34.120 100%
5.66 0% 0.00 0% 1.00 5.660 100%
197.64 0% 0.00 0% 36.00 197.640 100%
141.24 0% 0.00 0% 33.00 141.240 100%
387.20 0% 0.00 0% 2.00 387.200 100%
7.52 0% 0.00 0% 4.00 7.520 100%
801.60 1% 0.00 0% 0.000 0% 8
14.34 0% 0.00 0% 3.00 14.340 100%
862.38 1% 0.00 0% 3.00 862.380 100%
115.47 0% 0.00 0% 3.00 115.470 100%
489.60 0% 0.00 0% 6.00 489.600 100%
29.94 0% 0.00 0% 6.00 29.940 100%
469.02 0% 0.00 0% 3.00 469.020 100%
96.32 0% 0.00 0% 16.00 6.880 7%
240.30 0% 0.00 0% 6.00 240.300 100%
0.80 0% 0.00 0% 16.00 0.800 100%
119.07 0% 0.00 0% 3.00 119.070 100%
0.20 0% 0.00 0% 4.00 0.200 100%

CALENDARIO MATERIALES 9
ESPINO
INGENIERIA Y CONSTRUCCION
34.00 0% 0.00 0% 4.00 34.000 100%
53.52 0% 0.00 0% 6.00 53.520 100%
21.84 0% 0.00 0% 3.00 21.840 100%
183.29 0% 0.00 0% 0.000 0%
709.00 1% 0.00 0% 1.00 709.000 100%
208.65 0% 0.00 0% 0.000 0%
27.33 0% 0.00 0% 1.00 27.330 100%
37.55 0% 1.130 37.46 100% 0.000 0%
101.38 0% 0.00 0% 19.20 100.805 99%
15.67 0% 0.00 0% 2.40 15.683 100%
S/. 113,863.19 100% S/. 279.25 S/. 48,595.552

CALENDARIO MATERIALES 10
ESPINO
INGENIERIA Y CONSTRUCCION
S

REQUERIMIENTO - MES 03 REQUERIMIENTO - MES 04 REQUERIMIENTO - MES 05 REQUERIMIENTO


PPTO % METRADO PPTO % METRADO PPTO % METRADO
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 64 35.200 57% 38 20.900 34%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 52 121.680 16% 56 131.040 18%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
280.800 38% 98 229.320 31% 31 72.540 10%

CALENDARIO MATERIALES 11
ESPINO
INGENIERIA Y CONSTRUCCION
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 25 13.500 22% 20 10.800 18%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 54 24.299 18% 34.84 15.678 12%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 4.63 543.517 29% 1.98 200.000 12%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
6.530 33% 0.000 0% 0.000 0%
0.000 0% 4.87 25.568 36% 2.96 15.540 22%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 24 3.600 11% 23 3.450 10%

CALENDARIO MATERIALES 12
ESPINO
INGENIERIA Y CONSTRUCCION
0.000 0% 41 17.630 37% 2 0.860 2%
0.000 0% 4 351.160 31% 5 438.950 38%
0.000 0% 0.000 0% 1 31.160 100%
0.000 0% 2 52.520 33% 2 52.520 33%
0.000 0% 1 30.970 100% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 3 65.820 33% 3 65.820 33%
0.000 0% 7 45.430 78% 0.000 0%
0.000 0% 8 91.520 89% 0.000 0%
0.000 0% 46 526.240 82% 1 11.440 2%
0.000 0% 7 86.660 78% 0.000 0%
0.000 0% 45 595.350 83% 0.000 0%
0.000 0% 9 438.480 82% 1 48.720 9%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 34 23693.580 100%
0.000 0% 32 191.360 76% 4 23.920 10%
0.000 0% 61 189.710 82% 1 3.110 1%
0.000 0% 1 3.900 100% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
20.806 13% 16.12 83.018 53% 10.2 52.530 34%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 124 197.160 26% 182.03 289.428 39%
0.000 0% 120 250.000 26% 122.36 120.000 26%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
314.540 11% 6 943.620 33% 10 1572.700 56%
0.000 0% 0.000 0% 34 28297.860 100%
285.840 17% 10 1429.200 83% 0.000 0%
221.400 18% 4 442.800 36% 5 553.500 45%
0.000 0% 0.000 0% 0.000 0%

CALENDARIO MATERIALES 13
ESPINO
INGENIERIA Y CONSTRUCCION
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
106.880 13% 32 427.520 53% 10 133.600 17%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 128 55.040 57% 50 21.500 22%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%

CALENDARIO MATERIALES 14
ESPINO
INGENIERIA Y CONSTRUCCION
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 1 150.000 100%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 1 208.650 100% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
0.000 0% 0.000 0% 0.000 0%
S/. 1,236.796 144% S/. 7,720.442 S/. 56,031.145

CALENDARIO MATERIALES 15
ESPINO
INGENIERIA Y CONSTRUCCION
REQUERIMIENTO - MES 06
PPTO %
0.000 0%

CALENDARIO MATERIALES 16
ESPINO
INGENIERIA Y CONSTRUCCION
CALENDARIO MATERIALES 17
ESPINO
INGENIERIA Y CONSTRUCCION
CALENDARIO MATERIALES 18
ESPINO
INGENIERIA Y CONSTRUCCION
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%

CALENDARIO MATERIALES 19
ESPINO
INGENIERIA Y CONSTRUCCION
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
0.000 0%
S/. 0.000

CALENDARIO MATERIALES 20
ESPINO
INGENIERIA Y CONSTRUCCION

You might also like