Professional Documents
Culture Documents
Metrado
01 OBRAS PROVISIONALES
02 PAVIMENTOS
02.01 TRABAJOS PRELIMINARES
02.03.02 Concreto en Uñas para Pavimento Rígido, Mortero f'c = 210 Kg/cm2 m3 263.26
02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2 3,504.61
02.04 CURADO
02.05 JUNTAS
02.07 SEÑALIZACION
02.08.01 Eliminación de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/volquete m3 9,102.68
03 VEREDAS
03.01 TRABAJOS PRELIMINARES
03.02.03 Relleno Compactado c/Material de prestamo (Afirmado) para base de vereda m2 2,751.95
03.03 CONCRETO SIMPLE
03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. bruña m2 2,562.10
03.05.01 Curado de vereda con material de prèstamo, durante 7 dias - 4 veces x día m2 2,751.95
03.06 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE
03.06.01 Suministro y Colocacion encimado de Cajas Para Agua u 149.00
03.07.01 Eliminación de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/volquete m3 1,031.98
04 SARDINLES
04.01 TRABAJOS PRELIMINARES
04.03.04 Relleno de Juntas de Dilatación con mortero asfaltico 1"x2" m en sardinel m 130.25
04.03.06 Curado de sardinel con material de prèstamo, durante 7 dias - 4 veces x día m2 623.19
04.04.01 Eliminación de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/volquete m3 292.12
05 CUNETAS RECTANGULARES
05.01 TRABAJOS PRELIMINARES
05.04.05 Curado de sardinel y cuneta con material de prèstamo, durante 7 dias - 4 veces x día m2 2,972.52
05.05.01 Eliminación de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/volquete m3 636.97
06 MURO DE CONTENCION
06.01 TRABAJOS PRELIMINARES
06.05 JUNTAS
06.05.01 Juntas de Dilatación en Muro y Losa Inferior con water stop 6" cada 9.00 m. m 5.00
06.06 ELIMINACION DE MATERIAL EXCEDENTE
06.06.01 Eliminación de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/volquete m3 21.80
07 AREAS VERDES
07.01 Corte superficial para jardineras hasta 0.20 m m2 2,504.15
07.02 Acarreo de material excedente dp <=50 m m3 500.83
Precio S/. Parcial S/.
4,271.95
1,871.95 1,871.95
600.00 2,400.00
1,290,423.89
35,803.93
4.99 29,976.78
0.97 5,827.15
189,028.65
4.60 33,497.84
4.94 29,676.41
13.75 82,601.34
7.20 43,253.06
754,307.80
82.31 494,466.62
268.37 70,651.09
51.59 180,802.83
599.09 8,387.26
20,965.72
3.49 20,965.72
58,838.19
1.75 4,011.86
34.07 8,667.41
16.01 6,702.11
20.74 39,456.81
30,190.68
18.16 24,930.05
5.72 5,260.63
4,124.87
3,026.63
6.86 3,026.63
1,098.24
68.64 1,098.24
197,164.05
21.66 197,164.05
369,722.57
33,079.24
4.99 13,680.93
0.97 2,659.42
15.50 14,649.98
33.21 2,088.91
71,770.86
26.60 29,280.75
6.23 17,144.65
9.21 25,345.46
186,679.60
54.99 140,889.88
58.24 11,056.86
17.63 34,732.86
36,823.51
10.49 6,558.35
4.66 25,643.98
5.19 4,621.18
10,484.93
3.81 10,484.93
8,531.74
23.63 3,520.87
33.63 5,010.87
22,352.69
21.66 22,352.69
216,918.06
2,321.43
4.99 1,943.61
0.97 377.82
6,216.42
26.60 6,216.42
202,052.89
342.66 66,733.04
41.69 84,437.68
4.71 28,290.10
7.99 1,040.70
40.99 19,158.32
3.84 2,393.05
6,327.32
21.66 6,327.32
335,241.41
6,074.14
4.99 5,085.56
0.97 988.58
24.32 12,392.74
302,977.76
342.66 72,753.57
4.71 22,944.48
41.69 84,976.73
40.99 87,031.20
3.81 11,325.30
575.36 23,946.48
13,796.77
21.66 13,796.77
21,934.59
539.27
4.99 451.50
0.97 87.77
1,324.13
31.00 788.64
59.17 535.49
1,205.19
26.64 1,205.19
18,197.96
47.53 2,687.82
4.60 5,050.39
513.74 10,459.75
195.85
39.17 195.85
472.19
21.66 472.19
103,956.34
5.71 14,298.70
25.34 12,691.03
Item
Descripción Und. Metrado
07.03
Suministro y Colocacion de Tierra Agricola m2 2,504.15
07.04
Sembria De Gras m2 2,504.15
07.05
Arborizacion Con Plantones u 227.00
07.06
Eliminación de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/volquete m3 626.04
08
VARIOS
08.01
Limpieza FInal de Obra m2 12,226.44
COSTO DIRECTO
UTILIDAD (5%)
SUB TOTAL
IGV (18%)
PRESUPUESTO TOTAL
SON : TRES MILLONES CIENTONOVENTA Y UN MIL TRESCIENTOS TREINTA Y NUEVE Y 55/100 NUEVOS SOLES
Precio Parcial S/.
S/.
13.59 34,031.40
9.40 23,539.01
25.71 5,836.17
21.66 13,560.03
9,292.09
0.76 9,292.09
2,351,760.90
235,176.09
117,588.05
=================
2,704,525.04
486,814.51
2,351,760.90
3,191,339.55
=================
3,191,339.55