You are on page 1of 4

TATAOUINE GAZ PROJECT

TATAOUINE BRANCH LINE TBL

Rev: 01 Page 1 sur 4

List of modifications to be considered within the ITT documents:

Document TATAOUINE BRANCH LINE SCOPE OF WORK Rev B9


Reference Section to be modified Modification
Page 15, Scope: Scope:
Section 1.2 Line Pipe clearance, Offloading, Gabes Harbor Reception, Transportation Handling and transportation from COMPANY STORAGE yard in
and Storage until the construction phase. Bouchemma (Gabes)
Page 16 & Battery Limits: Civil Battery limits:
17, Section The GTP-T EPCC CONTRACTOR will provide the exact layout plan & the
2.3 geographic coordinates for the Pig Receiver location within the
Tataouine GTP plant.

Page, 18 Summary of scope: Summary of scope:


Section 3.2 Handling, Customs clearance and transportation of line pipe. Handling and transportation of line pipe

Page 65, Shipping, imports and Custom Formalities: Sipping, imports and Custom Formalities:
section 6.14, The CONTRACTOR shall be responsible for line pipe logistics from arrival The CONTRACTOR shall be responsible for line pipe logistics from
onboard at Gabes port to the SITE including but not limited: COMPANY storage yard in Bouchemma (Gabes) to the SITE including
- Coordination with Freight forwarder. but not limited to:
- Line pipe Handling. - Line pipe Handling.
- Line Pipe warehouse until the construction phase. - Line Pipe temporary storage during construction phase.
- Line pipe transportation from the Port to the SITE to be convened with - Line pipe transportation from the COMPANY yard to the SITE to be
COMPANY. The site would be one of the project's construction locations convened with COMPANY. The site would be one of the project's
in Tataouine. The CONTRACTOR shall be responsible for complying with construction locations in Tataouine. The CONTRACTOR shall be
the current Tunisian legislation. responsible for complying with the current Tunisian legislation.
TATAOUINE GAZ PROJECT
TATAOUINE BRANCH LINE TBL

Rev: 01 Page 2 sur 4

Page 70, Line pipe clearance, Gabes harbor reception, transportation and storage Line pipe transportation and storage :
section 7.2.2 : Contractor shall be responsible for supplying all required material,
Contractor shall be responsible for supplying all required material, warehouse, equipment and personnel to perform the following:
warehouse, equipment and personnel to perform the following: - Line Pipe Transportation to Warehouse,
- Line Pipe Clearance, - Line Pipe storage.
- Gabes Harbor Reception,
- Line Pipe offloading,
- Libe Pipe Transportation to Warehouse,
- and Line Pipe storage.

Page 72, Work procedures: Work procedures:


section 7.2.5 - Procedure of pipe transportation from the port to the yard(s) - Procedure of pipe transportation from COMPANY storage yard to the
SITE
Document SPECIFICATION FOR FIELD WELD JOINTING Rev B2
Reference Section to be modified Modification
Page 9, Purpose of Document Purpose of Document
section 2 This Specification gives the minimum technical requirements for external This Specification gives the minimum technical requirements for
corrosion protection of welded field joints using heat shrinkable sleeves external corrosion protection of welded field joints using heat
for the export pipeline systems. The preparation, installation and shrinkable sleeves for the export pipeline systems. The preparation,
inspection of the field joint coating shall be in accordance with the installation and inspection of the field joint coating shall be in
requirements of field joint coating types 2B and 2C in ISO 21809-3 and accordance with the requirements of field joint coating types 2B in ISO
this specification. 21809-3 and this specification.
The pipe will be factory coated with a 3-layer polypropylene (3LPP) or 3- The pipe is factory coated with a 3-layer polypropylene (3LPP) coating
layer polyethylene (3LPE) coating system complying with ISO 21809-1 system complying with ISO 21809-1.
when buried and painted when exposed.
Page 12, 4.1. FIELD JOINT COATING TYPES 4.1. FIELD JOINT COATING TYPES
section 4.1 The field joint coatings shall be heat shrink sleeves consist of a polyolefin The field joint coatings shall be heat shrink sleeves consist of a
based backing with a hot melt adhesive inner layer, and appropriate for polyethylene 3LPE. Heat shrinkable materials shall be applied in
3LPE and 3LPP pipeline coatings, as appropriate. Heat shrinkable conjunction with a compatible primer to be provided by the same
materials shall be applied in conjunction with a compatible primer to be supplier as heat shrink sleeve.
TATAOUINE GAZ PROJECT
TATAOUINE BRANCH LINE TBL

Rev: 01 Page 3 sur 4

provided by the same supplier as heat shrink sleeve.


Document PIPELINE ESDV VALVE DATASHEET Rev A1
Reference Section to be modified Modification
Page 2 General General
End Connections: Weld ends, to ASME B16.25 End Connections: Flanged ends, to ASME B16.5
Document PIPELINE VALVES DATASHEET Rev B1
Reference Section to be modified Modification
Page 4 General General
End Connections: RTJ Flanged ends, in conformity with ASME B16.25 End Connections: welded ends, in conformity with ASME B16.5
Document SCOPE OF SUPPLY – PIPELINE VALVES Rev B2
Reference Section to be modified Modification
Page 20 Appendix A-Bill Of Materials Appendix A-Bill Of Materials
The scope of supply under this quotation shall be in accordance with the The scope of supply under this quotation shall be in accordance with
following: the following:

It’s Supplier responsibility to ensure the provision of the Actuated


It’s Supplier responsibility to ensure the provision of the Actuated Valves Valves completely assembled with its actuators as follows:
completely assembled with its actuators as follows: - Two 12” Isolation Valves Packages where Each packages shall include:
- Two 12” Isolation Valves Packages where Each packages shall include: • Valve (Item1) + Actuator (Item 4)
• Valve (Item1) + Actuator (Item 4) - Two 12” ESDV Packages where Each packages shall include:
- Two 12” ESDV Packages where Each packages shall include:
TATAOUINE GAZ PROJECT
TATAOUINE BRANCH LINE TBL

Rev: 01 Page 4 sur 4

• Valve (Item1) + Actuator (Item 3) • Valve (Item1) + Actuator (Item 3)

Document PIPELINE CATHODIC PROTECTION SCOPE OF WORK – Rev B3


Reference Section to be modified Modification
Page 10, CP SYSTEM DESIGN REQUIREMENTS CP SYSTEM DESIGN REQUIREMENTS
Section 7.3 The ICCP shall consists of anodes arranged in ground bed (GB) and The ICCP shall consist of anodes arranged in ground bed (GB) and
connected to a solar generator (DC power source) using suitable connected to a solar generator (DC power source, Figure 1) or AC
insulated wire conductors (Figure 1) power source (when available) using suitable insulated wire conductors
Page 12, CP System Power Supply: CP System Power Supply:
section 7.3.3 CP sub-contractor use the Photovoltaic systems, to be supplied and CP sub-contractor shall use the Photovoltaic systems, to be supplied
installed by TBL EPCC Contractor, to provide necessary DC power supply and installed by TBL EPCC Contractor, and AC power source (when
for ICCP system. available) to provide necessary DC power supply for ICCP system.