You are on page 1of 23

MIYANEH STEEL COMPLEX

MME ELCO MMTE


Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:3/25
SIGNALING LIST

CONTENTS
SHEET TITLE PAGE

0001 CONTENT 3 /25


0002 REFERENCES 4 /25
0003 SIGNALLING LIST - 230KV OVER HEAD LINE 5 /25
0004 SIGNALLING LIST - 230KV OVER HEAD LINE 6 /25
0005 SIGNALLING LIST - 230KV OVER HEAD LINE 7 /25
0006 SIGNALLING LIST - 230KV OVER HEAD LINE 8 /25
0007 SIGNALLING LIST - 230KV OVER HEAD LINE 9 /25
0008 SIGNALLING LIST - 230KV BUSBAR PROTECTION 10 /25
0009 SIGNALLING LIST - 230/33KV TRANSFORMER 11 /25
0010 SIGNALLING LIST - 230/33KV TRANSFORMER 12 /25
0011 SIGNALLING LIST - 230/33KV TRANSFORMER 13 /25
0012 SIGNALLING LIST - 230/33KV TRANSFORMER 14 /25
0013 SIGNALLING LIST - 230/33KV TRANSFORMER 15 /25
0014 SIGNALLING LIST - 230KV MEASURING 16 /25
0015 SIGNALLING LIST - 33KV INCOMING 17 /25
0016 SIGNALLING LIST - 33KV OUTGOING 18 /25
0017 SIGNALLING LIST - 33KV BUSBAR & BUSCOUPLER 19 /25
0018 SIGNALLING LIST - 33KV BUSBAR & BUSCOUPLER 20 /25
0019 SIGNALLING LIST - 33KV MEASURING 21 /25
0020 SIGNALLING LIST - GENERAL-COMMON 22 /25
0021 SIGNALLING LIST - GENERAL-COMMON 23 /25
0022 SIGNALLING LIST - GENERAL-COMMON 24 /25
0023 SIGNALLING LIST - LVAC / LVDC MEASURING 25 /25
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:4/25
SIGNALING LIST

REFERENCES

1- CONTRACT DRAWINGS
2- SINGLE LINE DIAGRAM
MIYANEH STEEL COMPLEX
Steel Making Plant Project MME ELCO MMTE

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:5/25
SIGNALING LIST
DCS/FAULT RECORDER PANEL RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 LOSS OF PROT. DC SUPPLY SUB I X X X X
2 LOSS OF PROT. DC SUPPLY SUB II X X X X
3 DISTANCE RELAYS FAULTY SUB I / SUB II X X X X
4
5 CVT METERING MCB TRIP X X X X
6 CVT SUBI PROT. MCB TRIP X X X X
7 FUSE FAIL DISTANCE SUB I X X X X
8
9 CVT SUB II PROT. MCB TRIP X X X
10 FUSE FAIL DISTANCE SUB II X X X
11 SYNCHRO CVT MCB FAIL X X X
12 LINE CVT FAIL X
13
14 DISTANCE SUB I ZONE 1 TRIP X X X X
15 DISTANCE SUB I ZONE 2 TRIP X X X X
16 DISTANCE SUB I ZONE 3 TRIP X X X X
17 DISTANCE SUB I TRIP X
18
19 DISTANCE / DEF SUB I - PHASE A TRIP X X X X
20 DISTANCE / DEF SUB I - PHASE B TRIP X X X X
21 DISTANCE / DEF SUB I - PHASE C TRIP X X X X
22
23 DEF INSTANTANEOUS SUB I TRIP X X X X
24 DEF BACKUP2 SUB I TRIP X X X X
25 DEF BACKUP1 SUB I TRIP X X X X
26 DEF IDMT SUB I TRIP X X X X
27 DEF TIME DELAY SUB I TRIP X X X X
28 DIRECTIONAL EARTH FAULT SUB I TRIP X
29
30 DISTANCE SUB I POWER SWING BLOCKING X X X X
31 DISTANCE SUB II POWER SWING DETECTION X X X
32
33
34
35
MME ELCO MMTE
MIYANEH STEEL COMPLEX
Steel Making Plant Project
Document No. : REV ASCOTEC MMAH
Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:6/25
SIGNALING LIST
38 DISTANCE SUB I OVER VOLTAGE TRIP X X X X
39 DISTANCE SUB I UNDER VOLTAGE TRIP X X X X
40 DISTANCE SUB I SOFT/STUB/OV,UV X
41
42 DISTANCE SUB II ZONE 1 TRIP X X X X
43 DISTANCE SUB II ZONE 2 TRIP X X X X
44 DISTANCE SUB II ZONE 3 TRIP X X X X
45 DISTANCE SUB II TRIP X
46
47 DISTANCE/DEF SUB II - PHASE A TRIP X X X X
48 DISTANCE/DEF SUB II - PHASE B TRIP X X X X
49 DISTANCE/DEF SUB II - PHASE C TRIP X X X X
50
51 DIRECTIONAL EARTH FAULT SUB II TRIP X X X X X
52
53 DISTANCE SUB II SWITCH ON TO FAULT X X X X
54 DISTANCE SUB II STUB PROTECTION TRIP X X X X
55 DISTANCE SUB II OVER VOLTAGE TRIP X X X X
56 DISTANCE SUB II UNDER VOLTAGE TRIP X X X X
57 DISTANCE SUB II SOFT/STUB/OV,UV X
58
59 CARRIER CH.NO.1 RECEIVED (DISTANCE SUB I) X X X X
60 CARRIER CH.NO.2 RECEIVED (DISTANCE SUB II) X X X X
61 CARRIER CH.NO.3 RECEIVED (DEF) X X X X
62 CARRIER CH. NO.4 RECEIVED (DIRECT TRIP ) X X X X
63 CARRIER CH. NO.5 RECEIVED (DIRECT TRIP ) X X X X
64 LINE PROTECTION SIGNAL RECEIVED X
65
66 DISTANCE SUB I ACCELERATION TRIP X X
67 DIRECTIONAL EARTH FAULT SUB I ACCELERATION TRIP X X
68 DISTANCE SUB II ACCELERATION TRIP X X
69 DIRECTIONAL EARTH FAULT SUB II ACCELERATION TRIP X X
70 X
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:7/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
71 DISTANCE SIGNAL SEND (CH. NO. 1) X X X
72 D.E.F SIGNAL SEND (CH. NO. 2) X X X
73 DIRECT TRIP SEND (CH. NO. 3) X X X
74 DIRECT TRIP SEND (CH. NO. 4) X X X
75
76 CARRIER CH. NO. 1 OFF / TROUBLE X X X X
77 CARRIER CH. NO. 2 OFF / TROUBLE X X X X
78 CARRIER CH. NO. 3 OFF / TROUBLE X X X X
79 CARRIER CH. NO. 4&5 OFF / TROUBLE X X X X
80 CARRIER OFF/TROUBLE X
81
82 AUTO RECLOSER CB(-Q01) LOCKOUT X X X X
83 AUTO RECLOSER CB(-Q03) LOCKOUT X X X X
84 AUTO RECLOSER CB LOCKOUT X
85 AUTO RECLOSER CLOSE COMMAND(CB /-Q01) X X
86 AUTO RECLOSER CLOSE COMMAND(CB /-Q03) X X
87 AUTO RECLOSER IN SERVICE(A/R ON) X X X
88 AUTO RECLOSER IN PROGRESS X
89 AUTO RECLOSER RELAY FAULTY(CB -Q03) x X X X
90 AUTO RECLOSER BLOCKING INPUT X
91
92 LINE D.S CLOSE X X X X X X X TO BCU & DISTANCE I/II
93 LINE D.S OPEN X X X X X X X TO BCU & DISTANCE I/II
94
95 LINE E.S CLOSE X X X X X X X TO BCU & DISTANCE I/II
96 LINE E.S OPEN X X X X X X X TO BCU & DISTANCE I/II
97
98 CB/-Q01 CLOSE X X X X X X X TO BCU & DISTANCE I/II
99 CB/-Q01 OPEN X X X X X X X TO BCU & DISTANCE I/II
100
101 CB/-Q03 CLOSE X X X X X X X TO BCU & DISTANCE I/II
102 CB/-Q03 OPEN X X X X X X X TO BCU & DISTANCE I/II
103
104 DS/-Q1 CLOSE X X X X X X X TO BCU
105 DS/-Q1 OPEN X X X X X X X TO BCU
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:8/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
106 DS/-Q93 CLOSE X X X X X X TO BCU
107 DS/-Q93 OPEN X X X X X X TO BCU
108
109 DS/-Q95 CLOSE X X X X X X TO BCU
110 DS/-Q95 OPEN X X X X X X TO BCU
111
112 DS/-Q96 CLOSE X X X X X X TO BCU
113 DS/-Q96 OPEN X X X X X X TO BCU
114
115 CIRCUIT BREAKER FAILURE RELAY OPERATED X X X X
116 SHORT ZONE PROT. OPERATED X X X X
117 POLE DISCORDANCE TRIP X X X X
118 POLE DISCORDANCE/CBF / SHORT ZONE PROT. OPERATED X
119
120 -Q01 T.C.S RELAY COIL 1 OPERATED (TRIP CIRCUIT FAULTY) X X X X FOR EACH PHASE
121 -Q01 T.C.S RELAY COIL 2 OPERATED (TRIP CIRCUIT FAULTY) X X X X FOR EACH PHASE
122
123 -Q03 T.C.S RELAY COIL 1 OPERATED (TRIP CIRCUIT FAULTY) X X X X FOR EACH PHASE
124 -Q03 T.C.S RELAY COIL 2 OPERATED (TRIP CIRCUIT FAULTY) X X X X FOR EACH PHASE
125
126 SF6 PRESSURE LOW - FIRST STAGE X X X X
127 SF6 PRESSURE LOW - SECOND STAGE(C.B BLOCK DUE TO LOSS OF SF6) X X X X
128
129 LOSS OF CONTROL&OPERATION DC SUPPLY X X X X
130
131 CB & DS & ES MOTOR SUPPLY FAIL X X X X FOR EACH CB/DS/ES
132 CB & DS & ES HEATING & LIGHTING SUPPLY FAIL X X X X FOR EACH CB/DS/ES
133 CB & DS & ES POSITION FAULTY X X X X FOR EACH CB/DS/ES
134
135 C.B IN REMOTE POSITION X X X X FOR EACH C.B-TO BCU
136 C.B IN LOCAL POSITION X X X X X FOR EACH C.B-TO BCU
137
138 C.B LOCKOUT OPERATED X X X X FOR EACH C.B-TO BCU&DIST.
139 LOCKOUT RESET COMMAND X X FOR EACH C.B-TO BCU&DIST.
140
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:9/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
141 INTERLOCK BYPASS X X X X TO BCU
142
143 BCU FAULTY X X X X
144 BCU DC SUPPLY FAIL X X X X
145 BCU IN LOCAL POSITION X X X X
146 BCU IN REMOTE POSITION X X X X
147
148 C.B -Q01 CLOSE COMMAND X X X
149 C.B -Q01 OPEN COMMAND X X X
150 C.B -Q01 SYNCHRO CALLING/CANCELING X ONLY EMERGENCY CONTROL
151
152 C.B -Q03 OPEN COMMAND X X X
153 C.B -Q03 CLOSE COMMAND X X X
154 C.B -Q03 SYNCHRO CALLING/CANCELING X ONLY EMERGENCY CONTROL
155
156 LINE D.S -Q91 CLOSE COMMAND X X X
157 LINE D.S -Q91 OPEN COMMAND X X X
158
159 D.S -Q1 CLOSE COMMAND X X X
160 D.S -Q1 OPEN COMMAND X X X
161
162 D.S -Q93 CLOSE COMMAND X X X
163 D.S -Q93 OPEN COMMAND X X X
164
165 LINE E.S -Q81 CLOSE COMMAND X X X
166 LINE E.S -Q81 OPEN COMMAND X X X
167
168 D.S -Q95 CLOSE COMMAND X X X
169 D.S -Q95 OPEN COMMAND X X X
170
171 D.S -Q96 CLOSE COMMAND X X X
172 D.S -Q96 OPEN COMMAND X X X
173
174 BCU/EMERGENCY SW. X X ONLY EMERGENCY CONTROL
175 BCU LOCAL/REMOTE SW. X X ONLY EMERGENCY CONTROL
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:108/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 230KV BB1 CVT WIND.1 METERING MCB TRIP X X X X
2 230KV BB1 CVT WIND.2 SYNC.MCB TRIP X X X X
3 230 KV BB1 FUSE FAIL RELAY OPERATED X X X X
4
5 230KV BB2 CVT WIND.1 METERING MCB TRIP X X X X
6 230KV BB2 CVT WIND.2 SYNC.MCB TRIP X X X X
7 230 KV BB2 FUSE FAIL RELAY OPERATED X X X X
8 230KV BBs CVT FAIL X
9
10 230KV BB1 PROTECTION TRIP X
11 230KV BB2 PROTECTION TRIP X
12 230KV BB PROTECTION TRIP X
13
14 LOSS OF 230KV B.B PROTECTION DC - SUB I X X X X X
15 LOSS OF 230KV B.B PROTECTION DC - SUB II X X X X X
16
17 BWS RELAY BB1 PROTECTION BLOCK X X X X
18 BWS RELAY BB2 PROTECTION BLOCK X X X X
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009

Project Document No. : MDES1U43E300010011 PAGE:11/25

DCS RELAY SCADA PANEL


No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 RELAYS FAULTY SUB I X X X X
2 RELAYS FAULTY SUB II X X X X
3 LOSS OF PROT. DC SUPPLY SUB I X X X X
4 LOSS OF PROT. DC SUPPLY SUB II X X X X
5
6 230KV CVT FUSE FAIL RELAY OPERATED (HV) X X X X
7 CVT METERING & SYNCHRO MCB TRIP (HV) X X X X
8 230KV CVT FAIL (HV) X
9
10 63KV CVT FUSE FAIL RELAY OPERATED (LV) X X X X
11 CVT METERING & SYNCHRO MCB TRIP (LV) X X X X
12 63KV CVT FAIL (LV) X
13
14 OVER-FLUXING RELAY ALARM X X X X
15 OVER-FLUXING RELAY TRIP X X X X
16
17 DIFFERENTIAL RELAY TRIP X X X X
18
19 U/V , O/V TRIP (LV) X X X X
20 TRANS U/V,O/V,O/F,DIFFERENTIAL TRIP X
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:12/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
36 TRANS. WINDING TEMP. HIGH TRIP(HV) X X X X
37 TRANS. WINDING TEMP. HIGH TRIP (LV) X X X X
38 TRANS. OIL TEMP HIGH TRIP X X X X
39 TRANS. Oil/WINDING TEMP. HIGH TRIP X
40
41 TRANS. PRESSURE RELIEF VALVE TRIP X X X X
42 TRANS. BUCHHOLZ TRIP X X X X
43 TRANS. NON RETURN VALVE TRIP X X X X
44 TRANS. MECHANICAL PROTECTION TRIP X
45
46 OLTC PRESSURE RELIEF VALVE TRIP X X X X
47 OLTC PROTECTION RELAY TRIP X X X X
48 OLTC PRESSURE RELAY TRIP X X X X
49 OLTC MECHANICAL PROTECTION TRIP X
50
51 TRANS. BUCHHOLZ ALARM X X X X
52 OLTC PRESSURE RELIEF VALVE ALARM X X X X
53
54
55 TRANS. OIL TEMP HIGH ALARM X X X X
56 TRANS. WINDING TEMP HIGH ALARM (H.V) X X X X
57 TRANS. WINDING TEMP HIGH ALARM (L.V) X X X X
58 TRANS. MECHANICAL PROT. ALARM X
59
60 REF RELAY TRIP (HV) X X X X
61 INST.& INV. TIME O/C TRIP (HV) X X X X
62 INST.& INV. TIME E/F TRIP (HV) X X X X
65 TR. REF,O/C,E/F PROT. TRIP (HV) X
63
64 INST.& INV. TIME O/C TRIP (LV) X X X X
66 INST.& INV. TIME E/F TRIP (LV) X X X X
67 R.E.F RELAY TRIP (LV) X X X X
68 TR. REF,O/C,E/F PROT. TRIP (LV) X
69
70
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:13/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
71 TRANS. OIL LEVEL ALARM X X X X
72 OLTC OIL LEVEL ALARM X X X X
73 TRANS. BUCHHOLZ RELAY AIR DETECTOR ALARM X X X X
74 TRANS. OIL LEVEL & AIR BAG RUPTURE ALARM X
75
76
77 AUXILIARY TR.PRESSURE RELIEF TRIP X X X X
78 AUXILIARY TR. BUCHHOLZ TRIP X X X X
79 AUXILIARY TR. OIL TEMP TRIP X X X X
80 AUXILIARY TR. MECHANICAL PROT. TRIP X
81
82
83 AUXILIARY TR. BUCHHOLZ ALARM X X X X
84 AUXILIARY TR.OIL TEMP. ALARM X X X X
85 AUXILIARY TR. MECHANICAL PROT. ALARM X
86 AUXILIARY TR. OIL LEVEL MINIMUM ALARM X X X X
87 AUXILIARY TR. OIL LEVEL MAXIMUM ALARM X X X X
88
89 SOURCE ALIVE/FAILURE (LOSS OF AC SUPPLY) X X X X
90 SOURCE (MAIN AC FAILURE) X X X X
91 GROUP 1 & 2 FAN FAIL. X X X X
92 GROUP 3 & 4 FAN FAIL. X X X X
93 MOTOR DRIVE X X X X
94 TRANS FAN CONTROL FAIL. X X X X
95 TRANS COOLING FANS FAILURE X
96
97 TRANS CUBICLE HEATING & LIGHTING & SOCKET MCB FAIL. X X X X
98
99 MOTOR SUPPLY FAILURE X X X X
100 CONTROL SUPPLY FAILURE X X X X
101 AUTOMATIC CUT OUT X X X X
102 TAP CHANGED DELAYED X X X X
103 OLTC FAILED X
104
105
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:14/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
106 UNDER VOLTAGE X X X X
107 OVER VOLTAGE X X X X
108 OVER CURRENT X X X X
109 REGULATOR BLOCKED X X X X
110 SELF MONITORING X X X X
111 FAIL MK30E TR.I X X X X
112 AVR SUPPLY FAILURE X X X X
113 CUBICLE SUPPLY FAILURE X X X X
114 AVR FAULTY X X
115
116 TAP POSITION INDICATOR X X X
117
118 AVR IN MANUAL CONTROL X X X X X X EMERGENCY CONTROL
119 AVR IN AUTO CONTROL X X X X X X EMERGENCY CONTROL
120
121 AVR IN LOCAL CONTROL X X X X X EMERGENCY CONTROL
122
123 AVR RAISE COMMAND (AUTO) X X
124 AVR LOWER COMMAND (AUTO) X X
125
126 AVR RAISE COMMAND (MANUAL) X X X EMERGENCY CONTROL
127 AVR LOWER COMMAND (MANUAL) X X X EMERGENCY CONTROL
128 TAP CHANGER EMERGENCY STOP (MANUAL) X X X X EMERGENCY CONTROL
129
130
131
132
133
134
135
136
137
138
139
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:15/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
106 CB/-Q02 CLOSE X X X X X X X TO BCU
107 CB/-Q02 OPEN X X X X X X X TO BCU - SHZ RELAY
108
109 DS/-Q2 CLOSE X X X X X X X TO BCU
110 DS/-Q2 OPEN X X X X X X X TO BCU
111
112 DS/-Q94 CLOSE X X X X X X X TO BCU
113 DS/-Q94 OPEN X X X X X X X TO BCU
114
115 DS/-Q92 CLOSE X X X X X X X TO BCU
116 DS/-Q92 OPEN X X X X X X X TO BCU
117
118 ES/-Q82 CLOSE X X X X X X X TO BCU
119 ES/-Q82 OPEN X X X X X X X TO BCU
120
121 DS =F01/F02-Q8 CLOSE X X X X X X X TO BCU
122 DS =F01/F02 -Q8 OPEN X X X X X X X TO BCU
123
124 C.B -Q02 OPEN COMMAND X X X
125 C.B -Q02 CLOSE COMMAND X X X
126 C.B -Q02 SYNCHRO CALLING/CANCELING X ONLY EMRGENCY CONTROL
127
128 DS -Q2 OPEN COMMAND X X X
129 DS -Q2 CLOSE COMMAND X X X
130
131 DS -Q94 OPEN COMMAND X X X
132 DS -Q94 CLOSE COMMAND X X X
133
134 DS -Q92 OPEN COMMAND X X X
135 DS -Q92 CLOSE COMMAND X X X
136
137
138
139
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:16/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 Vab (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
2 Vbc (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
3 Vca (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
4 Van (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
5 Vbn (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
6 Vcn (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
7 Ia (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
8 Ib (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
9 Ic (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
10 In (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
11 Total Power Factor (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
12 Frequency (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
13 Total Real Power (EMA90-LINE&TRANS) X X X
14 Total Reactive Power (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
15 Total Apparent Power (EMA90-LINE&TRANS) X X X
16 Export Real Energy (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
17 Export Reactive Energy (EMA90-LINE&TRANS) X X X MEASURING WINDOW IN HMI
18
19 Vbn (BCU-BB.1/BB.2) X X X MEASURING WINDOW IN HMI
20 Frequency (BCU-BB.1/BB.2) X X X MEASURING WINDOW IN HMI
21
22 TRANS HYDROCAL(DIGITAL SIGNALS) X 8 DIGITAL INPUT(TM 1703 MIC)
23 TRANS HYDROCAL(ANALOG SIGNALS) X 4 ANALOG INPUT(TM 1703 MIC)
24
25
26
27
28
29
30
31
32
33
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:17/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 CONTROL & OPERATION DC SUPPLY FAIL. X X X X
2 MOTOR SUPPLY FAIL. X X X X
3
4 TCS OPERATED X X X X
5
6 SPRING CHARGE FAIL X X X X
7
8 VT FAIL X X X X
9
10 SEF RELAY TRIP X X X X
11 O.C RELAY TRIP X X X X
12
13 CB OPEN X X X X X X
14 CB CLOSE X X X X X X
15
16 CB IN SUBSTATION CONTROL X X X X
17 CB IN SCADA CONTROL X X X X
18
19 ES OPEN X X X X X X
20 ES CLOSE X X X X X X
21
22 TRUCK IN SERVICE X X X X
23 TRUCK IN TEST X X X X
24
25 CB IN LOCAL CONTROL X X X X
26 CB LOCKOUT X X X X
27 CB LOCKOUT/RESET FROM SUB. X X X
28 CB LOCKOUT RESET FROM SCADA X X X
29
30 BCU FAULTY X x x x
31 BCU DC SUPPLY FAIL X x x x
32 BCU IN LOCAL POSITION X X X X
33 BCU IN REMOTE POSITION X X X X
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:18/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 CONTROL & OPERATION DC SUPPLY FAIL. X X X X
2 MOTOR SUPPLY FAIL. X X X X
3
4 TCS OPERATED X X X X
5
6 O.C RELAY TRIP X X X X
7 E.F RELAY TRIP X X X X
8
9 VT FAIL X X X X
10 SPRING CHARGE FAIL X X X
11 X
12 CB IN LOCAL X X X
13 CB LOCKOUT X X X X
14 CB LOCKOUT / RESET FROM SUB. X X X X
15 CB LOCKOUT / RESET FROM SCADA X X X X
16 X
17 O.C , E.F RELAY FAULTY X X X
18 X
19 CB OPEN X X X X
20 CB CLOSE X X X X X X
21 X X
22 CB IN SUBSTATION CONTROL X X X
23 CB IN SCADA CONTROL X X
24 X
25 ES OPEN X X X X
26 ES CLOSE X X X X X X
27 X X
28 TRUCK IN SERVICE X X X
29 TRUCK IN TEST X X X X
30 X
31 AUTO RECLOSER IN SERVICE X
32 AUTO RECLOSER IN PROGRESS X X x
33 AUTO RECLOSER CLOSE COMMAND X X
34 AUTO RECLOSER BLOCKING INPUT X
35 AUTO RECLOSER LOCK OUT X X X
x
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:19/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 CONTROL & OPERATION DC SUPPLY FAIL. X X X X
2 MOTOR SUPPLY FAIL. X X X X
3
4 TCS OPERATED X X X X
5
6 O.C RELAY TRIP X X X X
7 E.F RELAY TRIP X X X X
8
9 UNDER VOLTAGE RELAY TRIP BUS.1 X X X X
10 UNDER VOLTAGE RELAY TRIP BUS.2 X X X X
11
12 BB1 ES OPEN X X X X
13 BB1 ES CLOSE X X X X
14 BB2 ES OPEN X X X X
15 BB2 ES CLOSE X X X X
16
17 CB SPRING CHARGE FAIL X X X X
18
19 CB IN LOCAL X X X X
20 CB LOCKOUT X X X X
21 CB CLOSE LOCKOUT / RESET FROM SUB. X X X X
22 CB CLOSE LOCKOUT/ RESET FROM SCADA X X X X
23
24 O.C , E.F RELAY FAULTY X X X X
25
26 VT FAIL BUS.1 X X X X
27 VT FAIL BUS.2 X X X X
28 VT FAIL X
29
30
31
32
33
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC `MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:20/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
36 CB OPEN X X X X X X
37 CB CLOSE X X X X X X
38
39 CB IN SUBSTATION CONTROL X X X
40 CB IN SCADA CONTROL X X X
41
42 ES OPEN X X X X X X
43 ES CLOSE X X X X X X
44
45 TRUCK IN SERVICE X X X X
46 TRUCK IN TEST X X X X
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
65
63
64
66
67
68
69
70
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:21/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 Vab (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
2 Vbc (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
3 Vca (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
4 Ia (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
5 Ib (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
6 Ic (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
7 In (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
8 Total Power Factor (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
9 Frequency (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
10 Total Real Power (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
11 Total Reactive Power (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
12 Total Apparent Power (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
13 Export Real Energy (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
14 Export Reactive Energy (ALFA2000)FOR EACH INCOMING X X X MEASURING WINDOW IN HMI
15
16 Vab (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
17 Vbc (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
18 Vca (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
19 Ia (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
20 Ib (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
21 Ic (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
22 In (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
23 Total Power Factor (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
24 Frequency (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
25 Total Real Power (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
26 Total Reactive Power (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
27 Total Apparent Power (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
28 Export Real Energy (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
29 Export Reactive Energy (ALFA2000)FOR EACH FEEDER X X X MEASURING WINDOW IN HMI
30
31 Vbn (BCU-BB.1/BB.2) X X X MEASURING WINDOW IN HMI
32 Frequency (BCU-BB.1/BB.2) X X X MEASURING WINDOW IN HMI
33
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:22/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 LVAC INCOMING 1 SUPPLY FAIL X X X X
2 LVAC INCOMING 2 SUPPLY FAIL X X X X
3 LVAC SUPPLY FAIL X
4
5 LVAC INCOMING 1 TRIP X X X X
6 LVAC INCOMING 2 TRIP X X X X
7 LVAC INCOMING 3 TRIP X X X X
8 LVAC INCOMING TRIP X
9
10 LVAC AUTO CHANGEOVER OPERATED X X
11
12 LOSS OF CONTROL SUPPLY ACBs X X X X
13 LOSS OF MOTOR SUPPLY ACBs X X X X
14 LVAC DC SUPPLY FAIL X
15
16 110 V DC SYSTEM E/F (SUB 1) X X X X
17 CHARGER NO.1 UNDER/OVER VOLTAGE RELAYS X X X X
18 BATTERY/ CHARGER NO. 1 TROUBLE (SUB 1) X X COMMON BCU
19
20 110 V DC SYSTEM E/F (SUB 2) X X X X
21 CHARGER NO.2 UNDER/OVER VOLTAGE RELAY X X X X
22 BATTERY/ CHARGER NO. 2 TROUBLE (SUB 2) X X COMMON BCU
23
24 LVAC IN LOCAL CONTROL X X X X
25 LVAC OUTGOING MCCBS TRIP X X X X
26
28
29 EVENT RECORDER PRINTER TROUBLE X X X
30
31 SUBSTATION AUTO/MANUAL IN AUTO (AC/DC PANEL) X X X X X X
32 SUBSTATION AUTO/MANUAL IN MANUAL (AC/DC PANEL) X X X X X X
33
34
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:23/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
36 LOSS OF HEATING/LIGHTING/SOCKET SUPPLY OF PROT. PANELS X X X
37 LOSS OF HEATING/LIGHTING/SOCKET SUPPLY OF CONTROL PANELS X X X
38 LOSS OF HEATING/SOCKET SUPPLY OF AC/DC PANELS X X X
39 LOSS OF AC SUPPLY OF PANELS X
40
41 LVAC INCOMING 1 MASTER X X X X X EMERGENCY CONTROL
42 LVAC INCOMING 2 MASTER X X X X X EMERGENCY CONTROL
43
44 CONTOL FROM SUBSTATION X X X X X
45 CONTROL FROM SCADA X X X X X
46
47 COMMON BCU FAULTY X X X X
48
49 LVDC /DCS SW IN LVDC X X X X EMERGENCY CONTROL
50 LVDC /DCS SW IN DCS X X X X EMERGENCY CONTROL
51 LVAC /DCS SW IN LVAC X X X X EMERGENCY CONTROL
52 LVAC /DCS SW IN DCS X X X X EMERGENCY CONTROL
53
54 ALARM SUPPLY FAIL OF PROTECTION PANELS X X X X
55 ALARM SUPPLY FAIL OF CONTOL PANELS X X X X
56 ALARM SUPPLY FAIL OF AC/DC PROTECTION PANELS X X X X
57 ALARM SUPPLY FAIL OF PANELS X X
58
59 110V DC SUB I INCOMING TRIP X X X X
60 110V DC SUB II INCOMING TRIP X X X X
61 110 V COUPLER TRIP X X X X
62 110V DC INCOMING/COUPLER TRIP X X
63
64 110V DC SUB I UNDER/OVER VOLTAGE X X X X
65 110V DC SUB II UNDER/OVER VOLTAGE X X X X
66
67 LVDC IN LOCAL CONTROL X X X X
68 110V DC SUB I OUTGOING MCB'S TRIP X X X X
69 110V DC SUB II OUTGOING MCB'S TRIP X X X X
70
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:24/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 LVAC ACB -Q01 OPEN X X X X X COMMON BCU
2 LVAC ACB -Q01 CLOSE X X X X X COMMON BCU
3 LVAC ACB -Q02 OPEN X X X X X COMMON BCU
4 LVAC ACB -Q02 CLOSE X X X X X COMMON BCU
5 LVAC ACB -Q03 OPEN X X X X X COMMON BCU
6 LVAC ACB -Q03 CLOSE X X X X X COMMON BCU
7 LVAC ACB -Q04 OPEN X X X X X COMMON BCU
8 LVAC ACB -Q04 CLOSE X X X X X COMMON BCU
9
10 LVAC ACB -Q01 OPEN COMMAND X X X
11 LVAC ACB -Q01 CLOSE COMMAND X X X
12 LVAC ACB -Q02 OPEN COMMAND X X X
13 LVAC ACB -Q02 CLOSE COMMAND X X X
14 LVAC ACB -Q03 OPEN COMMAND X X X
15 LVAC ACB -Q03 CLOSE COMMAND X X X
16 LVAC ACB -Q04 OPEN COMMAND X X X
17 LVAC ACB -Q04 CLOSE COMMAND X X X
18
19
20
21 LVDC ACB -Q100 OPEN X X X X X COMMON BCU
22 LVDC ACB -Q100 CLOSE X X X X X COMMON BCU
23 LVDC ACB -Q200 OPEN X X X X X COMMON BCU
24 LVDC ACB -Q200 CLOSE X X X X X COMMON BCU
25 LVDC ACB -Q300 OPEN X X X X X COMMON BCU
26 LVDC ACB -Q300 CLOSE X X X X X COMMON BCU
28
29 LVDC ACB -Q100 OPEN COMMAND X X X
30 LVDC ACB -Q100 CLOSE COMMAND X X X
31 LVDC ACB -Q200 OPEN COMMAND X X X
32 LVDC ACB -Q200 CLOSE COMMAND X X X
33 LVDC ACB -Q300 OPEN COMMAND X X X
34 LVDC ACB -Q300 CLOSE COMMAND X X X
35
MIYANEH STEEL COMPLEX
MME ELCO MMTE
Steel Making Plant Project

Document No. : REV ASCOTEC MMAH


Document Title : Designer Document No. : MISP1301EA2001 1-1 Date : NOV. 2009
230/33 KV SUBSTATION
Project Document No. : MDES1U43E300010011 PAGE:25/25
SIGNALING LIST
DCS RELAY SCADA PANEL
No. SIGNALS ALARM ALARM
REMARK
IND. CONT. E/L HW SW DIS/R IND. ALARM CONT. IND. WIN.
CL.3 CL.2 CL.1
1 Vab (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
2 Vbc (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
3 Vca (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
4 Van (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
5 Vbn (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
6 Vcn (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
7 Ia (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
8 Ib (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
9 Ic (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
10 In (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
11 Total Power Factor (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
12 Frequency (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
13 Total Real Power (EMA90-LVAC INCOMING I/II/III) X X X
14 Total Reactive Power (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
15 Total Apparent Power (EMA90-LVAC INCOMING I/II/III) X X X
16 Export Real Energy (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
17 Export Reactive Energy (EMA90-LVAC INCOMING I/II/III) X X X MEASURING WINDOW IN HMI
18
19
20 VOLTAGE (ANALOG-LVAC INCOMING I/II/III) X
21
22
23
24 VOLTAGE (TRASDUCER-LVDC INCOMING I/II) X X X MEASURING WINDOW IN HMI
25 CURRENT (TRASDUCER-LVDC INCOMING I/II) X X X MEASURING WINDOW IN HMI
26
27 VOLTAGE (ANALOG-LVAC INCOMING I/II/III) X
28 CURRENT (ANALOG-LVAC INCOMING I/II/III) X
29
30
31
32
33
34
35

You might also like