You are on page 1of 7

Nombre del

Trabajo
recurso 30-Nov 7-Dec 14-Dec 21-Dec 28-Dec 4-Jan
Obrero 14,560 64 192 320 480 1,056 1,424
Capataz 1,380.80 16 51.2 44.8 64.8 115.2 168.8
Operario 3,168 96 224
Oficial 384

Ope. Equipo 5,024


Liviano
80 312 608 760
Soldador 720 32 88
Electricista 800
Topografo 240 16 24 64h 56
Total HH 26276.8 80 243 461 881 1,907 2,721

HH
Acumuladas
80 323 784 1,665 3,572 6,293

HORAS HOMBRE (HH) MANO DE OBRA D


30,000

25,000

20,000

15,000

10,000

5,000

0
7-Dec 14-Dec 21-Dec 28-Dec 4-Ja n 11-Jan 18-Jan 25-Jan 1-
11-Jan 18-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 29-Feb
1,648 1,944 2,320 2,384 1,712 728 272 16
128.8 139.2 167.2 206.4 172 82.4 24
376 504 624 664 440 160 80
40 104 136 80 24

696 616 624 632 464 184 48


144 144 144 112 56
32 96 160 192 176 96 48
48 32
3,073 3,515 4,143 4,326 3,100 1,274 472 16

9,366 12,881 17,024 21,350 24,450 25,725 26,197 26,213

RE (HH) MANO DE OBRA DIRECTA

11-Jan 18-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 29-Feb


Nombre del
Trabajo Grupo
recurso 30-Nov 7-Dec 14-Dec 21-Dec 28-Dec
Excavadora 1,040 EQUIPO 16 96 144
Tractor 80 EQUIPO 16 24 32
Cargador 560 EQUIPO
Frontal 16 24 32
Volquete 1,040 EQUIPO 32 96 160
Rodillo 480 EQUIPO
Cama Baja 576 EQUIPO 16 48 32 24 80
Montacarga 576 EQUIPO 16 48 32 24 80
SideBoom 864 EQUIPO 24 80
Maq. Soldar 1,728 EQUIPO
64
Total HH 5904 0 32 96 144 312 672

HH
Acumuladas
0 32 128 272 584 1,256

Horas Maquina
8,000

7,000

6,000

5,000

4,000

3,000

2,000

1,000

0
30-Nov 7-Dec 14-Dec 21-Dec 28-Dec 4-Ja n 11-Jan 18-Jan 25-Jan
4-Jan 11-Jan 18-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb
184 144 144 144 112 56
8

8 24 80 136 136 80 24
152 144 144 144 112 56
24 80 136 136 80 24
136 136 80 24
136 136 80 24
136 136 120 128 136 80 24

176 304 360 368 288 160 8


936 1,000 976 992 920 624 192 48

2,192 3,192 4,168 5,160 6,080 6,704 6,896 6,944

Horas Maquina

an 11-Jan 18-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb


29-Feb
Nombre del
Costo Grupo
recurso
Obrero S/. 145,600.00 MOD
Capataz S/. 20,712.00 MOD
Operario S/. 47,520.00 MOD
Oficial S/. 4,992.00 MOD

Ope. Equipo S/. 75,360.00 MOD


Liviano

Soldador S/. 10,800.00 MOD


Excavadora S/. 208,000.00 EQUIPO
Tractor S/. 12,000.00 EQUIPO
Cargador S/. 84,000.00 EQUIPO
Frontal
Volquete S/. 104,000.00 EQUIPO
Rodillo S/. 57,600.00 EQUIPO
Cama Baja S/. 57,600.00 EQUIPO
Montacarga S/. 57,600.00 EQUIPO
SideBoom S/. 172,800.00 EQUIPO

Maq. Soldar S/. 86,400.00 EQUIPO

Electricista S/. 12,000.00 MOD


Topografo S/. 0.00 MOD
Cemento S/. 10,000.00 MATERIAL
Fierro S/. 2,400.00 MATERIAL
Corrugado
Piedra S/. 0.00 MATERIAL
Arena Fina S/. 0.00 MATERIAL

Tuveria PVC S/. 0.00 MATERIAL

Ladrillo S/. 4,000.00 MATERIAL


Premezclad S/. 124,800.00 MATERIAL
o
Madera S/. 0.00 MATERIAL
tornillo
Clavos S/. 0.00 MATERIAL
Madera S/. 0.00 MATERIAL
Fenolica
Perfil Acero S/. 3,000.00 MATERIAL

Inst. Presion S/. 12,000.00 MATERIAL

Inst. Control S/. 8,000.00 MATERIAL

Cable S/. 4,080.00 MATERIAL


Electrico
Mat. S/. 4,800.00 MATERIAL
Relleno