CPM - WEEKLY PLANNING WEEK 16 - 2018 (16 - 20 April 2018) WUR KRS

Order
No Contractor Company WO St Short Description
Number

1 WUR KRS North 3508716 55 SLEEVEINSTALLATION 30 IBUL-DMI

2 WUR KRS North 3508730 55 SLEEVEINSTALLATION 30IBUL-DMI

3 WUR KRS North 3508738 55 SLEEVEINSTALLATION 30 IBUL-DMI

4 WUR KRS North 3508744 55 SLEEVEINSTALLATION 30 IBUL-DMI

5 WUR KRS North SLEEVEINSTALLATION 30 IBUL-DMI

6 WUR KRS North 3512516 55 ROAD CROSSING 30" MNSDRI

7 WUR KRS North 3512518 55 ROAD CROSSING MNSDRI 30

8 WUR KRS North 3512556 55 ROAD CROSSING 10 "MNSDRI

9 WUR KRS North 3512554 55 ROAD CROSSING 10 "MNSDRI

10 WUR KRS North 3512523 55 ROAD CROSSING 30" MNSDRI

11 WUR KRS North 3534321 55 ROAD CROSSING 10"MNS TO DRI


12 WUR KRS North 3512544 55 ROAD CROSSING 10 "MNSDRI

13 WUR KRS North RWL - 30"

14 WUR KRS North 3531245 55 ROAD CROSSING30DRI-DMI (PACK2)

15 WUR KRS North 3528137 55 ROAD CROSSING IMP 36 DRI-DMI

16 WUR KRS North 55 ROAD CROSSING IMP 36 DRI-DMI

17 WUR KRS North 3481148 55 COATING APPLICATION 30 DRI-DMI (Package 1)


2018) WUR KRS

Problem Description Equipment Number Equipment Description/Location

PIPE SLEEVE 30" DRI IBUL-DUMAI PKM 30.004-34784 HCT-FOMN-CPL-30BKODMI-6 30" BKO-DMI PKM30001-35000

SLEEVE INSTALLATION 30 IBUL-DMI PKM 35.349-39.689 HCT-FOMN-CPL-30BKODMI-7 30" BKO-DMI PKM35001-40000

SLEEVE INSTALLATION 30" IBUL-DMI PKM 44.724 HCT-FOMN-CPL-30BKODMI-8 30" BKO-DMI PKM40001-45000

SLEEVE INSTALATION 30" IBUL-DMI PKM 45250 HCT-FOMN-CPL-30BKODMI-9 30" BKO-DMI PKM45001-50000

SLEEVE INSTALLATION 30" IBUL-DMI PKM 50.000-55.000 PKM 50.000-55.000

ROAD CROSSING MNS 30" TO DRI PKM 36.400-40.000 HCT-FOMN-CPL-30MNSDRI-1 30" MNS-DRI PKM36400-40000

ROAD CROSSING 30 "MNS TO DRI PKM 40.001-45.000 HCT-FOMN-CPL-30MNSDRI-2 30" MNS-DRI PKM40001-45000

ROAD CROSSING 10"MNS TO DRI PKM 33.001-38.000 HCT-FOMN-GPL-10MDLDRI-5 10" MDL-DRI PKM33001-38000

ROAD CROSSING 10"MNS TO DRI PKM 38.001-43.000 HCT-FOMN-GPL-10MDLDRI-6 10" MDL-DRI PKM38001-43000

ROAD CROSSING 30" MNS TO DRI PKM 45.001-50.000 HCT-FOMN-CPL-30MNSDRI-3 30" MNS-DRI PKM45001-50000

ROAD CROSSING 10"MNS TO DRI PKM 43.001 - 46.304 HCT-FOMN-GPL-10MDLDRI-7 10" MDL-DRI PKM43001-46304
ROAD CROSSING 10"MNS TO DRI PKM 46.304-55.000 HCT-FOMN-GPL-10MDLDRI HCT-FOMN-GPL-10" MINDL TO DURI

RWL - 30" (PKM 19.340-19.365) PKM 19.340-19.365 PKM 19.340-19.365

ROAD CROSSING 30" DRI-DMI (EPL PACKAGE 2) HCT-FOMN-CPL-30DRIDMI-4 30" DRI TO DMI PKM 10001-15000

ROAD CROSSING IMP 36 DRI-DMI PKM 8.750-13.750(PACKAGE


HCT-FOMN-CPL-36DRIDMI-1 36" DRI-DMI PKM8750-13750
2)

ROAD CROSSING IMP 36 DRI-DMI PKM 13.751- PKM 13.751 - 15000 PKM 13.751 - 15000
15.000(PACKAGE 2)

COATING APPLICATION 30" DRI-DMI PKM 8.413-9.479 HCT-FOMN-CPL-30DRIDMI-3 30" DRI TO DMI PKM 7800-10000
( Package 1)
Planned Start Date Planned Finish
Coordinate/PKM Detail Loc 3 MOC Number Business Unit
(Week 15) Date (Week 15)

PKM 3330.8 H01 N/A 16-Apr-18 20-Apr-18 2500CP5221

PKM 3566.57 H01 N/A 16-Apr-18 20-Apr-18 2500CP5221

PKM 4423.21 H01 N/A 16-Apr-18 20-Apr-18 2500CP5221

PKM 4688.46
PKM 4883.34 H01 N/A 16-Apr-18 20-Apr-18 2500CP5221
PKM 4998.4
PKM 5305.34
H01 N/A 16-Apr-18 20-Apr-18 2500CP5221
PKM 5371.39

PKM 37542 - 37545


PKM 38160 - 38162
PKM 38670 - 38674 H01 456908 16-Apr-18 20-Apr-18 2500CP5221
PKM 39310 - 39313
PKM 39795 - 39797

PKM 40100 - 40103


PKM 40120 - 40122 H01 456908 16-Apr-18 20-Apr-18 2500CP5221
PKM 40180 - 40183

PKM 37542 - 37545 H01 456908 16-Apr-18 20-Apr-18 2500CP5221

PKM 38160 - 38162


PKM 38670 - 38674
PKM 39310 - 39313
PKM 39795 - 39797 H01 456908 16-Apr-18 20-Apr-18 2500CP5221
PKM 40100 - 40103
PKM 40120 - 40122
PKM 40180 - 40183

PKM 45350 - 45352


PKM 45370 - 45373
PKM 45380 - 45383
PKM 45400 - 45403
PKM 45420 - 45423
PKM 45430 - 45433 H01 456908 16-Apr-18 20-Apr-18 2500CP5221
PKM 45440 - 45442
PKM 45500 - 45502
PKM 45800 - 45803
PKM 45820 - 46820
PKM 46000 - 46850

PKM 45350 - 45352


PKM 45370 - 45373
PKM 45380 - 45383
PKM 45400 - 45403
PKM 45420 - 45423 H01 456908 16-Apr-18 20-Apr-18 2500CP5221
PKM 45430 - 45433
PKM 45440 - 45442
PKM 45500 - 45502
PKM 45800 - 45803
PKM 45820 - 46820 H01 456908 16-Apr-18 20-Apr-18 2500CP5221
PKM 46000 - 46850

PKM 19.340-19.365 H01 306795 16-Apr-18 20-Apr-18 2500CP5221

PKM 13.004
PKM 13.026
PKM 13.153
PKM 13.953
PKM 13.973 H01 N/A 16-Apr-18 20-Apr-18 2500CP5221
PKM 14.001
PKM 14.037
PKM 14.074
PKM 14.087
PKM 14.481

PKM 13.004
PKM 13.026 H01 480743 16-Apr-18 20-Apr-18 2500CP5221
PKM 13.153

PKM 13.953
PKM 13.973
PKM 14.001
PKM 14.037 H01 306780 16-Apr-18 20-Apr-18 2500CP5221
PKM 14.074
PKM 14.087
PKM 14.481

H01 N/A 16-Apr-18 20-Apr-18 2500CP5221


Fareps Size Target in Week
Lead Craf Fareps CPI PMCOW Local 11
SMBR (Inch) 15 - 2018

Andi Rinaldo
EPL-CONS-NO YUN HENRI SLV 30
Dedi Sukmara
Andi Rinaldo
EPL-CONS-NO Syafrizon SLV 30
Dedi Sukmara
Andi Rinaldo 1. Saud.T
EPL-CONS-NO Syafrizon SLV 30
Dedi Sukmara 2. Dafris 16
3. Akmal
Andi Rinaldo
EPL-CONS-NO Syafrizon SLV 30
Dedi Sukmara

Andi Rinaldo
EPL-CONS-NO Syafrizon SLV 30
Dedi Sukmara

Glundung S 1. Marigjen
EPL-CONS-NO Mairudi Zulhamdi RCW 30 18
2. Ali Rahmat
Andi T

Glundung S 1. Marigjen
EPL-CONS-NO Mairudi Zulhamdi RCW 30 9
2. Ali Rahmat
Andi T

Glundung S 1. Marigjen
EPL-CONS-NO Mairudi Zulhamdi RCW 10 3
2. Ali Rahmat
Andi T

Glundung S 1. Marigjen
EPL-CONS-NO Mairudi Zulhamdi RCW 10 24
2. Ali Rahmat
Andi T

Glundung S 1. Loderman
EPL-CONS-NO Mairudi Zulhamdi RCW 30 54
2. Joni. S
Andi T

Glundung S 1. Loderman
EPL-CONS-NO Mairudi Zulhamdi RCW 10 30
2. Joni. S
Andi T
Glundung S 1. Loderman
EPL-CONS-NO Mairudi Zulhamdi RCW 10 24
2. Joni. S
Andi T
Glundung S 1. Loderman
EPL-CONS-NO Mairudi Bujang Saad SLV 30 20
2. Joni. S
Andi T

1. Juara
Glundung S 2. Alin Panjaitan
EPL-CONS-NO Mairudi Zulhamdi 3. Parasian RCW 30 36
Andi T Sinaga
4. Henri. TP

1. Juara
Glundung S 2. Alin Panjaitan
EPL-CONS-NO Mairudi Zulhamdi 3. Parasian RCW 36
Andi T Sinaga
4. Henri. TP

36

Glundung S 1. John K
EPL-CONS-NO Mairudi Zulhamdi SLV 30
2. Desfrianto
Andi T

Glundung S 1. Tigor
EPL-CONS-NO Mairudi Zulhamdi PM 30 70
Simanjuntak
Andi T

198
Mall Sleeve Material Welding Crew
UOM Total Welders Material Location
Status Availability Availability

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK


10

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK

14
pair OK OK KRS Yard OK

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK

pair OK OK KRS Yard OK


pair OK OK KRS Yard OK

pair 4 OK OK KRS Yard OK

pair 12 OK OK KRS Yard OK

OK OK KRS Yard OK

pair 12

OK OK KRS Yard OK

meter 0 OK OK KRS Yard OK

60
Civil Crew Scafolding Maintenance Access Social Issues
Lifing Equipment Availability
Availability Availability Readiness (Need PGPA or Not)

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT
OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT

OK N/A OK OK NOT
CPM - WEEKLY PLANNING WEEK 15 - 2018 (09 - 13 April 2018)

No Contractor Company Order Number Problem Description Equipment Description/Location Coordinate/PKM Detail Size Target in Week UOM Total Work
14 - 2018 Welder Type

WUR KRS North 3537298 SLEEVE INSTALLATION 30"IBUL-DUMAI PKM 4.219 - 10.000 30" BKO-DMI PKM4219-10000 30 pair SLV

WUR KRS North 3534263 SLEEVE INSTALLATION 30"IBUL-DUMAI PKM 15.001-20.000 30" BKO-DMI PKM15001-20000 30 26 pair 14 SLV

WUR KRS North 3534298 SLEEVE INSTALLATION 30"IBUL-DUMAI PKM 20.001-25.000 30" BKO-DMI PKM20001-25000 30 pair SLV

WUR KRS North 3534306 ROAD CROSSING 30" DRI-DMI PKM 10.001-15.000 (EPL Package 2) 30" DRI TO DMI PKM 10001-15000 30 60 pair 12 RCW

WUR KRS North 3481147 ROAD CROSSING 36" DRI-DMI PKM 8.750 - 13.750 36" DRI-DMI PKM8750-13750 36 60 pair 12 RCW

WUR KRS North 3480993 SLEEVE INSTALLATION 30 DRI-DMI PKM35.001-40.000 (10 PAIRS) 30" DRI-DMI PKM35001-40000 30 20 pair 4 SLV

WUR KRS North 3481148 COATING APPLICATION 30" DRI-DMI PKM 8.413-9.479 ( Package 1) 30" DRI TO DMI PKM 7800-10000 30 70 meter 0 PM

WUR KRS North 3512516 ROAD CROSSING MNS 30" TO DRI PKM 36.400-40.000 (222 PAIRS) 30" MNS-DRI PKM36400-40000 30 32 pair 7 RCW

WUR KRS North 3512556 ROAD CROSSING 10"MNS TO DRI PKM 33.001-38.000 10" MDL-DRI PKM33001-38000 10 16 pair 3 RCW

WUR KRS North 3512554 ROAD CROSSING 10"MNS TO DRI PKM 38.001-43.000 10" MDL-DRI PKM38001-43000 10 16 pair 4 RCW

WUR KRS North 3481013 SLEEVE INSTALLATION 30 NBS-DRI PKM 45.000-50.000 30" MNS-DRI PKM45001-50000 30 20 pair 4 SLV

WUR MMP North 3479042 SLEEVE INSTALLATION 12" LBO-DRI PKM10001-15000 12" LBO-DRI PKM10001-15000 12 pair SLV

WUR MMP North 3479044 SLEEVE INSTALLATION 12" LBO-DRI PKM20001-25000 12" LBO-DRI PKM20001-25000 12 pair SLV

WUR MMP North 3479046 SLEEVE INSTALLATION 12" LBO-DRI PKM25001-30000 12" LBO-DRI PKM25001-30000 12 pair SLV

WUR MMP North 3479047 SLEEVE INSTALLATION 12" LBO-DRI PKM 30.001-35.000 12" LBO-DRI PKM30001-35000 12 pair SLV

WUR MMP North 3479048 SLEEVE INSTALLATION 12" LBO-DRI PKM 35.001-40.000 12" LBO-DRI PKM35001-40000 12 4 pair SLV
2
WUR MMP North 3479039 SLEEVE INSTALLATION 12" LBO-DRI PKM45001-50000 12" LBO-DRI PKM45001-50000 12 4 pair SLV

WUR MMP North 3479054 SLEEVE INSTALLATION 10" MDL-DRI PKM 13.000-18.000 10" MDL-DRI PKM13000-18000 10 pair SLV

WUR MMP North 3479055 SLEEVE INSTALLATION 10" MDL-DRI PKM23001-28000 10" MDL-DRI PKM23001-28000 10 4 pair 2 SLV

WUR MMP North 3479057 SLEEVE INSTALLATION I10" MDL-DRI PKM33001-38000 10" MDL-DRI PKM33001-38000 10 pair SLV

WUR MMP North 3526258 ROAD CROSSING 20" BKO - PEMATANG IBUL PKM 0 - 4.219 20" BKO - DMI PKM 0 - 4219 20 15 pair 2 RCW

WUR MMP North 3526314 ACCESS ROAD SPOT CLEARING 10" MINDAL TO DURI PKM 2.549-4.850 HCT-FOMN-GPL-10" MINDL TO DURI 10 SLV

WUR MMP North 3532895 INSTALLATION PIPE SLEEVE 30"CPS TO CGS#5 PKM 0 - 4.000 30" DRI TO DMI PKM 0.000-4000 30 5 pair 2 SLV

WUR MMP North 3532898 INSTALLATION PIPE SLEEVE 30"CPS TO CGS#5 30" DRI-DMI PKM4001-7800 30 pair SLV

WUR MMP North 3526613 INSTALL SACP AT 30" NBS (PUNGUT) - DURI PKM 45.001 - 50.000 30" MNS-DRI PKM45001-50000 30 pcs IST
6
WUR MMP North 3526621 INSTALL SACP AT 10" MINDAL (PUNGUT) - DURI PKM 47.900 - 52.520 HCT-FOMN-GPL-10" MINDL TO DURI 10 pcs IST

RUR WKS North 3531270 NEW INSTALLATION PIPE SLEEVE CONDENS 6" CORRIDOR 5SE-5SW JOIN83- Pipe,5SE-CGC-101-06-CVC05 6 0 pair 1 SLV
147(560 PAIRS)

RUR WKS North 3534524 PIPE SLEEV E 10 WADUK PROD LINE LIBO 18 TO LIBO GS PL 10 LIBO 18 TO LIBO GS 10 10 pair 4 SLV

RUR WKS North 3519677 DISMANTLE INSULATION PIPE 10” LIBO PRODUCTION LINE (CLEARING MANUAL PL 10 LIBO 18 TO LIBO GS 10 350 meter 0 SLV
PIPE 24" 5L34)

RUR WKS North 3479965 SLEEVE INSTALLATION 16" DDP-DGF PKM 0 - 2.430 (17 PAIRS) 16" DRI-DDP PKM0-2430 16 16 pair 4 SLV

RUR WKS North 3528091 INSTALLATION PIPE SLEEVE 8 " CGC LINE NEAR R/C 6N-75 TO CGS-5 (70 PAIRS) Pipe,6GN-CGC-403-08-NSC65 8 10 pair 2 SLV

WUR WKS South 3534526 INSTALL WEAR PLATE 12" PRODUCTION LINE MINAS PL 12in 6F61-PL 16in 6E64 12 20 Spot 4 REP

WUR WKS South 3496893 CONDITION MONITORING TRIGGERED PL 12in 6F61-PL 16in 6E64 16 80 pair 9 SLV
North Area South Area
No Type of Work UOM
KRS MMP WKS MMP WKS TOTAL
1 Coating Application 70 70 Sq. Meter
2 Sleeve Installation 66 17 36 80 199 Pair
3 Road Crossing Improvement 184 15 199 Pair
4 Anode Installation 6 6 Pcs
5 Pipe Support & Wear Plate 20 20 Spot
REPORT SCHEDULE
No Description Time To
1 Daily Report 8:00 AM Every Working Day All
2 Weekly Report 11:00 AM Every Monday SMBR
3 Weekly Report 11:00 AM Every Tuesday CPI
4 7 days Planning and Scheduling 3:00 PM Every Tuesday CPI
5 Sponsor Estimate 3:00 PM 2nd day on 4th week Every Month CPI
PIC
All Contractor's Planner
All Contractor's Planner
SMBR Reps
All Contractor's Planner
All Contractor's Planner