You are on page 1of 6

KEL017

Revised October 3, 2012

SUNIL CHOPRA

CRU Computer Rentals


Richard Sarkis, general manager for CRU Computer Rentals, was studying the sales and
financial figures for the first quarter of the year and was at a loss to explain the numbers. After a
period of declining sales toward the end of last year, sales had picked up during the last quarter.
However, profitability continued to decline and was, in fact, worse than last year. Wondering how
to proceed, Sarkis scheduled a meeting with his vice presidents for sales and operations. He asked
them to come prepared with data for the meeting.

Background
CRU was one of two national computer rental companies. The company’s business had
grown rapidly since it began in 1990. CRU purchased CPUs, monitors, printers, and other
peripherals and rented them out for either the long or short term. The duration of these leases
ranged from one day to two years. Last year, CRU’s revenues totaled about $15 million.

The majority of CRU’s customers fit into one of the following categories:

 Large corporate clients who wanted to stay on the cutting edge of technology and replace
their machines every year, thus leasing for that duration
 Consulting firms and smaller business customers requiring a computer for the medium
term, typically two to four months
 Participants in trade shows who required a short-term rental for the duration of the show

Customers expected short lead times in this business (typically one to two days) and placed a
high value on quick, accurate delivery and installation. All firms in the computer rental business
worked hard to ensure a quick response.

The items that CRU carried in inventory were primarily driven by customer demand. CRU
tried to be customer sensitive and often purchased machines requested by good customers, even if
they were not typically held in stock. Since the rate of new product introduction was rapid in this
industry and prices fell rapidly, CRU was under tremendous pressure to generate revenue quickly
from units that it had purchased. If certain models were no longer in demand, CRU sold them in
the open market as used machines. So far, CRU had generally managed to recover the book value
(purchase price – amount depreciated) on their machines. Each week, CRU bought some new
machines that replaced the old machines that were sold. As a result, CRU had to spend the

©2003 by the Kellogg School of Management, Northwestern University. This case was prepared by Professor Sunil Chopra. Cases are
developed solely as the basis for class discussion. Cases are not intended to serve as endorsements, sources of primary data, or
illustrations of effective or ineffective management. To order copies or request permission to reproduce materials, call 800-545-7685
(or 617-783-7600 outside the United States or Canada) or e-mail custserv@hbsp.harvard.edu. No part of this publication may be
reproduced, stored in a retrieval system, used in a spreadsheet, or transmitted in any form or by any means—electronic, mechanical,
photocopying, recording, or otherwise—without the permission of the Kellogg School of Management.
This document is authorized for use only by Doug Nguyen in BUSN 40000 81,01 (Spring 2019) Operations Management: Business Process Fundamentals at University of Chicago, 2019.
CRU COMPUTER RENTALS KEL017

equivalent of the weekly depreciation on new machines to keep its inventory of computers
relatively fresh.

CRU Operations and the Rental Cycle


CRU currently had two main warehouses (or “Mega Centers”) located in Naperville, Illinois,
and Fullerton, California, and 23 local retail centers (LRCs) located throughout the country.
Exhibit 1 shows the Mega Center and LRC locations. All equipment that was available to rent
was stocked at one of these locations with more than 90 percent of the equipment held at the
Mega Centers. When returned from the customers, all equipment was sent to the Mega Centers
for repair and reconfiguration.

The flow of orders and units through the CRU system was as follows. A customer called a
toll-free number or a local CRU rental number. Calls were automatically routed to a sales
specialist at either a nearby LRC or to one of the two Mega Centers. The sales specialist
identified the customer (existing or new), verified credit, and took the order. The sales specialist
had access to the Available for Rent inventory in each warehouse, by item code, on a screen in
front of her. She assigned a particular unit in a warehouse to be shipped to the customer. Once an
order was taken, the unit was removed from the Available for Rent inventory (status 20) and put
on a Reserve status (status 32). Sales specialists were trained to search for substitutes in case a
specific piece of equipment was not available. They recommended these substitutes to customers,
working with the customer to find something suitable.

Once an order was entered into the system, it was routed to Quality Assurance and Picking
where the order printed out automatically from a printer linked to the order-taking system. The
printed document contained the details of the order as well as the shipping date. It sometimes also
contained specific instructions with regard to the order. After reviewing the order for accuracy
and the delivery date, the picker located the specific item(s) in the warehouse, picked it (them),
and delivered it (them) to a holding area in the Configuration section. Technicians picked up
orders for configuration along with the order forms from this holding area. The technicians were
required to pick orders in sequence. There was, however, a tendency to pick orders that were
perceived to be easy.

Machines in the warehouse were stored in a standard configuration in terms of hardware and
software. However, most orders required some variation in terms of memory, hard-drive size,
other hardware, or even software. The technician in the Configuration section configured the
equipment as per customer request by cleaning the equipment, installing any necessary hardware
(e.g., memory chips, print cartridges, etc.), and loading appropriate software. All technicians were
capable of installing all types of hardware and software.

Once all items comprising an order were configured, the technician rolled the cart containing
the configured order to the Shipping department. A shipper then reviewed the invoice tag to
verify contents, ship date, and ship mode. The items were then packaged, labeled, and shipped out
by the appropriate mode. The shipping cost (borne by CRU) averaged $25 per unit.

Once the customer completed the rental term, (s)he packaged the units and shipped them
back, using pre-addressed labels, to one of the Mega Centers. The return shipping cost (incurred
by CRU) also averaged $25 per unit. Sometimes the units were returned by the customers prior to
the end of the rental term because they were “broken” or need repairs. All returned units were

2 KELLOGG SCHOOL OF MANAGEMENT


This document is authorized for use only by Doug Nguyen in BUSN 40000 81,01 (Spring 2019) Operations Management: Business Process Fundamentals at University of Chicago, 2019.
KEL017 CRU COMPUTER RENTALS

received at a Mega Center in the Receiving department. Upon arrival, each unit was classified as
defective (status 40) or not defective (status 24). Status 24 units were put into storage to be
worked on by the Pre-Configuration department, and status 40 units were put into storage to be
worked on by the Repairs group. Historically, 30 percent of the units received had been classified
as status 40 and 70 percent of the units received had been classified as status 24 at Receiving.

When a technician in the Pre-Configuration department was ready to work on a unit, it was
picked from storage and brought to the technician. The technician did a quick check to see that it
was not defective. Historically, 15 percent of the status 24 units had turned out to be defective. In
other words, they should have been classified as status 40 at Receiving but were not classified
correctly. In this case, the technician changed the status of the unit to status 40 and returned it to
storage. If the unit worked, the technician then removed any stickers that might have been
specific to the previous customer, reformatted the hard drive, did some basic cleaning, and put the
unit back into storage as Available for Rent, or status 20. The average material cost to convert a
unit from status 24 to status 20 was $4.

When a technician in the Repairs group was ready to work on a unit, it was picked from
storage and brought to the technician. The technician then ran a series of tests to identify any
parts that might need to be replaced. An order sheet was completed and sent to the Parts
department. The unit was now classified as status 41. The Repairs technician then sent the status
41 unit into storage. The order sheets themselves queued up at the Parts department. The Parts
department used information from the order sheets to place orders with the suppliers. Once an
order was placed with the parts supplier, it took an average of one week before the part arrived to
the Parts department. When the parts came in, they were received by the Parts group and taped
on top of the machines for later installation. The unit was now classified as status 42. Repair
technicians pulled status 42 units from storage, repaired them, and converted them to status 20
units, making them Available for Rent. The average parts cost when repairing a defective unit was
$150 per unit. This did not include any labor costs.

Performance Measures
The key performance measure tracked at CRU had been “utilization.” It was defined as

Utilization = Number of Units on Rent  Number of Units Owned by CRU.

Utilization is primarily an inventory-related measure and can be restated as

Utilization = Inventory on Rent  Total Inventory Owned by CRU.

For the last several years, Sarkis had managed the business by trying to ensure that utilization
at CRU never dropped below 50 percent. The idea behind this is that if most of the units owned
by CRU were with customers, they were generating revenue. On entering the office of CRU in
Naperville, one first encountered a monitor displaying current utilization figures and historical
trends during the last 12 weeks.

Each unit in the CRU inventory had an average purchase price of $1,000, and CRU had
followed a straight-line depreciation over 36 months.

KELLOGG SCHOOL OF MANAGEMENT 3


This document is authorized for use only by Doug Nguyen in BUSN 40000 81,01 (Spring 2019) Operations Management: Business Process Fundamentals at University of Chicago, 2019.
CRU COMPUTER RENTALS KEL017

Situation Last Year


Last year, units were being rented at the rate of 1,000 units per week. The average rental term
(duration of time the unit is with the customer) was eight weeks. The average weekly revenue per
unit for rentals of this term was $30. A study showed the average inventory distribution in the
system to be as follows:

Units waiting at Receiving = 500


Units in status 40 = 1,000
Units in status 24 = 1,500
Units in status 42 = 500

The number of units in status 41 was unknown. However, there were, on average, 500 units
for which the Repairs group had requested parts, but the Parts department had not yet placed a
parts order. As stated earlier, once the Parts department placed an order, it took one week, on
average, for the parts to come in from the supplier. CRU policy required that inventory to cover
about two weeks’ demand be available for rent in status 20 at all times.

Situation This Year


At the beginning of this year, the rental market started to decline, and CRU saw demand fall
to 600 units per week. This led to a big drop in utilization and was of great concern at CRU. One
option that CRU had was to dispose of the extra units and only maintain the units required to
service the lower demand, using the previous utilization rate. Sarkis and the vice president of
sales, however, decided to try and spur demand by offering some customer incentives and also
offering extra bonus payments to the sales staff for new business generated. These efforts bore
fruit, and within a couple of months, CRU saw demand go up to 1,400 units per week. Of the
1,400 units, 600 were being rented for an average term of eight weeks and brought in revenue of
$30 per week per unit. The remaining 800 units were being rented for an average term of four
weeks and brought in revenue of $35 per week per unit. (The original pricing would have brought
in $40 per week per unit, but the incentives offered to spur sales lowered revenues.)

A review where the product sat in inventory revealed that the average time spent between two
stages was the same as it was last year. The company still kept two weeks’ worth of demand in
the status 20 buffer. Of course, additional units had been purchased since demand had increased
from 1,000 units per week last year to 1,400 units per week this year.

All these efforts brought revenues and utilization back to reasonable levels, and Sarkis
expected that profitability would follow. However, he was shocked when the next quarter
numbers came in and revealed that they were making even less money than before. He wondered
whether utilization was an appropriate performance measure as a leading indicator of future
financial performance. When he scheduled a meeting with his two vice presidents, he was looking
for a framework to analyze the situation and come up with an appropriate recommendation.

4 KELLOGG SCHOOL OF MANAGEMENT


This document is authorized for use only by Doug Nguyen in BUSN 40000 81,01 (Spring 2019) Operations Management: Business Process Fundamentals at University of Chicago, 2019.
KEL017 CRU COMPUTER RENTALS

Study Questions
1. Draw a flowchart of CRU’s operations.

2. What was the utilization achieved by CRU last year?

3. Calculate the average time spent by a unit in each buffer last year.

4. Calculate the average weekly profit (revenues – variable costs – depreciation) to CRU last
year. Ignore labor and facility costs in this calculation; we assume that they are fixed. How
does the contribution margin compare with the weekly depreciation?

5. What do you think about the decision to launch a sales drive this year? If you had a chance to
advise Sarkis, what actions would you suggest Sarkis focus on to improve performance at
CRU? (Give a concrete plan listing the resulting benefits.) What are key performance
measures that he should focus on?

6. Exhibit 2 contains the pricing scheme used by CRU. Sarkis has to decide how the sales effort
will be assigned among the various market segments (represented by duration of rental).
There are three options that have been suggested by the vice president of sales, and a decision
has to be made. The three options have the following outcomes:

 Capture 60% of the four-week market, 30% of the eight-week market, and 10% of the
twelve-week market
 Capture 40% of the four-week market, 40% of the eight-week market, and 20% of the
twelve-week market
 Capture 20% of the four-week market, 50% of the eight-week market, and 25% of the
twelve-week market

(i) Assume that Operations will be able to ensure that all buffer sizes are the same as
they were last year for all three options (status 20 buffer continues at two weeks).
Which of the three options would you recommend? Why?
(ii) Assume that Operations will be able to ensure that the time spent in all buffers is the
same as it was last year. Which of the three options would you recommend? Why?

KELLOGG SCHOOL OF MANAGEMENT 5


This document is authorized for use only by Doug Nguyen in BUSN 40000 81,01 (Spring 2019) Operations Management: Business Process Fundamentals at University of Chicago, 2019.
CRU COMPUTER RENTALS KEL017

Exhibit 1: Center Locations

Mega Center Locations


1. Naperville, IL
2. Fullerton, CA

Local Rental Center Locations (In order of decreasing rental volume)


1. Fullerton, CA
2. Atlanta, GA
3. Naperville, IL
4. Minneapolis, MN
5. Seattle, WA
6. Santa Fe Springs, CA
7. Cleveland, OH
8. Paramus, NJ
9. Kansas City, MO
10. Tampa, FL
11. Dallas, TX
12. Raleigh, NC
13. Tucson, AZ
14. Boston, MA
15. Houston, TX
16. Fort Lauderdale, FL
17. Philadelphia, PA
18. Rochester, NY
19. White Plains, NY
20. Pittsburgh, PA
21. Austin, TX
22. Salt Lake City, UT
23. Detroit, MI
24. St. Louis, MO
25. Washington, DC

Exhibit 2: Rate Plans


The rate charged from the customer is dependent on the duration of the rental. As the term of
the rental increases, the rate charged per week declines. The current pricing and total market
demand in terms of rentals per week is as shown below. CRU captures a fraction of the total
market demand.

Rental Term Revenue per Week Total Market Demand


4 weeks $40 1,500 units per week
8 weeks $30 1,000 units per week
12 weeks $25 600 units per week

6 KELLOGG SCHOOL OF MANAGEMENT


This document is authorized for use only by Doug Nguyen in BUSN 40000 81,01 (Spring 2019) Operations Management: Business Process Fundamentals at University of Chicago, 2019.

You might also like